Foundation pit excavation engineering is an old subject full of decision making. Yet, it still deserves further research due to the associated high failure cost and the complexity of the geological conditions and/or t...Foundation pit excavation engineering is an old subject full of decision making. Yet, it still deserves further research due to the associated high failure cost and the complexity of the geological conditions and/or the surrounding existing infrastructure around it. This article overviews the risk control practice of foundation pit excavation projects in close proximity to <span style="font-family:Verdana;">existing</span><span style="font-family:Verdana;"> disconnected piled raft. More focus is given to geotechnical aspects. The review begins with achievements to ensure excavation performance </span><span style="font-family:Verdana;">requirements,</span><span style="font-family:Verdana;"> and follows to discuss the complex </span><span style="font-family:Verdana;">soil structure</span><span style="font-family:Verdana;"> interaction involved among the fundamental components</span><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;">: </span></span></span><span><span><span style="font-family:;" "=""><span style="font-family:Verdana;">the retaining wall, mat, piles, cushion, and the soil. After bringing consensus points to practicing engineers and </span><span style="font-family:Verdana;">decision makers</span><span style="font-family:Verdana;">, it then suggests possible future research directions.</span></span></span></span>展开更多
Under the combination of currents and waves, seabed scour occurs around offshore wind turbine foundations, which affects the stability and safe operation of offshore wind turbines. In this study, physical model experi...Under the combination of currents and waves, seabed scour occurs around offshore wind turbine foundations, which affects the stability and safe operation of offshore wind turbines. In this study, physical model experiments under unidirectional flow, bidirectional flow, and wave-current interactions with different flow directions around the pile group foundation were first conducted to investigate the development of scour around the pile group foundation.Additionally, a three-dimensional scour numerical model was established via the open-source software REEF3D to simulate the flow field and scour around the prototype-scale foundation. The impact of flow on scour was discussed.Under unidirectional flow, scour equilibrium was reached more quickly, with the maximum scour depth reaching approximately 1.2 times the pile diameter and the extent of the scour hole spanning about 4.9 times the pile diameter.Compared with those under unidirectional flow, the scour depths under combinations of currents and waves, as well as bidirectional flow, were slightly smaller. However, the morphology of scour holes was more uniform and symmetrical. The numerical simulation results show good agreement with the experimental data, demonstrating the impact of varying flow directions on the velocity distribution around the foundation, the morphology of scour holes, and the location of the maximum scour depth.展开更多
In order to effectively improve the horizontal bearing capacity of pile foundations,this study proposes post-expanded arm grouting technology and associated pile foundations.The horizontal bearing characteristic of th...In order to effectively improve the horizontal bearing capacity of pile foundations,this study proposes post-expanded arm grouting technology and associated pile foundations.The horizontal bearing characteristic of the post-expanded arm grouting pile was explored through model tests.The test results indicate that the post-expanded arm grouting pile can increase the contact area between the pile and soil,and can improve the strength of the soil.The horizontal bearing capacity of the post-expanded arm grouting pile was approximately 3 times that of the conventional pile.It also shows that the larger the plate diameter ratio or grouting volume,the higher the horizontal bearing capacity of the post-expanded arm grouting pile.The maximum bending moment of the post-expanded arm grouting pile was located at the pile plate,and the displacement zero point of the new pile was higher than that of the conventional pile.The soil resistance at the pile plate was significantly higher than that of conventional piles,indicating that the pile plate effectively enhances the soil resistance.The improved p-y curve model and horizontal bearing capacity calculation method for the post-expanded arm grouting pile were proposed by considering the pile plate diameter factor.This method was finally verified by experimental results.The results of this study can provide a reference for calculating the horizontal bearing capacity of the post-expanded arm grouting pile.展开更多
To study the dynamic response rules of pile foundations of mega-bridges over faults in strong seismic areas,a finite element model of the pile foundation-soil-fault interaction of the Haiwen Bridge is established.The ...To study the dynamic response rules of pile foundations of mega-bridges over faults in strong seismic areas,a finite element model of the pile foundation-soil-fault interaction of the Haiwen Bridge is established.The 0.2-0.6 g peak acceleration of the 5010 seismic waves is input to study the effect of the seismic wave of different intensities and the distance changes between the fault and the pile foundation on the dynamic response of the pile body.The results show that the soil layer covering the bedrock amplifies the peak pile acceleration,and the amplifying effect decreases with increasing seismic wave intensity.However,bedrock has less of an effect on peak acceleration.The relative pile displacement shows the mechanical properties of elastic long piles.The pile foundation generates a large bending moment at the bedrock face and the upper soil layer interface,and a large shear force at the pile top and the soft-hard soil body interface.The relative displacement,bending,and shear bearing characteristics of the pile foundations on the upper and lower plates of the fault are significantly different.The deformation characteristics are affected by faults in a region ten times the pile diameter.Analysis of the dynamic p-y curves shows that the soil resistance on the pile side of the lower plate at the same depth is greater than that of the upper plate.Sensitivity of the dynamic response of pile foundations on either side of the fault to the effects of seismic intensity and distance between the pile foundation and the fault:distance l seismic intensity q.展开更多
In recent years,offshore wind turbines have rap-idly developed,and many pile foundations installed earlier are now approaching decommissioning.Thus,the efficient removal of pile foundations has become a critical issue...In recent years,offshore wind turbines have rap-idly developed,and many pile foundations installed earlier are now approaching decommissioning.Thus,the efficient removal of pile foundations has become a critical issue for the sustainable development of offshore wind energy.To ad-dress this issue,this paper systematically investigates three methods for the recovery of pile foundations using physical model experiments:water injection+lifting,air injection+lifting,and air retention+water injection.The experimental results show that the water injection+lifting method exhibits remarkable advantages in recovering large-diameter and in-clined pile foundations;however,realigning inclined piles during recovery remains challenging,and a risk of pile over-turning exists.The air injection+lifting method proves ef-fective for realigning inclined piles but presents a risk of air expulsion failure,which may affect the continuity and stabil-ity of the recovery process.By contrast,the air retention+water injection method combines the characteristics of water injection and air injection techniques,effectively avoiding air expulsion failure and exhibiting pronounced displacement jumps during pile uplift.These findings provide a valuable reference for future decommissioning practices of offshore wind pile foundations,offer important engineering applica-tion value,and contribute positively to the sustainable devel-opment of the offshore wind industry.展开更多
