The failure characteristic of talus-derived rock mass continues to challenge quantitative hazard assessments in open-pit mining. Physical model test was used to assess the failure modes and mechanisms on talus-derived...The failure characteristic of talus-derived rock mass continues to challenge quantitative hazard assessments in open-pit mining. Physical model test was used to assess the failure modes and mechanisms on talus-derived rock mass. The different types of failure modes of the talus-derived rock mass were introduced and a possible failure mechanism relation between the failure zone and the structure of the talus-derived rock mass was also shown. The physical model test results indicate that the rainfall has significant influence on the stability and failure modes of talus-derived rock mass during open-pit mining. The development of the seepage area caused by rainfall initiates the localized failure in that particular area, and the initiation of localized instability is mainly induced by stress changes concentrated in the seepage area.展开更多
The advancement of intelligent mining in open-pit operations has imposed higher demands on geological transparency,aiming to provide a robust foundation for intelligent drilling and charging.In this study,a linear arr...The advancement of intelligent mining in open-pit operations has imposed higher demands on geological transparency,aiming to provide a robust foundation for intelligent drilling and charging.In this study,a linear array of 120 nodal seismometers was deployed along the surfaces of the C8 and C9 platforms at Fenghuang Mountain to investigate cavities within the rock mass and prevent improper intelligent charging.The seismometers were 1 m apart along measurement lines,with a 2-m spacing between lines,and the monitoring time for each line was set at 2 h.This deployment was paired with spatial autocorrelation and station autocorrelation to analyze ambient noise seismic data and image the velocity and structure within the rock mass.The results demonstrate that the locations and sizes of cavities or loose structures can be accurately identified at the prepared excavation site.Compared with traditional geological exploration methods for openpit mines,the approach in this study off ers higher accuracy,greater efficiency,reduced labor intensity,and insensitivity to water conditions.Ambient noise seismic imaging for detecting adverse geological conditions in open-pit mines provides critical insights and references for intelligent mining advancements.展开更多
The development of open-pit mines can adversely affect and even damage existing access tunnels. To ensure the safety and serviceability of them, it is essential to know potential adverse effects of the mining sequence...The development of open-pit mines can adversely affect and even damage existing access tunnels. To ensure the safety and serviceability of them, it is essential to know potential adverse effects of the mining sequence on existing tunnels such as displacements of the lining and additional loads on the lining. In this paper, three-dimensional numerical parametric study is performed to explore this complex interaction. This study investigates the effects of different parameters that may affect the tunnel response. These parameters are: excavation sequence method, horizontal/vertical stress ratio, slope angle, and tunnel diameter. This study shows that the mining sequence affects the stability of the tunnels. The open-pit mining activities lead to both higher axial forces in rock bolts and normal forces and bending moments in the lining. The results of the analysis also demonstrate that the mining sequence causes tunnel heave and significant tensile forces in the lining. Based on the study in this paper a better understanding of the interaction between oDen-oit minin~ seouence and tunnels will he ohtained展开更多
Mineral resources have played a very important role in promoting the development of Chinese society. Due to the continuous development of society and economy, Chinese demand for mineral resources is also increasing, a...Mineral resources have played a very important role in promoting the development of Chinese society. Due to the continuous development of society and economy, Chinese demand for mineral resources is also increasing, and mining technology is also improving. Open-pit mining technology, as the main operation mode in mining industry, has been widely used. However, due to the excessive development and utilization of resources, the former open-pit mining site has already entered the deep concave mining stage, which further leads to the worse working environment. Therefore, it is necessary to further improve the mining technology. Next, this paper mainly studies the current development of opencast mining technology in China, and briefly expounds the future prospect.展开更多
Under circumstances in which both underground mining and open-pit mining are employed, the mining effects of two approaches will be superposed and the mining slope will receive several induced stress fields, which mak...Under circumstances in which both underground mining and open-pit mining are employed, the mining effects of two approaches will be superposed and the mining slope will receive several induced stress fields, which makes the sliding mechanism and deformation law of slope rock mass more complicated. This paper, targeting at the east slope of Antaibao Mine with the joint employment of underground mining and open-pit mining, aims to study the moving law of the slope rock mass and the damage mechanism to the overburden of the goaf by numerical simulation. It is supposed that models of possible damage to the slope could be explored for guidance to safety-production of the mine.展开更多
A methodology applicable at any phase of a surface mining project for evaluating its current technical and economic feasibility is presented.It requires the typically available quantitative data on the ore-body,with i...A methodology applicable at any phase of a surface mining project for evaluating its current technical and economic feasibility is presented.It requires the typically available quantitative data on the ore-body,with its three-dimensional block model developed upon accurate interpolations.Thus it allows estimations of exploitable reserves in function of various cut-off grades,such as the average grade of mineable ore,the tonnages of ore and waste rock,stripping ratios and proft estimates for different production levels.If cost evaluations of essential mine operations are available(such as ore mining,waste removal,ore concentration,transportation,indirect project costs and expected concentrate selling prices),the methodology will provide clear indications on the economic feasibility of mining,including the best available options at any moment.Simple expressions are developed on the basis of a proft mathematical function and an application example is presented with data available from an existing iron ore deposit.展开更多
