Typhoons can cause large-area blackouts or partial outages of distribution networks.We define a partial outage state in the distribution network as a gray state and propose a gray-start strategy and two-stage distribu...Typhoons can cause large-area blackouts or partial outages of distribution networks.We define a partial outage state in the distribution network as a gray state and propose a gray-start strategy and two-stage distribution network emergency recovery framework.A phase-space reconstruction and stacked integrated model for predicting wind and photovoltaic generation during typhoon disasters is proposed in the first stage.This provides guidance for second-stage post-disaster emergency recovery scheduling.The emergency recovery scheduling model is established in the second stage,and this model is supported by a thermal power-generating unit,mobile emergency generators,and distributed generators.Distributed generation includes wind power generation,photovoltaics,fuel cells,etc.Simultaneously,we con-sider the gray-start based on the pumped storage unit to be an important first step in the emergency recovery strategy.This model is val-idated on the improved IEEE 33 node system,which utilizes data from the 2022 super typhoon“Muifa”in Zhoushan,Zhejiang,China.Simulations indicate the superiority of a gray start with a pumped storage unit and the proposed emergency recovery strategy.展开更多
The integration of large-scale renewable energy introduces frequency instability challenges due to inherent intermittency.While doubly-fed pumped storage units(DFPSUs)offer frequency regulation potential in pumping mo...The integration of large-scale renewable energy introduces frequency instability challenges due to inherent intermittency.While doubly-fed pumped storage units(DFPSUs)offer frequency regulation potential in pumping mode,conventional strategies fail to address hydraulic-mechanical coupling dynamics and operational constraints,limiting their effectiveness.This paper presents an innovative primary frequency control strategy for double-fed pumped storage units(DFPSUs)operating in pumpingmode,integrating an adaptive parameter calculation method.This method is constrained by operational speed and power limits,addressing key performance factors.A dynamic model that incorporates the reversible pump-turbine characteristics is developed to translate frequency deviations into coordinated adjustments in speed and power during pumping operations.The research thoroughly analyzes the influence of control parameters on the frequency response dynamics.Additionally,the paper introduces a deep reinforcement learning(DRL)-based optimization framework,which enables real-time tuning of control parameters in response to changing rotor speed and frequency states.This method strategicallymanages the utilization of kinetic energy while ensuring compliance with operational safety constraints.The effectiveness of the proposed strategy is validated through simulation studies conducted on a four-machine,two-area DFPSU system.These studies demonstrate the strategy’s potential for improving frequency regulation performance under a variety of operating conditions,highlighting its effectiveness in optimizing energy storage and frequency control in power grids.展开更多
To enhance energy interaction among low-voltage stations(LVSs)and reduce the line loss of the distribution network,a novel operation mode of the micro-pumped storage system(mPSS)has been proposed based on the common r...To enhance energy interaction among low-voltage stations(LVSs)and reduce the line loss of the distribution network,a novel operation mode of the micro-pumped storage system(mPSS)has been proposed based on the common reservoir.First,some operation modes of mPSS are analyzed,which include the separated reservoir mode(SRM)and common reservoir mode(CRM).Then,based on the SRM,and CRM,an energy mutual assistance control model between LVSs has been built to optimize energy loss.Finally,in the simulation,compared to the model without pumped storage in the LVS,the SRMand CLRMcan decrease the total energy loss by 294.377 and 432.578 kWh,respectively.The configuration of mPSS can improve the utilization rate of the new energy source generation system,and relieve the pressure of transformer capacity in the LVS.Compared with the SRM,the proposed CRM has reduced the total energy loss by 138.201 kWh,increased the new energy consumption by 161.642 kWh,and decreased the line loss by 7.271 kWh.With the efficiency of the mPSS improving,the total energy loss reduction of CRM will be 3.5 times that of SRM.Further,the CRMcan significantly reduce the reservoir capacity construction of mPSS and ismore suitable for scenarios where the capacity configuration of mPSS is limited.展开更多
With the rapid integration of renewable energy sources,modern power systems are increasingly challenged by heightened volatility and uncertainty.Doubly-fed variable-speed pumped storage units(DFVS-PSUs)have emerged as...With the rapid integration of renewable energy sources,modern power systems are increasingly challenged by heightened volatility and uncertainty.Doubly-fed variable-speed pumped storage units(DFVS-PSUs)have emerged as promising technologies for mitigating grid oscillations and enhancing system flexibility.However,the excitation converters in DFVS-PSUs are prone to significant issues such as elevated common-mode voltage(CMV)and neutral-point voltage(NPV)fluctuations,which can lead to electromagnetic interference and degrade transient performance.To address these challenges,an optimized virtual space vector pulse width modulation(OVSVPWM)strategy is proposed,aiming to suppress CMV and NPV simultaneously through coordinated multi-objective control.Specifically,a dynamic feedback mechanism is introduced to adjust the balancing factor of basic vectors in the synthesized virtual small vector in real-time,achieving autonomous balancing of the NPV.To address the excessive switching actions introduced by the OVSVPWM strategy,a phase duty ratio-based sequence reconstruction method is adopted,which reduces the total number of switching actions to half of the original.A zero-level buffering scheme is employed to reconstruct the single-phase voltage-level output sequence,achieving peak CMV suppression down to udc/6.Simulation results demonstrate that the proposed strategy significantly improves electromagnetic compatibility and operational stability while maintaining high power quality.展开更多
In the context of the accelerated global transition to green and low-carbon energy,China’s energy structure is undergoing profound changes.As of early 2025,the installed capacity of wind and photovoltaic power in Chi...In the context of the accelerated global transition to green and low-carbon energy,China’s energy structure is undergoing profound changes.As of early 2025,the installed capacity of wind and photovoltaic power in China has exceeded 1.4 billion kilowatts,accounting for 42.9%of the total installed power generation capacity,historically surpassing thermal power as the largest power source.However,the randomness,volatility,and intermittency of renewable energy generation pose unprecedented challenges to the power system’s regulatory capacity.In this context,pumped storage,as the most technically mature and economically advantageous large-scale energy storage method,is experiencing explosive growth,providing strategic opportunities for the transformation and upgrading of manufacturing enterprises.展开更多