The problems noted in the structures built on wooden foundation piles in a lake environment required various works to strengthen over time.This work mainly consists of the recovery of the foundation mass by micropiles...The problems noted in the structures built on wooden foundation piles in a lake environment required various works to strengthen over time.This work mainly consists of the recovery of the foundation mass by micropiles due to the increase in loads on the structures,or the recovery of the foundation mass by injection,which is carried out when voids form between the ground and the wooden foundation elements.The high cost of foundation reinforcement methods led the National Agency for the Development of Tourist Heritage in Benin(ANPT)to replace the wooden foundation piles with reinforced concrete piles in the implementation of the project“reinventing the lakeside city of Ganvié”.This article presents an artisanal technology for the creation of reinforced concrete foundation piles in a lake environment.On-site examples made it possible to evaluate the performance of this artisanal implementation technique.The installation of these piles is carried out following manual drilling,followed by the installation of reinforcement and the pouring of concrete on site.The implementation of reinforced concrete foundation piles in place of the wooden ones studied in this article only impacted the infrastructure of the homes of the lakeside town of Ganviébut not the superstructure,which preserved the old traditional wooden architecture and thatched roofs.Thus,the ambition to move this city of Ganviéfrom the stage of a lake village to that of a floating city is very successful.This will contribute to improving the environment and living conditions of the populations and will promote economic development through tourism.展开更多
At present,shield tunneling often needs to pass through a large number of bridge pile foundations.However,there are few studies on the influence of shield tunneling on adjacent pile foundations by combining with groun...At present,shield tunneling often needs to pass through a large number of bridge pile foundations.However,there are few studies on the influence of shield tunneling on adjacent pile foundations by combining with groundwater seepage.Based on Winkler model,the calculation equations of shield tunneling on vertical and horizontal displacement of adjacent bridge pile are derived.Meanwhile,full and part three-dimensional finite element models are established to analyze the trend of bridge pier settlement,ground surface settlement trough,vertical and horizontal displacement of the pile and pile stress under three calculation conditions,i.e.,not considering groundwater effect,considering stable groundwater effect and fluid-soil interaction.The results show that the calculated value is small when the effect of groundwater is not considered;the seepage velocity of the soil above the excavation face is faster than that of the surrounding soil under fluid-soil interaction,and after the shield passing,the groundwater on both sides shows a flow trend of“U”shape on the ground surface supplying to the upper part of the tunnel;the vertical displacement of the pile body is bounded by the horizontal position of the top of the tunnel,the upper pile body settles,and the lower pile body deforms upward.The horizontal displacement of pile body presents a continuous“S”shape distribution,causing stress concentration near the tunnel.The calculated results of fluid-soil interaction are in good agreement with the field measured data and accord with the actual situation.展开更多
Based on reasonable assumptions that simplified the calculational model,a simple and practical method was proposed to calculate the post-construction settlement of high-speed railway bridge pile foundation by using th...Based on reasonable assumptions that simplified the calculational model,a simple and practical method was proposed to calculate the post-construction settlement of high-speed railway bridge pile foundation by using the Mesri creep model to describe the soil characteristics and the Mindlin-Geddes method considering pile diameter to calculate the vertical additional stress of pile bottom.A program named CPPS was designed for this method to calculate the post-construction settlement of a high-speed railway bridge pile foundation.The result indicates that the post-construction settlement in 100 years meets the requirements of the engineering specifications,and in the first two decades,the post-construction settlement is about 80% of its total settlement,while the settlement in the rest eighty years tends to be stable.Compared with the measured settlement after laying railway tracks,the calculational result is closed to that of the measured,and the results are conservative with a high computational accuracy.It is noted that the method can be used to calculate the post-construction settlement for the preliminary design of high-speed railway bridge pile foundation.展开更多
Although the load applied to pile foundations is usually a combination of vertical and lateral components,there have been few investigations on the behavior of piles subjected to combined loadings.Those few studies le...Although the load applied to pile foundations is usually a combination of vertical and lateral components,there have been few investigations on the behavior of piles subjected to combined loadings.Those few studies led to inconsistent results with regard to the effects of vertical loads on the lateral response of piles.A series of three-dimensional(3D) finite differences analyses is conducted to evaluate the influence of vertical loads on the lateral performance of pile foundations.Three idealized sandy and clayey soil profiles are considered:a homogeneous soil layer,a layer with modulus proportional to depth,and two-layered strata.The pile material is modeled as linearly elastic,while the soil is idealized using the Mohr-Coulomb constitutive model with a non-associated flow rule.In order to confirm the findings of this study,soils in some cases are further modeled using more sophisticated models(i.e.CYsoil model for sandy soils and modified Cam-Clay(MCC) model for clayey soils).Numerical results showed that the lateral resistance of the piles does not appear to vary considerably with the vertical load in sandy soil especially at the loosest state.However,the presence of a vertical load on a pile embedded in homogeneous or inhomogeneous clay is detrimental to its lateral capacity,and it is unconservative to design piles in clays assuming that there is no interaction between vertical and lateral loads.Moreover,the current results indicate that the effect of vertical loads on the lateral response of piles embedded in twolayered strata depends on the characteristics of soil not only surrounding the piles but also located beneath their tips.展开更多
