Energy supply is one of the most critical challenges of wireless sensor networks(WSNs)and industrial wireless sensor networks(IWSNs).While research on coverage optimization problem(COP)centers on the network’s monito...Energy supply is one of the most critical challenges of wireless sensor networks(WSNs)and industrial wireless sensor networks(IWSNs).While research on coverage optimization problem(COP)centers on the network’s monitoring coverage,this research focuses on the power banks’energy supply coverage.The study of 2-D and 3-D spaces is typical in IWSN,with the realistic environment being more complex with obstacles(i.e.,machines).A 3-D surface is the field of interest(FOI)in this work with the established hybrid power bank deployment model for the energy supply COP optimization of IWSN.The hybrid power bank deployment model is highly adaptive and flexible for new or existing plants already using the IWSN system.The model improves the power supply to a more considerable extent with the least number of power bank deployments.The main innovation in this work is the utilization of a more practical surface model with obstacles and training while improving the convergence speed and quality of the heuristic algorithm.An overall probabilistic coverage rate analysis of every point on the FOI is provided,not limiting the scope to target points or areas.Bresenham’s algorithm is extended from 2-D to 3-D surface to enhance the probabilistic covering model for coverage measurement.A dynamic search strategy(DSS)is proposed to modify the artificial bee colony(ABC)and balance the exploration and exploitation ability for better convergence toward eliminating NP-hard deployment problems.Further,the cellular automata(CA)is utilized to enhance the convergence speed.The case study based on two typical FOI in the IWSN shows that the CA scheme effectively speeds up the optimization process.Comparative experiments are conducted on four benchmark functions to validate the effectiveness of the proposed method.The experimental results show that the proposed algorithm outperforms the ABC and gbest-guided ABC(GABC)algorithms.The results show that the proposed energy coverage optimization method based on the hybrid power bank deployment model generates more accurate results than the results obtained by similar algorithms(i.e.,ABC,GABC).The proposed model is,therefore,effective and efficient for optimization in the IWSN.展开更多
Starting June 28,passengers on Chinese domestic flights face stricter power bank regulations.The Civil Aviation Administration of China now bans power banks without valid 3C certification(China5s mandatory safety stan...Starting June 28,passengers on Chinese domestic flights face stricter power bank regulations.The Civil Aviation Administration of China now bans power banks without valid 3C certification(China5s mandatory safety standard)or those recalled for safety defects-a move triggered by rising incidents of lithium-ion battery fires and smoke emissions mid-flight.展开更多
The main purpose of the electrical power system is to transport and distribute energy generated by the central power plants in a safe and reliable manner to the customer premises. Most of the electrical equipment is e...The main purpose of the electrical power system is to transport and distribute energy generated by the central power plants in a safe and reliable manner to the customer premises. Most of the electrical equipment is exposed within the open which suggests they can be vulnerable to lightning strikes, road dwindling, windstorms, and a few engineering activities with the potential of causing different degrees of damage to the electrical equipment. One of the ways to guard the equipment is to deploy switching devices. However, the operations of most of these switching devices produce oscillatory transient in the electrical transmission and distribution systems which result in voltage, current, and frequency fluctuations in the load. This paper investigates the effect of switching devices on power quality and proposes a positive sequence voltage power transient suppression technique that can spontaneously improve the distorted voltage at the instant of capacitor switching using the capacitor line model as a case study. MATLAB/Simulink software was utilized for the analysis on an electrical network model with bus voltages of 69 kV/12.47 kV and 480 V. The results showed that, during switching operations, the positive sequence voltage power detector block produces ripple-free accurate results.展开更多
随着移动设备对高功率、高效率充电需求的不断增长,通用串行总线功率传输(Universal Serial Bus Power Delivery,USB PD)协议逐渐成为移动电源设计的核心标准。简要论述USB PD协议,研究磁吸充电技术、Buck-Boost工作模式及保护电路模块...随着移动设备对高功率、高效率充电需求的不断增长,通用串行总线功率传输(Universal Serial Bus Power Delivery,USB PD)协议逐渐成为移动电源设计的核心标准。简要论述USB PD协议,研究磁吸充电技术、Buck-Boost工作模式及保护电路模块的优化设计,提出磁吸移动电源优化方案,旨在为磁吸移动电源的标准化与高效设计提供技术参考。展开更多
DC/AC converters are very important components that have to be chosen efficiently for each type of power station. In this article, we present in details, a comparison between three different architectures of multileve...DC/AC converters are very important components that have to be chosen efficiently for each type of power station. In this article, we present in details, a comparison between three different architectures of multilevel inverters, the flying capacitor multilevel inverter (FCMLI), the diode clamped multilevel inverter (DCMLI), and the cascaded H-bridge multilevel inverter (CHMLI). Thus the comparison is focused on the output voltage quality, the complexity of the power circuits, the cost of implementation, and the influence on a power bank inside the renewable power station. We also investigate trough simulation the efficient number of levels and suitable characteristics for the CHMLI that showed the most promising performance. The study uses Matlab Simulink platform as a tool of simulation, and aim to choose the most qualified inverter, for a potential insertion on a hybrid renewable energy platform (wind-solar). In all the simulations we use the same PWM control type (SPWM).展开更多
