期刊文献+
共找到10篇文章
< 1 >
每页显示 20 50 100
Unit Commitment with Joint Chance Constraints in Multi-area Power Systems with Wind Power Based on Partial Sample Average Approximation 被引量:1
1
作者 Jinghua Li Hongyu Zeng Yutian Xie 《Journal of Modern Power Systems and Clean Energy》 2025年第1期241-252,共12页
Joint chance constraints(JCCs)can ensure the consistency and correlation of stochastic variables when participating in decision-making.Sample average approximation(SAA)is the most popular method for solving JCCs in un... Joint chance constraints(JCCs)can ensure the consistency and correlation of stochastic variables when participating in decision-making.Sample average approximation(SAA)is the most popular method for solving JCCs in unit commitment(UC)problems.However,the typical SAA requires large Monte Carlo(MC)samples to ensure the solution accuracy,which results in large-scale mixed-integer programming(MIP)problems.To address this problem,this paper presents the partial sample average approximation(PSAA)to deal with JCCs in UC problems in multi-area power systems with wind power.PSAA partitions the stochastic variables and historical dataset,and the historical dataset is then partitioned into non-sampled and sampled sets.When approximating the expectation of stochastic variables,PSAA replaces the big-M formulation with the cumulative distribution function of the non-sampled set,thus preventing binary variables from being introduced.Finally,PSAA can transform the chance constraints to deterministic constraints with only continuous variables,avoiding the large-scale MIP problem caused by SAA.Simulation results demonstrate that PSAA has significant advantages in solution accuracy and efficiency compared with other existing methods including traditional SAA,SAA with improved big-M,SAA with Latin hypercube sampling(LHS),and the multi-stage robust optimization methods. 展开更多
关键词 Unit commitment joint chance constraint renewable energy multi-area power system wind power sample average approximation partial sample average approximation
原文传递
SAMPLE AVERAGE APPROXIMATION METHOD FOR A CLASS OF STOCHASTIC VARIATIONAL INEQUALITY PROBLEMS 被引量:7
2
作者 Mingzheng WANG Guihua LIN Yuli GAO M. Montaz ALI 《Journal of Systems Science & Complexity》 SCIE EI CSCD 2011年第6期1143-1153,共11页
This paper considers a class of stochastic variational inequality problems. As proposed by Jiang and Xu (2008), by using the so-called regularized gap function, the authors formulate the problems as constrained opti... This paper considers a class of stochastic variational inequality problems. As proposed by Jiang and Xu (2008), by using the so-called regularized gap function, the authors formulate the problems as constrained optimization problems and then propose a sample average approximation method for solving the problems. Under some moderate conditions, the authors investigate the limiting behavior of the optimal values and the optimal solutions of the approximation problems. Finally, some numerical results are reported to show efficiency of the proposed method. 展开更多
关键词 CONVERGENCE gap function sample average approximation method stochastic variational inequality.
原文传递
A case study on sample average approximation method for stochastic supply chain network design problem
3
作者 Yuan WANG Ruyan SHOU +1 位作者 Loo Hay LEE Ek Peng CHEW 《Frontiers of Engineering Management》 2017年第3期338-347,共10页
This study aims to solve a typical long-term strategic decision problem on supply chain network design with consideration to uncertain demands. Existing methods for these problems are either deterministic or limited i... This study aims to solve a typical long-term strategic decision problem on supply chain network design with consideration to uncertain demands. Existing methods for these problems are either deterministic or limited in scale. We analyze the impact of uncertainty on demand based on actual large data from industrial companies.Deterministic equivalent model with nonanticipativity constraints, branch-and-fix coordination, sample average approximation(SAA) with Bayesian bootstrap, and Latin hypercube sampling were adopted to analyze stochastic demands. A computational study of supply chain network with front-ends in Europe and back-ends in Asia is presented to highlight the importance of stochastic factors in these problems and the efficiency of our proposed solution approach. 展开更多
关键词 supply chain network stochastic demand sampling average approximation Bayesian bootstrap Latin hypercube sampling
原文传递
Providing Robust and Low-Cost Edge Computing in Smart Grid:An Energy Harvesting Based Task Scheduling and Resource Management Framework 被引量:1
4
作者 Xie Zhigang Song Xin +1 位作者 Xu Siyang Cao Jing 《China Communications》 2025年第2期226-240,共15页
