期刊文献+
共找到1,864篇文章
< 1 2 94 >
每页显示 20 50 100
Scheduling Rules Based on Gene Expression Programming for Resource-Constrained Project Scheduling Problem 被引量:3
1
作者 贾艳 李晋航 《Journal of Donghua University(English Edition)》 EI CAS 2015年第1期91-96,共6页
In order to minimize the project duration of resourceconstrained project scheduling problem( RCPSP), a gene expression programming-based scheduling rule( GEP-SR) method is proposed to automatically discover and select... In order to minimize the project duration of resourceconstrained project scheduling problem( RCPSP), a gene expression programming-based scheduling rule( GEP-SR) method is proposed to automatically discover and select the effective scheduling rules( SRs) which are constructed using the project status and attributes of the activities. SRs are represented by the chromosomes of GEP, and an improved parallel schedule generation scheme( IPSGS) is used to transform the SRs into explicit schedules. The framework of GEP-SR for RCPSP is designed,and the effectiveness of the GEP-SR approach is demonstrated by comparing with other methods on the same instances. 展开更多
关键词 resource-constrained project scheduling problem(RCPSP) gene expression programming(GEP) scheduling rules(SRs)
在线阅读 下载PDF
Hybrid ant colony optimization for the resource-constrained project scheduling problem 被引量:10
2
作者 Linyi Deng Yan Lin Ming Chen 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2010年第1期67-71,共5页
To solve the resource-constrained project scheduling problem (RCPSP), a hybrid ant colony optimization (HACO) approach is presented. To improve the quality of the schedules, the HACO is incorporated with an extend... To solve the resource-constrained project scheduling problem (RCPSP), a hybrid ant colony optimization (HACO) approach is presented. To improve the quality of the schedules, the HACO is incorporated with an extended double justification in which the activity splitting is applied to predict whether the schedule could be improved. The HACO is tested on the set of large benchmark problems from the project scheduling problem library (PSPLIB). The computational result shows that the proposed algo- rithm can improve the quality of the schedules efficiently. 展开更多
关键词 project scheduling double justification ant colony optimization activity splitting.
在线阅读 下载PDF
Improved differential evolution algorithm for resource-constrained project scheduling problem 被引量:4
3
作者 Lianghong Wu Yaonan Wang Shaowu Zhou 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2010年第5期798-805,共8页
An improved differential evolution(IDE)algorithm that adopts a novel mutation strategy to speed up the convergence rate is introduced to solve the resource-constrained project scheduling problem(RCPSP)with the obj... An improved differential evolution(IDE)algorithm that adopts a novel mutation strategy to speed up the convergence rate is introduced to solve the resource-constrained project scheduling problem(RCPSP)with the objective of minimizing project duration Activities priorities for scheduling are represented by individual vectors and a senal scheme is utilized to transform the individual-represented priorities to a feasible schedule according to the precedence and resource constraints so as to be evaluated.To investigate the performance of the IDE-based approach for the RCPSP,it is compared against the meta-heuristic methods of hybrid genetic algorithm(HGA),particle swarm optimization(PSO) and several well selected heuristics.The results show that the proposed scheduling method is better than general heuristic rules and is able to obtain the same optimal result as the HGA and PSO approaches but more efficient than the two algorithms. 展开更多
关键词 differential evolution algorithm project soheduling resource constraint priority-based scheduling.
在线阅读 下载PDF
Memetic algorithm for multi-mode resource-constrained project scheduling problems 被引量:1
4
作者 Shixin Liu Di Chen Yifan Wang 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2014年第4期609-617,共9页
A memetic algorithm (MA) for a multi-mode resourceconstrained project scheduling problem (MRCPSP) is proposed. We use a new fitness function and two very effective local search procedures in the proposed MA. The f... A memetic algorithm (MA) for a multi-mode resourceconstrained project scheduling problem (MRCPSP) is proposed. We use a new fitness function and two very effective local search procedures in the proposed MA. The fitness function makes use of a mechanism called "strategic oscillation" to make the search process have a higher probability to visit solutions around a "feasible boundary". One of the local search procedures aims at improving the lower bound of project makespan to be less than a known upper bound, and another aims at improving a solution of an MRCPSP instance accepting infeasible solutions based on the new fitness function in the search process. A detailed computational experiment is set up using instances from the problem instance library PSPLIB. Computational results show that the proposed MA is very competitive with the state-of-the-art algorithms. The MA obtains improved solutions for one instance of set J30. 展开更多
关键词 project scheduling resource-constrained multi-mode memetic algorithm (MA) local search procedure.