Geotechnical engineering deals with materials(e.g. soil and rock) that, by their very nature, exhibit varied and uncertain behavior due to the imprecise physical processes associated with the formation of these mate...Geotechnical engineering deals with materials(e.g. soil and rock) that, by their very nature, exhibit varied and uncertain behavior due to the imprecise physical processes associated with the formation of these materials. Modeling the behavior of such materials in geotechnical engineering applications is complex and sometimes beyond the ability of most traditional forms of physically-based engineering methods. Artificial intelligence(AI) is becoming more popular and particularly amenable to modeling the complex behavior of most geotechnical engineering applications because it has demonstrated superior predictive ability compared to traditional methods. This paper provides state-of-the-art review of some selected AI techniques and their applications in pile foundations, and presents the salient features associated with the modeling development of these AI techniques. The paper also discusses the strength and limitations of the selected AI techniques compared to other available modeling approaches.展开更多
Based on the characteristic that the potential sliding surfaces of rock slope are commonly in the shape of either line or fold line,analysis thought of conventional pile foundation in the flat ground under complex loa...Based on the characteristic that the potential sliding surfaces of rock slope are commonly in the shape of either line or fold line,analysis thought of conventional pile foundation in the flat ground under complex load condition was applied and the upper-bound theorem of limit analysis was used to compute thrust of rock layers with all possible distribution shapes. The interaction of slope and pile was considered design load in terms of slope thrust,and the finite difference method was derived to calculate inner-force and displacement of bridge pile foundation in rock slope under complex load condition. The result of example shows that the distribution model of slope thrust has certain impact on displacement and inner-force of bridge pile foundation. The maximum displacement growth rate reaches 54% and the maximum moment and shear growth rates reach only 15% and 20%,respectively,but the trends of inner-force and displacement of bridge pile foundation are basically the same as those of the conventional pile foundation in the flat ground. When the piles bear the same level lateral thrust,the distribution shapes of slope thrust have different influence on inner-force of pile foundation,especially the rectangle distribution,and the triangle thrust has the smallest displacement and inner-force of pile foundation.展开更多
Case history investigations have shown that pile foundations are more critically damaged in liquefiable soils than non-liquefiable soils.This study examines the differences in seismic response of pile foundations in l...Case history investigations have shown that pile foundations are more critically damaged in liquefiable soils than non-liquefiable soils.This study examines the differences in seismic response of pile foundations in liquefiable and non-liquefiable soils and their sensitivity to numerical model parameters.A two-dimensional finite element(FE)model is developed to simulate the experiment of a single pile foundation centrifuge in liquefiable soil subjected to earthquake motions and is validated against real-world test results.The differences in soil-pile seismic response of liquefiable and non-liquefiable soils are explored.Specifically,the first-order second-moment method(FOSM)is used for sensitivity analysis of the seismic response.The results show significant differences in seismic response for a soil-pile system between liquefiable and non-liquefiable soil.The seismic responses are found to be significantly larger in liquefiable soil than in non-liquefiable soil.Moreover,the pile bending moment was mainly affected by the kinematic effect in liquefiable soil,while the inertial effect was more significant in non-liquefiable soil.The controlling parameters of seismic response were PGA,soil density,and friction angle in liquefiable soil,while the pile bending moment was mainly controlled by PGA,the friction angle of soil,and shear modulus of loose sand in non-liquefiable soil.展开更多
A three-dimensional finite element simulation was carried out to investigate the effects of tunnel construction on nearby pile foundation.The displacement controlled model (DCM) was used to simulate the tunneling-indu...A three-dimensional finite element simulation was carried out to investigate the effects of tunnel construction on nearby pile foundation.The displacement controlled model (DCM) was used to simulate the tunneling-induced volume loss effects.The numerical model was verified based on the results of a centrifuge test and a set of parametric studies was implemented based on this model.There is good agreement between the trend of the results of the centrifuge test and the present model.The results of parametric studies show that the tunnelling-induced pile internal force and deformation depend mainly on the pile?tunnel distance,the pile length to tunnel depth ratio and the volume loss.Two different zones are separated by a 45° line projected from the tunnel springline.Within the zone of influence,the pile is subjected to tensile force and large settlement;whereas outside the zone of influence,dragload and small settlement are induced.It is also established that the impact of tunnelling on a pile group is substantially smaller as compared with a single pile in the same location with the rear pile in a group,demonstrating a positive pile group effect.展开更多
A number of dry bridges have been built to substitute for the roadbed on the Qinghai-Tibet Railway,China.The aim of this study was to investigate the exothermic process of cast-in-place (CIP) pile foundation of a dry ...A number of dry bridges have been built to substitute for the roadbed on the Qinghai-Tibet Railway,China.The aim of this study was to investigate the exothermic process of cast-in-place (CIP) pile foundation of a dry bridge and its harm to the stability of nearby frozen ground.We present 3D heat conduction functions of a concrete pile and of frozen ground with related boundaries.Our analysis is based on the theory of heat conduction and the exponent law describing the adiabatic temperature rise caused by hydration heat.Results under continuous and initial conditions were combined to establish a finite element model of a CIP pile-frozen ground system for a dry bridge under actual field conditions in cold regions.Numerical results indicated that the process could effectively simulate the exothermic process of CIP pile foundation.Thermal disturbance to frozen ground under a long dry bridge caused by the casting temperature and hydration heat of CIP piles was substantial and long-lasting.The simulated thermal analysis results agreed with field measurements and some significant rules relating to the problem were deduced and conclusions reached.展开更多
The process and characteristics of loading on high-speed railway bridge pile foundation were firstly obtained by means of field research and analysis,and the corresponding loading function was presented.One-dimensiona...The process and characteristics of loading on high-speed railway bridge pile foundation were firstly obtained by means of field research and analysis,and the corresponding loading function was presented.One-dimensional consolidation equation of elastic multilayered soils was then established with single drainage or double drainages under multilevel loading.Moreover,the formulas for calculating effective stress and settlement were derived from the Laplace numerical inversion transform.The three-dimensional composite analysis method of bridge pile group was improved,where the actual load conditions of pile foundation could be simulated,and the consolidation characteristics of soil layers beneath pile were also taken into account.Eventually,a corresponding program named LTPGS was developed to improve the calculation efficiency.The comparison between long-term settlement obtained from the proposed method and the in-situ measurements of pile foundation was illustrated,and a close agreement is obtained.The error between computed and measured results is less than 1 mm,and it gradually reduces with time.It is shown that the proposed method can effectively simulate the long-term settlement of pile foundation and program LTPGS can provide a reliable estimation.展开更多
