期刊文献+
共找到1,857篇文章
< 1 2 93 >
每页显示 20 50 100
Settlement Control Standards of Construction and Expansion for Mountainous Highway Roadbeds 被引量:1
1
作者 Zhipan Yang Wei Gan Haonan Ding 《Journal of Architectural Research and Development》 2024年第2期43-49,共7页
This article analyzes the differential settlement of new and old roadbeds after widening and its characteristics based on a highway reconstruction and expansion project case study.The research proposes a subgrade sett... This article analyzes the differential settlement of new and old roadbeds after widening and its characteristics based on a highway reconstruction and expansion project case study.The research proposes a subgrade settlement control standard that states that the maximum differential settlement value should be less than 5 cm when the embankment fill height exceeds 20 m.Similarly,the maximum differential settlement value should be less than 10 cm when the embankment fill height does not exceed 20 m.The findings of the study can provide a useful reference for the design of roadbed widening in highway reconstruction and expansion projects. 展开更多
关键词 Mountainous highway Reconstruction and expansion Roadbed widening settlement control
在线阅读 下载PDF
Settlement Control Technology of High Filled Soil-Rock Embankment in Alpine and High-Altitude Areas
2
作者 Guangxi Wu 《Journal of World Architecture》 2023年第4期75-81,共7页
China's infrastructure has gradually achieved large-scale development,and transportation construction has also shifted from east to west,transitioning from plains to mountainous areas.High-fill embankments of diff... China's infrastructure has gradually achieved large-scale development,and transportation construction has also shifted from east to west,transitioning from plains to mountainous areas.High-fill embankments of different sizes in mountainous areas are unavoidable,and the settlement of high-fill embankments is usually the most concerned issue in high-fill projects.According to the current research of highway projects,most of the high embankments in mountainous areas are soil-rock mixed embankments or rock-filled embankments,and their post-construction settlements are