Large-scale new energy grid connection leads to the weakening of the system frequency regulation capability,and the system frequency stability is facing unprecedented challenges.In order to solve rapid frequency fluct...Large-scale new energy grid connection leads to the weakening of the system frequency regulation capability,and the system frequency stability is facing unprecedented challenges.In order to solve rapid frequency fluctuation caused by new energy units,this paper proposes a new energy power system frequency regulation strategy with multiple units including the doubly-fed pumped storage unit(DFPSU).Firstly,based on the model predictive control(MPC)theory,the state space equations are established by considering the operating characteristics of the units and the dynamic behavior of the system;secondly,the proportional-differential control link is introduced to minimize the frequency deviation to further optimize the frequency modulation(FM)output of the DFPSU and inhibit the rapid fluctuation of the frequency;lastly,it is verified on theMatlab/Simulink simulation platform,and the results show that the model predictive control with proportional-differential control link can further release the FM potential of the DFPSU,increase the depth of its FM,effectively reduce the frequency deviation of the system and its rate of change,realize the optimization of the active output of the DFPSU and that of other units,and improve the frequency response capability of the system.展开更多
Within the framework of achieving carbon neutrality,various industries are confronted with fresh challenges.The ongoing process of downsizing coal industry operations has evolved into a new phase,with the burgeoning p...Within the framework of achieving carbon neutrality,various industries are confronted with fresh challenges.The ongoing process of downsizing coal industry operations has evolved into a new phase,with the burgeoning proliferation of abandoned mines posing a persistent issue.Addressing the challenges and opportunities presented by these abandoned mines,this paper advocates for a scientific approach centered on the advancement of pumped storage energy alongside gas-oil complementary energy.Leveraging abandoned mine tunnels to establish pumped storage power stations holds significant ecological and economic importance for repurposing these sites.This initiative not only serves as an effective means to restore the ecological balance in mining regions but also provides an environmentally friendly approach to repurposing abandoned mine tunnels,offering a blueprint for economically viable pumped storage power stations.This article delineates five crucial scientific considerations and outlines seven primary models for the utilization of abandoned mine sites,delineating a novel,comprehensive pathway for energy and power development that emphasizes multi-energy complementarity and synergistic optimization within abandoned mines.展开更多
During the construction and operation of the abandoned mine pumped storage power station,the underground space surrounding rock body faces the complex stress environment under the action of mining disturbance,frequent...During the construction and operation of the abandoned mine pumped storage power station,the underground space surrounding rock body faces the complex stress environment under the action of mining disturbance,frequent pumping,water storage and other dynamic disturbances.The stability of the abandoned mine surrounding rock body is the basis for guaranteeing the safety and effectiveness of water storage in the underground space of the abandoned mine.By considering the two main factors of different stress levels and disturbance amplitudes,the mechanical properties,damage characteristics and acoustic emission characteristics of the abandoned mine perimeter rock body under dynamic disturbance were investigated using a creep-disturbed dynamic impact loading system.The experimental results show that:1)The stress level is considered to be the major contributing factor of the failure of muddy sandstone,followed by the amplitude of the disturbances;2)The time required for the destruction of muddy sandstone decreases with the increase of amplitude.When the stress level is 80%,the sandstone specimens have a decreasing number of cycles as the disturbance amplitude increases.The disturbance amplitude is sequentially increased from 4 MPa to 5,6,7,and 8 MPa,the number of cycles required for specimen destruction decreases significantly by 96.71%,99.13%,99.60%,and 99.93%,respectively;3)Disturbance amplitude and stress level have a significant effect on muddy sandstone damage and damage occurs only after a certain threshold is reached.With the increase of stress level and disturbance amplitude,the macroscopic damage of muddy sandstone is mainly conical,with obvious flake spalling and poor damage integrity;4)According to the time-dependent changes in AE energy and ringing counts,the acoustic emission activity during the failure process could be divided into three phases,namely,weakening period,smooth period,and surge period,corresponding to the compaction phase,elastic rise phase and post-peak damage phase.The research results are of reference significance for the damage evolution analysis of muddy sandstone under dynamic disturbance and the safety and stability of abandoned mine perimeter rock body.展开更多
Based on global initiatives such as the clean energy transition and the development of renewable energy,the pumped storage power station has become a new and significant way of energy storage and regulation,and its co...Based on global initiatives such as the clean energy transition and the development of renewable energy,the pumped storage power station has become a new and significant way of energy storage and regulation,and its construction environment is more complex than that of a traditional reservoir.In particular,the stability of the rock strata in the underground reservoirs is affected by the seepage pressure and rock stress,which presents some challenges in achieving engineering safety and stability.Using the advantages of the numerical simulation method in dealing deal with nonlinear problems in engineering stability,in this study,the stability of the underground reservoir of the Shidangshan(SDS)pumped storage power station was numerically calculated and quantitatively analyzed based on fluid-structure coupling theory,providing an important reference for the safe operation and management of the underground reservoir.First,using the COMSOL software,a suitablemechanicalmodel was created in accordance with the geological structure and project characteristics of the underground reservoir.Next,the characteristics of the stress field,displacement field,and seepage field after excavation of the underground reservoir were simulated in light of the seepage effect of groundwater on the nearby rock of the underground reservoir.Finally,based on the construction specifications and Molar-Coulomb criterion,a thorough evaluation of the stability of the underground reservoir was performed through simulation of the filling and discharge conditions and anti-seepage strengthening measures.The findings demonstrate that the numerical simulation results have a certain level of reliability and are in accordance with the stress measured in the project area.The underground reservoir excavation resulted in a maximum displacement value of the rock mass around the caverns of 3.56 mm in a typical section,and the safety coefficient of the parts,as determined using the Molar-Coulomb criterion,was higher than 1,indicating that the project as a whole is in a stable state.展开更多