The pile-soil system interaction computational model in liquefaction-induced lateral spreading ground was established by the finite difference numerical method.Considering an elastic-plastic subgrade reaction method,n...The pile-soil system interaction computational model in liquefaction-induced lateral spreading ground was established by the finite difference numerical method.Considering an elastic-plastic subgrade reaction method,numerical methods involving finite difference approach of pile in liquefaction-induced lateral spreading ground were derived and implemented into a finite difference program.Based on the monotonic loading tests on saturated sand after liquefaction,the liquefaction lateral deformation of the site where group piles are located was predicted.The effects of lateral ground deformation after liquefaction on a group of pile foundations were studied using the fmite difference program mentioned above,and the failure mechanism of group piles in liquefaction-induced lateral spreading ground was obtained.The applicability of the program was preliminarily verified.The results show that the bending moments at the interfaces between liquefied and non-liquefied soil layers are larger than those at the pile's top when the pile's top is embedded.The value of the additional static bending moment is larger than the peak dynamic bending moment during the earthquake,so in the pile foundation design,more than the superstructure's dynamics should be considered and the effect of lateral ground deformation on pile foundations cannot be neglected.展开更多
Liquefaction has b e e n a m ain cause o f dam ag e to civil en g in eerin g stru ctu res in seism ically active areas.The effects o f dam ag e o f liquefaction o n d eep foundations are v ery d estructive. Seism ic b...Liquefaction has b e e n a m ain cause o f dam ag e to civil en g in eerin g stru ctu res in seism ically active areas.The effects o f dam ag e o f liquefaction o n d eep foundations are v ery d estructive. Seism ic beh av io r o f pilefoundations is w idely discussed by m any researchers for safer an d m ore econom ic design purposes. Thisp a p e r p resen ts a p se u d o -static m eth o d for analysis o f piles in liquefiable soil u n d e r seism ic loads. A freefieldsite resp o n se analysis using th ree-d im en sio n al (3D) num erical m odeling w as p erfo rm ed to d e te rmine kin em atic loads from lateral g ro u n d disp lacem en ts an d inertial loads from vib ratio n o f th e supe rstru ctu re . The effects o f various p aram eters, such as soil layering, k in em atic and inertial forces,b o u n d ary con d itio n o f pile h ead an d gro u n d slope, o n pile resp o n se w e re studied. By com paring th enum erical results w ith th e centrifuge te s t results, it can be concluded th a t th e use o f th e p-y curves w ithvarious d eg rad atio n factors in liquefiable sand gives reasonable results.展开更多
Long-pile groups of railway foundation undergo excessive settlements after groundwater reductions,which may exceed the settlement limit and threaten the safe operation of high-speed trains.However,the effect of ground...Long-pile groups of railway foundation undergo excessive settlements after groundwater reductions,which may exceed the settlement limit and threaten the safe operation of high-speed trains.However,the effect of groundwater reduction on a long-pile group(greater than 20 m in length)has not been fully understood,especially in respect of repeated reductions.In this study,a centrifuge test was conducted to investigate the responses of pile groups in silty soils subjected to repeated falls in the water table.The behavior of the piles was discussed based both on the test and on 3D numerical analyses.With the derived coef-ficientβfor the axial force evaluation of the pile,the effect of lowering the water table on the railway pile foundation could be seen.Results of the tests and numerical analyses indicated that the water table decline significantly increased the down-drag and axial force of the pile,causing significant settlement.A longer pile presented a larger axial force at the neutral point.Nevertheless,the incremental percentage of the axial force decreased with increasing pile length with the same water table reduction.Because of group effect,the displacement of soil next to the center pile was smaller than that near the corner piles and showed a similar trend as the axial force of the pile.As the water table fell,the static load ratio affecting the progress of pile settlement increased dis-advantageously,possibly inducing excessive pile settlement.A design method for railway pile foundations taking account of lowering groundwater was proposed with an example application,which provided a reference for similar projects.展开更多
To reveal the bearing capacity of the X-section concrete piles pile raft foundation in silica sand,a series of vertical load tests are carried out.The X-section concrete piles are compared with circular section pile w...To reveal the bearing capacity of the X-section concrete piles pile raft foundation in silica sand,a series of vertical load tests are carried out.The X-section concrete piles are compared with circular section pile with the same section area.The load−settlement curves,axial force and skin friction,strain on concave and convex edge of the pile,pile-sand stress ratio,distributions of side and tip resistance are presented.The results show that bearing capacity of the X section concrete pile raft foundation is much larger than that of the circular pile raft foundation.Besides,compared with the circular pile,the peak axial force of X-section piles under raft is deeper and smaller while the neutral point of X-section concrete pile is deeper.Moreover,the strain on the concave edge is much larger than that on the convex edge of the pile,and the convex edge has more potential in bearing capacity as the vertical load increases.The X-section pile has higher pile-sand stress ratios and load-sharing between side resistance and tip resistance.Above all,the X-section concrete pile can significantly increase the bearing capacity of pile-raft foundations in silica sand.展开更多
As the top of the pile foundation in high-pile wharf is connected to the superstructure and most of the pile bodies are located below the water surface, traditional damage detection methods are greatly limited in thei...As the top of the pile foundation in high-pile wharf is connected to the superstructure and most of the pile bodies are located below the water surface, traditional damage detection methods are greatly limited in their application to pile foundation in service. In the present study, a new method for pile foundation damage detection is developed based on the curve shape of the curvature mode difference(CMD) before and after damage. In the method, the influence at each node on the overall CMD curve shape is analyzed through a data deletion model, statistical characteristic indexes are established to reflect the difference between damaged and undamaged units, and structural damage is accurately detected. The effectiveness and robustness of the method are verified by a finite element model(FEM) of high-pile wharf under different damage conditions and different intensities of Gaussian white noise. The applicability of the method is then experimentally validated by a physical model of high-pile wharf. Both the FEM and the experimental results show that the method is capable of detecting pile foundation damage in noisy curvature mode and has strong application potential.展开更多