directly related to construction technology and the type of filler used.In this paper,the problems in the settlement control of earth-filled embankment and related factors are analyzed in detail.The settlement control technology of high-fill embankment in high-cold and high-altitude areas is also discussed,so as to ensure the overall quality of high-fill embankment. 展开更多
关键词 High-altitude and cold areas High soil-rock embankment settlement control technology
在线阅读 下载PDF
Shallow Tunneling Method and Control Measure for Ground Surface Settlement 被引量:1
3
作者 Jinxiao Jia Xiong Zhou 《Journal of World Architecture》 2023年第3期46-52,共7页
In order to ensure that the tunnel deformation and surface settlement are controlled within the allowable range during the construction process,the design unit has compiled technical measures and monitoring schemes fo... In order to ensure that the tunnel deformation and surface settlement are controlled within the allowable range during the construction process,the design unit has compiled technical measures and monitoring schemes for ground settlement control of this project.Based on the example of a shallow tunneling project on Subway line 8,this paper analyzes and discusses the shallow tunneling method in detail and puts forward corresponding technical measures for ground settlement control. 展开更多
关键词 Shallow tunneling Ground surface settlement control Advance ductule
在线阅读 下载PDF
Analysis of Control Measures for Settlement of Differences on the Problems of Highway Subgrade Widening
4
作者 Yuyan Wang 《Open Journal of Civil Engineering》 2015年第2期149-153,共5页
The study mainly discusses the issues of the settlement of differences that occurs in the process of highway subgrade widening. Firstly, it briefly introduces the settlement of difference and its harms;then it analyze... The study mainly discusses the issues of the settlement of differences that occurs in the process of highway subgrade widening. Firstly, it briefly introduces the settlement of difference and its harms;then it analyzes the mechanism of settlement of differences in the process of difference widening, including four aspects: the new and old