Created a new damage model for explosive for LS-DYNA3D,taking advantageof the Taylor method aimed at the high gassy and low permeability coal seam,and numericallysimulated and analyzed the deep-hole presplitting explo...Created a new damage model for explosive for LS-DYNA3D,taking advantageof the Taylor method aimed at the high gassy and low permeability coal seam,and numericallysimulated and analyzed the deep-hole presplitting explosion.The entire processof explosion was represented,including cracks caused by dynamic pressure,transmissionand vibration superposition of stress waves,as well as cracks growth driven by gas generatedby explosion.The influence of the cracks generated in the process of explosion andthe performance of improving permeability caused by the difference of interval between.explosive holes were analyzed.A reasonable interval between explosive holes of deepholepresplitting explosions in high gassy and low permeability coal seams was proposed,and the resolution of gas drainage in high gassy and low permeability coal seam was putforward.展开更多
Controlled blasting techniques are used to control overbreak and to aid in the stability of the remaining rock formation. Presplitting is one of the most common methods which is used in many open pit mining and surfac...Controlled blasting techniques are used to control overbreak and to aid in the stability of the remaining rock formation. Presplitting is one of the most common methods which is used in many open pit mining and surface blast design. The purpose of presplitting is to form a fracture plane across which the radial cracks from the production blast cannot travel. The purpose of this study is to investigate of effect of presplitting on the generation of a smooth wall in continuum and jointed rock mass. The 2D distinct element code was used to simulate the presplitting in a rock slope. The blast load history as a function of time was applied to the inner wall of each blasthole. Important parameters that were considered in the analysis were stress tensor and fracturing pattern. The blast loading magnitude and blasthole spacing and jointing pattern were found to be very significant in the final results.展开更多
针对A矿井下煤炭采出率低的不足,以2101综采面为改善对象提出了采用无煤柱开采技术。为了保证无煤柱开采技术的顺利实施,引进UDEC(Universal Distinct Element Code,通用离散单元法程序)仿真分析技术对聚能预裂爆破关键参数进行了分析,...针对A矿井下煤炭采出率低的不足,以2101综采面为改善对象提出了采用无煤柱开采技术。为了保证无煤柱开采技术的顺利实施,引进UDEC(Universal Distinct Element Code,通用离散单元法程序)仿真分析技术对聚能预裂爆破关键参数进行了分析,确定了最佳切顶高度和切缝角度,为无煤柱开采技术的顺利实施奠定了基础。展开更多
基金Supported by the National Science Foundation of China(50534090,2007BAK28B01,2007BAK29B06)the Science Foundation of Anhui Province(050440403)Creative Team Plan for High School of Anhui(2006KJ005TD)
文摘Created a new damage model for explosive for LS-DYNA3D,taking advantageof the Taylor method aimed at the high gassy and low permeability coal seam,and numericallysimulated and analyzed the deep-hole presplitting explosion.The entire processof explosion was represented,including cracks caused by dynamic pressure,transmissionand vibration superposition of stress waves,as well as cracks growth driven by gas generatedby explosion.The influence of the cracks generated in the process of explosion andthe performance of improving permeability caused by the difference of interval between.explosive holes were analyzed.A reasonable interval between explosive holes of deepholepresplitting explosions in high gassy and low permeability coal seams was proposed,and the resolution of gas drainage in high gassy and low permeability coal seam was putforward.
文摘Controlled blasting techniques are used to control overbreak and to aid in the stability of the remaining rock formation. Presplitting is one of the most common methods which is used in many open pit mining and surface blast design. The purpose of presplitting is to form a fracture plane across which the radial cracks from the production blast cannot travel. The purpose of this study is to investigate of effect of presplitting on the generation of a smooth wall in continuum and jointed rock mass. The 2D distinct element code was used to simulate the presplitting in a rock slope. The blast load history as a function of time was applied to the inner wall of each blasthole. Important parameters that were considered in the analysis were stress tensor and fracturing pattern. The blast loading magnitude and blasthole spacing and jointing pattern were found to be very significant in the final results.
文摘针对A矿井下煤炭采出率低的不足,以2101综采面为改善对象提出了采用无煤柱开采技术。为了保证无煤柱开采技术的顺利实施,引进UDEC(Universal Distinct Element Code,通用离散单元法程序)仿真分析技术对聚能预裂爆破关键参数进行了分析,确定了最佳切顶高度和切缝角度,为无煤柱开采技术的顺利实施奠定了基础。