Recently,one of the main challenges facing the smart grid is insufficient computing resources and intermittent energy supply for various distributed components(such as monitoring systems for renewable energy power sta... Recently,one of the main challenges facing the smart grid is insufficient computing resources and intermittent energy supply for various distributed components(such as monitoring systems for renewable energy power stations).To solve the problem,we propose an energy harvesting based task scheduling and resource management framework to provide robust and low-cost edge computing services for smart grid.First,we formulate an energy consumption minimization problem with regard to task offloading,time switching,and resource allocation for mobile devices,which can be decoupled and transformed into a typical knapsack problem.Then,solutions are derived by two different algorithms.Furthermore,we deploy renewable energy and energy storage units at edge servers to tackle intermittency and instability problems.Finally,we design an energy management algorithm based on sampling average approximation for edge computing servers to derive the optimal charging/discharging strategies,number of energy storage units,and renewable energy utilization.The simulation results show the efficiency and superiority of our proposed framework. 展开更多
关键词 edge computing energy harvesting energy storage unit renewable energy sampling average approximation task scheduling
在线阅读 下载PDF
An Improvement of the Quantitative Stability Analysis for the Two-Stage Stochastic Variational Inequality Problems
5
作者 WANG Zhenlong LIN Liqin +1 位作者 WANG Yiting LIU Jianxun 《Wuhan University Journal of Natural Sciences》 CSCD 2024年第6期539-546,共8页
This paper extends the quantitative stability results to a more general class of two-stage stochastic variational inequality problems(TSVIP).The existence of solutions to the TSVIP is discussed,and the quantitative re... This paper extends the quantitative stability results to a more general class of two-stage stochastic variational inequality problems(TSVIP).The existence of solutions to the TSVIP is discussed,and the quantitative relationship between the TSVIP and its distribution perturbed problem is derived. 展开更多
关键词 two-stage stochastic variational inequality problems residual function quantitative stability analysis sample average approximation
原文传递
Flight Schedule Recovery under Uncertain Airport Capacity 被引量:2
6
作者 Zhu Bo Zhu Jinfu 《Transactions of Nanjing University of Aeronautics and Astronautics》 EI CSCD 2016年第4期479-490,共12页
Airlines adjust their flight schedules to satisfy more stringent airport capacity constraints caused by inclement weather or other unexpected disruptions.The problem will be more important and complicated if uncertain... Airlines adjust their flight schedules to satisfy more stringent airport capacity constraints caused by inclement weather or other unexpected disruptions.The problem will be more important and complicated if uncertain disruptions occur in hub airports.A two-stage stochastic programming model was established to deal with the realtime flight schedule recovery and passenger re-accommodation problem.The first-stage model represents the flight re-timing and re-fleeting decision in current time period when capacity information is deterministic,while the second-stage recourse model evaluates the passenger delay given the first-stage solutions when one future scenario is realized.Aiming at the large size of the problem and requirement for quick response,an algorithmic framework combining the sample average approximation and heuristic method was proposed.The computational results indicated of that the proposed method could obtain solutions with around 5% optimal gaps,and the computing time was linearly positive to the sample size. 展开更多
关键词 flight recovery passenger re-accommodation two-stage stochastic model sample average approximation heuristic method
在线阅读 下载PDF
A Projection and Contraction Method for P-Order Cone Constraint Stochastic Variational Inequality Problem
7
作者 Mengdi Zheng Xiaohui Xu Juhe Sun 《Journal of Applied Mathematics and Physics》 2022年第4期1113-1125,共13页
In this paper, we study the p-order cone constraint stochastic variational inequality problem. We first take the sample average approximation method to deal with the expectation and gain an approximation problem, furt... In this paper, we study the p-order cone constraint stochastic variational inequality problem. We first take the sample average approximation method to deal with the expectation and gain an approximation problem, further the rationality is given. When the underlying function is Lipschitz continuous, we acquire a projection and contraction algorithm to solve the approximation problem. In the end, the method is applied to some numerical experiments and the effectiveness of the algorithm is verified. 展开更多
关键词 Stochastic Variational Inequality sample average approximation Projection and Contraction Method Convergence Analysis Numerical Experiments
在线阅读 下载PDF
Joint Chance-constrained Economic Dispatch Involving Joint Optimization of Frequency-related Inverter Control and Regulation Reserve Allocation
8
作者 Ye Tian Zhengshuo Li +1 位作者 Wenchuan Wu Miao Fan 《CSEE Journal of Power and Energy Systems》 2025年第3期1030-1044,共15页
