The bonding quality of the cement sheath interface decreases during well completion because of the change in the casing pressure.To explore the root cause of such phenomena,experiments on the mechanical properties and...The bonding quality of the cement sheath interface decreases during well completion because of the change in the casing pressure.To explore the root cause of such phenomena,experiments on the mechanical properties and interface bonding strength of a cement sheath have been carried out taking the LS25-1 high-temperature and high-pressure(HTHP)gas field as an example.Moreover,a constitutive model of the cement sheath has been defined and verified both by means of a full-scale HTHP cement sheath sealing integrity evaluation experiment and three-dimensional finite element simulations.The results show that the low initial cementing surface strength is the root cause of cement sheath interface bonding failure.When the pressure in the casing exceeds a certain limit,the stress caused by the change in the internal pressure in the casing is transmitted to the cement sheath,resulting in the degradation of the interface stiffness of the cement sheath.However,with an increase in the casing wall thickness,the stress transmission capacity decreases.Therefore,it is concluded that improving the interfacial cementing strength,appropriately increasing the casing wall thickness and increasing the initial stress of the cement sheath are the keys to ensuring the sealing integrity of the cement sheath in high-temperature and high-pressure gas wells.展开更多
It is urgent to carry out detailed research on storage performance of rubber sealing ring to get the criterion for its storage life. This paper acquires material ageing regularity by theoretical analysis and experimen...It is urgent to carry out detailed research on storage performance of rubber sealing ring to get the criterion for its storage life. This paper acquires material ageing regularity by theoretical analysis and experimental confirmation. On this condition, failure mode and failure criterion of typical sealing structure is studied, and the failure mechanism is found. Thus by analyzing the stress distribution, the relationship between ageing state and sealing condition is established. Rationalization proposal is put forward and storage life of sealing ring is evaluated. The research mentionedabove has special reference to the design of sealing structures and can provide reference for prolonging their service life.展开更多
The use of shield method in tunnel construction is limited by the engineering conditions of highwater pressure.This is mainly due to the uncertainty of the pressure-bearing capacity of the sealing chambers of the shie...The use of shield method in tunnel construction is limited by the engineering conditions of highwater pressure.This is mainly due to the uncertainty of the pressure-bearing capacity of the sealing chambers of the shield tail under different grades and conditions when subjected to different external water pressures.Therefore,it is crucial to determine the pressure-bearing capacity of the sealing chambers.However,there is a lack of studies on the calculating method of the pressure-bearing capacity,which requires more theoretical investigation.To explore the common patterns of multi-grade sealing-related parameters and quantify the pressure-bearing capacity of the sealing chambers,a breakdown and leakage model of the shield tail is proposed,targeting the basic sealing unit of the system.Based on non-Newtonian fluid dynamics and fractal theory of porous media,the model is used to calculate the breakdown pressure and grease seepage rate corresponding to tunneling and shutdown states.In addition,a hydraulic breakdown device of the sealing unit of the static shield tail is built to investigate the relationship between the shield tail clearance and the shield tail brush porous media area,which helps to verify the theoretical model.Finally,the analysis of sealing chamber geometry parameters,grease rheological parameters,and an environmental parameter using the proposed theoretical model shows that the pressure-bearing capacity of the shield tail can be improved by increasing the shield tail clearance and grease yield stress.It also shows that the length of the sealing chamber and the plastic viscosity of the grease do not have a significant effect on the breakdown pressure of the shield tail.The model proposed in this paper will provide ideas for the calculation of the pressure-bearing capacity of multi-grade sealing chambers in the future.展开更多
基金The authors gratefully acknowledge the CNOOC scientific research project“Study of risk assessment and countermeasures of well drilling and completion under ultrahigh temperature and high pressure”and“Research on development feasibility of LS25-1 gas field”(Grant Nos.YXKY-ZX-09-2021,2020FS-08).
文摘The bonding quality of the cement sheath interface decreases during well completion because of the change in the casing pressure.To explore the root cause of such phenomena,experiments on the mechanical properties and interface bonding strength of a cement sheath have been carried out taking the LS25-1 high-temperature and high-pressure(HTHP)gas field as an example.Moreover,a constitutive model of the cement sheath has been defined and verified both by means of a full-scale HTHP cement sheath sealing integrity evaluation experiment and three-dimensional finite element simulations.The results show that the low initial cementing surface strength is the root cause of cement sheath interface bonding failure.When the pressure in the casing exceeds a certain limit,the stress caused by the change in the internal pressure in the casing is transmitted to the cement sheath,resulting in the degradation of the interface stiffness of the cement sheath.However,with an increase in the casing wall thickness,the stress transmission capacity decreases.Therefore,it is concluded that improving the interfacial cementing strength,appropriately increasing the casing wall thickness and increasing the initial stress of the cement sheath are the keys to ensuring the sealing integrity of the cement sheath in high-temperature and high-pressure gas wells.
文摘It is urgent to carry out detailed research on storage performance of rubber sealing ring to get the criterion for its storage life. This paper acquires material ageing regularity by theoretical analysis and experimental confirmation. On this condition, failure mode and failure criterion of typical sealing structure is studied, and the failure mechanism is found. Thus by analyzing the stress distribution, the relationship between ageing state and sealing condition is established. Rationalization proposal is put forward and storage life of sealing ring is evaluated. The research mentionedabove has special reference to the design of sealing structures and can provide reference for prolonging their service life.
基金supported by the National Natural Science Foundation of China(Grant No.52378387)the Beijing Nova Program(Grant No.20220484037)China Railway 14th Bureau Group Corporation Limited Science and Technology R&D Program Subjects(No.913700001630559891202201).
文摘The use of shield method in tunnel construction is limited by the engineering conditions of highwater pressure.This is mainly due to the uncertainty of the pressure-bearing capacity of the sealing chambers of the shield tail under different grades and conditions when subjected to different external water pressures.Therefore,it is crucial to determine the pressure-bearing capacity of the sealing chambers.However,there is a lack of studies on the calculating method of the pressure-bearing capacity,which requires more theoretical investigation.To explore the common patterns of multi-grade sealing-related parameters and quantify the pressure-bearing capacity of the sealing chambers,a breakdown and leakage model of the shield tail is proposed,targeting the basic sealing unit of the system.Based on non-Newtonian fluid dynamics and fractal theory of porous media,the model is used to calculate the breakdown pressure and grease seepage rate corresponding to tunneling and shutdown states.In addition,a hydraulic breakdown device of the sealing unit of the static shield tail is built to investigate the relationship between the shield tail clearance and the shield tail brush porous media area,which helps to verify the theoretical model.Finally,the analysis of sealing chamber geometry parameters,grease rheological parameters,and an environmental parameter using the proposed theoretical model shows that the pressure-bearing capacity of the shield tail can be improved by increasing the shield tail clearance and grease yield stress.It also shows that the length of the sealing chamber and the plastic viscosity of the grease do not have a significant effect on the breakdown pressure of the shield tail.The model proposed in this paper will provide ideas for the calculation of the pressure-bearing capacity of multi-grade sealing chambers in the future.