期刊文献+
共找到903篇文章
< 1 2 46 >
每页显示 20 50 100
New type of overrunning clutch based on curved-plate compression-torsion metamaterial 被引量:1
1
作者 Yanbin Wang Haifeng Ou Lingling Hu 《Acta Mechanica Sinica》 SCIE EI CAS CSCD 2024年第8期154-165,共12页
Overrunning clutches are unidirectional drive mechanisms that are widely used in transmission systems.However,existing overrunning clutches have complex structures,require high preparation accuracy,and fail after a ce... Overrunning clutches are unidirectional drive mechanisms that are widely used in transmission systems.However,existing overrunning clutches have complex structures,require high preparation accuracy,and fail after a certain degree of wear.To address these issues,we propose a new type of overrunning clutch consisting of a conical structure and novel compression-torsion conversion(CTC)metamaterial with curved plates.Theoretical calculations are employed to guide the material distribution and ensure the deformation coordination of the curved-plate CTC metamaterial for greater ultimate torque.The transmission mechanism of the proposed overrunning clutch is derived to guide the parameter selection of the CTC metamaterial and the conical structure.Experiments and finite element simulations reveal that the curved-plate CTC metamaterial features excellent CTC efficiency,flexibility,and transverse stiffness,which is conducive reducing the resistance of the overrunning state and ensures stability during operation.The unidirectional transmission system constructed with the new overrunning clutch shows reliable performances under working and overrunning states.The constructed overrunning clutch provides an effective one-way transmission method.The clutch with simple construction and self-compensated ability for wear exhibits great potential in miniaturized and lightweight equipment or robots. 展开更多
关键词 overrunning clutch Mechanical metamaterial Compression-torsion conversion Curved-plate configuration
原文传递
Effect of Camel Milk Fortified with Dates in Ice Cream Manufacture on Viscosity, Overrun, and Rheological Properties during Storage Period 被引量:1
2
作者 S. A. Salem Fardous M. Meead G. H. El-Rashody 《Food and Nutrition Sciences》 2017年第5期551-564,共14页
The effect of using camel milk with 2 dates types (Sokary & Al-Khalas), in 3 forms (paste, pieces, and molasses), with 2 different concentrations (5% & 10%) in the manufacturing of ice cream on its viscosity, ... The effect of using camel milk with 2 dates types (Sokary & Al-Khalas), in 3 forms (paste, pieces, and molasses), with 2 different concentrations (5% & 10%) in the manufacturing of ice cream on its viscosity, overrun%, rheological and melting properties during storage period up to 60 days at -18&#176C was studied. It was noticed that there are higher mean of viscosity values (cp) when using “Al-khalas” dates paste 5% and 10% followed by samples with “sokary” paste then samples with molasses in ice cream samples compared to those with added date’s pieces of either “Sokary” or “Al-khalas”. There are significant differences of overrun values between all treatments and samples with the added date paste of either “sokary” or “Al-khalas” which recorded the lowest values. Increased melting resistance and good qualities as heat shock and melting properties were significantly better for the samples with added dates pieces or paste unlike the molasses. The storage effect is obvious decline, especially when using dates molasses. 展开更多
关键词 CAMEL MILK DATES Ice CREAM VISCOSITY overrun Melting Properties Heat Shock Storage Period
暂未订购
Application of predictive control scheduling method to real-time periodic control tasks overrun 被引量:1
3
作者 沈青 桂卫华 +1 位作者 阳春华 杨铁军 《Journal of Central South University of Technology》 EI 2007年第2期266-270,共5页
Based on the abort strategy of fixed periods, a novel predictive control scheduling methodology was proposed to efficiently solve overrun problems. By applying the latest control value in the prediction sequences to t... Based on the abort strategy of fixed periods, a novel predictive control scheduling methodology was proposed to efficiently solve overrun problems. By applying the latest control value in the prediction sequences to the control objective, the new strategy was expected to optimize the control system for better performance and yet guarantee the schedulability of all tasks under overrun. The schedulability of the real-time systems with p-period overruns was analyzed, and the corresponding stability criteria was given as well. The simulation results show that the new approach can improve the performance of control system compared to that of conventional abort strategy, it can reduce the overshoot and adjust time as well as ensure the schedulability and stability. 展开更多