Seawater pumped storage systems have bright prospect for energy storage in the coming years.The operational conditions of seawater pumped storage system are complex and harsh,where metal materials suff er from severe ...Seawater pumped storage systems have bright prospect for energy storage in the coming years.The operational conditions of seawater pumped storage system are complex and harsh,where metal materials suff er from severe general and local corrosion.The corrosion behavior of Q235B carbon steel in simulated seawater pumped storage system under operational conditions was studied by potentiodynamic polarization,cyclic potentiodynamic polarization,and scanning electron microscope(SEM).The results confi rm that the working pressure aff ected the corrosion resistance of Q235B carbon steel during the whole immersion period.The pressure promoted the electrochemical reaction of corrosion process and the corrosion rate increased with pressure at the initial immersion period.However,the stable rust layer formed after longtime immersion at diff erent pressures increased the corrosion resistance of carbon steel,and decreased the corrosion degree of carbon steel.Meanwhile,the working pressure aff ected the pitting corrosion behavior of Q235B carbon steel during the whole immersion period.The pitting corrosion potential was more negative and the tendency of pitting corrosion was higher at 4 MPa during the whole immersion period.However,pressure also accelerated the formation rate of protective rust layer on the steel surface.Q235B carbon steel has higher susceptibility to pitting corrosion at 4 MPa in the static seawater.展开更多
Variable speed pumped storage machines are used extensively in wind power plant and pumped storage power plant. This paper presents direct torque and flux control(DTFC) of a variable speed pumped storage power plant(V...Variable speed pumped storage machines are used extensively in wind power plant and pumped storage power plant. This paper presents direct torque and flux control(DTFC) of a variable speed pumped storage power plant(VSPSP). By this method both torque and flux have been applied to control the VSPSP. The comparison between VSPSP's control strategies is studied. At the first, a wind turbine with the capacity 2.2 k W and DTFC control strategies simulated then a 250 MW VSPSP is simulated with all of its parts(including electrical, mechanical, hydraulic and its control system) by MATLAB software. In all of simulations, both converters including two-level voltage source converter(2LVSC) and three-level voltage source converter(3LVSC) are applied. The results of applying 2LVSC and 3LVSC are the rapid dynamic responses with better efficiency, reducing the total harmonic distortion(THD) and ripple of rotor torque and flux.展开更多
Usually the water head of the pumped storage hydro-plant is high, generally up to 400-500 m, therefore the rock mass under the high-pressure bifurcation pipe have to bear as high as millions Pascal water pressure, in ...Usually the water head of the pumped storage hydro-plant is high, generally up to 400-500 m, therefore the rock mass under the high-pressure bifurcation pipe have to bear as high as millions Pascal water pressure, in according with the requirements of high water head pumped storage hydro-plant should be 1.2 times of the water head special high-pressure packer permeability test compared with normal to test the permeability of rock and rock cleavage pressure value. The test results on the choice of design options often play a decisive role. Based on the engineering practice, the authors studied the drillhole high-pressure packer permeability test in the pumped storage hydro-plant's underground powerhouse, by the analysis of test results, this article offers a demonstration of the deformation of rock fracture witch under building in the condition of high-pressure water head, it provides a more detailed engineering geological background.展开更多
To solve the severe problem of wind power curtailment in the winter heating period caused by "power determined by heat" operation constraint of cogeneration units, this paper analyzes thermoelectric load, wind power...To solve the severe problem of wind power curtailment in the winter heating period caused by "power determined by heat" operation constraint of cogeneration units, this paper analyzes thermoelectric load, wind power output distribution and fluctuation characteristics at different time scales, and finally proposes a two level coordinated control strategy based on electric heat storage and pumped storage. The optimization target of the first level coordinated control is the lowest operation cost and the largest wind power utilization rate. Based on prediction of thermoelectric load and wind power, the operation economy of the system and wind power accommodation level are improved with the cooperation of electric heat storage and pumped storage in regulation capacity. The second level coordinated control stabilizes wind power real time fluctuations by cooperating electric heat storage and pumped storage in control speed. The example results of actual wind farms in Jiuquan, Gansu verifies the feasibility and effectiveness of the proposed coordinated control strategy.展开更多
The shrink fit retaining ring is currently the easiest to install and the most widely used end fixed for structure AC excitation variable speed generator-motor rotor end windings.However,the current research on the ef...The shrink fit retaining ring is currently the easiest to install and the most widely used end fixed for structure AC excitation variable speed generator-motor rotor end windings.However,the current research on the effect of high strength sealing on the ventilation and heat dissipation performance of the end is not enough.In this paper,based on the actual structural parameters and periodic symmetry simplification,the three-dimensional coupled calculation model of fluid field and temperature field is established.After solving the fluid and thermal equations,the influence of the length of rotor support block,the height of rotor support block,and the number of rotor support block on the fluid flow and temperature distribution in the rotor end region of generator-motor is studied using the finite volume method.The rheological characteristics of the air in the rotor domain,such as velocity and inter-winding flow,are analyzed.The law of temperature variation with local structure in the computational domain is studied.The variation law of cooling medium performance inside the large variable speed power generator motor is revealed.展开更多
In this paper, a method of stabilizing electric power by a system which is a combination of wind power generation and pumped storage power generation is proposed. The system operates based on the output predicted valu...In this paper, a method of stabilizing electric power by a system which is a combination of wind power generation and pumped storage power generation is proposed. The system operates based on the output predicted value of the windfarm. When the measured windfarm output is larger than the predicted value, the system is pumping up water with surplus power. When the windfarm output is smaller than the predicted value, the system is filling up lack power by hydro generator. Also, since hydro generator works with a start-up delay time, output shortage occurs at this time. To improve output shortage at the time, we estimate the time below the predicted value by a statistical model. As the result, the system succeeded in stabilizing the power and improving the start-up delay time of the hydro generator.展开更多