With the rapid development of modern science and technology, UAV aerial photography technology is also more and more applied to the monitoring of open-pit mines, greatly improving the efficiency of open-pit mining. Co...With the rapid development of modern science and technology, UAV aerial photography technology is also more and more applied to the monitoring of open-pit mines, greatly improving the efficiency of open-pit mining. Compared with the traditional detection technology, UAV aerial photography technology has irreplaceable advantages. This paper analyzes the measurement accuracy and available reserves measurement of aerial photography, expounds the functions of aerial photography technology in open-air excavation, and sums up the main advantages of aerial photography technology in open-air excavation, so as to provide some reference suggestions for improving the mining efficiency and monitoring accuracy.展开更多
Three important aspects of phase-mining must be optimized:the number of phases,the geometry and location of each phase-pit(including the ultimate pit),and the ore and waste quantities to be mined in each phase.A model...Three important aspects of phase-mining must be optimized:the number of phases,the geometry and location of each phase-pit(including the ultimate pit),and the ore and waste quantities to be mined in each phase.A model is presented,in which a sequence of geologically optimum pits is first generated and then dynamically evaluated to simultaneously optimize the above three aspects,with the objective of maximizing the overall net present value.In this model,the dynamic nature of the problem is fully taken into account with respect to both time and space,and is robust in accommodating different pit wall slopes and different bench heights.The model is applied to a large deposit consisting of 2044 224 blocks and proved to be both efficient and practical.展开更多
Enhancing the mining speed of a working face has become the primary approach to achieve high production and efficiency in coal mines,thereby further improving the production capacity.However,the problem of rock bursts...Enhancing the mining speed of a working face has become the primary approach to achieve high production and efficiency in coal mines,thereby further improving the production capacity.However,the problem of rock bursts resulting from this approach has become increasingly serious.Therefore,to implement coal mine safety and efficient extraction,the impact of deformation pressure caused by different mining speeds should be considered,and a reasonable mining speed of the working face should be determined.The influence of mining speed on overlying rock breaking in the stope is analyzed by establishing a key layer block rotation and subsidence model.Results show that with the increasing mining speed,the compression amount of gangue in the goaf decreases,and the rotation and subsidence amount of rock block B above goaf decreases,forcing the rotation and subsidence amount of rock block A above roadway to increase.Consequently,the contact mode between rock block A and rock block B changes from line contact to point contact,and the horizontal thrust and shear force between blocks increase.The increase in rotation and subsidence of rock block A intensifies the compression degree of coal and rock mass below the key layer,thereby increasing the stress concentration degree of coal and rock mass as well as the total energy accumulation.In addition,due to the insufficient compression of gangue in the goaf,the bending and subsidence space of the far-field key layer are limited,the length of the suspended roof increases,and the influence range of mining stress and the energy accumulation range expand.Numerical test results and underground microseismic monitoring results verify the correlation between mining speed and stope energy,and high-energy events generally appear 1-2 d after the change in mining speed.On this basis,the statistical principle confirms that the maximum mining speed of the working face at 6 m/d is reasonable.展开更多
In the context of increasing demand for coal mine resources in China’s current socio-economic development,traditional mining methods have been difficult to effectively meet the requirements of safety production and e...In the context of increasing demand for coal mine resources in China’s current socio-economic development,traditional mining methods have been difficult to effectively meet the requirements of safety production and environmental protection.As a result,coal mine filling mining technology has emerged,which can effectively achieve the goal of controlling surface subsidence in practical applications,while also significantly improving the recovery rate of coal resources.Based on this,this study will first elaborate on the characteristics of filling mining technology,and then analyze the key points of the application of supporting technology for mechanical and electrical equipment in the corresponding working face based on actual cases,in order to provide support for improving the efficiency of coal mining.展开更多
Coal mine underground reservoir(CMUR) technology mitigates water scarcity in China's coal-rich western regions but lacks tailored solutions for steeply inclined coal seams.This study develops a novel framework of ...Coal mine underground reservoir(CMUR) technology mitigates water scarcity in China's coal-rich western regions but lacks tailored solutions for steeply inclined coal seams.This study develops a novel framework of steeply inclined coal mine underground reservoirs(SICMUR),which is a paradigm shift from conventional CMUR that the coal seam itself serves as the reservoir floor,challenging conventional designs due to depth-dependent permeability and mechanical constraints.Triaxial mechanical-seepage tests on Xinjiang Wudong coal samples(100,200,300 m depths) revealed a 3.5 MPa triaxial strength increase per 100 m depth and a 58-fold post-peak permeability surge at 300 versus 100 m.Similar model simulations revealed mining-induced stress redistribution and significant deformation effects,particularly subsidence and water-conducting fractures during lower coal seam mining.Results indicate a minimum 40 m safety distance between reservoirs and lower coal seams.Critical construction parameters were investigated for Wudong mine SICMUR as collapse zone heights(9.9–12.31 m) and waterconducting fracture zone heights(31.96–37.40 m).This work systematically bridges SICMUR concepts to field implementation,offering a framework for water preservation in steeply inclined mining while addressing safety concerns,providing a new approach for water reservation in steeply inclined coal mining.展开更多