关键词 real-time system overrun predictive control scheduling STABILITY
在线阅读 下载PDF
A Study on Factors Influencing Cost Overrun in High-rise Building Construction across India 被引量:1
4
作者 Mohammed Tayyab Mohammed Furkhan +2 位作者 Mohammed Rizwan M.Jameel, Aaron Chadee 《Journal of Smart Buildings and Construction Technology》 2023年第1期52-83,共32页
Cost overrun is a common problem in construction projects worldwide.Most Indian construction projects,particularly those involving high-rise buildings,have had severe cost overruns.For managers,architects,engineers,an... Cost overrun is a common problem in construction projects worldwide.Most Indian construction projects,particularly those involving high-rise buildings,have had severe cost overruns.For managers,architects,engineers,and contractors,completing building projects within the specified cost budget has become the most important and hard assignment.Since it is common for high-rise building projects to go over budget,the aim of this study is to find out the causes of cost overruns and provide effective measures.The study found 70 cost overrun factors based on a comprehensive literature review and expert opinions.A Google form questionnaire was distributed to 150 construction professionals across India.After following up,101 of the 150 responses were received.A five-point Likert scale was used and the acquired data was analyzed and ranked using the Relative Importance Index(RII)technique.According to the findings of RII,the top ten critical factors influencing cost overruns were frequent change orders during construction by the owner,delay in construction,escalation of material prices,market inflation or deflation,rework,frequent changes in design,inaccurate evaluation of the project timeline,unforeseen ground condition,inaccurate quantity take-off,and delay in progressive payment by the owner.Spearman’s rank correlation test revealed that there is a very significant relationship between the rankings of factors provided by the owner,the consultant,and the contractor.In addition,a factor analysis tool in the SPSS software was also used to categorize the seventy factors into sixteen core components.The top ten critical factors were presented to subject matter experts,and their suggestions were being compiled.These results are expected to help construction professionals minimize cost overruns,improve cost control measures,and initiate future research. 展开更多
关键词 Cost overrun High-rise buildings RII Factor analysis Subject matter expert(SME) INDIA
在线阅读 下载PDF
Transient dynamic analysis and comparison on wedging processes of overrunning clutches with different contact surfaces
5
作者 魏巍 周洽 +1 位作者 刘树成 闫清东 《Journal of Beijing Institute of Technology》 EI CAS 2015年第2期207-212,共6页
The effects of contact surface on dynamic wedging behavior of the roller and inner-ring of the overrunning clutch in a dual-turbine torque converter were investigated to reveal the friction self- locking mechanism and... The effects of contact surface on dynamic wedging behavior of the roller and inner-ring of the overrunning clutch in a dual-turbine torque converter were investigated to reveal the friction self- locking mechanism and dynamic process. Planar strain clutch models including roller, inner-ring and outer-ring were built, and transient wedging process was analyzed with an explicit dynamics meth- od. The modeling of stress and strain distribution and variation of two kinds of contact surfaces show that there are three stages named slipping, wedging and binding respectively during whole wed- ging process. Meanwhile the geometric structures of contact surfaces greatly influence the peak stress and strain distribution of the wedging process of the roller and inner-ring. The load bearing performance of contact surfaces with logarithmic spiral curve is better than that with straight line. Our study provides theoretical foundation for design and further optimization of wedging contact surface of an overrunning clutch in a dual-turbine hydrodynamic torque converter. 展开更多
关键词 overrunning clutch wedging process explicit dynamics torque converter
在线阅读 下载PDF
Study of Factors Causing Time and Cost Overrun in Pre-Construction Project (A Case Study of Malaysia)
6
作者 Muhammad Ilyas Jing Li Irfan Ullah 《World Journal of Engineering and Technology》 2020年第1期1-12,共12页