在线阅读 下载PDF
Fuzzy Resource-Constrained Project Scheduling Problem for Software Development
5
作者 WANG Xianggang HUANG Wei 《Wuhan University Journal of Natural Sciences》 CAS 2010年第1期25-30,共6页
This paper presents a new method to solve the resource-constrained project scheduling problem for software development. In this method,activity duration times are described as fuzzy variables and resource-constrained ... This paper presents a new method to solve the resource-constrained project scheduling problem for software development. In this method,activity duration times are described as fuzzy variables and resource-constrained software project scheduling problems are described as fuzzy programming models. First,how to model the software project scheduling problem under the fuzzy environment conditions is proposed. Second,in order to satisfy the different requirements of decision-making,two novel fuzzy project scheduling models,expected cost model and credibility maximization model,are suggested. Third,a hybrid intelligent algorithm integrated by genetic algorithm and fuzzy simulation is designed to solve the above two fuzzy programming models. Numerical experiments illustrate the effectiveness of the hybrid intelligent algorithm. 展开更多
关键词 project scheduling problem fuzzy simulation genetic algorithm hybrid intelligent algorithm
原文传递
An Evolutionary Algorithm with Multi-Local Search for the Resource-Constrained Project Scheduling Problem
6
作者 Zhi-Jie Chen Chiuh-Cheng Chyu 《Intelligent Information Management》 2010年第3期220-226,共7页
This paper introduces a hybrid evolutionary algorithm for the resource-constrained project scheduling problem (RCPSP). Given an RCPSP instance, the algorithm identifies the problem structure and selects a suitable dec... This paper introduces a hybrid evolutionary algorithm for the resource-constrained project scheduling problem (RCPSP). Given an RCPSP instance, the algorithm identifies the problem structure and selects a suitable decoding scheme. Then a multi-pass biased sampling method followed up by a multi-local search is used to generate a diverse and good quality initial population. The population then evolves through modified order-based recombination and mutation operators to perform exploration for promising solutions within the entire region. Mutation is performed only if the current population has converged or the produced offspring by recombination operator is too similar to one of his parents. Finally the algorithm performs an intensified local search on the best solution found in the evolutionary stage. Computational experiments using standard instances indicate that the proposed algorithm works well in both computational time and solution quality. 展开更多
关键词 resource-constrained project scheduling EVOLUTIONARY ALGORITHMS Local SEARCH HYBRIDIZATION
在线阅读 下载PDF
Efficient Genetic Algorithm for Resource-Constrained Project Scheduling Problem
7
作者 王宏 李同玲 林丹 《Transactions of Tianjin University》 EI CAS 2010年第5期376-382,共7页
This paper presents a new genetic algorithm for the resource-constrained project scheduling problem(RCPSP).The algorithm employs a standardized random key(SRK) vector representation with an additional gene that determ... This paper presents a new genetic algorithm for the resource-constrained project scheduling problem(RCPSP).The algorithm employs a standardized random key(SRK) vector representation with an additional gene that determines whether the serial or parallel schedule generation scheme(SGS) is to be used as the decoding procedure.The iterative forward-backward improvement as the local search procedure is applied upon all generated solutions to schedule the project three times and obtain an SRK vector,which is rese... 展开更多
关键词 project management resource constrained scheduling genetic algorithm
在线阅读 下载PDF
Optimization of Multi-Execution Modes and Multi-Resource-Constrained Offshore Equipment Project Scheduling Based on a Hybrid Genetic Algorithm
8
作者 Qi Zhou Jinghua Li +2 位作者 Ruipu Dong Qinghua Zhou Boxin Yang 《Computer Modeling in Engineering & Sciences》 SCIE EI 2023年第2期1263-1281,共19页
Offshore engineering construction projects are large and complex,having the characteristics of multiple execution modes andmultiple resource constraints.Their complex internal scheduling processes can be regarded as r... Offshore engineering construction projects are large and complex,having the characteristics of multiple execution modes andmultiple resource constraints.Their complex internal scheduling processes can be regarded as resourceconstrained project scheduling problems(RCPSPs).To solve RCPSP problems in offshore engineering construction more rapidly,a hybrid genetic algorithmwas established.To solve the defects of genetic algorithms,which easily fall into the local optimal solution,a local search operation was added to a genetic algorithm to defend the offspring after crossover/mutation.Then,an elitist strategy and adaptive operators were adopted to protect the generated optimal solutions,reduce the computation time and avoid premature convergence.A calibrated function method was used to cater to the roulette rules,and appropriate rules for encoding,decoding and crossover/mutation were designed.Finally,a simple network was designed and validated using the case study of a real offshore project.The performance of the genetic algorithmand a simulated annealing algorithmwas compared to validate the feasibility and effectiveness of the approach. 展开更多
