This paper introduces how Longyuan Power Group Company successfully carried out foreign debt financing for Jiangsu's power projects through its overseas financing window-Xiongya (Virgin) Co. Ltd. The entire proces...This paper introduces how Longyuan Power Group Company successfully carried out foreign debt financing for Jiangsu's power projects through its overseas financing window-Xiongya (Virgin) Co. Ltd. The entire process of raising funds is revealed with regard to employment of foreign debt financing, selection of funded projects, preparation of project and financing documents, credit rating, roadshow, line of credit, and financing experiences.展开更多
The construction of wind power project is conducive to saving energy,reducing emissions and regulating energy structure. But it inevitably causes some impacts on the environment in the construction process. Because th...The construction of wind power project is conducive to saving energy,reducing emissions and regulating energy structure. But it inevitably causes some impacts on the environment in the construction process. Because that the height of wind power generator generally exceeds 100 m,and visual range in plain region is farther,it is necessary to scientifically and rationally evaluate and analyze landscape visual environment impact of wind power generator in plain region. One wind power farm project of Zhanjiang is located in typical plain region of Guangdong coast. Referring to traditional analytic method of landscape visual impact and comparing with actual situation for the same kind of project in the region,results show that it is " extremely sensitive" area at 0- 2. 5 km from wind power generator, " very sensitive" area at 2. 5- 5. 0 km, " sensitive" area at 5- 10 km, "generally sensitive" area at 10- 20 km,and non-sensitive area outside 20 km.展开更多
Two agreements to provide guarantees and insurance for an $80-million export buyers’ credit to a Pakistani thermal power project were signed on August in Beijing. The agreements were reached between the People’s Ins...Two agreements to provide guarantees and insurance for an $80-million export buyers’ credit to a Pakistani thermal power project were signed on August in Beijing. The agreements were reached between the People’s Insurance (Property) Co Ltd (PICC Property), Bank of China and the Harbin Power Engineering Co Ltd. The UCH power project of Pakistan, which will cost $630 million and have a 586 MW capacity, is one of Pakistan’s first batch of non-governmental power projects. It will be built in Pakistan by the General Electric International Operations Co Inc of the United States and the Harbin Power Engineering Co Ltd. The US firm展开更多
On April 25, the Hainan Changjiang nuclear power project, jointly invested by China National Nuclear Corporation (CNNC) and China Huaneng Group with 51% and 49% shares, respectively, formally
At the end of September, the approach way and linkage roads of Pengze Nuclear Power Project, a project developed by China Power Investment Corporation in Jiangxi Province, were all linked up, laying a solid foundation...At the end of September, the approach way and linkage roads of Pengze Nuclear Power Project, a project developed by China Power Investment Corporation in Jiangxi Province, were all linked up, laying a solid foundation for the construction of the project.展开更多
The general contracts of Fuqing and Fangjiashannuclear power projects affiliated to CNNC were signedon April 30th. It is the first time for CNNC to developnuclear power projects by EPC contracts includingdesign, purch...The general contracts of Fuqing and Fangjiashannuclear power projects affiliated to CNNC were signedon April 30th. It is the first time for CNNC to developnuclear power projects by EPC contracts includingdesign, purchasing and construction.Fuqing nuclear power project is located in展开更多
At present, China's demand for various energy sources is gradually increasing, and the demand for various conventional energy sources is gradually showing an upward trend. However, due to the limited resources, th...At present, China's demand for various energy sources is gradually increasing, and the demand for various conventional energy sources is gradually showing an upward trend. However, due to the limited resources, the development of sustainable energy sources will become an inevitable trend in the future market development. The establishment and improvement of wind power projects is more to effectively improve the development of energy. However, in the actual operation process, the wind power project itself has a relatively large impact on the environment, especially for some nature reserves, the ecological impact is particularly prominent. Therefore, as a research manager, it is necessary to deeply analyze and evaluate the direct impact of the wind power project on the ecological environment of the nature reserve under the existing working conditions. Based on the current evaluation model, this paper puts forward targeted measures to mitigate compensation, in order to speed up the transformation and optimization of working methods, realize the innovation of management methods, mitigate environmental conflicts, and increase the promotion and use of new energy sources. It also lays a solid foundation for the later development of market economy.展开更多
Nuclear power project is one of the important development projects in China and in the process of the project, reasonable schedule control is very important. With the change of China's economic system, the contrac...Nuclear power project is one of the important development projects in China and in the process of the project, reasonable schedule control is very important. With the change of China's economic system, the contract mode of the project has also changed. In order to guarantee the process of development of nuclear power project goes well, the country's nuclear power project in the new EPC contract mode, the following based on the brief analysis of EPC contract mode, to explore how nuclear power project in EPC mode to ensure the progress control, thereby reducing the problem in the process of nuclear power project, and promote the development of the process of nuclear power project in China, perfecting the deficiencies in the progress control of nuclear power project under EPC mode.展开更多
The quality management of overseas power projects, because it involves contract requirements, local regulations, standards, language communication and other aspects, has an important impact on the success or failure o...The quality management of overseas power projects, because it involves contract requirements, local regulations, standards, language communication and other aspects, has an important impact on the success or failure of the project. In the quality management of overseas power projects, the introduction of international third-party quality engineers will get twice the result with half the effort. This is mainly because we can quickly find quality engineers who are familiar with the power project process, have outstanding professional technology, and have strong English communication skills, and can deal with and solve quality problems in a timely manner.展开更多
文摘This paper introduces how Longyuan Power Group Company successfully carried out foreign debt financing for Jiangsu's power projects through its overseas financing window-Xiongya (Virgin) Co. Ltd. The entire process of raising funds is revealed with regard to employment of foreign debt financing, selection of funded projects, preparation of project and financing documents, credit rating, roadshow, line of credit, and financing experiences.