Xinli district of Sanshandao Gold Mine is the first subsea metal mine in China.To achieve 6 kt/d production capacity under the premise of safe mining,high-intensity mining might destroy the in-situ stress filed and th...Xinli district of Sanshandao Gold Mine is the first subsea metal mine in China.To achieve 6 kt/d production capacity under the premise of safe mining,high-intensity mining might destroy the in-situ stress filed and the stability of rockmass.According to sampling and testing of ore-rock and backfill and in-situ stress field measurement,safety factor method calculation model based on stress-strain strength reduction at arbitrary points and Mohr-Coulomb yield criterion was established and limit displacement subsidence values under the safety factor of different limit stoping steps were calculated.The results from three years in-situ mining and strata movement monitoring using multi-point displacements meter showed that the lower settlement frame stope hierarchical level filling mining method,mining sequence are reasonable and rockmass stability evaluation using safety factor method,in-situ real-time monitoring can provide the technical foundation for the safety of seabed mining.展开更多
A new pseudolites (PLs) structure optimization model of global navigation satellite system (GNSS)/PLs integration positioning system used in deep open-pit mine was presented. Position dilution of precision (Pdop...A new pseudolites (PLs) structure optimization model of global navigation satellite system (GNSS)/PLs integration positioning system used in deep open-pit mine was presented. Position dilution of precision (Pdop) and reliability were selected as the optimization indicators to build a multi-objective optimization model to decide the optimum PLs location. A scheme was designed by establishing a four-dimensional model taking azimuth (a), elevation angle (e) and epoch (t) of satellites as the input independent variables and Pdop as the dependent variable to calculate the optimum PLs location zone considering the real circumstances. And then the ultimate PLs location can be fixed by testing the curves of Pdop along time. A field collected Trimble R8 GPS data set in China University of Mining and Technology (CUMT) campus was used for the model test to show the effectiveness, and the proposed PLs optimum design scheme was used at the west open-pit mine of Fushun mining group Co., Ltd., in China, better Pdop and reliability have been achieved for the integration system. Both experiments show that the proposed scheme is excellent in designing GNSS/PLs system which is helpful for improving the performance of the positioning system and reducing the cost.展开更多
Taking the test stopes during continuous mining induced roof caving of Tongkeng ore-body No.92 as example, the calculation flow of unloading analysis was established. According to the unloading region division method ...Taking the test stopes during continuous mining induced roof caving of Tongkeng ore-body No.92 as example, the calculation flow of unloading analysis was established. According to the unloading region division method of the affected zone theory, and the deterioration laws of mechanics parameters of unloading rock mass, the continuous mining process in underground mine was analyzed by the software MIDAS/GTS, the mechanical response of roof rock mass unloading was studied, and the differences were analyzed with the conventional simulation. The result shows that the maximum tensile stress, subsidence displacement and equivalent plastic strain of roof rock mass are 1.5 MPa, 20 cm and 1.5% in the unloading analysis, while 1.0 MPa, 13 cm and 0.9% in the conventional analysis. The values of unloading analysis, which are also closer to the actual situation, are greater than those of conventional analysis; the maximum step in continuous mining is 48 m, which shows that the induced treatment of the roof should be carried out after 2 mining steps展开更多
A modified algorithm of combined GPS/GLONASS precise point positioning (GG-PPP) was developed by decreasing the number of unknowns to be estimated so that accurate position solutions can be achieved in the case of l...A modified algorithm of combined GPS/GLONASS precise point positioning (GG-PPP) was developed by decreasing the number of unknowns to be estimated so that accurate position solutions can be achieved in the case of less number of visible satellites. The system time difference between GPS and GLONASS (STDGG) and zenith tropospheric delay (ZTD) values were firstly estimated in an open sky condition using the traditional GG-PPP algorithm. Then, they were used as a priori known values in the modified algorithm instead of estimating them as unknowns. The proposed algorithm was tested using observations collected at BJFS station in a simulated open-pit mine environment. The results show that the position filter converges much faster to a stable value in all three coordinate components using the modified algorithm than using the traditional algorithm. The modified algorithm achieves higher positioning accuracy as well. The accuracy improvement in the horizontal direction and vertical direction reaches 69% and 95% at a satellite elevation mask angle of 50°, respectively.展开更多
Ore production is usually affected by multiple influencing inputs at open-pit mines.Nevertheless,the complex nonlinear relationships between these inputs and ore production remain unclear.This becomes even more challe...Ore production is usually affected by multiple influencing inputs at open-pit mines.Nevertheless,the complex nonlinear relationships between these inputs and ore production remain unclear.This becomes even more challenging when training data(e.g.truck haulage information and weather conditions)are massive.In machine learning(ML)algorithms,deep neural network(DNN)is a superior method for processing nonlinear and massive data by adjusting the amount of neurons and hidden layers.This study adopted DNN to forecast ore production using truck haulage information and weather conditions at open-pit mines as training data.Before the prediction models were built,principal component analysis(PCA)was employed to reduce the data dimensionality and eliminate the multicollinearity among highly correlated input variables.To verify the superiority of DNN,three ANNs containing only one hidden layer and six traditional ML models were established as benchmark models.The DNN model with multiple hidden layers performed better than the ANN models with a single hidden layer.The DNN model outperformed the extensively applied benchmark models in predicting ore production.This can provide engineers and researchers with an accurate method to forecast ore production,which helps make sound budgetary decisions and mine planning at open-pit mines.展开更多