roadbeds themselves, design, construction and other links;finally, based on the above analysis of the mechanism, it discusses the corresponding control measures, mainly proposing these suggestions as followings: the use of lightweight materials, the foundation treatment, the cut slope excavation steps, and the strict control of the degree of compaction, etc. The paper is expected to provide some theoretical basis for the control measures of highway subgrade widening settlement of difference. 展开更多
关键词 Road WIDENING settlement of DIFFERENCE Mechanism control MEASURE
暂未订购
TBM隧道近接下穿运营高铁隧道模型试验研究
5
作者 董宇 童孝红 +1 位作者 杜威 谢强 《路基工程》 2026年第1期218-223,共6页
依托温州市瓯江引水工程TBM隧道下穿高速铁路隧道,采用模型试验与现场监测相结合的方法,探究新建隧道下穿对既有隧道产生的沉降影响。研究表明:模型试验既有隧道沉降最终为1.92mm,满足控制标准;既有隧道沉降呈凹槽型分布,随着既有隧道... 依托温州市瓯江引水工程TBM隧道下穿高速铁路隧道,采用模型试验与现场监测相结合的方法,探究新建隧道下穿对既有隧道产生的沉降影响。研究表明:模型试验既有隧道沉降最终为1.92mm,满足控制标准;既有隧道沉降呈凹槽型分布,随着既有隧道轴线方向距离增加,既有隧道拱顶沉降逐渐减小;随着穿越间距的增加,新建隧道下穿对既有隧道的沉降影响逐渐减小;现场监测穿越过程中,既有隧道出现隆起现象,而后随着穿越的进行发生沉降;既有隧道先开挖一侧产生沉降略大于后开挖一侧,且最大沉降位置沿轴线方向移动。 展开更多
关键词 引水隧道 TBM下穿 监控量测 变形规律 沉降控制
在线阅读 下载PDF
深厚软弱地层强夯与CFG桩地基处理多向对比分析
6
作者 严义招 梁杨 +1 位作者 杨渊 杨泉 《路基工程》 2026年第1期160-165,共6页
强夯法具有施工便捷、成本低等特点,适合软弱地基的加固。采用数值仿真对8000kN·m高能级强夯加固地基的效果进行模拟,并现场钻孔取样对比,数值模拟结果与现场数据拟合良好,模拟结果可靠。计算分析表明:7次8000kN·m强夯加固人... 强夯法具有施工便捷、成本低等特点,适合软弱地基的加固。采用数值仿真对8000kN·m高能级强夯加固地基的效果进行模拟,并现场钻孔取样对比,数值模拟结果与现场数据拟合良好,模拟结果可靠。计算分析表明:7次8000kN·m强夯加固人工弃土层的有效加固深度为11.5m,模量由4MPa提升至44MPa,加固效果良好;相比未加固地层,强夯加固与CFG桩加固地基工后沉降分别减小65.0%、75.0%,效果均较好,满足变形控制要求;相比CFG桩,强夯法施工更加便利,采用强夯加固工程成本仅为CFG桩62.9%,可替代CFG桩进行本工点加固方案。 展开更多
关键词 铁路车站 复合地基 强夯 方案优化 沉降控制 经济性
在线阅读 下载PDF
富水砂层盾构隧道施工影响因素及分析
7
作者 陈信举 王旭春 +1 位作者 刘多兴 马子敬 《低温建筑技术》 2026年第1期25-29,共5页
为探究富水砂层中盾构施工参数对地表沉降和管片位移的影响规律,实现参数配置优化以保证施工安全。文中依托青岛地铁盾构区间,采用FLAC3D建立数值模型,依据实际工程力学参数和开挖工况进行模拟,系统分析了富水砂层中土仓压力、注浆压力... 为探究富水砂层中盾构施工参数对地表沉降和管片位移的影响规律,实现参数配置优化以保证施工安全。文中依托青岛地铁盾构区间,采用FLAC3D建立数值模型,依据实际工程力学参数和开挖工况进行模拟,系统分析了富水砂层中土仓压力、注浆压力以及等代层厚度对地表沉降和管片位移的影响规律。确定了优化配置范围及敏感性排序,为类似工程提供了技术参考。 展开更多
关键词 盾构隧道 富水砂层 管片位移 沉降控制
在线阅读 下载PDF
Study on the Evolution of Rural Settlement Landscapes on Guanzhong Plain of China 被引量:1
8
作者 王琼 乔征 王葆华 《Journal of Landscape Research》 2012年第1期35-38,41,共5页