The electric energy which is generated by wind power plants depends on the wind speed and exceeds with strong permissible wind speed the electric energy requirements of the country. In order not to reduce this electri...The electric energy which is generated by wind power plants depends on the wind speed and exceeds with strong permissible wind speed the electric energy requirements of the country. In order not to reduce this electrical energy, it must be stored. The sensible energy storage is currently the pumped storage power plants. As the mountain ranges for conventional pumped storage power plants with drop heights of H 〉 600 m are strictly limited, the development of low potential pumped storage power plants has begun. Increasing the capacity of pumped storage power plants with regard to the wind power plants is urgently needed. In this paper, it is shown using the example of an unneeded port facility, how a port facility can be used after low conversion as a test facility for low potential pumped storage power plants and at the same time for the testing of hydro-kinetic turbines. This type of pump storage power plants does not save the energy due to large drop heights, but primarily due to the large volume flow of water.展开更多
The demand for renewable energy technologies is increasing globally.With the rapid depletion of fossil fuels and the growing awareness of their harmful impacts on the environment and climate,there is an urgent need to...The demand for renewable energy technologies is increasing globally.With the rapid depletion of fossil fuels and the growing awareness of their harmful impacts on the environment and climate,there is an urgent need to focus on developing renewable resources.However,a significant challenge with renewable energy is its variability due to factors like weather and time of day.This causes the amount of generated power to vary drastically in unfavorable situations,making the design of effective storage technologies a high priority.The primary role of these structures is to store excess energy and release it later at peak shaving.Among various available storage methods,pumped hydro storage systems are prominent,particularly for bulk energy storage.Owing to the complexity of the site selection process for these structures,developing and arranging key site selection indicators based on precise location criteria is critical.In the present case study in Tehran Province,Iran,seven suitability indicators based on 24 location criteria were defined to optimize the site selection process for hydro-pumped storage systems.Each index includes a specific number of site selection sub-criteria.To prioritize the criteria,the Fuzzy Analytic Hierarchy Process method and surveys from five experts were applied to determine the final weights.Using this method,several suitable locations with different varieties were identified throughout the Tehran Province,Iran.展开更多
With the gradual increase in the penetration rate of renewable energy,the multifunctional role of pumped storage is becoming increasingly prominent,and the joint operation of“renewable energy+pumped storage”is a cur...With the gradual increase in the penetration rate of renewable energy,the multifunctional role of pumped storage is becoming increasingly prominent,and the joint operation of“renewable energy+pumped storage”is a current research hotspot.However,during the joint system operation,there are dual risks from internal(renewable energy output)and external(market prices)factors,which significantly impact the system’s overall revenue.Therefore,an analysis is conducted around the operational mechanism of the“wind power–pumped storage”joint operation,and the uncertain factors faced during the system’s operation are identified.Second,an optimization model for wind power–pumped storage under deterministic scenarios is constructed,employing robust optimization theory and information gap decision theory to describe the uncertainty of electricity prices and wind power,thus forming a hybrid of the information gap decision theory and the robust optimization model for wind power–pumped storage.Finally,the results show that:(1)The total revenue of the model proposed in the paper has increased by 2.36%compared to the robust optimization model and by 9.04%compared to the deterministic model,significantly enhancing the model’s robustness and risk resistance capabilities.(2)From the perspective of the economic feasibility of different energy storage system configurations,the wind plant equipped with pumped storage has the highest economic feasibility,with an internal rate of return of 9.8%and net present value of 872 million ChineseYuan,which is higher than that of compressed air energy storage and electrochemical energy storage systems.(3)Decision makers can set the risk deviation coefficient and the uncertainty budget according to their risk preferences,thereby changing the robustness of the model for differentiated decision making.However,an increase in the uncertainty budget coefficient will cause the total revenue of the joint operation system first to increase and then decrease,with the maximum revenue achievable within the range of 500–625;the total revenue reaches its maximum when the risk deviation coefficient is between 0.1 and 0.125.展开更多
With the establishment of “carbon peaking and carbon neutrality” goals in China, along with the development of new power systems and ongoing electricity market reforms, pumped-storage power stations (PSPSs) will inc...With the establishment of “carbon peaking and carbon neutrality” goals in China, along with the development of new power systems and ongoing electricity market reforms, pumped-storage power stations (PSPSs) will increasingly play a significant role in power systems. Therefore, this study focuses on trading and bidding strategies for PSPSs in the electricity market. Firstly, a comprehensive framework for PSPSs participating in the electricity energy and frequency regulation (FR) ancillary service market is proposed. Subsequently, a two-layer trading model is developed to achieve joint clearing in the energy and frequency regulation markets. The upper-layer model aims to maximize the revenue of the power station by optimizing the bidding strategies using a Q-learning algorithm. The lower-layer model minimized the total electricity purchasing cost of the system. Finally, the proposed bi-level trading model is validated by studying an actual case in which data are obtained from a provincial power system in China. The results indicate that through this decision-making method, PSPSs can achieve higher economic revenue in the market, which will provide a reference for the planning and operation of PSPSs.展开更多
基金supported in part by the National Nat-ural Science Foundation of China(52177110)Key Pro-gram of the National Natural Science Foundation of China(U22B20106,U2142206)+2 种基金Shenzhen Science and Technology Program(JCYJ20210324131409026)the Science and Technology Project of the State Grid Corpo-ration of China(5200-202319382A-2-3-XG)State Grid Zhejiang Elctric Power Co.,Ltd.Science and Tech-nology Project(B311DS24001A).