Given the conditions of residual coal from the boundary of a flat dipping open-pit mine,which uses strip areas mining and inner dumping with slope-covering,we propose an open-pit and underground integrated mining tech...Given the conditions of residual coal from the boundary of a flat dipping open-pit mine,which uses strip areas mining and inner dumping with slope-covering,we propose an open-pit and underground integrated mining technology for residual coal of end slopes.In the proposal a conveyance road and ventilation conveyance near the slope are built,corresponding to the pit mining area and the surface coal mine dump,as well as an interval haulage tunnel and air-inlet tunnel.The outcome shows that such mining method may reduce the effect to slope stability from underground mining,it does not affect the dumping advance and has a high recovery rate of residual coal resources.The working face is timbered by single hydraulic props,transported by a scraper conveyor and supported by coal walls.This method of mining is one of layered top coal caving,with high resource recovery,low production cost where positive economic benefit can be realized.展开更多
The design and practice in supporting the cut slope of an open-pit mine wereintroduced, in which the high pressure grouting method was used in reinforcing the weak formation inthe slopes. Based on a detailed geologica...The design and practice in supporting the cut slope of an open-pit mine wereintroduced, in which the high pressure grouting method was used in reinforcing the weak formation inthe slopes. Based on a detailed geological survey of the slope, a theoretical analysis was carriedout, and the design parameters were proposed, where the Tresca or Mohr-Coulomb yield criteria wasemployed. A patent technology, named 'Technology of high pressure and multiple grouting in differentlevels within a single hole', was employed in the construction. Anchor bars were also installed asgrouting proceeds. This method combines anchoring and grouting comprehensively and was foundsuccessful in practice.展开更多
The retained coal in the end slope of an open-pit mine can be mined by the highwall mining techniques.However,the instability mechanism of the reserved rib pillar under dynamic loads of mining haul trucks and static l...The retained coal in the end slope of an open-pit mine can be mined by the highwall mining techniques.However,the instability mechanism of the reserved rib pillar under dynamic loads of mining haul trucks and static loads of the overlying strata is not clear,which restricts the safe and efcient application of highwall mining.In this study,the load-bearing model of the rib pillar in highwall mining was established,the cusp catastrophe theory and the safety coefcient of the rib pillar were considered,and the criterion equations of the rib pillar stability were proposed.Based on the limit equilibrium theory,the limit stress of the rib pillar was analyzed,and the calculation equations of plastic zone width of the rib pillar in highwall mining were obtained.Based on the Winkler foundation beam theory,the elastic foundation beam model composed of the rib pillar and roof under the highwall mining was established,and the calculation equations for the compression of the rib pillar under dynamic and static loads were developed.The results showed that with the increase of the rib pillar width,the total compression of the rib pillar under dynamic and static loads decreases nonlinearly,and the compression of the rib pillar caused by static loads of the overlying strata and trucks has a decisive role.Numerical simulation and theoretical calculation were also performed in this study.In the numerical simulation,the coal seam with a buried depth of 122 m and a thickness of 3 m is mined by highwall mining techniques.According to the established rib pillar instability model of the highwall mining system,it is found that when the mining opening width is 3 m,the reasonable width of the rib pillar is at least 1.3 m,and the safety factor of the rib pillar is 1.3.The numerical simulation results are in good agreement with the results of theoretical calculation,which verifes the feasibility of the theoretical analysis of the rib pillar stability.This research provides a reference for the stability analysis of rib pillars under highwall mining.展开更多
Fully mechanized solid backfill mining(FMSBM) technology adopts dense backfill body to support the roof. Based on the distinguishing characteristics and mine pressure control principle in this technology, the basic pr...Fully mechanized solid backfill mining(FMSBM) technology adopts dense backfill body to support the roof. Based on the distinguishing characteristics and mine pressure control principle in this technology, the basic principles and methods for mining pressure monitoring were analyzed and established. And the characteristics of overburden strata movement were analyzed by monitoring the support resistance of hydraulic support, the dynamic subsidence of immediate roof, the stress of backfill body, the front abutment pressure, and the mass ratio of cut coal to backfilled materials. On-site strata behavior measurements of 7403 W solid backfilling working face in Zhai Zhen Coal Mine show that the backfill body can effectively support the overburden load, obviously control the overburden strata movement, and weaken the strata behaviors distinctly. Specific performances are as follows. The support resistance decreases obviously; the dynamic subsidence of immediate roof keeps consistent to the variation of backfill body stress, and tends to be stable after the face retreating to 120-150 m away from the cut. The peak value of front abutment pressure arises at 5-12 m before the operating face, and mass ratio is greater than the designed value of 1.15, which effectively ensures the control of strata movement. The research results are bases for intensively studying basic theories of solid backfill mining strata behaviors and its control, and provide theoretical guidance for engineering design in FMSBM.展开更多
基金Project (41202220) supported by the National Natural Science Foundation of ChinaProject (2-9-2012-65) supported by the Fundamental Research Funds for the Central Universities, ChinaProject (20120022120003) supported by the Ph.D Program Foundation of Ministry of Education of China
文摘The failure characteristic of talus-derived rock mass continues to challenge quantitative hazard assessments in open-pit mining. Physical model test was used to assess the failure modes and mechanisms on talus-derived rock mass. The different types of failure modes of the talus-derived rock mass were introduced and a possible failure mechanism relation between the failure zone and the structure of the talus-derived rock mass was also shown. The physical model test results indicate that the rainfall has significant influence on the stability and failure modes of talus-derived rock mass during open-pit mining. The development of the seepage area caused by rainfall initiates the localized failure in that particular area, and the initiation of localized instability is mainly induced by stress changes concentrated in the seepage area.