Cost and time overrun are the key troubles of any improvement ventures. These troubles are inflicting the terrible end result in the development of kingdom monetary improvement and thriving. To overcome these problems... Cost and time overrun are the key troubles of any improvement ventures. These troubles are inflicting the terrible end result in the development of kingdom monetary improvement and thriving. To overcome these problems, the?paper examines predominant impact on elements causing the mission postponement and cost. A poll review was led for the situation study embracing various information-gathering procedures. The discoveries from the contextual investigation uncovered that the most persuasive factors in Malaysia:?1) contractor’s inappropriate arranging, 2) poor site the board, 3) deficient contractual worker experience,?are the most powerful factors. This paper has likewise broken down the normal and least effective of the postpone variables causing task deferral and cost overrun in Malaysia. It likewise infers that there are various measures as per the idea of deferring components to decrease the effect on task postponement and cost overruns in the development industry.?There are significant factors in the control of time overrun that would be actual thought related to know and tackle in great impact to improvement rate which may additionally no capacity that be recovered. Thirty (30) massive development extensions in Malaysia were exceptional coping with time overrun at some stage in development. Out of 30 undertakings, 17 (56.67%) ventures had been introduced by using 1100 days’ time overrun, 5 (16.67%) extensions in the middle of a hundred and one to 200 days, 5 (16.67%) ventures?201 to 300 days while three (10%) ventures have been deferred for timeframe over 300 days. 展开更多
关键词 COST and TIME overruns DELAY Factors Construction Industry PROJECTS DELAY
在线阅读 下载PDF
Avoiding Cost Overruns in Construction Projects in India
7
作者 Abdussalam Shibani Kumar Arumugam 《Management Studies》 2015年第4期192-202,共11页
The main aim of this paper is to identify the major reasons for cost overruns in construction projects in India as well as the critical success factors that are helping to avoid the cost overruns. For this, the existi... The main aim of this paper is to identify the major reasons for cost overruns in construction projects in India as well as the critical success factors that are helping to avoid the cost overruns. For this, the existing literature is reviewed and critical success factors are identified. Based on them, survey questions and interview questions are prepared. The findings supported the proposed hypothesis, i.e., lack of certain critical success factors leads to cost overruns in construction projects in India. They also confirmed the proposed proactive and reactive strategies of some researchers. The effective critical success factors include appropriate planning in the initial stages, skills of contractors and architects, good relationship and regular coordination among client and contractor, and early contribution of contractor with the project. The ideal methods that help to reduce cost overruns include efficient planning, proper management of site and supervision of the project, suitable planning and arrangement of project, proper methods for construction, regular meetings on development of the project, and hiring proficient subcontractors and suppliers. 展开更多
关键词 INDIA CONSTRUCTION critical success factors cost overrun
在线阅读 下载PDF
Project Team Perception of Causes of Building Cost Overruns: A Reflection in Tanzania
8
作者 Harriet Eliufoo 《Journal of Civil Engineering and Architecture》 2017年第2期149-158,共10页
The paper provides an empirical insight into the significance of shared cognition reflected in the perception of key actors in selected construction projects. It has explored how clients, consultants and contractors p... The paper provides an empirical insight into the significance of shared cognition reflected in the perception of key actors in selected construction projects. It has explored how clients, consultants and contractors prioritize causes of cost overrun in building projects in Tanzania and measured the statistical variance in their order of rank. A total of 55 respondents were selected from public projects that had experienced cost overruns. The results show an inclination of the top 4 causes of cost overrun being technical and originate from internal sources. The Spearman correlation coefficient established a strong positive correlation in the ranking of causes of cost overrun in construction project by clients, consultants and contractors, suggesting a shared cognition is in place for the project team. The outcome provides a good base for contemplating success of mitigation measures for cost overruns and reiterates the significance for a shared cognition for project team success. 展开更多
关键词 Cost overrun construction project shared cognition team success.