文摘Foundation pit excavation engineering is an old subject full of decision making. Yet, it still deserves further research due to the associated high failure cost and the complexity of the geological conditions and/or the surrounding existing infrastructure around it. This article overviews the risk control practice of foundation pit excavation projects in close proximity to <span style="font-family:Verdana;">existing</span><span style="font-family:Verdana;"> disconnected piled raft. More focus is given to geotechnical aspects. The review begins with achievements to ensure excavation performance </span><span style="font-family:Verdana;">requirements,</span><span style="font-family:Verdana;"> and follows to discuss the complex </span><span style="font-family:Verdana;">soil structure</span><span style="font-family:Verdana;"> interaction involved among the fundamental components</span><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;">: </span></span></span><span><span><span style="font-family:;" "=""><span style="font-family:Verdana;">the retaining wall, mat, piles, cushion, and the soil. After bringing consensus points to practicing engineers and </span><span style="font-family:Verdana;">decision makers</span><span style="font-family:Verdana;">, it then suggests possible future research directions.</span></span></span></span>
基金financially supported by the National Key Research and Development Program of China (Grant No. 2021YFB2601100)the National Natural Science Foundation of China (Grant No. 51979190)。
文摘Under the combination of currents and waves, seabed scour occurs around offshore wind turbine foundations, which affects the stability and safe operation of offshore wind turbines. In this study, physical model experiments under unidirectional flow, bidirectional flow, and wave-current interactions with different flow directions around the pile group foundation were first conducted to investigate the development of scour around the pile group foundation.Additionally, a three-dimensional scour numerical model was established via the open-source software REEF3D to simulate the flow field and scour around the prototype-scale foundation. The impact of flow on scour was discussed.Under unidirectional flow, scour equilibrium was reached more quickly, with the maximum scour depth reaching approximately 1.2 times the pile diameter and the extent of the scour hole spanning about 4.9 times the pile diameter.Compared with those under unidirectional flow, the scour depths under combinations of currents and waves, as well as bidirectional flow, were slightly smaller. However, the morphology of scour holes was more uniform and symmetrical. The numerical simulation results show good agreement with the experimental data, demonstrating the impact of varying flow directions on the velocity distribution around the foundation, the morphology of scour holes, and the location of the maximum scour depth.
基金supported by the National Natural Science Foundation of China(Grant Nos.52208333 and 52378328)China Communications Construction Company Ltd.(Grant No.2023-ZJKJ-01).
文摘In order to effectively improve the horizontal bearing capacity of pile foundations,this study proposes post-expanded arm grouting technology and associated pile foundations.The horizontal bearing characteristic of the post-expanded arm grouting pile was explored through model tests.The test results indicate that the post-expanded arm grouting pile can increase the contact area between the pile and soil,and can improve the strength of the soil.The horizontal bearing capacity of the post-expanded arm grouting pile was approximately 3 times that of the conventional pile.It also shows that the larger the plate diameter ratio or grouting volume,the higher the horizontal bearing capacity of the post-expanded arm grouting pile.The maximum bending moment of the post-expanded arm grouting pile was located at the pile plate,and the displacement zero point of the new pile was higher than that of the conventional pile.The soil resistance at the pile plate was significantly higher than that of conventional piles,indicating that the pile plate effectively enhances the soil resistance.The improved p-y curve model and horizontal bearing capacity calculation method for the post-expanded arm grouting pile were proposed by considering the pile plate diameter factor.This method was finally verified by experimental results.The results of this study can provide a reference for calculating the horizontal bearing capacity of the post-expanded arm grouting pile.
基金funded by National Natural Science Foundation of China Projects(51708040)Hainan Provincial Transportation Science and Technology Project(HNZXY2015-045R)Changan University Central University Basic Research Business Fund Special Funds(No.300102218115).
文摘To study the dynamic response rules of pile foundations of mega-bridges over faults in strong seismic areas,a finite element model of the pile foundation-soil-fault interaction of the Haiwen Bridge is established.The 0.2-0.6 g peak acceleration of the 5010 seismic waves is input to study the effect of the seismic wave of different intensities and the distance changes between the fault and the pile foundation on the dynamic response of the pile body.The results show that the soil layer covering the bedrock amplifies the peak pile acceleration,and the amplifying effect decreases with increasing seismic wave intensity.However,bedrock has less of an effect on peak acceleration.The relative pile displacement shows the mechanical properties of elastic long piles.The pile foundation generates a large bending moment at the bedrock face and the upper soil layer interface,and a large shear force at the pile top and the soft-hard soil body interface.The relative displacement,bending,and shear bearing characteristics of the pile foundations on the upper and lower plates of the fault are significantly different.The deformation characteristics are affected by faults in a region ten times the pile diameter.Analysis of the dynamic p-y curves shows that the soil resistance on the pile side of the lower plate at the same depth is greater than that of the upper plate.Sensitivity of the dynamic response of pile foundations on either side of the fault to the effects of seismic intensity and distance between the pile foundation and the fault:distance l seismic intensity q.
基金The National Natural Science Foundation of China (No. 52171274)。
文摘In recent years,offshore wind turbines have rap-idly developed,and many pile foundations installed earlier are now approaching decommissioning.Thus,the efficient removal of pile foundations has become a critical issue for the sustainable development of offshore wind energy.To ad-dress this issue,this paper systematically investigates three methods for the recovery of pile foundations using physical model experiments:water injection+lifting,air injection+lifting,and air retention+water injection.The experimental results show that the water injection+lifting method exhibits remarkable advantages in recovering large-diameter and in-clined pile foundations;however,realigning inclined piles during recovery remains challenging,and a risk of pile over-turning exists.The air injection+lifting method proves ef-fective for realigning inclined piles but presents a risk of air expulsion failure,which may affect the continuity and stabil-ity of the recovery process.By contrast,the air retention+water injection method combines the characteristics of water injection and air injection techniques,effectively avoiding air expulsion failure and exhibiting pronounced displacement jumps during pile uplift.These findings provide a valuable reference for future decommissioning practices of offshore wind pile foundations,offer important engineering applica-tion value,and contribute positively to the sustainable devel-opment of the offshore wind industry.