Overall figures of rural settlement landscapes on Guanzhong Plain were summarized,material components of these landscapes were classified into living landscape facilities and production landscape facilities,and then i... Overall figures of rural settlement landscapes on Guanzhong Plain were summarized,material components of these landscapes were classified into living landscape facilities and production landscape facilities,and then introduced respectively.From the perspective of rural central landscapes,rural yard landscapes,rural cluster landscapes and rural road landscapes,evolution of rural landscape spatial forms on Guanzhong Plain was analyzed.Moreover,problems of present rural landscapes were proposed,necessity and urgency of controlling evolution of rural settlement landscapes were stressed,and a rural landscape control mode in view of regional characteristics of Guanzhong Plain was given. 展开更多
关键词 RURAL settlement RURAL LANDSCAPE EVOLUTION control STRATEGY
在线阅读 下载PDF
基于双重预顶撑的PBA法密贴下穿既有车站施工技术
9
作者 刘佳杰 冀大亨 +1 位作者 马海燕 高琨 《工程建设》 2026年第2期66-72,共7页
为了有效解决密贴下穿既有车站施工中既有车站结构受扰及沉降控制难题,本文通过针对基于双重预顶撑的PBA法展开系统研究,重点分析其在初期支护中增设千斤顶和丝杠构建双重预顶撑体系实施路径及作用机制。结果表明:相较于传统暗挖工艺,... 为了有效解决密贴下穿既有车站施工中既有车站结构受扰及沉降控制难题,本文通过针对基于双重预顶撑的PBA法展开系统研究,重点分析其在初期支护中增设千斤顶和丝杠构建双重预顶撑体系实施路径及作用机制。结果表明:相较于传统暗挖工艺,基于双重预顶撑的PBA施工技术能够显著降低施工对既有车站的扰动影响,有效控制沉降变形,并为施工全过程的安全可控提供了关键保障;同时,该技术通过双重预顶撑体系的应用,进一步提升了暗挖结构的整体稳定性。本文成果可为类似复杂工程实践提供借鉴与参考。 展开更多
关键词 PBA施工技术 双重预顶撑 密贴下穿 既有车站 沉降控制
原文传递
超大直径盾构下穿引发的堤坝沉降分析与控制
10
作者 孔垂烨 刘燕 +4 位作者 刘俊岩 刘锋 赵世超 闫文博 扈萍 《济南大学学报(自然科学版)》 北大核心 2026年第2期305-312,共8页
为了合理地控制超大直径盾构下穿引发的堤坝沉降,基于山东省山东大学某超大直径盾构下穿水库工程的监测数据,分析堤坝沉降的规律与特点,建立数值模型精细化模拟盾构下穿过程,对比数值模型的数值解与监测值,验证数值模型的可靠性;进一步探... 为了合理地控制超大直径盾构下穿引发的堤坝沉降,基于山东省山东大学某超大直径盾构下穿水库工程的监测数据,分析堤坝沉降的规律与特点,建立数值模型精细化模拟盾构下穿过程,对比数值模型的数值解与监测值,验证数值模型的可靠性;进一步探究盾构机的切口水压、注浆压力、过渡段位置及堤坝两侧水位差等要素对堤坝沉降的影响,并结合工程施工情况,从切口水压、注浆压力、盾构掘进速度3个角度提出堤坝沉降控制措施。结果表明,在盾构下穿过程中,切口水压由0.16~0.32 MPa增至0.3~0.5 MPa且在提前过渡距离即与堤脚线的水平距离为1.0H~1.5H(H为隧道埋深)处提前开始盾构掘进参数过渡的措施,可以在保持堤坝隆起变形较小的条件下,使堤坝沉降变形减小约40%,堤坝沉降控制效果较好。 展开更多
关键词 超大直径盾构隧道 堤坝沉降控制 监测数据 数值模拟 流固耦合
在线阅读 下载PDF
项目施工成本管控与结算评审审减风险控制浅谈 被引量:1
11
作者 李瑞平 《价值工程》 2026年第2期28-30,共3页