在线阅读 下载PDF
Seem to overrun on time and budget for engineering projects
9
作者 CHEN Yu LIANG De Xiang 《International Journal of Technology Management》 2014年第8期177-178,共2页
In this thesis,construction industries face with the major challenges are cost overruns and time delays, which have existed in most of projects, especially in developing countries. Construction projects and the enviro... In this thesis,construction industries face with the major challenges are cost overruns and time delays, which have existed in most of projects, especially in developing countries. Construction projects and the environment are increasingly complex, thus it has greater demands on project managers and cost managers that deliver processes on time. However the process of construction is limited to unforeseeable and variable factors, resulting from many sources. The aim of the report is to analyze determining factors about causing budget overrun and time delays by reviewing and identifying past cases. Furthermore, the construction process is made up of three critical phases, i.e. conception, design, construction. Generally, the majority of time delays and cost overrun happen in the period of construction, where many factors are always unforeseeable, and time delays usually associate with cost overruns. (Chan and Kumaraswamy, 1997) 展开更多
关键词 cost overruns and time delays the construction process case studies client and consultant
在线阅读 下载PDF
Research on Cost Overrun Risk of Construction Phase of Vietnam Highway International Contracting Project
10
作者 Hong Anh Vu Jianqiong Wang +2 位作者 Lianxing Min Sy Hung Mai Hong Phong Nguyen 《Engineering(科研)》 2016年第3期86-98,共13页
Recently, the highway construction projects increase rapidly in Vietnam and most of them are international contracting projects. It results serious negative influence on the local government and enterprises that the c... Recently, the highway construction projects increase rapidly in Vietnam and most of them are international contracting projects. It results serious negative influence on the local government and enterprises that the common cost overrun of projects, and the risk factors of it is different in the different countries, different stages and projects types. So in this paper, we generate an evaluation