文摘The problems noted in the structures built on wooden foundation piles in a lake environment required various works to strengthen over time.This work mainly consists of the recovery of the foundation mass by micropiles due to the increase in loads on the structures,or the recovery of the foundation mass by injection,which is carried out when voids form between the ground and the wooden foundation elements.The high cost of foundation reinforcement methods led the National Agency for the Development of Tourist Heritage in Benin(ANPT)to replace the wooden foundation piles with reinforced concrete piles in the implementation of the project“reinventing the lakeside city of Ganvié”.This article presents an artisanal technology for the creation of reinforced concrete foundation piles in a lake environment.On-site examples made it possible to evaluate the performance of this artisanal implementation technique.The installation of these piles is carried out following manual drilling,followed by the installation of reinforcement and the pouring of concrete on site.The implementation of reinforced concrete foundation piles in place of the wooden ones studied in this article only impacted the infrastructure of the homes of the lakeside town of Ganviébut not the superstructure,which preserved the old traditional wooden architecture and thatched roofs.Thus,the ambition to move this city of Ganviéfrom the stage of a lake village to that of a floating city is very successful.This will contribute to improving the environment and living conditions of the populations and will promote economic development through tourism.
基金Project(52078060)supported by the National Natural Science Foundation of ChinaProject(2020JJ4606)supported by the National Science Foundation of Hunan Province,China+1 种基金Project(18A127)supported by the Key Foundation of Education Department of Hunan Province,ChinaProject(2018IC19)supported by the International Cooperation and Development Project of Double-First-Class Scientific Research in Changsha University of Science&Technology,China。
文摘At present,shield tunneling often needs to pass through a large number of bridge pile foundations.However,there are few studies on the influence of shield tunneling on adjacent pile foundations by combining with groundwater seepage.Based on Winkler model,the calculation equations of shield tunneling on vertical and horizontal displacement of adjacent bridge pile are derived.Meanwhile,full and part three-dimensional finite element models are established to analyze the trend of bridge pier settlement,ground surface settlement trough,vertical and horizontal displacement of the pile and pile stress under three calculation conditions,i.e.,not considering groundwater effect,considering stable groundwater effect and fluid-soil interaction.The results show that the calculated value is small when the effect of groundwater is not considered;the seepage velocity of the soil above the excavation face is faster than that of the surrounding soil under fluid-soil interaction,and after the shield passing,the groundwater on both sides shows a flow trend of“U”shape on the ground surface supplying to the upper part of the tunnel;the vertical displacement of the pile body is bounded by the horizontal position of the top of the tunnel,the upper pile body settles,and the lower pile body deforms upward.The horizontal displacement of pile body presents a continuous“S”shape distribution,causing stress concentration near the tunnel.The calculated results of fluid-soil interaction are in good agreement with the field measured data and accord with the actual situation.
基金Projects(2009G008-B,2010G018-E-3) supported by Key Projects of China Railway Ministry Science and Technology Research and Development ProgramProject(CX2013B076) supported by Hunan Provincial Innovation Foundation For Postgraduate,China
文摘Based on reasonable assumptions that simplified the calculational model,a simple and practical method was proposed to calculate the post-construction settlement of high-speed railway bridge pile foundation by using the Mesri creep model to describe the soil characteristics and the Mindlin-Geddes method considering pile diameter to calculate the vertical additional stress of pile bottom.A program named CPPS was designed for this method to calculate the post-construction settlement of a high-speed railway bridge pile foundation.The result indicates that the post-construction settlement in 100 years meets the requirements of the engineering specifications,and in the first two decades,the post-construction settlement is about 80% of its total settlement,while the settlement in the rest eighty years tends to be stable.Compared with the measured settlement after laying railway tracks,the calculational result is closed to that of the measured,and the results are conservative with a high computational accuracy.It is noted that the method can be used to calculate the post-construction settlement for the preliminary design of high-speed railway bridge pile foundation.
文摘Although the load applied to pile foundations is usually a combination of vertical and lateral components,there have been few investigations on the behavior of piles subjected to combined loadings.Those few studies led to inconsistent results with regard to the effects of vertical loads on the lateral response of piles.A series of three-dimensional(3D) finite differences analyses is conducted to evaluate the influence of vertical loads on the lateral performance of pile foundations.Three idealized sandy and clayey soil profiles are considered:a homogeneous soil layer,a layer with modulus proportional to depth,and two-layered strata.The pile material is modeled as linearly elastic,while the soil is idealized using the Mohr-Coulomb constitutive model with a non-associated flow rule.In order to confirm the findings of this study,soils in some cases are further modeled using more sophisticated models(i.e.CYsoil model for sandy soils and modified Cam-Clay(MCC) model for clayey soils).Numerical results showed that the lateral resistance of the piles does not appear to vary considerably with the vertical load in sandy soil especially at the loosest state.However,the presence of a vertical load on a pile embedded in homogeneous or inhomogeneous clay is detrimental to its lateral capacity,and it is unconservative to design piles in clays assuming that there is no interaction between vertical and lateral loads.Moreover,the current results indicate that the effect of vertical loads on the lateral response of piles embedded in twolayered strata depends on the characteristics of soil not only surrounding the piles but also located beneath their tips.
文摘Geotechnical engineering deals with materials(e.g. soil and rock) that, by their very nature, exhibit varied and uncertain behavior due to the imprecise physical processes associated with the formation of these materials. Modeling the behavior of such materials in geotechnical engineering applications is complex and sometimes beyond the ability of most traditional forms of physically-based engineering methods. Artificial intelligence(AI) is becoming more popular and particularly amenable to modeling the complex behavior of most geotechnical engineering applications because it has demonstrated superior predictive ability compared to traditional methods. This paper provides state-of-the-art review of some selected AI techniques and their applications in pile foundations, and presents the salient features associated with the modeling development of these AI techniques. The paper also discusses the strength and limitations of the selected AI techniques compared to other available modeling approaches.