基金National science and technology signifi cant special(No.2024ZD1003406)Natural Science Research Project of Colleges and Universities in Anhui Province(No.2024AH050374)National Natural Science Foundation of China(Grant No.52274071).
文摘The advancement of intelligent mining in open-pit operations has imposed higher demands on geological transparency,aiming to provide a robust foundation for intelligent drilling and charging.In this study,a linear array of 120 nodal seismometers was deployed along the surfaces of the C8 and C9 platforms at Fenghuang Mountain to investigate cavities within the rock mass and prevent improper intelligent charging.The seismometers were 1 m apart along measurement lines,with a 2-m spacing between lines,and the monitoring time for each line was set at 2 h.This deployment was paired with spatial autocorrelation and station autocorrelation to analyze ambient noise seismic data and image the velocity and structure within the rock mass.The results demonstrate that the locations and sizes of cavities or loose structures can be accurately identified at the prepared excavation site.Compared with traditional geological exploration methods for openpit mines,the approach in this study off ers higher accuracy,greater efficiency,reduced labor intensity,and insensitivity to water conditions.Ambient noise seismic imaging for detecting adverse geological conditions in open-pit mines provides critical insights and references for intelligent mining advancements.
文摘The development of open-pit mines can adversely affect and even damage existing access tunnels. To ensure the safety and serviceability of them, it is essential to know potential adverse effects of the mining sequence on existing tunnels such as displacements of the lining and additional loads on the lining. In this paper, three-dimensional numerical parametric study is performed to explore this complex interaction. This study investigates the effects of different parameters that may affect the tunnel response. These parameters are: excavation sequence method, horizontal/vertical stress ratio, slope angle, and tunnel diameter. This study shows that the mining sequence affects the stability of the tunnels. The open-pit mining activities lead to both higher axial forces in rock bolts and normal forces and bending moments in the lining. The results of the analysis also demonstrate that the mining sequence causes tunnel heave and significant tensile forces in the lining. Based on the study in this paper a better understanding of the interaction between oDen-oit minin~ seouence and tunnels will he ohtained
文摘Mineral resources have played a very important role in promoting the development of Chinese society. Due to the continuous development of society and economy, Chinese demand for mineral resources is also increasing, and mining technology is also improving. Open-pit mining technology, as the main operation mode in mining industry, has been widely used. However, due to the excessive development and utilization of resources, the former open-pit mining site has already entered the deep concave mining stage, which further leads to the worse working environment. Therefore, it is necessary to further improve the mining technology. Next, this paper mainly studies the current development of opencast mining technology in China, and briefly expounds the future prospect.
文摘Under circumstances in which both underground mining and open-pit mining are employed, the mining effects of two approaches will be superposed and the mining slope will receive several induced stress fields, which makes the sliding mechanism and deformation law of slope rock mass more complicated. This paper, targeting at the east slope of Antaibao Mine with the joint employment of underground mining and open-pit mining, aims to study the moving law of the slope rock mass and the damage mechanism to the overburden of the goaf by numerical simulation. It is supposed that models of possible damage to the slope could be explored for guidance to safety-production of the mine.
文摘A methodology applicable at any phase of a surface mining project for evaluating its current technical and economic feasibility is presented.It requires the typically available quantitative data on the ore-body,with its three-dimensional block model developed upon accurate interpolations.Thus it allows estimations of exploitable reserves in function of various cut-off grades,such as the average grade of mineable ore,the tonnages of ore and waste rock,stripping ratios and proft estimates for different production levels.If cost evaluations of essential mine operations are available(such as ore mining,waste removal,ore concentration,transportation,indirect project costs and expected concentrate selling prices),the methodology will provide clear indications on the economic feasibility of mining,including the best available options at any moment.Simple expressions are developed on the basis of a proft mathematical function and an application example is presented with data available from an existing iron ore deposit.