index system of highway construction projects cost overrun risk in Vietnam in the perspective of different project participants, and also evaluate the effects of these factors in method of regression analysis. The empirical results confirmed 7 main factors that have aggravated cost overrun risk in construction stages, e.g. survey and design scheme risk. In final, the corresponding suggestions are proposed to reduce the project cost overrun risk. 展开更多
关键词 HIGHWAY CONSTRUCTION Cost overrun Risk Management VIETNAM
在线阅读 下载PDF
Structural Design of an Overrun Duplex Apartment in Chongqing
11
作者 SHENChongsheng 《外文科技期刊数据库(文摘版)工程技术》 2022年第3期214-219,共6页
Due to the functional requirements of the buildings with leaping floors, even and odd floors are required to have staggered openings. As a result, there are many wall pillars and weak connecting plates passing through... Due to the functional requirements of the buildings with leaping floors, even and odd floors are required to have staggered openings. As a result, there are many wall pillars and weak connecting plates passing through the floors. This kind of hole wall column should be regarded as the key component;This kind of weak connection plate and strip plays an important role in connecting the peripheral vertical members under the horizontal action of wind and earthquake. At the same time, the structural units of foreign houses are often frame-supported transfer structures for the use of basements. Therefore, this paper focuses on the performance of portal wall columns, weak connection beams at the sides of the portal, connection strips, frame pillar beams and floor shear walls under earthquake resistance and rare earthquakes. According to the analysis results, targeted structural technical measures are taken. 展开更多
关键词 THERMOCLINE floor slabs with openings overrun analysis
原文传递
分散式新能源并网稳定性问题分析与控制方法 被引量:2
12
作者 李勇 常樊睿 +3 位作者 彭衍建 王绍阳 张曦壬 曹一家 《高电压技术》 北大核心 2025年第4期1543-1559,共17页
发展新能源是构建新型能源体系、助力中国实现“双碳”目标的重要战略举措。中国中部、东部和南部地区因其地形特征多采用分散式的新能源开发模式。但分散式新能源通常处于网架结构薄弱地区,工业负荷接入周边,加之其自身显著的电力电子... 发展新能源是构建新型能源体系、助力中国实现“双碳”目标的重要战略举措。中国中部、东部和南部地区因其地形特征多采用分散式的新能源开发模式。但分散式新能源通常处于网架结构薄弱地区,工业负荷接入周边,加之其自身显著的电力电子特性,并网后会给电力系统带来复杂的稳定控制难题。为此,针对分散式新能源并网稳定性问题的机理分析与控制方法进行综述,从多时间尺度的角度归纳了谐波、电压、暂态同步以及频率等方面不同类型的稳定性问题,并总结了中国新能源并网的相关标准;进一步分析了复杂并网稳定性问题的产生原因,阐述并比较了各类稳定性控制方法的原理、优缺点等;最后结合新型储能与人工智能算法的发展趋势,对该领域未来研究方向进行了总结与展望。 展开更多