Many industrial installations in developing countries start-up as small factories, without regard for the need of compensation of reactive power, leading to significant financial losses in the long term. By improving ...Many industrial installations in developing countries start-up as small factories, without regard for the need of compensation of reactive power, leading to significant financial losses in the long term. By improving the power factor, the customer can reduce its power demand and potentially increase efficiency of their equipment. A PIC microcontroller is used to switch capacitor banks to compensate for the reactive power. In order to determine the size of the capacitor bank needed, the microcontroller calculates the phase difference between the voltage and the current. The results obtained based on the lagging power factor for three test loads show an improvement in the power factor from 0.52 to 0.96 under different test load conditions.展开更多
文摘Energy supply is one of the most critical challenges of wireless sensor networks(WSNs)and industrial wireless sensor networks(IWSNs).While research on coverage optimization problem(COP)centers on the network’s monitoring coverage,this research focuses on the power banks’energy supply coverage.The study of 2-D and 3-D spaces is typical in IWSN,with the realistic environment being more complex with obstacles(i.e.,machines).A 3-D surface is the field of interest(FOI)in this work with the established hybrid power bank deployment model for the energy supply COP optimization of IWSN.The hybrid power bank deployment model is highly adaptive and flexible for new or existing plants already using the IWSN system.The model improves the power supply to a more considerable extent with the least number of power bank deployments.The main innovation in this work is the utilization of a more practical surface model with obstacles and training while improving the convergence speed and quality of the heuristic algorithm.An overall probabilistic coverage rate analysis of every point on the FOI is provided,not limiting the scope to target points or areas.Bresenham’s algorithm is extended from 2-D to 3-D surface to enhance the probabilistic covering model for coverage measurement.A dynamic search strategy(DSS)is proposed to modify the artificial bee colony(ABC)and balance the exploration and exploitation ability for better convergence toward eliminating NP-hard deployment problems.Further,the cellular automata(CA)is utilized to enhance the convergence speed.The case study based on two typical FOI in the IWSN shows that the CA scheme effectively speeds up the optimization process.Comparative experiments are conducted on four benchmark functions to validate the effectiveness of the proposed method.The experimental results show that the proposed algorithm outperforms the ABC and gbest-guided ABC(GABC)algorithms.The results show that the proposed energy coverage optimization method based on the hybrid power bank deployment model generates more accurate results than the results obtained by similar algorithms(i.e.,ABC,GABC).The proposed model is,therefore,effective and efficient for optimization in the IWSN.
文摘Starting June 28,passengers on Chinese domestic flights face stricter power bank regulations.The Civil Aviation Administration of China now bans power banks without valid 3C certification(China5s mandatory safety standard)or those recalled for safety defects-a move triggered by rising incidents of lithium-ion battery fires and smoke emissions mid-flight.
文摘The main purpose of the electrical power system is to transport and distribute energy generated by the central power plants in a safe and reliable manner to the customer premises. Most of the electrical equipment is exposed within the open which suggests they can be vulnerable to lightning strikes, road dwindling, windstorms, and a few engineering activities with the potential of causing different degrees of damage to the electrical equipment. One of the ways to guard the equipment is to deploy switching devices. However, the operations of most of these switching devices produce oscillatory transient in the electrical transmission and distribution systems which result in voltage, current, and frequency fluctuations in the load. This paper investigates the effect of switching devices on power quality and proposes a positive sequence voltage power transient suppression technique that can spontaneously improve the distorted voltage at the instant of capacitor switching using the capacitor line model as a case study. MATLAB/Simulink software was utilized for the analysis on an electrical network model with bus voltages of 69 kV/12.47 kV and 480 V. The results showed that, during switching operations, the positive sequence voltage power detector block produces ripple-free accurate results.
文摘随着移动设备对高功率、高效率充电需求的不断增长,通用串行总线功率传输(Universal Serial Bus Power Delivery,USB PD)协议逐渐成为移动电源设计的核心标准。简要论述USB PD协议,研究磁吸充电技术、Buck-Boost工作模式及保护电路模块的优化设计,提出磁吸移动电源优化方案,旨在为磁吸移动电源的标准化与高效设计提供技术参考。
文摘DC/AC converters are very important components that have to be chosen efficiently for each type of power station. In this article, we present in details, a comparison between three different architectures of multilevel inverters, the flying capacitor multilevel inverter (FCMLI), the diode clamped multilevel inverter (DCMLI), and the cascaded H-bridge multilevel inverter (CHMLI). Thus the comparison is focused on the output voltage quality, the complexity of the power circuits, the cost of implementation, and the influence on a power bank inside the renewable power station. We also investigate trough simulation the efficient number of levels and suitable characteristics for the CHMLI that showed the most promising performance. The study uses Matlab Simulink platform as a tool of simulation, and aim to choose the most qualified inverter, for a potential insertion on a hybrid renewable energy platform (wind-solar). In all the simulations we use the same PWM control type (SPWM).
文摘Many industrial installations in developing countries start-up as small factories, without regard for the need of compensation of reactive power, leading to significant financial losses in the long term. By improving the power factor, the customer can reduce its power demand and potentially increase efficiency of their equipment. A PIC microcontroller is used to switch capacitor banks to compensate for the reactive power. In order to determine the size of the capacitor bank needed, the microcontroller calculates the phase difference between the voltage and the current. The results obtained based on the lagging power factor for three test loads show an improvement in the power factor from 0.52 to 0.96 under different test load conditions.