The issues of uncertainty and frequency security become significantly serious in power systems with the high penetration of volatile inverter-based renewables(IBRs),which makes it necessary to consider the uncertainty... The issues of uncertainty and frequency security become significantly serious in power systems with the high penetration of volatile inverter-based renewables(IBRs),which makes it necessary to consider the uncertainty and frequency-related constraints in the economic dispatch(ED)programs.However,existing ED studies rarely proactively optimize the control parameters of inverter-based resources related to fast regulation(e.g.,virtual inertia and droop coefficients)in cooperation with other dispatchable resources to improve the system frequency security and dispatch reliability.This paper proposes a joint chance-constrained economic dispatch model that jointly optimizes the frequency-related inverter control,the system up/down reserves,and base-point power for the minimal total operational cost.In the proposed model,multiple dispatchable resources,including thermal units,dispatchable IBRs,and energy storage,are considered,and the(virtual)inertias,the regulation reserve allocations,and base-point power are coordinated.To ensure the system reliability,the joint chance-constraint formulation is also adopted.Additionally,since the traditional sample average approximation(SAA)method imposes a huge computational burden,a novel mix-SAA(MSAA)method is proposed to transform the original intractable model into a linear model that can be efficiently solved via commercial solvers.The case studies validate the satisfactory efficacy of the proposed ED model and demonstrate that the MSAA can save nearly 90%calculation time compared with the traditional SAA. 展开更多
关键词 Economic dispatch joint chance constraint RESERVES sample average approximation
暂未订购
A joint stochastic programming approach for aircraft landing and terminal traffic flow problem under weather scenarios
9
作者 T.C.Yeung Chenliang Zhang +1 位作者 Zhongyi Jin Kam K.H.Ng 《Journal of the Air Transport Research Society》 2024年第2期255-264,共10页
A stochastic programming model on the combination of aircraft landing problem and terminal traffic flow management under uncertainty is proposed in this work.In reality,various kinds of uncertainties,including adverse... A stochastic programming model on the combination of aircraft landing problem and terminal traffic flow management under uncertainty is proposed in this work.In reality,various kinds of uncertainties,including adverse weather events,occur more frequently and interrupt air traffic operations.Some of these uncertain events can appear and disappear in a short period.Furthermore,the occurrence of these events affects the flights significantly,delaying the flights or event harming the safety of passengers.Thus,it is essential to respond to these uncertainties to ensure the level of safety at runtime.Runway operation may cease due to strong wind shear,turbulence,microburst or other extreme weather scenarios,is limited due to the restricted airspace capacity,and we extend the problem covering the terminal airspace.The proposed model can significantly reduce the total delay time of aircraft in the computations. 展开更多
关键词 Stochastic programming model Aircraft landing problem Terminal traffic flow problem sample average approximation
在线阅读 下载PDF
A two-stage skilled manpower planning model with demand uncertainty
10
作者 Mohsen Sadeghi-Dastaki Abbas Afrazeh 《International Journal of Intelligent Computing and Cybernetics》 EI 2018年第4期526-551,共26页
Purpose-Human resources are one of the most important and effective elements for companies.In other words,employees are a competitive advantage.This issue is more vital in the supply chains and production systems,beca... Purpose-Human resources are one of the most important and effective elements for companies.In other words,employees are a competitive advantage.This issue is more vital in the supply chains and production systems,because of high need for manpower in the different specification.Therefore,manpower planning is an important,essential and complex task.The purpose of this paper is to present a manpower planning model for production departments.The authors consider workforce with individual and hierarchical skills with skill substitution in the planning.Assuming workforce demand as a factor of uncertainty,a two-stage stochastic model is proposed.Design/methodology/approach–To solve the proposed mixed-integer model in the real-world cases and large-scale problems,a Benders’decomposition algorithm is introduced.Some test instances are solved,with scenarios generated by Monte Carlo method.For some test instances,to find the number of suitable scenarios,the authors use the sample average approximation method and to generate scenarios,the authors use Latin hypercube sampling method.Findings–The results show a reasonable performance in terms of both quality and solution time.Finally,the paper concludes with some analysis of the results and suggestions for further research.Originality/value–Researchers have attracted to other uncertainty factors such as costs and products demand in the literature,and have little attention to workforce demand as an uncertainty factor.Furthermore,most of the time,researchers assume that there is no difference between the education level and skill,while they are not necessarily equivalent.Hence,this paper enters these elements into decision making. 展开更多
关键词 Workforce planning Supply chain Benders’decomposition algorithm Latin hypercube sampling sample average approximation Two-stage stochastic programming
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部