文摘With the rapid development of modern science and technology, UAV aerial photography technology is also more and more applied to the monitoring of open-pit mines, greatly improving the efficiency of open-pit mining. Compared with the traditional detection technology, UAV aerial photography technology has irreplaceable advantages. This paper analyzes the measurement accuracy and available reserves measurement of aerial photography, expounds the functions of aerial photography technology in open-air excavation, and sums up the main advantages of aerial photography technology in open-air excavation, so as to provide some reference suggestions for improving the mining efficiency and monitoring accuracy.
基金Project(50974041) supported by the National Natural Science Foundation of ChinaProject(20090042120040) supported by the Doctoral Program Foundation of the Ministry of Education, ChinaProject(20093910) supported by the Natural Science Foundation of Liaoning Province, China
文摘Three important aspects of phase-mining must be optimized:the number of phases,the geometry and location of each phase-pit(including the ultimate pit),and the ore and waste quantities to be mined in each phase.A model is presented,in which a sequence of geologically optimum pits is first generated and then dynamically evaluated to simultaneously optimize the above three aspects,with the objective of maximizing the overall net present value.In this model,the dynamic nature of the problem is fully taken into account with respect to both time and space,and is robust in accommodating different pit wall slopes and different bench heights.The model is applied to a large deposit consisting of 2044 224 blocks and proved to be both efficient and practical.
基金supported by Technology Innovation Fund of China Coal Research Institute(2022CX-I-04)Science and Technology Innovation Venture Capital Project of China Coal Technology Engineering Group(2020-2-TD-CXY005)。
文摘Enhancing the mining speed of a working face has become the primary approach to achieve high production and efficiency in coal mines,thereby further improving the production capacity.However,the problem of rock bursts resulting from this approach has become increasingly serious.Therefore,to implement coal mine safety and efficient extraction,the impact of deformation pressure caused by different mining speeds should be considered,and a reasonable mining speed of the working face should be determined.The influence of mining speed on overlying rock breaking in the stope is analyzed by establishing a key layer block rotation and subsidence model.Results show that with the increasing mining speed,the compression amount of gangue in the goaf decreases,and the rotation and subsidence amount of rock block B above goaf decreases,forcing the rotation and subsidence amount of rock block A above roadway to increase.Consequently,the contact mode between rock block A and rock block B changes from line contact to point contact,and the horizontal thrust and shear force between blocks increase.The increase in rotation and subsidence of rock block A intensifies the compression degree of coal and rock mass below the key layer,thereby increasing the stress concentration degree of coal and rock mass as well as the total energy accumulation.In addition,due to the insufficient compression of gangue in the goaf,the bending and subsidence space of the far-field key layer are limited,the length of the suspended roof increases,and the influence range of mining stress and the energy accumulation range expand.Numerical test results and underground microseismic monitoring results verify the correlation between mining speed and stope energy,and high-energy events generally appear 1-2 d after the change in mining speed.On this basis,the statistical principle confirms that the maximum mining speed of the working face at 6 m/d is reasonable.
文摘In the context of increasing demand for coal mine resources in China’s current socio-economic development,traditional mining methods have been difficult to effectively meet the requirements of safety production and environmental protection.As a result,coal mine filling mining technology has emerged,which can effectively achieve the goal of controlling surface subsidence in practical applications,while also significantly improving the recovery rate of coal resources.Based on this,this study will first elaborate on the characteristics of filling mining technology,and then analyze the key points of the application of supporting technology for mechanical and electrical equipment in the corresponding working face based on actual cases,in order to provide support for improving the efficiency of coal mining.
基金supported by Beijing Natural Science Foundation (No.8254049)the National Natural Science Foundation of China (No.52374139)the Deep Earth Probe and Mineral Resources Exploration-National Science and Technology Major Project (No.2024ZD1004505)。
文摘Coal mine underground reservoir(CMUR) technology mitigates water scarcity in China's coal-rich western regions but lacks tailored solutions for steeply inclined coal seams.This study develops a novel framework of steeply inclined coal mine underground reservoirs(SICMUR),which is a paradigm shift from conventional CMUR that the coal seam itself serves as the reservoir floor,challenging conventional designs due to depth-dependent permeability and mechanical constraints.Triaxial mechanical-seepage tests on Xinjiang Wudong coal samples(100,200,300 m depths) revealed a 3.5 MPa triaxial strength increase per 100 m depth and a 58-fold post-peak permeability surge at 300 versus 100 m.Similar model simulations revealed mining-induced stress redistribution and significant deformation effects,particularly subsidence and water-conducting fractures during lower coal seam mining.Results indicate a minimum 40 m safety distance between reservoirs and lower coal seams.Critical construction parameters were investigated for Wudong mine SICMUR as collapse zone heights(9.9–12.31 m) and waterconducting fracture zone heights(31.96–37.40 m).This work systematically bridges SICMUR concepts to field implementation,offering a framework for water preservation in steeply inclined mining while addressing safety concerns,providing a new approach for water reservation in steeply inclined coal mining.