基金Project(50578060) supported by the National Natural Science Foundation of China
文摘Based on the characteristic that the potential sliding surfaces of rock slope are commonly in the shape of either line or fold line,analysis thought of conventional pile foundation in the flat ground under complex load condition was applied and the upper-bound theorem of limit analysis was used to compute thrust of rock layers with all possible distribution shapes. The interaction of slope and pile was considered design load in terms of slope thrust,and the finite difference method was derived to calculate inner-force and displacement of bridge pile foundation in rock slope under complex load condition. The result of example shows that the distribution model of slope thrust has certain impact on displacement and inner-force of bridge pile foundation. The maximum displacement growth rate reaches 54% and the maximum moment and shear growth rates reach only 15% and 20%,respectively,but the trends of inner-force and displacement of bridge pile foundation are basically the same as those of the conventional pile foundation in the flat ground. When the piles bear the same level lateral thrust,the distribution shapes of slope thrust have different influence on inner-force of pile foundation,especially the rectangle distribution,and the triangle thrust has the smallest displacement and inner-force of pile foundation.
基金National Science Foundation for Excellent Young Scholars of China under Grant No.51722801National Natural Science Foundation of China under Grant Nos.51808006 and 52078016。
文摘Case history investigations have shown that pile foundations are more critically damaged in liquefiable soils than non-liquefiable soils.This study examines the differences in seismic response of pile foundations in liquefiable and non-liquefiable soils and their sensitivity to numerical model parameters.A two-dimensional finite element(FE)model is developed to simulate the experiment of a single pile foundation centrifuge in liquefiable soil subjected to earthquake motions and is validated against real-world test results.The differences in soil-pile seismic response of liquefiable and non-liquefiable soils are explored.Specifically,the first-order second-moment method(FOSM)is used for sensitivity analysis of the seismic response.The results show significant differences in seismic response for a soil-pile system between liquefiable and non-liquefiable soil.The seismic responses are found to be significantly larger in liquefiable soil than in non-liquefiable soil.Moreover,the pile bending moment was mainly affected by the kinematic effect in liquefiable soil,while the inertial effect was more significant in non-liquefiable soil.The controlling parameters of seismic response were PGA,soil density,and friction angle in liquefiable soil,while the pile bending moment was mainly controlled by PGA,the friction angle of soil,and shear modulus of loose sand in non-liquefiable soil.
文摘A three-dimensional finite element simulation was carried out to investigate the effects of tunnel construction on nearby pile foundation.The displacement controlled model (DCM) was used to simulate the tunneling-induced volume loss effects.The numerical model was verified based on the results of a centrifuge test and a set of parametric studies was implemented based on this model.There is good agreement between the trend of the results of the centrifuge test and the present model.The results of parametric studies show that the tunnelling-induced pile internal force and deformation depend mainly on the pile?tunnel distance,the pile length to tunnel depth ratio and the volume loss.Two different zones are separated by a 45° line projected from the tunnel springline.Within the zone of influence,the pile is subjected to tensile force and large settlement;whereas outside the zone of influence,dragload and small settlement are induced.It is also established that the impact of tunnelling on a pile group is substantially smaller as compared with a single pile in the same location with the rear pile in a group,demonstrating a positive pile group effect.
基金Project supported by the National Natural Science Foundation of China (No.50678076)the Opening Foundation of the State Key Laboratory of Frozen Soil Engineering (No.SKLFSE200603),China
文摘A number of dry bridges have been built to substitute for the roadbed on the Qinghai-Tibet Railway,China.The aim of this study was to investigate the exothermic process of cast-in-place (CIP) pile foundation of a dry bridge and its harm to the stability of nearby frozen ground.We present 3D heat conduction functions of a concrete pile and of frozen ground with related boundaries.Our analysis is based on the theory of heat conduction and the exponent law describing the adiabatic temperature rise caused by hydration heat.Results under continuous and initial conditions were combined to establish a finite element model of a CIP pile-frozen ground system for a dry bridge under actual field conditions in cold regions.Numerical results indicated that the process could effectively simulate the exothermic process of CIP pile foundation.Thermal disturbance to frozen ground under a long dry bridge caused by the casting temperature and hydration heat of CIP piles was substantial and long-lasting.The simulated thermal analysis results agreed with field measurements and some significant rules relating to the problem were deduced and conclusions reached.
基金Project(2012QNZT050)supported by the Special Fund for Basic Scientific Research of Central Colleges,ChinaProjects(51208518,U1361204,51208519,51108464)supported by the National Natural Science Foundation of China+1 种基金Project supported by the Postdoctoral Foundation of Central South University,ChinaProjects(2013RS4030,2012RS4002)sponsored by Hunan Postdoctoral Scientific Program,China
文摘The process and characteristics of loading on high-speed railway bridge pile foundation were firstly obtained by means of field research and analysis,and the corresponding loading function was presented.One-dimensional consolidation equation of elastic multilayered soils was then established with single drainage or double drainages under multilevel loading.Moreover,the formulas for calculating effective stress and settlement were derived from the Laplace numerical inversion transform.The three-dimensional composite analysis method of bridge pile group was improved,where the actual load conditions of pile foundation could be simulated,and the consolidation characteristics of soil layers beneath pile were also taken into account.Eventually,a corresponding program named LTPGS was developed to improve the calculation efficiency.The comparison between long-term settlement obtained from the proposed method and the in-situ measurements of pile foundation was illustrated,and a close agreement is obtained.The error between computed and measured results is less than 1 mm,and it gradually reduces with time.It is shown that the proposed method can effectively simulate the long-term settlement of pile foundation and program LTPGS can provide a reliable estimation.