关键词 Offshore project multi-execution modes resource-constrained project scheduling hybrid genetic algorithm
在线阅读 下载PDF
SOLVING RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEMS WITH BI-CRITERIA HEURISTIC SEARCH TECHNIQUES
9
作者 M Kamrul AHSAN De-bi TSAO 《Systems Science and Systems Engineering》 CSCD 2003年第2期190-203,共14页
In this paper we formulate a bi-criteria search strategy of a heuristic learning algorithm for solving multiple resource-constrained project scheduling problems. The heuristic solves problems in two phases. In the pre... In this paper we formulate a bi-criteria search strategy of a heuristic learning algorithm for solving multiple resource-constrained project scheduling problems. The heuristic solves problems in two phases. In the pre-processing phase, the algorithm estimates distance between a state and the goal state and measures complexity of problem instances. In the search phase, the algorithm uses estimates of the pre-processing phase to further estimate distances to the goal state. The search continues in a stepwise generation of a series of intermediate states through search path evaluation process with backtracking. Developments of intermediate states are exclusively based on a bi-criteria new state selection technique where we consider resource utilization and duration estimate to the goal state. We also propose a variable weighting technique based on initial problem complexity measures. Introducing this technique allows the algorithm to efficiently solve complex project scheduling problems. A numerical example illustrates the algorithm and performance is evaluated by extensive experimentation with various problem parameters. Computational results indicate significance of the algorithm in terms of solution quality and computational performance. 展开更多
关键词 resource-constrained project scheduling search algorithm HEURISTICS state-space representation
原文传递
Solving Resource-constrained Multiple Project Scheduling Problem Using Timed Colored Petri Nets
10
作者 吴瑜 庄新村 +2 位作者 宋国辉 许晓栋 李从心 《Journal of Shanghai Jiaotong university(Science)》 EI 2009年第6期713-719,共7页
To solve the resource-constrained multiple project scheduling problem(RCMPSP) more effectively,a method based on timed colored Petri net(TCPN) was proposed.In this methodology,firstly a novel mapping mechanism between... To solve the resource-constrained multiple project scheduling problem(RCMPSP) more effectively,a method based on timed colored Petri net(TCPN) was proposed.In this methodology,firstly a novel mapping mechanism between traditional network diagram such as CPM(critical path method)/PERT(program evaluation and review technique) and TCPN was presented.Then a primary TCPN(PTCPN) for solving RCMPSP was modeled based on the proposed mapping mechanism.Meanwhile,the object PTCPN was used to simulate the multiple projects scheduling and to find the approximately optimal value of RCMPSP.Finally,the performance of the proposed approach for solving RCMPSP was validated by executing a mould manufacturing example. 展开更多
关键词 timed colored Petri nets resource-constrained multiple project scheduling problem (RCMPSP) mapping mechanism
原文传递
Economic optimization of resource-constrained project scheduling:a two-phase metaheuristic approach
11
作者 Angela H.L.CHEN Chiuh-Cheng CHYU 《Journal of Zhejiang University-Science C(Computers and Electronics)》 SCIE EI 2010年第6期481-494,共14页
This paper deals with the problem of project scheduling subject to multiple execution modes with non-renewable resources, and a model that handles some of monetary issues in real world applications.The objective is to... This paper deals with the problem of project scheduling subject to multiple execution modes with non-renewable resources, and a model that handles some of monetary issues in real world applications.The objective is to schedule the activities to maximize the expected net present value(NPV) of the project, taking into account the activity costs, the activity durations, and the cash flows generated by successfully completing an activity.Owing to the combinatorial nature of this problem, the current study develops a hybrid of branch-and-bound procedure and memetic algorithm to enhance both mode assignment and activity scheduling.Modifications for the makespan minimization problem have been made through a set of benchmark problem instances.Algorithmic performance is rated on the maximization of the project NPV and computational results show that the two-phase hybrid metaheuristic performs competitively for all instances of different problem sizes. 展开更多
关键词 Memetic algorithm(MA) Branch and bound(B&B) algorithm Net present value(NPV) project scheduling problem
原文传递
Study on the Coordinated Management of Construction Project Schedule and Quality
12
作者 Zhiwei Zhuang 《Journal of Architectural Research and Development》 2025年第4期52-57,共6页
