期刊文献+
共找到6篇文章
< 1 >
每页显示 20 50 100
Establishment of the“4 stages-6 sequences”repair method and quantification analysis on post-earthquake functional recovery of railway station
1
作者 Song Jiayu Gao Haiwang +1 位作者 Pan Yi Jiang Junpeng 《Earthquake Engineering and Engineering Vibration》 2025年第3期827-842,共16页
Quantifying the post-earthquake functional recovery of railway stations presents significant challenges.This paper first establishes a post-earthquake function calculation method for railway stations,encompassing the ... Quantifying the post-earthquake functional recovery of railway stations presents significant challenges.This paper first establishes a post-earthquake function calculation method for railway stations,encompassing the establishment of relationships between the station’s function and the damage state,function loss,and failure probability of components and professional equipment in each layer.Also,the“4 stages-6 sequences”post-earthquake repair method is present,taking into account the functional and structural characteristics of railway stations.Additionally,a novel piecewise function for the post-earthquake functional dynamic recovery of railway stations is developed.A case study is conducted on a typical railway station to demonstrate the analysis procedure.Results indicate that under fortification,rare,and extremely rare earthquake scenarios,the interlayer drift ratio(IDR)of the railway station were 1/276,1/143,and 1/52,respectively,and corresponding peak floor acceleration(PFA)were 6.31 m/s^(2),7.82 m/s^(2),and 8.57 m/s^(2),respectively.The post-earthquake function of the railway station was 93.21%,82.33%,and 64.16%of its initial function.The repair times were 6.66 days,18.65 days,and 37.42 days.The displacement-sensitive,non-structural components were identified as the most vulnerable to damage.And the first repair stage(R_(1))which was mainly used to repair structural components and non-structural transport components,accounted for the highest proportion of total repair time. 展开更多
关键词 railway stations seismic response post-earthquake function functional recovery model repair method
在线阅读 下载PDF
The Impact Assessment of Heavy Metal Contaminated Soil Environment and Exploration of Remediation Methods
2
作者 XIE Ying 《外文科技期刊数据库(文摘版)自然科学》 2020年第2期107-109,共3页
Heavy metals are very serious land pollution sources, which are difficult to deal with and repair. This paper focuses on the contents and key points of the environmental impact assessment of heavy metal contaminated s... Heavy metals are very serious land pollution sources, which are difficult to deal with and repair. This paper focuses on the contents and key points of the environmental impact assessment of heavy metal contaminated soil, then puts forward effective remediation methods, and analyzes the advantages of various remediation measures, hoping that the analysis in this paper can provide beneficial enlightenment for relevant practitioners. 展开更多
关键词 heavy metals soil pollution impact evaluation repair methods
原文传递
Research on the Repair Technology of Mine Motor Rotor Shaft
3
作者 FU Pin'ang WANG Xianglong 《外文科技期刊数据库(文摘版)工程技术》 2021年第1期727-731,共5页
With the continuous development of coal mine automation mining technology, the motor as the power source of automatic mine system, its role is self-evident. As the core component of motor power output, the motor rotor... With the continuous development of coal mine automation mining technology, the motor as the power source of automatic mine system, its role is self-evident. As the core component of motor power output, the motor rotor shaft requires very high precision. This paper analyzes and discusses the motor rotor repair technology from many aspects, hoping to provide some reference for related workers. 展开更多
关键词 mine motor maintenance and repair repair methods
原文传递
Research on Fault Prevention and Maintenance of Electrical Automation Equipment
4
作者 HAN Jiangbing 《外文科技期刊数据库(文摘版)工程技术》 2021年第6期383-385,共5页
Automated electrical equipment can be processed, researched and developed by computer, which can effectively improve the safety and stability of the equipment. However, the mechanical and electrical equipment system i... Automated electrical equipment can be processed, researched and developed by computer, which can effectively improve the safety and stability of the equipment. However, the mechanical and electrical equipment system is affected by various factors in the process of operation, and often fails, which seriously affects the normal production. On this basis, we have made an in-depth study of automation equipment failures and introduced the basic strategies and maintenance methods to prevent common failures, which are just references. 展开更多
关键词 electrical automation equipment failure preventive measures maintenance and repair methods
原文传递
Coordinate scheduling approach for EDS observation tasks and data transmission jobs 被引量:9
5
作者 Hao Chen Jiangjiang Wu +2 位作者 Wenyuan Shi Jun Li Zhinong Zhong 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2016年第4期822-835,共14页
Electromagnetic detection satellite(EDS) is a type of Earth observation satellite(EOS). Satellites observation and data down-link scheduling plays a significant role in improving the efficiency of satellite observ... Electromagnetic detection satellite(EDS) is a type of Earth observation satellite(EOS). Satellites observation and data down-link scheduling plays a significant role in improving the efficiency of satellite observation systems. However, the current works mainly focus on the scheduling of imaging satellites, little work focuses on the scheduling of EDSes for its specific requirements.And current works mainly schedule satellite resources and data down-link resources separately, not considering them in a globally optimal perspective. The EDSes and data down-link resources are scheduled in an integrated process and the scheduling result is searched globally. Considering the specific constraints of EDS, a coordinate scheduling model for EDS observation tasks and data transmission jobs is established and an algorithm based on the genetic algorithm is proposed. Furthermore, the convergence of our algorithm is proved. To deal with some specific constraints, a solution repairing algorithm of polynomial computing time is designed. Finally, some experiments are conducted to validate the correctness and practicability of our scheduling algorithms. 展开更多
关键词 electromagnetic detection satellites scheduling satellites and ground stations coordinate scheduling constraint handling solution repairing method genetic algorithm
在线阅读 下载PDF
Thermal segregation of asphalt material in road repair 被引量:5
6
作者 Juliana Byzyka Mujib Rahman Denis Albert Chamberlain 《Journal of Traffic and Transportation Engineering(English Edition)》 2017年第4期360-371,共12页
This paper presents results from a field study of asphaltic pavement patching operations performed by three different contractors working in a total of ten sites. It forms part of an ongoing research programme towards... This paper presents results from a field study of asphaltic pavement patching operations performed by three different contractors working in a total of ten sites. It forms part of an ongoing research programme towards improving the performance of pothole repairs. Thermal imaging technology was used to record temperatures of the patching material throughout the entire exercise, from the stage of material collection, through transportation to repair site, patch forming, and compaction. Practical complications occurring during patch repairs were also identified. It was found that depending on the weather conditions, duration of the travel and poor insulation of the transported hot asphalt mix, its temperature can drop as high as 116.6 ℃ over the period that the reinstatement team travel to the site and prepare the patch. This impacting is on the durability and perfor- mance of the executed repairs. Cold spots on the asphalt mat and temperature differentials between the new hot-fill asphalt mix and existing pavement were also identified as poorly compacted areas that were prone to premature failure. For example, over the five-minute period, the temperature at one point reduced by 33% whereas the temperatures of nearby areas decreased by 65% and 71%. A return visit to the repair sites, three months later, revealed that locations where thermal segregation was noted, during the patching opera- tion, had failed prematurely. 展开更多
关键词 Hot mix asphalt PotholePatch repair Thermal segregation Thermography method
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部