文摘Typhoons can cause large-area blackouts or partial outages of distribution networks.We define a partial outage state in the distribution network as a gray state and propose a gray-start strategy and two-stage distribution network emergency recovery framework.A phase-space reconstruction and stacked integrated model for predicting wind and photovoltaic generation during typhoon disasters is proposed in the first stage.This provides guidance for second-stage post-disaster emergency recovery scheduling.The emergency recovery scheduling model is established in the second stage,and this model is supported by a thermal power-generating unit,mobile emergency generators,and distributed generators.Distributed generation includes wind power generation,photovoltaics,fuel cells,etc.Simultaneously,we con-sider the gray-start based on the pumped storage unit to be an important first step in the emergency recovery strategy.This model is val-idated on the improved IEEE 33 node system,which utilizes data from the 2022 super typhoon“Muifa”in Zhoushan,Zhejiang,China.Simulations indicate the superiority of a gray start with a pumped storage unit and the proposed emergency recovery strategy.
文摘The integration of large-scale renewable energy introduces frequency instability challenges due to inherent intermittency.While doubly-fed pumped storage units(DFPSUs)offer frequency regulation potential in pumping mode,conventional strategies fail to address hydraulic-mechanical coupling dynamics and operational constraints,limiting their effectiveness.This paper presents an innovative primary frequency control strategy for double-fed pumped storage units(DFPSUs)operating in pumpingmode,integrating an adaptive parameter calculation method.This method is constrained by operational speed and power limits,addressing key performance factors.A dynamic model that incorporates the reversible pump-turbine characteristics is developed to translate frequency deviations into coordinated adjustments in speed and power during pumping operations.The research thoroughly analyzes the influence of control parameters on the frequency response dynamics.Additionally,the paper introduces a deep reinforcement learning(DRL)-based optimization framework,which enables real-time tuning of control parameters in response to changing rotor speed and frequency states.This method strategicallymanages the utilization of kinetic energy while ensuring compliance with operational safety constraints.The effectiveness of the proposed strategy is validated through simulation studies conducted on a four-machine,two-area DFPSU system.These studies demonstrate the strategy’s potential for improving frequency regulation performance under a variety of operating conditions,highlighting its effectiveness in optimizing energy storage and frequency control in power grids.
基金sponsored by the State Grid Corporation of China Technology Project(Research on Key Technologies and Equipment Development of Micro Pumped Storage for Distributed New Energy Consumption in Distribution Networks,5400-202324196A-1-1-ZN).
文摘To enhance energy interaction among low-voltage stations(LVSs)and reduce the line loss of the distribution network,a novel operation mode of the micro-pumped storage system(mPSS)has been proposed based on the common reservoir.First,some operation modes of mPSS are analyzed,which include the separated reservoir mode(SRM)and common reservoir mode(CRM).Then,based on the SRM,and CRM,an energy mutual assistance control model between LVSs has been built to optimize energy loss.Finally,in the simulation,compared to the model without pumped storage in the LVS,the SRMand CLRMcan decrease the total energy loss by 294.377 and 432.578 kWh,respectively.The configuration of mPSS can improve the utilization rate of the new energy source generation system,and relieve the pressure of transformer capacity in the LVS.Compared with the SRM,the proposed CRM has reduced the total energy loss by 138.201 kWh,increased the new energy consumption by 161.642 kWh,and decreased the line loss by 7.271 kWh.With the efficiency of the mPSS improving,the total energy loss reduction of CRM will be 3.5 times that of SRM.Further,the CRMcan significantly reduce the reservoir capacity construction of mPSS and ismore suitable for scenarios where the capacity configuration of mPSS is limited.
文摘With the rapid integration of renewable energy sources,modern power systems are increasingly challenged by heightened volatility and uncertainty.Doubly-fed variable-speed pumped storage units(DFVS-PSUs)have emerged as promising technologies for mitigating grid oscillations and enhancing system flexibility.However,the excitation converters in DFVS-PSUs are prone to significant issues such as elevated common-mode voltage(CMV)and neutral-point voltage(NPV)fluctuations,which can lead to electromagnetic interference and degrade transient performance.To address these challenges,an optimized virtual space vector pulse width modulation(OVSVPWM)strategy is proposed,aiming to suppress CMV and NPV simultaneously through coordinated multi-objective control.Specifically,a dynamic feedback mechanism is introduced to adjust the balancing factor of basic vectors in the synthesized virtual small vector in real-time,achieving autonomous balancing of the NPV.To address the excessive switching actions introduced by the OVSVPWM strategy,a phase duty ratio-based sequence reconstruction method is adopted,which reduces the total number of switching actions to half of the original.A zero-level buffering scheme is employed to reconstruct the single-phase voltage-level output sequence,achieving peak CMV suppression down to udc/6.Simulation results demonstrate that the proposed strategy significantly improves electromagnetic compatibility and operational stability while maintaining high power quality.
