This paper introduces the process flow, technical parameters and relevant features of Baosteel's No. 8 air separation unit (ASU) with a capacity of 60000m^3/h. It summarizes the commissioning work, which includes t...This paper introduces the process flow, technical parameters and relevant features of Baosteel's No. 8 air separation unit (ASU) with a capacity of 60000m^3/h. It summarizes the commissioning work, which includes the adjustment of the air compressor,the system's naked cooling,the precooling system and the operation adjustment. It also provides detailed analyses on some failures which occurred in the commissioning. Through the modification of the design and the interlocks, the tripping probability of the air compressor was greatly reduced. Through the heating of the system and the control of the water cooler's nitrogen flow,the overproof content of carbon dioxide and fluctuation of oxygen flow were avoided. Nitrogen-block in the argon system was eliminated by the precise control of the argon rectification flow and argon content. All these solutions have been proved to be effective by practice.展开更多
On December 21, 2014 the first in the world coal-basedsecond-generation methanol-to-olefin (DMTO-II) commercialdemonstration unit was successfully started up atthe Clean Energy Chemical Company Limited in Puchengcit...On December 21, 2014 the first in the world coal-basedsecond-generation methanol-to-olefin (DMTO-II) commercialdemonstration unit was successfully started up atthe Clean Energy Chemical Company Limited in Puchengcity, Shaanxi province, which has symbolized the majorachievements of this phase associated with the disseminationand application of the new generation technology formanufacture of olefins from methanol, the independentintellectual property rights of which are in the hands ofthis Chinese enterprise.展开更多
Tianjin Beijiang Power Plant, one of the first series of Circular Economy Demonstration Project in the country, successfully put its second unit into operation on November 30, 2009
The 200 MW thermal power unit of Yaugzonghai Reconstruction Project phase I was commissioned and put into system operation on 17th November 1996, it is the first 200 MW thermal unit in operation in Yunnan Province.
This article will briefly outline the origins,structure and functions of United Nations Environment Program and the Commission on Sustainable Development in the context of the goals of ecologically sustainable develop...This article will briefly outline the origins,structure and functions of United Nations Environment Program and the Commission on Sustainable Development in the context of the goals of ecologically sustainable development(ESD).Economic development,social development and environmental protection form the three interconnected parts of ESD.The achievements of the key UN environmental institutions and programs in opening up the global system to civil society,the private sector and a diversity of actors and interests,promoting the role of poverty alleviation as part of ESD through the Millennium Development Goals,and facilitating important Multilateral Environmental Agreements should be recognized.However,with these notable exceptions,organizations such as United Nations Environment Program and the Commission on Sustainable Development have become weak in scientific and technical leadership,global policy,co-ordination(inside and outside the UN) and has few achievements in the international and national implementation of obligations and standards in Global Environmental Governance-including enforcement,compliance and effectiveness.This article will outline the key reasons for this inadequacy.Attention will also be focused on the way forward through of a new United Nations Environment Organization.This will require a clarification of purpose and function(within the UN system and as part of global governance structures) as well as consideration of whether it depends on system-wide UN reform.It is recommended that medium and long term strategies for reform are necessary.展开更多
文摘This paper introduces the process flow, technical parameters and relevant features of Baosteel's No. 8 air separation unit (ASU) with a capacity of 60000m^3/h. It summarizes the commissioning work, which includes the adjustment of the air compressor,the system's naked cooling,the precooling system and the operation adjustment. It also provides detailed analyses on some failures which occurred in the commissioning. Through the modification of the design and the interlocks, the tripping probability of the air compressor was greatly reduced. Through the heating of the system and the control of the water cooler's nitrogen flow,the overproof content of carbon dioxide and fluctuation of oxygen flow were avoided. Nitrogen-block in the argon system was eliminated by the precise control of the argon rectification flow and argon content. All these solutions have been proved to be effective by practice.
文摘On December 21, 2014 the first in the world coal-basedsecond-generation methanol-to-olefin (DMTO-II) commercialdemonstration unit was successfully started up atthe Clean Energy Chemical Company Limited in Puchengcity, Shaanxi province, which has symbolized the majorachievements of this phase associated with the disseminationand application of the new generation technology formanufacture of olefins from methanol, the independentintellectual property rights of which are in the hands ofthis Chinese enterprise.
文摘Tianjin Beijiang Power Plant, one of the first series of Circular Economy Demonstration Project in the country, successfully put its second unit into operation on November 30, 2009
文摘The 200 MW thermal power unit of Yaugzonghai Reconstruction Project phase I was commissioned and put into system operation on 17th November 1996, it is the first 200 MW thermal unit in operation in Yunnan Province.
文摘This article will briefly outline the origins,structure and functions of United Nations Environment Program and the Commission on Sustainable Development in the context of the goals of ecologically sustainable development(ESD).Economic development,social development and environmental protection form the three interconnected parts of ESD.The achievements of the key UN environmental institutions and programs in opening up the global system to civil society,the private sector and a diversity of actors and interests,promoting the role of poverty alleviation as part of ESD through the Millennium Development Goals,and facilitating important Multilateral Environmental Agreements should be recognized.However,with these notable exceptions,organizations such as United Nations Environment Program and the Commission on Sustainable Development have become weak in scientific and technical leadership,global policy,co-ordination(inside and outside the UN) and has few achievements in the international and national implementation of obligations and standards in Global Environmental Governance-including enforcement,compliance and effectiveness.This article will outline the key reasons for this inadequacy.Attention will also be focused on the way forward through of a new United Nations Environment Organization.This will require a clarification of purpose and function(within the UN system and as part of global governance structures) as well as consideration of whether it depends on system-wide UN reform.It is recommended that medium and long term strategies for reform are necessary.