本文围绕建设施工项目的施工成本在招投标、分包合同签约及履行、结算等整个施工阶段的控制,同时针对结算评审审减风险的降低,以结算审核为导向,简述竣工结算应对结算评审在施工阶段应做的准备工作,最终形成“有说服力”的项目结算,减... 本文围绕建设施工项目的施工成本在招投标、分包合同签约及履行、结算等整个施工阶段的控制,同时针对结算评审审减风险的降低,以结算审核为导向,简述竣工结算应对结算评审在施工阶段应做的准备工作,最终形成“有说服力”的项目结算,减少结算审减,提高项目利润率。为项目管理者提供理论支持和实操指导。 展开更多
关键词 施工成本管控 结算评审 施工阶段 审减风险
在线阅读 下载PDF
智能技术在铁路路基填筑质量及沉降控制中的应用研究
12
作者 王玮 《价值工程》 2026年第1期114-117,共4页
在铁路建设规模持续拓展、质量标准持续提升的背景下传统以人工为主导的路基填筑质量管控与沉降监测方法已然无法符合需求。本文首先探究智能技术在助力铁路工程智能化转变方面的应用意义,其次结合某铁路路基工程系统整理工程实践中监... 在铁路建设规模持续拓展、质量标准持续提升的背景下传统以人工为主导的路基填筑质量管控与沉降监测方法已然无法符合需求。本文首先探究智能技术在助力铁路工程智能化转变方面的应用意义,其次结合某铁路路基工程系统整理工程实践中监测数据分散且孤立、智能设备对环境适应性欠佳、设备操作复杂且脱离一线需求、填筑过程与沉降控制相互脱节等难题,最后提出了智能化技术的应用策略,实现了填筑过程实时监管、沉降趋势的智能预判。 展开更多
关键词 智能技术 铁路路基 填筑质量 沉降控制
在线阅读 下载PDF
地铁车辆基地和停车场大库结构设计重难点研究
13
作者 董晓鹏 《铁道勘察》 2026年第1期150-155,共6页
针对地铁车辆基地与停车场大库结构设计,分别从联合检修库及物资总库主体结构选型、运用库悬挂式起重机振动分析与优化、库区二次吊挂免焊节点设计和库区沉降控制4个方面,分析地铁车辆基地与停车场大库结构设计的重难点。研究表明,相较... 针对地铁车辆基地与停车场大库结构设计,分别从联合检修库及物资总库主体结构选型、运用库悬挂式起重机振动分析与优化、库区二次吊挂免焊节点设计和库区沉降控制4个方面,分析地铁车辆基地与停车场大库结构设计的重难点。研究表明,相较于“排架柱+钢网架、排架柱+钢桁架”两种结构形式,门式刚架结构形式具有对二次吊挂荷载不敏感、施工难度小和施工周期短的优势,尽管用钢量多3~5 kg/m^(2),但仍可作为联合检修库及物资总库结构方案的首选;悬挂式起重机附加振动位移和振动加速度分别是牛腿支撑式起重机的20倍和2.7倍,应慎重选择,以避免产生振动危害;为了避免二次吊挂焊接或开孔施工对大库主体结构的安全产生不利影响,建议采用抱箍节点等免焊接连接方式;针对大库内不同基础类型的沉降控制要求,建议采用复合地基处理措施,以确保地基方案的经济性和合理性。 展开更多
关键词 地铁 车辆基地 结构选型 起重机振动 二次吊挂 沉降控制
在线阅读 下载PDF
地铁隧道穿越既有地铁线微沉降控制技术应用研究
14
作者 米军红 《建筑机械》 2026年第1期246-249,共4页
地铁隧道建设中沉降量控制不当会导致结构体变形,危及结构安稳与运营安全。文章针对地铁隧道穿越工程微沉降控制技术进行深入探究,分析其技术原理,从施工前预处理、施工阶段参数优化及应急问题处理等方面制定具体的优化策略。通过系统... 地铁隧道建设中沉降量控制不当会导致结构体变形,危及结构安稳与运营安全。文章针对地铁隧道穿越工程微沉降控制技术进行深入探究,分析其技术原理,从施工前预处理、施工阶段参数优化及应急问题处理等方面制定具体的优化策略。通过系统化的技术应用,将隧道沉降严格控制在安全范围内,保障了新建隧道顺利掘进及既有线路稳定运营。 展开更多
关键词 地铁隧道 下穿施工 沉降控制
在线阅读 下载PDF
既有建筑加装电梯井道基础机械结构设计研究
15
作者 谢静 刘奇 《机械管理开发》 2026年第2期111-113,共3页
针对既有建筑加装电梯井道中差异沉降难以控制和抗震性能不足的问题,研究提出基于荷载传递路径重构与梯度截面支撑优化的井道基础机械结构,并通过高聚物隔离层和动态监测系统实现结构受力协同优化。实验表明,研究结构的成本稳定在100万... 针对既有建筑加装电梯井道中差异沉降难以控制和抗震性能不足的问题,研究提出基于荷载传递路径重构与梯度截面支撑优化的井道基础机械结构,并通过高聚物隔离层和动态监测系统实现结构受力协同优化。实验表明,研究结构的成本稳定在100万元~118万元之间,维护成本维持20万元~25万元区间;差异沉降控制精度最高达到4.2 mm,节点损伤指数最低为0.56,整体性能优于传统井道基础结构。研究提出的加装电梯井道基础机械结构能够提升井道安全性和全生命周期经济性,为既有建筑功能改造提供切实可行的技术路径。 展开更多
关键词 加装电梯 沉降控制 抗震强化 梯度截面支撑
在线阅读 下载PDF
路基高填方沉降监测与控制研究
16
作者 刘忠达 胡治宇 李鹏彬 《智能建筑与智慧城市》 2026年第2期167-169,共3页