关键词 分散式新能源 谐波 高/低电压穿越 暂态同步失稳 频率越限 电压抬升
原文传递
基于移动闭塞的列车越行优化设计
13
作者 李旭妍 石瑞 +1 位作者 郭华玲 刘杰 《机械工程与自动化》 2025年第3期67-70,共4页
随着我国经济的不断发展,人们对快速出行的需求日益增大。为缩短行车间隔时间,以移动闭塞为基础,提出了快慢车越行模式,并设计了基于移动闭塞的越行系统。该系统采用开源电子原型平台作为控制中心,利用测距芯片实时检测两车之间距离,并... 随着我国经济的不断发展,人们对快速出行的需求日益增大。为缩短行车间隔时间,以移动闭塞为基础,提出了快慢车越行模式,并设计了基于移动闭塞的越行系统。该系统采用开源电子原型平台作为控制中心,利用测距芯片实时检测两车之间距离,并实现了车-车通信;测距芯片传回的信息交由基站内的核心控制系统,系统再对数据进行处理分析,并判断两车距离是否小于预先设定的安全防护距离;控制中心针对不同情况对快慢车的电机驱动模块发送相应命令,实现两车安全防护下的越行功能;在越行站内设置越行警示灯,给相关工作人员及乘客提供预警,排除因进站信号机亮红灯锁闭使快车不能实现越行的隐患。利用该系统,可缩短乘客等待时间、增大行车密度、减少部分轨旁设备的建设。 展开更多
关键词 移动闭塞 列车越行 车-车通信 行车间隔时间
在线阅读 下载PDF
超越离合器外星轮的磨损分析及优化设计
14
作者 禹鑫 薛进学 +2 位作者 张作超 李泽强 王世杰 《轴承》 北大核心 2025年第6期23-28,共6页
针对超越离合器外星轮的磨损问题,通过故障树分析得出楔角、外星轮材料可能是导致磨损的主要因素,在此基础上通过理论分析得到磨损原因为楔角偏大以及外星轮材料硬度较低,建立有限元模型并结合试验验证了分析的正确性,提出将楔角由10... 针对超越离合器外星轮的磨损问题,通过故障树分析得出楔角、外星轮材料可能是导致磨损的主要因素,在此基础上通过理论分析得到磨损原因为楔角偏大以及外星轮材料硬度较低,建立有限元模型并结合试验验证了分析的正确性,提出将楔角由10°改为9°,外星轮材料由ZGCr15改为耐磨性更好的高速工具钢W18Cr4V,优化设计的超越离合器外星轮接触区域的磨损得到显著改善,验证了优化设计方案的正确性。 展开更多
关键词 超越离合器 磨损 楔角 材料 有限元法 试验 接触应力 疲劳寿命
在线阅读 下载PDF
构建灾害风险图谱提高电力系统安全调度能力
15
作者 解大 李子怡 +1 位作者 田洲 王凯 《上海交通大学学报》 北大核心 2025年第9期1338-1347,共10页
严重的地质灾害会导致大停电事故,从而影响电网的安全稳定运行.针对地质灾害对电网的影响,提出一种基于灾害风险图谱的电力系统安全调度策略.首先,构建多种灾害影响因子的灾害风险图谱,并将该图谱与输电线路的地理位置相结合,得到输电... 严重的地质灾害会导致大停电事故,从而影响电网的安全稳定运行.针对地质灾害对电网的影响,提出一种基于灾害风险图谱的电力系统安全调度策略.首先,构建多种灾害影响因子的灾害风险图谱,并将该图谱与输电线路的地理位置相结合,得到输电线路的危险情况;然后,建立电力系统运行风险模型,通过风险综合指标对电力系统的风险情况进行量化分析;最后,以新英格兰地区为例,采用粒子群算法构建发电机和灵活性资源的调节策略,并验证其有效性和可行性.结果表明,所提电力系统安全调度策略可以有效减少包括电力系统越限/重载风险在内的风险综合指标值,增强电网运行的安全性和稳定性. 展开更多
关键词 地质灾害 风险图谱 越限/重载风险 灵活性资源
在线阅读 下载PDF
航空器冲偏出跑道事件关键人为因素分析方法
16
作者 刘璐 陈玲 +2 位作者 朱晓波 杨磊 孙艺璇 《科学技术与工程》 北大核心 2025年第22期9640-9648,共9页
针对冲偏出跑道事件调查未全面揭示人为因素之间的复杂因果关系问题,提出了一种航空器冲偏出跑道事件关键人为因素分析方法。首先,改进人因分析和分类系统模型,用以识别冲偏出跑道的根本原因,基于事故树分析方法识别冲偏出跑道的直接原... 针对冲偏出跑道事件调查未全面揭示人为因素之间的复杂因果关系问题,提出了一种航空器冲偏出跑道事件关键人为因素分析方法。首先,改进人因分析和分类系统模型,用以识别冲偏出跑道的根本原因,基于事故树分析方法识别冲偏出跑道的直接原因。其次,构建人为因素调查决策支持模型,得到航空器冲偏出跑道事件人为因素致因链条。然后,构建冲偏出跑道事件人为因素的贝叶斯网络,通过预测推理、诊断推理及灵敏度分析量化致因因素的重要程度,得到冲偏出跑道事件的关键人为因素。结果表明:基于人为因素调查决策支持模型得到32条冲偏出跑道事件致因链条,全面揭示该事件的人为因素及其耦合关系;基于贝叶斯推理得到该事件的关键人因致因链条为“动作执行不当/信息预处理不当→不安全行为→冲偏出跑道”。以上结论与航空器冲偏出跑道事件调查结论基本一致,对航空器冲偏出跑道事件预警和防范能力的提升有积极意义。 展开更多
关键词 航空安全 冲偏出跑道 人为因素 贝叶斯网络 致因链条分析
在线阅读 下载PDF
考虑异构分布式光伏电压治理潜力的配电网集群式优化调控方法 被引量:1
