期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
PROXY-BASED PATCHING STREAM TRANSMISSION STRATEGY IN MOBILE STREAMING MEDIA SYSTEM
1
作者 Liao Jianxin Lei Zhengxiong Ma Xutao Zhu Xiaomin 《Journal of Electronics(China)》 2006年第4期515-519,共5页
A mobile transmission strategy, PMPatching (Proxy-based Mobile Patching) transmission strat-egy is proposed, it applies to the proxy-based mobile streaming media system in Wideband Code Division Multiple Access (WCDMA... A mobile transmission strategy, PMPatching (Proxy-based Mobile Patching) transmission strat-egy is proposed, it applies to the proxy-based mobile streaming media system in Wideband Code Division Multiple Access (WCDMA) network. Performance of the whole system can be improved by using patching stream to transmit anterior part of the suffix that had been played back, and by batching all the demands for the suffix arrived in prefix period and patching stream transmission threshold period. Experimental results show that this strategy can efficiently reduce average network transmission cost and number of channels consumed in central streaming media server. 展开更多
关键词 Mobile streaming media system proxy-based Mobile Patching (PMPatching) transmission strategy Patching stream Batching
在线阅读 下载PDF
Methodology and Assessment of Proxy-Based Vs30 Estimation in Sichuan Province, China 被引量:1
2
作者 Wen Wu Jifu Liu +1 位作者 Lanlan Guo Zhifei Deng 《International Journal of Disaster Risk Science》 SCIE CSCD 2020年第1期133-144,共12页
Although time-averaged shear wave velocity to the depth of 30 m(Vs30) is an important indicator of earthquake site effects, it is difficult to obtain. Several proxies have been used either individually or in combinati... Although time-averaged shear wave velocity to the depth of 30 m(Vs30) is an important indicator of earthquake site effects, it is difficult to obtain. Several proxies have been used either individually or in combination to infer Vs30 values during seismic hazard estimation under limited observational conditions. Sichuan Province is an area highly prone to earthquakes. Complex geological structures and lack of drilling sites mean that it is particularly important to establish a suitable approach for the estimation of Vs30 values for site classification. This study compared the application of three proxy-based approaches—geology-based, topographic slope-based, and terrain-based—to the estimation of Vs30 values in Sichuan Province. The results revealed that the residual between the measured logVs30 values and the estimations derived from the terrain-based approach was smallest, indicating best predictability. Stability analysis of the three approaches also showed that the terrain-based approach performed best. However, its performance in the plain area was poor,that is, the Vs30 values were mostly underestimated. This might indicate that the old strata, hard rock, and alluvial deposits formed by Quaternary glacier sediments were not identified appropriately in the plain area, highlighting the need for localized corrections. 展开更多
关键词 China Earthquake site effects proxy-based Vs30estimation SICHUAN PROVINCE
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部