Background As information technology has advanced and been popularized,open pit mining has rapidly developed toward integration and digitization.The three-dimensional reconstruction technology has been successfully ap...Background As information technology has advanced and been popularized,open pit mining has rapidly developed toward integration and digitization.The three-dimensional reconstruction technology has been successfully applied to geological reconstruction and modeling of surface scenes in open pit mines.However,an integrated modeling method for surface and underground mine sites has not been reported.Methods In this study,we propose an integrated modeling method for open pit mines that fuses a real scene on the surface with an underground geological model.Based on oblique photography,a real-scene model was established on the surface.Based on the surface-stitching method proposed,the upper and lower surfaces and sides of the model were constructed in stages to construct a complete underground three-dimensional geological model,and the aboveground and underground models were registered together to build an integrated open pit mine model.Results The oblique photography method used reconstructed a surface model of an open pit mine using a real scene.The surface-stitching algorithm proposed was compared with the ball-pivoting and Poisson algorithms,and the integrity of the reconstructed model was markedly superior to that of the other two reconstruction methods.In addition,the surface-stitching algorithm was applied to the reconstruction of different formation models and showed good stability and reconstruction efficiency.Finally,the aboveground and underground models were accurately fitted after registration to form an integrated model.Conclusions The proposed method can efficiently establish an integrated open pit model.Based on the integrated model,an open pit auxiliary planning system was designed and realized.It supports the functions of mining planning and output calculation,assists users in mining planning and operation management,and improves production efficiency and management levels.展开更多
The goal of this research is to develop mine-scale discrete fracture network(DFN)models in which the influence of the spatial heterogeneity of fracture distributions may be investigated on the rock wedge stability of ...The goal of this research is to develop mine-scale discrete fracture network(DFN)models in which the influence of the spatial heterogeneity of fracture distributions may be investigated on the rock wedge stability of an open pit slope.For this purpose,spatially conditioned DFN models were developed for the pit walls at Tasiast mine using comprehensive structural data from the mine.Using Sequential Gaussian Simulation(SGS),volumetric fracture intensities(P32)were modeled across the entire mine site in the form of 3D block models.The simulated P32 block models were used as the input constraints for conditional DFN fracture generation,where the DFN grid dimension is the same as the SGS 3D blocks.The spatially constrained DFN models were further calibrated using aerial fracture intensities(P21)data from the pit walls,obtained by a survey of the pit walls using an unmanned aerial vehicle(UAV)and measured traces of joints from 3D point cloud data.The final DFN model is expected to honor the fracture intensities gathered through different means with optimal model accuracy.Finally,bench-scale and interramp scale rock wedge slope stability analyses were conducted using the calibrated conditional DFN models.This work proves the significance of conditioned DFN models in rock wedge stability analysis.Such models provide detailed information regarding rock wedge stability so that site monitoring and prevention plans can be conducted with higher efficiency.展开更多
The ecological costs of open pit metal mining are quantified, which include lost value of direct eco-services, lost value of indirect eco-services, prevention and restoration costs, and cost of carbon emission from en...The ecological costs of open pit metal mining are quantified, which include lost value of direct eco-services, lost value of indirect eco-services, prevention and restoration costs, and cost of carbon emission from energy consumption. These ecological costs are incorporated in an iterative ultimate pit optimization algorithm. A case study is presented to demonstrate the influence of ecological costs on pit design outcome. The results show that it is possible to internalize ecological costs in mine designs. The pit optimization outcome shifts considerably to the conservative side and the profitability decreases substantially when ecological costs are accounted for.展开更多
Near-surface deposits that extend to considerable depths are often amenable to both open pit mining and/or underground mining.This paper investigates the strategy of mining options for an orebody using a Mixed Integer...Near-surface deposits that extend to considerable depths are often amenable to both open pit mining and/or underground mining.This paper investigates the strategy of mining options for an orebody using a Mixed Integer Linear Programming(MILP)optimization framework.The MILP formulation maximizes the Net Present Value(NPV)of the reserve when extracted with(i)open pit mining,(ii)underground mining,and(iii)concurrent open pit and underground mining.Comparatively,implementing open pit mining generates a higher NPV than underground mining.However considering the investment required for these mining options,underground mining generates a better return on investment than open pit mining.Also,in the concurrent open pit and underground mining scenario,the optimizer prefers extracting blocks using open pit mining.Although the underground mine could access ore sooner,the mining cost differential for open pit mining is more than compensated for by the discounting benefits associated with earlier underground mining.展开更多