基金Project(51109208)supported by the National Natural Science Foundation of ChinaProject(2013M531688)supported by the Postdoctoral Science Foundation of China+1 种基金Project(Z012009)supported by the Open Research Fund of State Key Laboratory of Geomechanics and Geotechnical Engineering(Institute of Rock and Soil Mechanics,Chinese Academy of Sciences)Project(CKSF2012054)supported by the Foundation of Changjiang River Scientific Research Institute,China
文摘The pile-soil system interaction computational model in liquefaction-induced lateral spreading ground was established by the finite difference numerical method.Considering an elastic-plastic subgrade reaction method,numerical methods involving finite difference approach of pile in liquefaction-induced lateral spreading ground were derived and implemented into a finite difference program.Based on the monotonic loading tests on saturated sand after liquefaction,the liquefaction lateral deformation of the site where group piles are located was predicted.The effects of lateral ground deformation after liquefaction on a group of pile foundations were studied using the fmite difference program mentioned above,and the failure mechanism of group piles in liquefaction-induced lateral spreading ground was obtained.The applicability of the program was preliminarily verified.The results show that the bending moments at the interfaces between liquefied and non-liquefied soil layers are larger than those at the pile's top when the pile's top is embedded.The value of the additional static bending moment is larger than the peak dynamic bending moment during the earthquake,so in the pile foundation design,more than the superstructure's dynamics should be considered and the effect of lateral ground deformation on pile foundations cannot be neglected.
文摘Liquefaction has b e e n a m ain cause o f dam ag e to civil en g in eerin g stru ctu res in seism ically active areas.The effects o f dam ag e o f liquefaction o n d eep foundations are v ery d estructive. Seism ic beh av io r o f pilefoundations is w idely discussed by m any researchers for safer an d m ore econom ic design purposes. Thisp a p e r p resen ts a p se u d o -static m eth o d for analysis o f piles in liquefiable soil u n d e r seism ic loads. A freefieldsite resp o n se analysis using th ree-d im en sio n al (3D) num erical m odeling w as p erfo rm ed to d e te rmine kin em atic loads from lateral g ro u n d disp lacem en ts an d inertial loads from vib ratio n o f th e supe rstru ctu re . The effects o f various p aram eters, such as soil layering, k in em atic and inertial forces,b o u n d ary con d itio n o f pile h ead an d gro u n d slope, o n pile resp o n se w e re studied. By com paring th enum erical results w ith th e centrifuge te s t results, it can be concluded th a t th e use o f th e p-y curves w ithvarious d eg rad atio n factors in liquefiable sand gives reasonable results.
基金Project supported by the Basic Science Center Program for Multiphase Evolution in Hypergravity at the National Natural Science Foundation of China(No.51988101)the Chinese Program of Introducing Talents of Discipline to University(111 Project)(No.B18047)the Key Research and Development Program of Zhejiang Province(No.2019C03111),China。
文摘Long-pile groups of railway foundation undergo excessive settlements after groundwater reductions,which may exceed the settlement limit and threaten the safe operation of high-speed trains.However,the effect of groundwater reduction on a long-pile group(greater than 20 m in length)has not been fully understood,especially in respect of repeated reductions.In this study,a centrifuge test was conducted to investigate the responses of pile groups in silty soils subjected to repeated falls in the water table.The behavior of the piles was discussed based both on the test and on 3D numerical analyses.With the derived coef-ficientβfor the axial force evaluation of the pile,the effect of lowering the water table on the railway pile foundation could be seen.Results of the tests and numerical analyses indicated that the water table decline significantly increased the down-drag and axial force of the pile,causing significant settlement.A longer pile presented a larger axial force at the neutral point.Nevertheless,the incremental percentage of the axial force decreased with increasing pile length with the same water table reduction.Because of group effect,the displacement of soil next to the center pile was smaller than that near the corner piles and showed a similar trend as the axial force of the pile.As the water table fell,the static load ratio affecting the progress of pile settlement increased dis-advantageously,possibly inducing excessive pile settlement.A design method for railway pile foundations taking account of lowering groundwater was proposed with an example application,which provided a reference for similar projects.
基金Project(51878103)supported by the National Natural Science Foundation of ChinaProject(2016YFE0200100)supported by the National Key Research and Development Program of China。
文摘To reveal the bearing capacity of the X-section concrete piles pile raft foundation in silica sand,a series of vertical load tests are carried out.The X-section concrete piles are compared with circular section pile with the same section area.The load−settlement curves,axial force and skin friction,strain on concave and convex edge of the pile,pile-sand stress ratio,distributions of side and tip resistance are presented.The results show that bearing capacity of the X section concrete pile raft foundation is much larger than that of the circular pile raft foundation.Besides,compared with the circular pile,the peak axial force of X-section piles under raft is deeper and smaller while the neutral point of X-section concrete pile is deeper.Moreover,the strain on the concave edge is much larger than that on the convex edge of the pile,and the convex edge has more potential in bearing capacity as the vertical load increases.The X-section pile has higher pile-sand stress ratios and load-sharing between side resistance and tip resistance.Above all,the X-section concrete pile can significantly increase the bearing capacity of pile-raft foundations in silica sand.
基金financially supported by the National Natural Science Foundation of China (Grant Nos. 51709093 and 51679081)Fujian Provincial Department of Transportation Science and Technology Development Project (Grant No. 201708)Hohai University Student Innovation and Entrepreneurship Training Project (Grant No. 201910294014Z)。
文摘As the top of the pile foundation in high-pile wharf is connected to the superstructure and most of the pile bodies are located below the water surface, traditional damage detection methods are greatly limited in their application to pile foundation in service. In the present study, a new method for pile foundation damage detection is developed based on the curve shape of the curvature mode difference(CMD) before and after damage. In the method, the influence at each node on the overall CMD curve shape is analyzed through a data deletion model, statistical characteristic indexes are established to reflect the difference between damaged and undamaged units, and structural damage is accurately detected. The effectiveness and robustness of the method are verified by a finite element model(FEM) of high-pile wharf under different damage conditions and different intensities of Gaussian white noise. The applicability of the method is then experimentally validated by a physical model of high-pile wharf. Both the FEM and the experimental results show that the method is capable of detecting pile foundation damage in noisy curvature mode and has strong application potential.