This paper explains the goal conflict between schedule and quality in construction projects,including how schedule compression can lead to quality risks,and how quality control may cause delays.It analyzes the interna... This paper explains the goal conflict between schedule and quality in construction projects,including how schedule compression can lead to quality risks,and how quality control may cause delays.It analyzes the internal logic of collaborative management and influencing factors such as construction plans.The paper also introduces collaborative management methods,such as establishing a responsibility traceability system based on Work Breakdown Structure(WBS),and emphasizes the role of intelligent construction technologies and their future development directions. 展开更多
关键词 Construction project schedule and quality Collaborative management
在线阅读 下载PDF
Complete fuzzy scheduling and fuzzy earned value management in construction projects 被引量:10
13
作者 José Luís PONZ-TIENDA Eugenio PELLICER Víctor YEPES 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2012年第1期56-68,共13页
This paper aims to present a comprehensive proposal for project scheduling and control by applying fuzzy earned value.It goes a step further than the existing literature:in the formulation of the fuzzy earned value we... This paper aims to present a comprehensive proposal for project scheduling and control by applying fuzzy earned value.It goes a step further than the existing literature:in the formulation of the fuzzy earned value we consider not only its duration,but also cost and production,and alternatives in the scheduling between the earliest and latest times.The mathematical model is implemented in a prototypical construction project with all the estimated values taken as fuzzy numbers.Our findings suggest that different possible schedules and the fuzzy arithmetic provide more objective results in uncertain environments than the traditional methodology.The proposed model allows for controlling the vagueness of the environment through the adjustment of the α-cut,adapting it to the specific circumstances of the project. 展开更多
关键词 CONSTRUCTION Earned value method(EVM) Fuzzy logic Fuzzy set project management scheduling
原文传递
Joint optimization scheduling for water conservancy projects incomplex river networks 被引量:6
14
作者 Qin Liu Guo-hua Fang +1 位作者 Hong-bin Sun Xue-wen Wu 《Water Science and Engineering》 EI CAS CSCD 2017年第1期43-52,共10页
In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi... In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi-period and multi-variable joint optimization scheduling model for flood control, drainage, and irrigation. In this model, the number of sluice holes, pump units, and hydropower station units to be opened were used as decision variables, and different optimization objectives and constraints were considered. This model was solved with improved genetic algorithms and verified using the Huaian Water Conservancy Project as an example. The results show that the use of the joint optimization scheduling led to a 10% increase in the power generation capacity and a 15% reduction in the total energy consumption. The change in the water level was reduced by 0.25 m upstream of the Yundong Sluice, and by 50% downstream of pumping stations No. 1, No. 2, and No. 4. It is clear that the joint optimization scheduling proposed in this study can effectively improve power generation capacity of the project, minimize operating costs and energy consumption, and enable more stable operation of various hydraulic structures. The results may provide references for the management of water conservancy projects in complex river networks. 展开更多
关键词 Complex river network Water conservancy project Hydraulic structure Flow capacity simulation scheduling model Optimal scheduling
在线阅读 下载PDF
Solving resource availability cost problem in project scheduling by pseudo particle swarm optimization 被引量:4
15
作者 Jianjun Qi Bo Guo +1 位作者 Hongtao Lei Tao Zhang 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2014年第1期69-76,共8页
This paper considers a project scheduling problem with the objective of minimizing resource availability costs appealed to finish al activities before the deadline. There are finish-start type precedence relations amo... This paper considers a project scheduling problem with the objective of minimizing resource availability costs appealed to finish al activities before the deadline. There are finish-start type precedence relations among the activities which require some kinds of renewable resources. We predigest the process of sol-ving the resource availability cost problem (RACP) by using start time of each activity to code the schedule. Then, a novel heuris-tic algorithm is proposed to make the process of looking for the best solution efficiently. And then pseudo particle swarm optimiza-tion (PPSO) combined with PSO and path relinking procedure is presented to solve the RACP. Final y, comparative computational experiments are designed and the computational results show that the proposed method is very effective to solve RACP. 展开更多
关键词 project scheduling resource availability cost problem(RACP) HEURISTICS particle swarm optimization (PSO) path relin-king.