Using GIS, GPS and GPRS, a dynamic management system of ore blending in an open pit mine has been designed and developed. A linear program was established in a practical application. The system is very good at automat...Using GIS, GPS and GPRS, a dynamic management system of ore blending in an open pit mine has been designed and developed. A linear program was established in a practical application. The system is very good at automatically drawing up a daily production plan of ore blending and monitors and controls the process of mining production in real time. Experiments under real conditions show that the performance of this system is stable and can satisfy production standards of ore blending in open pit mines.展开更多
Using GIS,GPS and GPRS,an intelligent monitoring and dispatch system of trucks and shovels in an open pit has been designed and developed.The system can monitor and dispatch open-pit trucks and shovels and play back t...Using GIS,GPS and GPRS,an intelligent monitoring and dispatch system of trucks and shovels in an open pit has been designed and developed.The system can monitor and dispatch open-pit trucks and shovels and play back their historical paths.An intelligent data algorithm is proposed in a practical application.The algorithm can count the times of deliveries of trucks and load- ings of shovels.Experiments on real scenes show that the performance of this system is stable and can satisfy production standards in open pits.展开更多
The measured data of vibrations induced by excavation of deep-buried cavern and open pit with method of bench blasting were analyzed by Fourier Transform and Wavelet Transform,and the characteristics of vibrations ind...The measured data of vibrations induced by excavation of deep-buried cavern and open pit with method of bench blasting were analyzed by Fourier Transform and Wavelet Transform,and the characteristics of vibrations induced under these two circumstances were studied.It is concluded that with the similar rock condition and drilling-blasting parameters,vibration induced by bench blasting in deep-buried cavern has a higher main frequency and more scattered energy distribution than that in open pit.The vibration induced by bench blasting in open pit is mainly originated from the blast load,while the vibration induced by bench blasting in deep-buried cavern is the superposition of vibrations induced by blast load and transient release of in-situ stress.The vibration induced by transient release of in-situ stress increases with the stress level.展开更多
A laser technique based scanning system was employed to make a comprehensive scanning through borehole forunmapped cavity under open pit bench,then the three-dimensional data will be obtained,and these data were used ...A laser technique based scanning system was employed to make a comprehensive scanning through borehole forunmapped cavity under open pit bench,then the three-dimensional data will be obtained,and these data were used for theoreticalanalysis and numerical simulation to analyze the stability of cap rock.Acoustic emission techniques were also adopted to carry outlong term real time rupture monitoring in cap rock.Therefore,a complete safety evaluation system for the cap rock was establishedto ensure safe operation of subsequent blasting processes.The ideal way of eliminating collapse hazard of such cavity is cap rockcaving through deep-hole blasting,thus,two deep-hole blasting schemes named as vertical deep-hole blasting scheme and one-timeraise driving integrated with deep-hole bench blasting scheme were proposed.The vertical deep-hole blasting scheme has moreexplosive consumption,but the relatively simple blasting net work structure can greatly reduce workloads.However,the one-timeraise driving integrated with deep-hole bench blasting scheme can obviously reduce explosive consumption,but the higher technicalrequirements on drilling,explosive charging and blasting network will increase workloads.展开更多
Reserve estimation is a key to find the correct NPV in a mining project. The most important factor in reserve estimation is the metal price. Metal price fluctuations in recent years were exaggerated, and imposed a hig...Reserve estimation is a key to find the correct NPV in a mining project. The most important factor in reserve estimation is the metal price. Metal price fluctuations in recent years were exaggerated, and imposed a high degree of uncertainty to the reserve estimation, and in consequence to the whole mine planning procedure. Real option approach is an efficient method of decision making in the uncertain conditions. This approach has been used for evaluation of defined natural resources projects until now. This study considering the metal price uncertainty used real option approach to prepare a methodology for reserve estimation in open pit mines. This study was done on a copper cylindrical deposit, but the achieved methodology can be adjusted for all kinds of deposits. This methodology was comprehensively described through the examples in such a manner that can be used by the mine planners.展开更多