基金Project(10872218) supported by the National Natural Science Foundation of ChinaProject(2010CB732004) supported by the National Key Basic Research Program of China+1 种基金Project(20090461022) supported by the National Postdoctoral Foundation of ChinaProject (11MX21) supported by the Students' Innovation Project Aubsidize Award of Arcelor Mittal
文摘Xinli district of Sanshandao Gold Mine is the first subsea metal mine in China.To achieve 6 kt/d production capacity under the premise of safe mining,high-intensity mining might destroy the in-situ stress filed and the stability of rockmass.According to sampling and testing of ore-rock and backfill and in-situ stress field measurement,safety factor method calculation model based on stress-strain strength reduction at arbitrary points and Mohr-Coulomb yield criterion was established and limit displacement subsidence values under the safety factor of different limit stoping steps were calculated.The results from three years in-situ mining and strata movement monitoring using multi-point displacements meter showed that the lower settlement frame stope hierarchical level filling mining method,mining sequence are reasonable and rockmass stability evaluation using safety factor method,in-situ real-time monitoring can provide the technical foundation for the safety of seabed mining.
基金Project(2013RC16)supported by the Fundamental Research Funds for the Central Universities,China
文摘A new pseudolites (PLs) structure optimization model of global navigation satellite system (GNSS)/PLs integration positioning system used in deep open-pit mine was presented. Position dilution of precision (Pdop) and reliability were selected as the optimization indicators to build a multi-objective optimization model to decide the optimum PLs location. A scheme was designed by establishing a four-dimensional model taking azimuth (a), elevation angle (e) and epoch (t) of satellites as the input independent variables and Pdop as the dependent variable to calculate the optimum PLs location zone considering the real circumstances. And then the ultimate PLs location can be fixed by testing the curves of Pdop along time. A field collected Trimble R8 GPS data set in China University of Mining and Technology (CUMT) campus was used for the model test to show the effectiveness, and the proposed PLs optimum design scheme was used at the west open-pit mine of Fushun mining group Co., Ltd., in China, better Pdop and reliability have been achieved for the integration system. Both experiments show that the proposed scheme is excellent in designing GNSS/PLs system which is helpful for improving the performance of the positioning system and reducing the cost.
基金Projects (50934006, 51074178) supported by the National Natural Science Foundation of ChinaProject (2010QZZD001) supported by the Fundamental Research Funds for the Central Universities of China
文摘Taking the test stopes during continuous mining induced roof caving of Tongkeng ore-body No.92 as example, the calculation flow of unloading analysis was established. According to the unloading region division method of the affected zone theory, and the deterioration laws of mechanics parameters of unloading rock mass, the continuous mining process in underground mine was analyzed by the software MIDAS/GTS, the mechanical response of roof rock mass unloading was studied, and the differences were analyzed with the conventional simulation. The result shows that the maximum tensile stress, subsidence displacement and equivalent plastic strain of roof rock mass are 1.5 MPa, 20 cm and 1.5% in the unloading analysis, while 1.0 MPa, 13 cm and 0.9% in the conventional analysis. The values of unloading analysis, which are also closer to the actual situation, are greater than those of conventional analysis; the maximum step in continuous mining is 48 m, which shows that the induced treatment of the roof should be carried out after 2 mining steps
基金Project(41004011)supported by the National Natural Science Foundation of ChinaProject(2014M550425)supported by the China Postdoctoral Science Foundation
文摘A modified algorithm of combined GPS/GLONASS precise point positioning (GG-PPP) was developed by decreasing the number of unknowns to be estimated so that accurate position solutions can be achieved in the case of less number of visible satellites. The system time difference between GPS and GLONASS (STDGG) and zenith tropospheric delay (ZTD) values were firstly estimated in an open sky condition using the traditional GG-PPP algorithm. Then, they were used as a priori known values in the modified algorithm instead of estimating them as unknowns. The proposed algorithm was tested using observations collected at BJFS station in a simulated open-pit mine environment. The results show that the position filter converges much faster to a stable value in all three coordinate components using the modified algorithm than using the traditional algorithm. The modified algorithm achieves higher positioning accuracy as well. The accuracy improvement in the horizontal direction and vertical direction reaches 69% and 95% at a satellite elevation mask angle of 50°, respectively.
基金This work was supported by the Pilot Seed Grant(Grant No.RES0049944)the Collaborative Research Project(Grant No.RES0043251)from the University of Alberta.
