This paper studies the cost problem caused by the activity of the work-piece in the supply chain. The objective function is to find an optimal ordering that minimizes the total cost of production, transportation and s...This paper studies the cost problem caused by the activity of the work-piece in the supply chain. The objective function is to find an optimal ordering that minimizes the total cost of production, transportation and subcontracting. This paper presents a dynamic programming algorithm for the corresponding sorting problem, and finally demonstrates the feasibility of the algorithm through an example.展开更多
文摘This paper studies the cost problem caused by the activity of the work-piece in the supply chain. The objective function is to find an optimal ordering that minimizes the total cost of production, transportation and subcontracting. This paper presents a dynamic programming algorithm for the corresponding sorting problem, and finally demonstrates the feasibility of the algorithm through an example.