17
作者 兰征 杨淳智 +3 位作者 谭仁煜 何东 易波 喻希 《电源学报》 北大核心 2025年第3期196-207,共12页
随着配电网中分布式光伏的渗透率不断提高,光伏功率倒送与电压越限问题日益加剧,且各光伏的控制方式与调控潜力存在差异,导致异构光伏难以协同,影响配电网的调控与运行。因此,本文提出1种考虑异构分布式光伏电压治理潜力的配电网集群式... 随着配电网中分布式光伏的渗透率不断提高,光伏功率倒送与电压越限问题日益加剧,且各光伏的控制方式与调控潜力存在差异,导致异构光伏难以协同,影响配电网的调控与运行。因此,本文提出1种考虑异构分布式光伏电压治理潜力的配电网集群式优化调控方法。首先,针对高渗透率分布式光伏接入场景下易出现节点电压越限的问题,提出计及电压偏差灵敏度的配电网集群划分方法,实现综合考虑电压偏差、功率平衡和节点耦合程度的配电网集群划分;其次,分析异构分布式光伏有功、无功调节特性,构建其在不同运行模式下的调控模型;再次,基于同步型交替方向乘子算法,以综合运行成本和电压偏差最低为目标建立考虑异构分布式光伏电压治理潜力的配电网集群式优化调控模型;最后,以改进的IEEE33节点配电网作为算例,验证所提优化模型的有效性。结果表明,所提策略实现了异构光伏的高效管控,在保证配电网经济运行的同时,改善了配电网的电压水平。 展开更多
关键词 功率倒送 电压越限 异构分布式光伏 电压偏差灵敏度 集群划分 优化调控
在线阅读 下载PDF
含电能路由器的光伏配电网电压越限问题潮流优化研究 被引量:4
18
作者 杨剑锋 李婷 +1 位作者 杨爱民 冯子宁 《发电技术》 2025年第1期113-125,共13页
【目的】随着高渗透率分布式光伏接入配电网,功率倒送、电压越限等问题愈发严重。为此,提出了一种基于改进的黑洞优化算法的电能路由器优化方案。【方法】通过对电能路由器进行端口稳态建模,建立了含多端口电能路由器的高渗透光伏配电... 【目的】随着高渗透率分布式光伏接入配电网,功率倒送、电压越限等问题愈发严重。为此,提出了一种基于改进的黑洞优化算法的电能路由器优化方案。【方法】通过对电能路由器进行端口稳态建模,建立了含多端口电能路由器的高渗透光伏配电网统一模型,并针对该模型提出了电压偏差与线路损耗最小的优化目标。在甘肃某地区的配电网简化模型下,采用改进的黑洞优化算法进行优化求解,并对比分析了加入电能路由器前后配电网系统的数据。【结果】光伏输出功率为0%、50%、100%时,电压最小(最大值)分别提升(降低)了10.86%、3.16%、9.64%,各节点电压幅值控制在0.93~1.07 pu范围内;线路平均损耗下降了57.94%~81.56%。【结论】通过加入电能路由器以及采用相应的优化策略,实现了分布式光伏配电网的潮流优化。研究成果对提高分布式光伏在配电网中的渗透率具有重要意义。 展开更多
关键词 新能源 光伏发电 光伏配电网 电能路由器 稳态建模 潮流优化 改进的黑洞优化算法 电压越限
在线阅读 下载PDF
多情景下飞机冲/偏出跑道应急资源配置优化研究
19
作者 张梓妍 邵荃 郑学荣 《交通科学与工程》 2025年第4期51-60,共10页
【目的】为应对飞机冲/偏出跑道事故中救援情景和应急需求高度不确定的问题,特别是在资源受限的条件下,采用基于动态适配策略的方法获取最佳资源配置方案,有助于提升救援效率、减少资源冗余,为机场应急管理提供决策支持。【方法】基于10... 【目的】为应对飞机冲/偏出跑道事故中救援情景和应急需求高度不确定的问题,特别是在资源受限的条件下,采用基于动态适配策略的方法获取最佳资源配置方案,有助于提升救援效率、减少资源冗余,为机场应急管理提供决策支持。【方法】基于100余起冲/偏出跑道事故案例,构建贝叶斯网络以识别关键情景因素。结合情景分析理论与离散事故建模方法,利用Anylogic软件建立多情景救援仿真模型,探究不同救援情景和资源配置数量对“资源利用率”“救援总时间”和“资源满足率”等指标的影响。【结果】在各种情景下均存在最优资源配置方案,同时,恶劣天气会显著降低救援效率。资源投入与救援效率呈非线性关系,过度配置资源可能会导致资源堆积和调度复杂性增加,进而降低效能。【结论】实现效率和效益平衡的合理资源配置,是提高应急救援效率的核心。 展开更多
关键词 航空运输 应急资源配置 Anylogic仿真 冲/偏出跑道 情景分析
在线阅读 下载PDF
工作面采空区瓦斯运移规律与治理分析 被引量:1
20
作者 翟晓宇 《凿岩机械气动工具》 2025年第4期84-86,共3页
为解决矿井采空区和巷道瓦斯超限的问题,文章通过建立瓦斯运移模型对采空区瓦斯运移规律展开分析,发现采空区沿空留巷侧中部位置更易聚集漏风流,从而导致该区域瓦斯浓度显著升高。通过调整配风比和抽采流量,文章采取了优化措施,有效降... 为解决矿井采空区和巷道瓦斯超限的问题,文章通过建立瓦斯运移模型对采空区瓦斯运移规律展开分析,发现采空区沿空留巷侧中部位置更易聚集漏风流,从而导致该区域瓦斯浓度显著升高。通过调整配风比和抽采流量,文章采取了优化措施,有效降低了巷道及采空区的瓦斯浓度,降低了巷道风压,从而为提升矿井的安全生产水平提供了技术支持。 展开更多
关键词 采空区 瓦斯超限 瓦斯运移规律 瓦斯治理 配风比 抽采流量
在线阅读 下载PDF
上一页 1 2 46 下一页 到第
使用帮助 返回顶部