文摘The construction of wind power project is conducive to saving energy,reducing emissions and regulating energy structure. But it inevitably causes some impacts on the environment in the construction process. Because that the height of wind power generator generally exceeds 100 m,and visual range in plain region is farther,it is necessary to scientifically and rationally evaluate and analyze landscape visual environment impact of wind power generator in plain region. One wind power farm project of Zhanjiang is located in typical plain region of Guangdong coast. Referring to traditional analytic method of landscape visual impact and comparing with actual situation for the same kind of project in the region,results show that it is " extremely sensitive" area at 0- 2. 5 km from wind power generator, " very sensitive" area at 2. 5- 5. 0 km, " sensitive" area at 5- 10 km, "generally sensitive" area at 10- 20 km,and non-sensitive area outside 20 km.
文摘Two agreements to provide guarantees and insurance for an $80-million export buyers’ credit to a Pakistani thermal power project were signed on August in Beijing. The agreements were reached between the People’s Insurance (Property) Co Ltd (PICC Property), Bank of China and the Harbin Power Engineering Co Ltd. The UCH power project of Pakistan, which will cost $630 million and have a 586 MW capacity, is one of Pakistan’s first batch of non-governmental power projects. It will be built in Pakistan by the General Electric International Operations Co Inc of the United States and the Harbin Power Engineering Co Ltd. The US firm
文摘On April 25, the Hainan Changjiang nuclear power project, jointly invested by China National Nuclear Corporation (CNNC) and China Huaneng Group with 51% and 49% shares, respectively, formally
文摘At the end of September, the approach way and linkage roads of Pengze Nuclear Power Project, a project developed by China Power Investment Corporation in Jiangxi Province, were all linked up, laying a solid foundation for the construction of the project.
文摘The general contracts of Fuqing and Fangjiashannuclear power projects affiliated to CNNC were signedon April 30th. It is the first time for CNNC to developnuclear power projects by EPC contracts includingdesign, purchasing and construction.Fuqing nuclear power project is located in
文摘At present, China's demand for various energy sources is gradually increasing, and the demand for various conventional energy sources is gradually showing an upward trend. However, due to the limited resources, the development of sustainable energy sources will become an inevitable trend in the future market development. The establishment and improvement of wind power projects is more to effectively improve the development of energy. However, in the actual operation process, the wind power project itself has a relatively large impact on the environment, especially for some nature reserves, the ecological impact is particularly prominent. Therefore, as a research manager, it is necessary to deeply analyze and evaluate the direct impact of the wind power project on the ecological environment of the nature reserve under the existing working conditions. Based on the current evaluation model, this paper puts forward targeted measures to mitigate compensation, in order to speed up the transformation and optimization of working methods, realize the innovation of management methods, mitigate environmental conflicts, and increase the promotion and use of new energy sources. It also lays a solid foundation for the later development of market economy.
文摘Nuclear power project is one of the important development projects in China and in the process of the project, reasonable schedule control is very important. With the change of China's economic system, the contract mode of the project has also changed. In order to guarantee the process of development of nuclear power project goes well, the country's nuclear power project in the new EPC contract mode, the following based on the brief analysis of EPC contract mode, to explore how nuclear power project in EPC mode to ensure the progress control, thereby reducing the problem in the process of nuclear power project, and promote the development of the process of nuclear power project in China, perfecting the deficiencies in the progress control of nuclear power project under EPC mode.
文摘The quality management of overseas power projects, because it involves contract requirements, local regulations, standards, language communication and other aspects, has an important impact on the success or failure of the project. In the quality management of overseas power projects, the introduction of international third-party quality engineers will get twice the result with half the effort. This is mainly because we can quickly find quality engineers who are familiar with the power project process, have outstanding professional technology, and have strong English communication skills, and can deal with and solve quality problems in a timely manner.