文摘In the context of the accelerated global transition to green and low-carbon energy,China’s energy structure is undergoing profound changes.As of early 2025,the installed capacity of wind and photovoltaic power in China has exceeded 1.4 billion kilowatts,accounting for 42.9%of the total installed power generation capacity,historically surpassing thermal power as the largest power source.However,the randomness,volatility,and intermittency of renewable energy generation pose unprecedented challenges to the power system’s regulatory capacity.In this context,pumped storage,as the most technically mature and economically advantageous large-scale energy storage method,is experiencing explosive growth,providing strategic opportunities for the transformation and upgrading of manufacturing enterprises.
基金supported by the National Natural Science Foundation of China(Project No.52377082)the Scientific Research Program of Jilin Provincial Department of Education(Project No.JJKH20230123KJ).
文摘Large-scale new energy grid connection leads to the weakening of the system frequency regulation capability,and the system frequency stability is facing unprecedented challenges.In order to solve rapid frequency fluctuation caused by new energy units,this paper proposes a new energy power system frequency regulation strategy with multiple units including the doubly-fed pumped storage unit(DFPSU).Firstly,based on the model predictive control(MPC)theory,the state space equations are established by considering the operating characteristics of the units and the dynamic behavior of the system;secondly,the proportional-differential control link is introduced to minimize the frequency deviation to further optimize the frequency modulation(FM)output of the DFPSU and inhibit the rapid fluctuation of the frequency;lastly,it is verified on theMatlab/Simulink simulation platform,and the results show that the model predictive control with proportional-differential control link can further release the FM potential of the DFPSU,increase the depth of its FM,effectively reduce the frequency deviation of the system and its rate of change,realize the optimization of the active output of the DFPSU and that of other units,and improve the frequency response capability of the system.
基金Project(202208340045)supported by the China Scholarship Council FundProject(U21A20110)supported by the Regional Innovation and Development Joint Fund of National Natural Science Foundation of China+1 种基金Project(EUCMR202201)supported by the Open Project Program of Anhui Engineering Research Center of Exploitation and Utilization of Closed/abandoned Mine Resources,ChinaProject(2023cxcyzx063)supported by the Anhui Province New Era Talent Education Project,China。
文摘Within the framework of achieving carbon neutrality,various industries are confronted with fresh challenges.The ongoing process of downsizing coal industry operations has evolved into a new phase,with the burgeoning proliferation of abandoned mines posing a persistent issue.Addressing the challenges and opportunities presented by these abandoned mines,this paper advocates for a scientific approach centered on the advancement of pumped storage energy alongside gas-oil complementary energy.Leveraging abandoned mine tunnels to establish pumped storage power stations holds significant ecological and economic importance for repurposing these sites.This initiative not only serves as an effective means to restore the ecological balance in mining regions but also provides an environmentally friendly approach to repurposing abandoned mine tunnels,offering a blueprint for economically viable pumped storage power stations.This article delineates five crucial scientific considerations and outlines seven primary models for the utilization of abandoned mine sites,delineating a novel,comprehensive pathway for energy and power development that emphasizes multi-energy complementarity and synergistic optimization within abandoned mines.
基金Project(52204101)supported by the National Natural Science Foundation of ChinaProject(ZR2022QE137)supported by the Natural Science Foundation of Shandong Province,ChinaProject(SKLGDUEK2023)supported by the Open Project of State Key Laboratory for Geomechanics and Deep Underground Engineering in China University of Mining&Technology,Beijing,China。
文摘During the construction and operation of the abandoned mine pumped storage power station,the underground space surrounding rock body faces the complex stress environment under the action of mining disturbance,frequent pumping,water storage and other dynamic disturbances.The stability of the abandoned mine surrounding rock body is the basis for guaranteeing the safety and effectiveness of water storage in the underground space of the abandoned mine.By considering the two main factors of different stress levels and disturbance amplitudes,the mechanical properties,damage characteristics and acoustic emission characteristics of the abandoned mine perimeter rock body under dynamic disturbance were investigated using a creep-disturbed dynamic impact loading system.The experimental results show that:1)The stress level is considered to be the major contributing factor of the failure of muddy sandstone,followed by the amplitude of the disturbances;2)The time required for the destruction of muddy sandstone decreases with the increase of amplitude.When the stress level is 80%,the sandstone specimens have a decreasing number of cycles as the disturbance amplitude increases.The disturbance amplitude is sequentially increased from 4 MPa to 5,6,7,and 8 MPa,the number of cycles required for specimen destruction decreases significantly by 96.71%,99.13%,99.60%,and 99.93%,respectively;3)Disturbance amplitude and stress level have a significant effect on muddy sandstone damage and damage occurs only after a certain threshold is reached.With the increase of stress level and disturbance amplitude,the macroscopic damage of muddy sandstone is mainly conical,with obvious flake spalling and poor damage integrity;4)According to the time-dependent changes in AE energy and ringing counts,the acoustic emission activity during the failure process could be divided into three phases,namely,weakening period,smooth period,and surge period,corresponding to the compaction phase,elastic rise phase and post-peak damage phase.The research results are of reference significance for the damage evolution analysis of muddy sandstone under dynamic disturbance and the safety and stability of abandoned mine perimeter rock body.
基金funded by the BeijingNatural Science Foundation of China(8222003)National Natural Science Foundation of China(41807180).