文摘Ore production is usually affected by multiple influencing inputs at open-pit mines.Nevertheless,the complex nonlinear relationships between these inputs and ore production remain unclear.This becomes even more challenging when training data(e.g.truck haulage information and weather conditions)are massive.In machine learning(ML)algorithms,deep neural network(DNN)is a superior method for processing nonlinear and massive data by adjusting the amount of neurons and hidden layers.This study adopted DNN to forecast ore production using truck haulage information and weather conditions at open-pit mines as training data.Before the prediction models were built,principal component analysis(PCA)was employed to reduce the data dimensionality and eliminate the multicollinearity among highly correlated input variables.To verify the superiority of DNN,three ANNs containing only one hidden layer and six traditional ML models were established as benchmark models.The DNN model with multiple hidden layers performed better than the ANN models with a single hidden layer.The DNN model outperformed the extensively applied benchmark models in predicting ore production.This can provide engineers and researchers with an accurate method to forecast ore production,which helps make sound budgetary decisions and mine planning at open-pit mines.
文摘Given the conditions of residual coal from the boundary of a flat dipping open-pit mine,which uses strip areas mining and inner dumping with slope-covering,we propose an open-pit and underground integrated mining technology for residual coal of end slopes.In the proposal a conveyance road and ventilation conveyance near the slope are built,corresponding to the pit mining area and the surface coal mine dump,as well as an interval haulage tunnel and air-inlet tunnel.The outcome shows that such mining method may reduce the effect to slope stability from underground mining,it does not affect the dumping advance and has a high recovery rate of residual coal resources.The working face is timbered by single hydraulic props,transported by a scraper conveyor and supported by coal walls.This method of mining is one of layered top coal caving,with high resource recovery,low production cost where positive economic benefit can be realized.
文摘The design and practice in supporting the cut slope of an open-pit mine wereintroduced, in which the high pressure grouting method was used in reinforcing the weak formation inthe slopes. Based on a detailed geological survey of the slope, a theoretical analysis was carriedout, and the design parameters were proposed, where the Tresca or Mohr-Coulomb yield criteria wasemployed. A patent technology, named 'Technology of high pressure and multiple grouting in differentlevels within a single hole', was employed in the construction. Anchor bars were also installed asgrouting proceeds. This method combines anchoring and grouting comprehensively and was foundsuccessful in practice.
基金fnancially supported by National Natural Science Foundation of China(Grant No.51974295).
文摘The retained coal in the end slope of an open-pit mine can be mined by the highwall mining techniques.However,the instability mechanism of the reserved rib pillar under dynamic loads of mining haul trucks and static loads of the overlying strata is not clear,which restricts the safe and efcient application of highwall mining.In this study,the load-bearing model of the rib pillar in highwall mining was established,the cusp catastrophe theory and the safety coefcient of the rib pillar were considered,and the criterion equations of the rib pillar stability were proposed.Based on the limit equilibrium theory,the limit stress of the rib pillar was analyzed,and the calculation equations of plastic zone width of the rib pillar in highwall mining were obtained.Based on the Winkler foundation beam theory,the elastic foundation beam model composed of the rib pillar and roof under the highwall mining was established,and the calculation equations for the compression of the rib pillar under dynamic and static loads were developed.The results showed that with the increase of the rib pillar width,the total compression of the rib pillar under dynamic and static loads decreases nonlinearly,and the compression of the rib pillar caused by static loads of the overlying strata and trucks has a decisive role.Numerical simulation and theoretical calculation were also performed in this study.In the numerical simulation,the coal seam with a buried depth of 122 m and a thickness of 3 m is mined by highwall mining techniques.According to the established rib pillar instability model of the highwall mining system,it is found that when the mining opening width is 3 m,the reasonable width of the rib pillar is at least 1.3 m,and the safety factor of the rib pillar is 1.3.The numerical simulation results are in good agreement with the results of theoretical calculation,which verifes the feasibility of the theoretical analysis of the rib pillar stability.This research provides a reference for the stability analysis of rib pillars under highwall mining.
基金Project(SKLCRSM12X01)supported by State Key Laboratory of Coal Resources and Safe Mining,China University of Mining&TechnologyProject(2014ZDPY02)supported by the Fundamental Research Funds for the Central Universities,ChinaProject(CXLX13_951)supported by the Research Innovation Program for College Graduates of Jiangsu Province,China
文摘Fully mechanized solid backfill mining(FMSBM) technology adopts dense backfill body to support the roof. Based on the distinguishing characteristics and mine pressure control principle in this technology, the basic principles and methods for mining pressure monitoring were analyzed and established. And the characteristics of overburden strata movement were analyzed by monitoring the support resistance of hydraulic support, the dynamic subsidence of immediate roof, the stress of backfill body, the front abutment pressure, and the mass ratio of cut coal to backfilled materials. On-site strata behavior measurements of 7403 W solid backfilling working face in Zhai Zhen Coal Mine show that the backfill body can effectively support the overburden load, obviously control the overburden strata movement, and weaken the strata behaviors distinctly. Specific performances are as follows. The support resistance decreases obviously; the dynamic subsidence of immediate roof keeps consistent to the variation of backfill body stress, and tends to be stable after the face retreating to 120-150 m away from the cut. The peak value of front abutment pressure arises at 5-12 m before the operating face, and mass ratio is greater than the designed value of 1.15, which effectively ensures the control of strata movement. The research results are bases for intensively studying basic theories of solid backfill mining strata behaviors and its control, and provide theoretical guidance for engineering design in FMSBM.