文章针对路基高填方易出现的累积沉降、不均匀沉降问题,结合高填方路基填料复杂、施工周期长、受环境影响大的特性,分析沉降成因,详解水准测量、GNSS、InSAR等监测技术的应用要点,提出填料改良、施工优化、地基预处理等控制措施,旨在通... 文章针对路基高填方易出现的累积沉降、不均匀沉降问题,结合高填方路基填料复杂、施工周期长、受环境影响大的特性,分析沉降成因,详解水准测量、GNSS、InSAR等监测技术的应用要点,提出填料改良、施工优化、地基预处理等控制措施,旨在通过“监测—分析—控制”闭环,减少沉降量,保障路基长期稳定,为公路、铁路高填方工程提供技术支撑。 展开更多
关键词 路基高填方 沉降监测 沉降控制 GNSS技术 地基预处理
在线阅读 下载PDF
基于岩土勘察的软土复合地基变形特性及控制措施研究
17
作者 谢秀芝 《广东建材》 2026年第3期117-120,共4页
为解决软土地区复合地基变形控制问题,本文以某园区地基工程为背景,基于岩土勘察分析,开展了软土复合地基变形特性及控制措施研究。通过设计监测方案,对地基应力分布与变形发展进行监测与分析。结果表明,天然软土地基在120 kPa附加荷载... 为解决软土地区复合地基变形控制问题,本文以某园区地基工程为背景,基于岩土勘察分析,开展了软土复合地基变形特性及控制措施研究。通过设计监测方案,对地基应力分布与变形发展进行监测与分析。结果表明,天然软土地基在120 kPa附加荷载下,地表累积最大沉降达258.63 mm;加载区边缘最大水平位移达31.75 mm,变形显著。基于变形特性分析,提出了“分级堆载预压结合塑料排水板”、“增设水泥土搅拌桩”及“加筋碎石垫层”控制措施。措施实施后,地表累积最大沉降降至82.14 mm,降幅达68.24%;加载区边缘最大水平位移降至9.23 mm,降幅达70.93%,变形得到有效控制,研究成果为类似软土区复合地基的变形控制提供了数据支撑与实践参考。 展开更多
关键词 软土地基 复合地基 岩土勘察 变形特性 沉降控制
在线阅读 下载PDF
高速公路改扩建中既有桥梁拼接施工技术及沉降控制
18
作者 王桥 《价值工程》 2026年第7期13-15,共3页
在巨大的交通流量下,高速公路扩建迫在眉睫,充分保障高速公路道路畅通,真正满足人民群众的交通运输需求。文章针对高速公路改扩建工程中既有桥梁拼接施工所面临的结构衔接复杂、沉降控制困难等问题,文章分析了桥梁拼接施工的主要类型与... 在巨大的交通流量下,高速公路扩建迫在眉睫,充分保障高速公路道路畅通,真正满足人民群众的交通运输需求。文章针对高速公路改扩建工程中既有桥梁拼接施工所面临的结构衔接复杂、沉降控制困难等问题,文章分析了桥梁拼接施工的主要类型与工艺流程,研究了拼接施工中的关键技术要点,如对接精度控制、混凝土浇筑协调及结构加固措施等,并进一步提出了针对沉降问题的控制技术措施,包括差异基础设计、滑动支座释荷、临时托架设置、分阶段浇筑及监测点精细量测等方法。 展开更多
关键词 高速公路改扩建 既有桥梁 拼接施工 沉降控制 结构加固
在线阅读 下载PDF
浅埋隧道下穿通行公路沉降影响及控制
19
作者 陈欣 《科技创新与应用》 2026年第1期139-142,共4页
浅埋隧道地质差、埋深浅,在行车荷载作用下,修建浅埋隧道是一项施工风险高、难度较大的工程,施工中洞内、外下沉、开裂、坍塌和冒顶等病害经常发生,危及周边建筑物的安全。通过实际案例分析浅埋隧道施工引起的沉降风险、因素,评估通行... 浅埋隧道地质差、埋深浅,在行车荷载作用下,修建浅埋隧道是一项施工风险高、难度较大的工程,施工中洞内、外下沉、开裂、坍塌和冒顶等病害经常发生,危及周边建筑物的安全。通过实际案例分析浅埋隧道施工引起的沉降风险、因素,评估通行公路与下穿隧道的影响,采用长管棚、径向小导管加强超前支护,实施洞内外注浆以及补偿注浆等措施,制定双侧壁导坑法支护、拆除方案,使地表及隧道开挖沉降得到有效控制,确保下穿浅埋隧道施工不影响拱顶二级公路的正常通行,达到平衡地层稳定和交通通行需求,确保工程安全。 展开更多
关键词 浅埋隧道 下穿公路 荷载影响 沉降控制 控制措施
在线阅读 下载PDF
复杂环境下矿山法隧道下穿既有地铁线路施工技术
20
作者 徐国保 《国防交通工程与技术》 2026年第2期60-64,共5页
以成都地铁18号线三期骡马市站后区间矿山法隧道为背景,研究富水卵石-泥岩复合地层下穿既有1号线条件下的施工技术。提出“超前支护-分步开挖-地层加固-信息化监测”综合技术体系,包括∅194 mm/∅146 mm大管棚、袖阀管注浆、拱盖法分导洞... 以成都地铁18号线三期骡马市站后区间矿山法隧道为背景,研究富水卵石-泥岩复合地层下穿既有1号线条件下的施工技术。提出“超前支护-分步开挖-地层加固-信息化监测”综合技术体系,包括∅194 mm/∅146 mm大管棚、袖阀管注浆、拱盖法分导洞开挖(循环进尺0.5 m)、二次衬砌分阶段浇筑等措施。通过自动化监测,既有线最大累计沉降5.95 mm(≤10 mm),隧道最大收敛8.6 mm(≤15 mm),验证了技术体系的有效性,可为类似工程提供参考。 展开更多
关键词 矿山法隧道 既有地铁 沉降控制 拱盖法 施工监测
在线阅读 下载PDF
上一页 1 2 93 下一页 到第
使用帮助 返回顶部