文摘Based on global initiatives such as the clean energy transition and the development of renewable energy,the pumped storage power station has become a new and significant way of energy storage and regulation,and its construction environment is more complex than that of a traditional reservoir.In particular,the stability of the rock strata in the underground reservoirs is affected by the seepage pressure and rock stress,which presents some challenges in achieving engineering safety and stability.Using the advantages of the numerical simulation method in dealing deal with nonlinear problems in engineering stability,in this study,the stability of the underground reservoir of the Shidangshan(SDS)pumped storage power station was numerically calculated and quantitatively analyzed based on fluid-structure coupling theory,providing an important reference for the safe operation and management of the underground reservoir.First,using the COMSOL software,a suitablemechanicalmodel was created in accordance with the geological structure and project characteristics of the underground reservoir.Next,the characteristics of the stress field,displacement field,and seepage field after excavation of the underground reservoir were simulated in light of the seepage effect of groundwater on the nearby rock of the underground reservoir.Finally,based on the construction specifications and Molar-Coulomb criterion,a thorough evaluation of the stability of the underground reservoir was performed through simulation of the filling and discharge conditions and anti-seepage strengthening measures.The findings demonstrate that the numerical simulation results have a certain level of reliability and are in accordance with the stress measured in the project area.The underground reservoir excavation resulted in a maximum displacement value of the rock mass around the caverns of 3.56 mm in a typical section,and the safety coefficient of the parts,as determined using the Molar-Coulomb criterion,was higher than 1,indicating that the project as a whole is in a stable state.
基金Supported by the National Key R&D Program of China(Nos.2017YFB0903700,2017YFB0903702)。
文摘Seawater pumped storage systems have bright prospect for energy storage in the coming years.The operational conditions of seawater pumped storage system are complex and harsh,where metal materials suff er from severe general and local corrosion.The corrosion behavior of Q235B carbon steel in simulated seawater pumped storage system under operational conditions was studied by potentiodynamic polarization,cyclic potentiodynamic polarization,and scanning electron microscope(SEM).The results confi rm that the working pressure aff ected the corrosion resistance of Q235B carbon steel during the whole immersion period.The pressure promoted the electrochemical reaction of corrosion process and the corrosion rate increased with pressure at the initial immersion period.However,the stable rust layer formed after longtime immersion at diff erent pressures increased the corrosion resistance of carbon steel,and decreased the corrosion degree of carbon steel.Meanwhile,the working pressure aff ected the pitting corrosion behavior of Q235B carbon steel during the whole immersion period.The pitting corrosion potential was more negative and the tendency of pitting corrosion was higher at 4 MPa during the whole immersion period.However,pressure also accelerated the formation rate of protective rust layer on the steel surface.Q235B carbon steel has higher susceptibility to pitting corrosion at 4 MPa in the static seawater.
基金the output of a research project (Title: Application of Doubly Fed Asynchronous machine in Pumped Storage Hydropower Plant in Generate Mode, supported by Islamic Azad University South Tehran Branch)
文摘Variable speed pumped storage machines are used extensively in wind power plant and pumped storage power plant. This paper presents direct torque and flux control(DTFC) of a variable speed pumped storage power plant(VSPSP). By this method both torque and flux have been applied to control the VSPSP. The comparison between VSPSP's control strategies is studied. At the first, a wind turbine with the capacity 2.2 k W and DTFC control strategies simulated then a 250 MW VSPSP is simulated with all of its parts(including electrical, mechanical, hydraulic and its control system) by MATLAB software. In all of simulations, both converters including two-level voltage source converter(2LVSC) and three-level voltage source converter(3LVSC) are applied. The results of applying 2LVSC and 3LVSC are the rapid dynamic responses with better efficiency, reducing the total harmonic distortion(THD) and ripple of rotor torque and flux.
文摘Usually the water head of the pumped storage hydro-plant is high, generally up to 400-500 m, therefore the rock mass under the high-pressure bifurcation pipe have to bear as high as millions Pascal water pressure, in according with the requirements of high water head pumped storage hydro-plant should be 1.2 times of the water head special high-pressure packer permeability test compared with normal to test the permeability of rock and rock cleavage pressure value. The test results on the choice of design options often play a decisive role. Based on the engineering practice, the authors studied the drillhole high-pressure packer permeability test in the pumped storage hydro-plant's underground powerhouse, by the analysis of test results, this article offers a demonstration of the deformation of rock fracture witch under building in the condition of high-pressure water head, it provides a more detailed engineering geological background.
基金National Natural Science Foundation of China(No.61663019)
文摘To solve the severe problem of wind power curtailment in the winter heating period caused by "power determined by heat" operation constraint of cogeneration units, this paper analyzes thermoelectric load, wind power output distribution and fluctuation characteristics at different time scales, and finally proposes a two level coordinated control strategy based on electric heat storage and pumped storage. The optimization target of the first level coordinated control is the lowest operation cost and the largest wind power utilization rate. Based on prediction of thermoelectric load and wind power, the operation economy of the system and wind power accommodation level are improved with the cooperation of electric heat storage and pumped storage in regulation capacity. The second level coordinated control stabilizes wind power real time fluctuations by cooperating electric heat storage and pumped storage in control speed. The example results of actual wind farms in Jiuquan, Gansu verifies the feasibility and effectiveness of the proposed coordinated control strategy.
基金This research was funded by Dongfang Electric Machinery Co., Ltd.
文摘The shrink fit retaining ring is currently the easiest to install and the most widely used end fixed for structure AC excitation variable speed generator-motor rotor end windings.However,the current research on the effect of high strength sealing on the ventilation and heat dissipation performance of the end is not enough.In this paper,based on the actual structural parameters and periodic symmetry simplification,the three-dimensional coupled calculation model of fluid field and temperature field is established.After solving the fluid and thermal equations,the influence of the length of rotor support block,the height of rotor support block,and the number of rotor support block on the fluid flow and temperature distribution in the rotor end region of generator-motor is studied using the finite volume method.The rheological characteristics of the air in the rotor domain,such as velocity and inter-winding flow,are analyzed.The law of temperature variation with local structure in the computational domain is studied.The variation law of cooling medium performance inside the large variable speed power generator motor is revealed.