在线阅读 下载PDF
Project Scheduling问题和Job-Shop问题的神经网络解 被引量:1
16
作者 章烔民 吴文娟 陶增乐 《计算机应用与软件》 CSCD 1998年第2期21-28,共8页
Project Scheduling问题和Job-Shop问题是著名的NP难题。本文用神经网络方法去解这两个问题,软件模拟结果是令人满意的。这种方法也为解一大类组合优化问题提供了一个新的途径。
关键词 JOB-SHOP问题 神经网络 优化问题
在线阅读 下载PDF
Fuzzy Flexible Resource Constrained Project Scheduling Based on Genetic Algorithm 被引量:1
17
作者 查鸿 张连营 《Transactions of Tianjin University》 EI CAS 2014年第6期469-474,共6页
Both fuzzy temporal constraint and flexible resource constraint are considered in project scheduling. In order to obtain an optimal schedule, we propose a genetic algorithm integrated with concepts on fuzzy set theory... Both fuzzy temporal constraint and flexible resource constraint are considered in project scheduling. In order to obtain an optimal schedule, we propose a genetic algorithm integrated with concepts on fuzzy set theory as well as specialized coding and decoding mechanism. An example demonstrates that the proposed approach can assist the project managers to obtain the optimal schedule effectively and make the correct decision on skill training before a project begins. 展开更多
关键词 project scheduling FUZZINESS FLEXIBILITY GENETIC algorithm TRAINING
在线阅读 下载PDF
Hybrid algorithm for project scheduling with capacity constraint 被引量:1
18
作者 Cheng Xu Wu Cheng 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2008年第5期1041-1046,共6页
Motivated by the projects constrained by space capacity and resource transporting time, a project scheduling probIem with capacity constraint was modeled. A hybrid algorithm is proposed, which uses the ideas of bi-lev... Motivated by the projects constrained by space capacity and resource transporting time, a project scheduling probIem with capacity constraint was modeled. A hybrid algorithm is proposed, which uses the ideas of bi-level scheduling and project decomposition technology, and the genetic algorithm and tabu search is combined. Topological reordering technology is used to improve the efficiency of evaluation. Simulation results show the proposed algorithm can obtain satisfied scheduling results in acceptable time. 展开更多
关键词 project scheduling capacity constraint heuristic algorithm bi-level scheduling.
在线阅读 下载PDF
Rules Mining-Based Gene Expression Programming for the Multi-Skill Resource Constrained Project Scheduling Problem 被引量:1
19
作者 Min Hu Zhimin Chen +2 位作者 Yuan Xia Liping Zhang Qiuhua Tang 《Computer Modeling in Engineering & Sciences》 SCIE EI 2023年第9期2815-2840,共26页
Themulti-skill resource-constrained project scheduling problem(MS-RCPSP)is a significantmanagement science problem that extends from the resource-constrained project scheduling problem(RCPSP)and is integrated with a r... Themulti-skill resource-constrained project scheduling problem(MS-RCPSP)is a significantmanagement science problem that extends from the resource-constrained project scheduling problem(RCPSP)and is integrated with a real project and production environment.To solve MS-RCPSP,it is an efficient method to use dispatching rules combined with a parallel scheduling mechanism to generate a scheduling scheme.This paper proposes an improved gene expression programming(IGEP)approach to explore newly dispatching rules that can broadly solve MS-RCPSP.A new backward traversal decoding mechanism,and several neighborhood operators are applied in IGEP.The backward traversal decoding mechanism dramatically reduces the space complexity in the decoding process,and improves the algorithm’s performance.Several neighborhood operators improve the exploration of the potential search space.The experiment takes the intelligent multi-objective project scheduling environment(iMOPSE)benchmark dataset as the training set and testing set of IGEP.Ten newly dispatching rules are discovered and extracted by IGEP,and eight out of ten are superior to other typical dispatching rules. 展开更多
关键词 project scheduling MULTI-SKILL gene expression programming dispatching rules
在线阅读 下载PDF
A New Algorithm for Resource Constraint Project Scheduling Problem Based on Multi-Agent Systems 被引量:1
20
作者 何曙光 齐二石 李钢 《Transactions of Tianjin University》 EI CAS 2003年第4期348-352,共5页
The resource constrained project scheduling problem (RCPSP) and a decision-making model based on multi-agent systems (MAS) and general equilibrium marketing are proposed. An algorithm leading to the resource allocatio... The resource constrained project scheduling problem (RCPSP) and a decision-making model based on multi-agent systems (MAS) and general equilibrium marketing are proposed. An algorithm leading to the resource allocation decision involved in RCPSP has also been developed. And this algorithm can be used in the multi-project scheduling field as well.Finally, an illustration is given. 展开更多
关键词 resource constrained project scheduling problem multi-agent systems general equilibrium market ALGORITHM
在线阅读 下载PDF
上一页 1 2 94 下一页 到第
使用帮助 返回顶部