期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
Energy-Performance Tradeoffs in laaS Cloud with Virtual Machine Scheduling 被引量:3
1
作者 DONG Jiankang WANG Hongbo CHENG Shiduan 《China Communications》 SCIE CSCD 2015年第2期155-166,共12页
In the cloud data centers,how to map virtual machines(VMs) on physical machines(PMs) to reduce the energy consumption is becoming one of the major issues,and the existing VM scheduling schemes are mostly to reduce ene... In the cloud data centers,how to map virtual machines(VMs) on physical machines(PMs) to reduce the energy consumption is becoming one of the major issues,and the existing VM scheduling schemes are mostly to reduce energy consumption by optimizing the utilization of physical servers or network elements.However,the aggressive consolidation of these resources may lead to network performance degradation.In view of this,this paper proposes a two-stage VM scheduling scheme:(1) We propose a static VM placement scheme to minimize the number of activating PMs and network elements to reduce the energy consumption;(2) In the premise of minimizing the migration costs,we propose a dynamic VM migration scheme to minimize the maximum link utilization to improve the network performance.This scheme makes a tradeoff between energy efficiency and network performance.We design a new twostage heuristic algorithm for a solution,and the simulations show that our solution achieves good results. 展开更多
关键词 IaaS cloud virtual machine scheduling network performance energy efficiency
在线阅读 下载PDF
Advantages and Application Paths of BIM5D Technology in Cost Control of Completed Houses
2
作者 Dongchun Xia Yanyu Chen 《Journal of Architectural Research and Development》 2025年第3期51-57,共7页
The purpose of this article is to analyze the advantages and application paths of BIM5D technology in the cost control of completed houses.In the research phase,based on the reading of literature and the combination o... The purpose of this article is to analyze the advantages and application paths of BIM5D technology in the cost control of completed houses.In the research phase,based on the reading of literature and the combination of project materials,the advantages of BIM5D in the cost control project of completed houses are analyzed after introducing the cost control of completed houses and the connotation of BIM5D technology.Finally,this article starts from multiple perspectives,including BIM5D modeling,cost deviation analysis under dynamic cost control,etc.,and finally forms a relatively systematic and complete BIM cost control technology system.It is hoped that this article can provide technical reference value for China’s completed housing projects,promote the improvement of the project team’s cost control level,obtain considerable economic benefits based on completing project construction with quality and quantity,and enhance the competitiveness of enterprises. 展开更多
关键词 BIM5D Cost deviation Cost performance Schedule performance
在线阅读 下载PDF
Pareto-Based Complete Local Search and Combined Timetabling for Multi-objective Job Shop Scheduling Problem with No-Wait Constraint 被引量:1
3
作者 杨玉珍 顾幸生 《Journal of Donghua University(English Edition)》 EI CAS 2016年第4期601-609,624,共10页
Job shop scheduling has become the basis and core of advanced manufacturing technology. Various differences exist between academic research and practical production. The majority of previous researches on job shop sch... Job shop scheduling has become the basis and core of advanced manufacturing technology. Various differences exist between academic research and practical production. The majority of previous researches on job shop scheduling problem (JSSP)describe the basic production environment, which have a single objective and limited constraints. However,a practical process of production is characterized by having multiple objectives,no-wait constraint,and limited storage. Thus this research focused on multiobjective,no-wait JSSP. To analyze the problem,it was further divided into two sub-problems, namely, sequencing and timetabling. Hybrid non-order strategy and modified complete local search with memory were used to solve each problem individually. A Pareto-based strategy for performing fitness assessment was presented in this study. Various experiments on benchmark problems proved the feasibility and effectiveness of the proposed algorithm. 展开更多
关键词 Pareto scheduling scheduling constraints benchmark crossover fitness performing objectives sequencing
在线阅读 下载PDF
MULTITASK SCHEDULING IN NETWORKED CONTROL SYSTEMS WITH APPLICATION TO LARGE SCALE VEHICLE CONTROL
4
作者 YANG Liman LI Yunhua 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2007年第1期69-72,共4页
Aiming at scheduling problems of networked control system (NCS) used to fulfill motion synthesis and cooperation control of the distributed multi-mechatronic systems, the differences of network scheduling and task s... Aiming at scheduling problems of networked control system (NCS) used to fulfill motion synthesis and cooperation control of the distributed multi-mechatronic systems, the differences of network scheduling and task scheduling are compared, and the mathematic description of task scheduling is presented. A performance index function of task scheduling of NCS according to task balance and traffic load matching principles is defined. According to this index, a static scheduling method is designed and implemented to controlling task set simulation of the DCY100 transportation vehicle. The simulation results are applied successfully to practical engineering in this case so as to validate the effectiveness of the proposed performance index and scheduling algorithm. 展开更多
关键词 Network control system(NCS) Multitask scheduling performance index Motion synthesis Large scale vehicle
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部