文摘In this paper, a method of stabilizing electric power by a system which is a combination of wind power generation and pumped storage power generation is proposed. The system operates based on the output predicted value of the windfarm. When the measured windfarm output is larger than the predicted value, the system is pumping up water with surplus power. When the windfarm output is smaller than the predicted value, the system is filling up lack power by hydro generator. Also, since hydro generator works with a start-up delay time, output shortage occurs at this time. To improve output shortage at the time, we estimate the time below the predicted value by a statistical model. As the result, the system succeeded in stabilizing the power and improving the start-up delay time of the hydro generator.
文摘The electric energy which is generated by wind power plants depends on the wind speed and exceeds with strong permissible wind speed the electric energy requirements of the country. In order not to reduce this electrical energy, it must be stored. The sensible energy storage is currently the pumped storage power plants. As the mountain ranges for conventional pumped storage power plants with drop heights of H 〉 600 m are strictly limited, the development of low potential pumped storage power plants has begun. Increasing the capacity of pumped storage power plants with regard to the wind power plants is urgently needed. In this paper, it is shown using the example of an unneeded port facility, how a port facility can be used after low conversion as a test facility for low potential pumped storage power plants and at the same time for the testing of hydro-kinetic turbines. This type of pump storage power plants does not save the energy due to large drop heights, but primarily due to the large volume flow of water.
文摘The demand for renewable energy technologies is increasing globally.With the rapid depletion of fossil fuels and the growing awareness of their harmful impacts on the environment and climate,there is an urgent need to focus on developing renewable resources.However,a significant challenge with renewable energy is its variability due to factors like weather and time of day.This causes the amount of generated power to vary drastically in unfavorable situations,making the design of effective storage technologies a high priority.The primary role of these structures is to store excess energy and release it later at peak shaving.Among various available storage methods,pumped hydro storage systems are prominent,particularly for bulk energy storage.Owing to the complexity of the site selection process for these structures,developing and arranging key site selection indicators based on precise location criteria is critical.In the present case study in Tehran Province,Iran,seven suitability indicators based on 24 location criteria were defined to optimize the site selection process for hydro-pumped storage systems.Each index includes a specific number of site selection sub-criteria.To prioritize the criteria,the Fuzzy Analytic Hierarchy Process method and surveys from five experts were applied to determine the final weights.Using this method,several suitable locations with different varieties were identified throughout the Tehran Province,Iran.
基金supported by the Economic and Technical Research Institute of State Grid Inner Mongolia Eastern Electric Power Co.,Ltd.(Research on the Benefit Mechanism of Source,Grid,Load,and Storage Multi-body Cooperative Outward Transmission of Large New Energy Base in Desert,Gobi,and Arakan,no.526606230001).
文摘With the gradual increase in the penetration rate of renewable energy,the multifunctional role of pumped storage is becoming increasingly prominent,and the joint operation of“renewable energy+pumped storage”is a current research hotspot.However,during the joint system operation,there are dual risks from internal(renewable energy output)and external(market prices)factors,which significantly impact the system’s overall revenue.Therefore,an analysis is conducted around the operational mechanism of the“wind power–pumped storage”joint operation,and the uncertain factors faced during the system’s operation are identified.Second,an optimization model for wind power–pumped storage under deterministic scenarios is constructed,employing robust optimization theory and information gap decision theory to describe the uncertainty of electricity prices and wind power,thus forming a hybrid of the information gap decision theory and the robust optimization model for wind power–pumped storage.Finally,the results show that:(1)The total revenue of the model proposed in the paper has increased by 2.36%compared to the robust optimization model and by 9.04%compared to the deterministic model,significantly enhancing the model’s robustness and risk resistance capabilities.(2)From the perspective of the economic feasibility of different energy storage system configurations,the wind plant equipped with pumped storage has the highest economic feasibility,with an internal rate of return of 9.8%and net present value of 872 million ChineseYuan,which is higher than that of compressed air energy storage and electrochemical energy storage systems.(3)Decision makers can set the risk deviation coefficient and the uncertainty budget according to their risk preferences,thereby changing the robustness of the model for differentiated decision making.However,an increase in the uncertainty budget coefficient will cause the total revenue of the joint operation system first to increase and then decrease,with the maximum revenue achievable within the range of 500–625;the total revenue reaches its maximum when the risk deviation coefficient is between 0.1 and 0.125.
基金Supported by the Innovation Project of the China Southern Power Grid Co.,Ltd.(020000KK52210005).
文摘With the establishment of “carbon peaking and carbon neutrality” goals in China, along with the development of new power systems and ongoing electricity market reforms, pumped-storage power stations (PSPSs) will increasingly play a significant role in power systems. Therefore, this study focuses on trading and bidding strategies for PSPSs in the electricity market. Firstly, a comprehensive framework for PSPSs participating in the electricity energy and frequency regulation (FR) ancillary service market is proposed. Subsequently, a two-layer trading model is developed to achieve joint clearing in the energy and frequency regulation markets. The upper-layer model aims to maximize the revenue of the power station by optimizing the bidding strategies using a Q-learning algorithm. The lower-layer model minimized the total electricity purchasing cost of the system. Finally, the proposed bi-level trading model is validated by studying an actual case in which data are obtained from a provincial power system in China. The results indicate that through this decision-making method, PSPSs can achieve higher economic revenue in the market, which will provide a reference for the planning and operation of PSPSs.