The setting of pre assessment criteria for soil compaction is hardly determined, especially, in case of undecided structure locations. Different design guidelines recommend achieving a specific value of relative densi...The setting of pre assessment criteria for soil compaction is hardly determined, especially, in case of undecided structure locations. Different design guidelines recommend achieving a specific value of relative density for the compaction of fill placement works. Alternatives were discussed through the literature to predict the value of relative density based on soil field tests (e.g. cone and standard penetration tests). This paper presents the weakness of using the Over Consolidation Ratio (OCR) as guidance to assess the value of cone tip resistance using the soil relative density. The variation of OCR (from 1 to 10) has a significant effect on the <i><span style="font-family:Verdana;">q</span><sub><span style="font-family:Verdana;">c</span></sub></i><span style="font-family:Verdana;"> value up to 110% when compared to the normally consolidated state. Then normally consolidated state can logically cover the compaction process with variation of 20%, 33%, and 4% for relative density values 85%, 70%, and 60%, respectively. A unified approach is recommended to predict the compaction </span><i><span style="font-family:Verdana;">q</span><sub><span style="font-family:Verdana;">c</span></sub></i><span style="font-family:Verdana;">-performance line using normally consolidated condition and sand relative density.</span>展开更多
A new cascade control program was proposed based on modified internal model control to handle stable,unstable and integrating processes with time delay.The program had totally four controllers of which the secondary l...A new cascade control program was proposed based on modified internal model control to handle stable,unstable and integrating processes with time delay.The program had totally four controllers of which the secondary loop had two controllers and the primary loop had two controllers.The two secondary loop controllers were designed using IMC technique.They were decoupled completely and could be adjusted independently,which avoided the undesirable influence on performance of the primary controllers.The main controller in the primary loop was devised as a PID using the method of minimum sensitivity,which could guarantee not only the nominal performance but also the robust stability of the system.A setpoint filter was added in the primary loop to improve the tracking performance.All the controllers of the two closed-loops were designed analytically,and could be adjusted and optimized by single parameter respectively.Simulations were carried out on three various processes with time delay,and the results show that the proposed method can provide a better performance of both set-point tracking and disturbance rejection and robustness against parameters perturbation.展开更多
Optic radiation(OR)injury can occur following various brain injuries and it is usually accompanied by visual field defects(Zhang et al.,2006).OR is very important for performing activities of daily living and prov...Optic radiation(OR)injury can occur following various brain injuries and it is usually accompanied by visual field defects(Zhang et al.,2006).OR is very important for performing activities of daily living and providing safety.展开更多
Function performance specification (FPS) is one of the value management (VM) techniques developed for the explicit statement of optimum product definition. This technique is widely used in software engineering and man...Function performance specification (FPS) is one of the value management (VM) techniques developed for the explicit statement of optimum product definition. This technique is widely used in software engineering and manufacturing industry, and proved to be successful to perform product defining tasks. This paper describes an FPS-oriented approach for construction briefing, which is critical to the successful delivery of construction projects. Three techniques, i.e., function analysis system technique, shared space, and computer-aided toolkit, are incorporated into the proposed approach. A computer-aided toolkit is developed to facilitate the implementation of FPS in the briefing processes. This approach can facilitate systematic, efficient identification, clarification, and representation of client requirements in trail running. The limitations of the approach and future research work are also discussed at the end of the paper.展开更多
文摘The setting of pre assessment criteria for soil compaction is hardly determined, especially, in case of undecided structure locations. Different design guidelines recommend achieving a specific value of relative density for the compaction of fill placement works. Alternatives were discussed through the literature to predict the value of relative density based on soil field tests (e.g. cone and standard penetration tests). This paper presents the weakness of using the Over Consolidation Ratio (OCR) as guidance to assess the value of cone tip resistance using the soil relative density. The variation of OCR (from 1 to 10) has a significant effect on the <i><span style="font-family:Verdana;">q</span><sub><span style="font-family:Verdana;">c</span></sub></i><span style="font-family:Verdana;"> value up to 110% when compared to the normally consolidated state. Then normally consolidated state can logically cover the compaction process with variation of 20%, 33%, and 4% for relative density values 85%, 70%, and 60%, respectively. A unified approach is recommended to predict the compaction </span><i><span style="font-family:Verdana;">q</span><sub><span style="font-family:Verdana;">c</span></sub></i><span style="font-family:Verdana;">-performance line using normally consolidated condition and sand relative density.</span>
基金Project(J11LG02) supported by the Science and Technology Funds of Education Department of Shandong Province,China
文摘A new cascade control program was proposed based on modified internal model control to handle stable,unstable and integrating processes with time delay.The program had totally four controllers of which the secondary loop had two controllers and the primary loop had two controllers.The two secondary loop controllers were designed using IMC technique.They were decoupled completely and could be adjusted independently,which avoided the undesirable influence on performance of the primary controllers.The main controller in the primary loop was devised as a PID using the method of minimum sensitivity,which could guarantee not only the nominal performance but also the robust stability of the system.A setpoint filter was added in the primary loop to improve the tracking performance.All the controllers of the two closed-loops were designed analytically,and could be adjusted and optimized by single parameter respectively.Simulations were carried out on three various processes with time delay,and the results show that the proposed method can provide a better performance of both set-point tracking and disturbance rejection and robustness against parameters perturbation.
基金supported by the National Research Foundation(NRF)of Korea Grant funded by the Korean Government(MSIP),No.2015R1A2A2A01004073
文摘Optic radiation(OR)injury can occur following various brain injuries and it is usually accompanied by visual field defects(Zhang et al.,2006).OR is very important for performing activities of daily living and providing safety.
文摘Function performance specification (FPS) is one of the value management (VM) techniques developed for the explicit statement of optimum product definition. This technique is widely used in software engineering and manufacturing industry, and proved to be successful to perform product defining tasks. This paper describes an FPS-oriented approach for construction briefing, which is critical to the successful delivery of construction projects. Three techniques, i.e., function analysis system technique, shared space, and computer-aided toolkit, are incorporated into the proposed approach. A computer-aided toolkit is developed to facilitate the implementation of FPS in the briefing processes. This approach can facilitate systematic, efficient identification, clarification, and representation of client requirements in trail running. The limitations of the approach and future research work are also discussed at the end of the paper.