According to the characteristics of opencast coal resources and dragline technology system application in China,the structure and shifting step of transport passage are optimized in this paper.Typical coal transport p...According to the characteristics of opencast coal resources and dragline technology system application in China,the structure and shifting step of transport passage are optimized in this paper.Typical coal transport passage is analyzed in aspects such as the internal dump occupation,dragline operation efficiency,coal transport distance,upper stripping distance and shifting quantities.The middle passage should be given priority in thick overburden open pit mine because the dragline system is only responsible for part stripping task.According to characteristics of middle passage,the transport passage is divided into parallel climbing,vertical climbing and horizontal transport.In addition,the transport passage structure optimization model and shifting distance optimization model are established in this paper.The case study in Heidaigou open pit mine shows that,the parallel climbing height is accounted for about 60%of the total height,and reasonable shifting distances of the first mining area and the second mining area are 240 and 320 m.Sensitivity analysis shows that,the total passage height has important influence on the shifting step,so it is with the stripping height and passage construction cost to the passage structure.展开更多
Rock slope hazard assessment is an important part of risk analysis for open pit mines.The main parameters that can lead to rock slope failures are the parameters traditionally used in geomechanical classifications,the...Rock slope hazard assessment is an important part of risk analysis for open pit mines.The main parameters that can lead to rock slope failures are the parameters traditionally used in geomechanical classifications,the slope geometrical parameters and external factors like rainfall and blasting.This paper presents a methodology for a hazard assessment system for open pit mine slopes based on 88 cases collated around the world using principal components analysis,discriminant analysis and confidence ellipses.The historical cases used in this study included copper,gold,iron,diamond,lead and zinc,platinum and claystone mines.The variables used in the assessment methodology are uniaxial compressive strength of intact rock;spacing,persistence,opening,roughness,infilling and orientation of the main discontinuity set;weathering of the rock mass;groundwater;blasting method;and height and inclination of the pit.While principal component analysis was used to quantify the data,the discriminant analysis was used to establish a rule to classify new slopes about its stability condition.To provide a practical hazard assessment system,confidence ellipses were used to propose a hazard graph and generate the HAS-Q.The discriminant rule developed in this research has a high discrimination capacity with an error rate of 11.36%.展开更多
Pit limit design has,up to date,focused mainly on maximization of economic profit alone,with environmental and social issues largely ignored.This paper focuses on incorporating both environmental and social issues in ...Pit limit design has,up to date,focused mainly on maximization of economic profit alone,with environmental and social issues largely ignored.This paper focuses on incorporating both environmental and social issues in the pit limit design process and provides an approach to pit limit optimization that is in compliance with sustainable development.The case study demonstrates that ecological costs have a substantial down-sizing effect and social benefits have a substantial up-sizing effect on the optimal pit limit.When the ecological costs are factored in,the optimal pit limit is 37.5%smaller than the economically optimal pit limit.However,when the social benefits are factored in,the optimal pit limit is 48.3%larger than the economically optimal one.The overall optimal pit limit,with the economic profit,ecological costs and social benefits simultaneously considered,is a result of balancing conflicting goals of maximizing economic profit,minimizing ecological cost,and maximizing social benefit.展开更多
Constrained long-term production scheduling problem(CLTPSP) of open pit mines has been extensively studied in the past few decades due to its wide application in mining projects and the computational challenges it pos...Constrained long-term production scheduling problem(CLTPSP) of open pit mines has been extensively studied in the past few decades due to its wide application in mining projects and the computational challenges it poses become an NP-hard problem.This problem has major practical significance because the effectiveness of the schedules obtained has strong economical impact for any mining project.Despite of the rapid theoretical and technical advances in this field,heuristics is still the only viable approach for large scale industrial applications.This work presents an approach combining genetic algorithms(GAs) and Lagrangian relaxation(LR) to optimally determine the CLTPSP of open pit mines.GAs are stochastic,parallel search algorithms based on the natural selection and the process of evolution.LR method is known for handling large-scale separable problems; however,the convergence to the optimal solution can be slow.The proposed Lagrangian relaxation and genetic algorithms(LR-GAs) combines genetic algorithms into Lagrangian relaxation method to update the Lagrangian multipliers.This approach leads to improve the performance of Lagrangian relaxation method in solving CLTPSP.Numerical results demonstrate that the LR method using GAs to improve its performance speeding up the convergence.Subsequently,highly near-optimal solution to the CLTPSP can be achieved by the LR-GAs.展开更多
Conventionally, mining industry relies on a deterministic view, where a unique mine plan is determined based on a single resource model. A major shortfall of this approach is the inability to assess the risk caused by...Conventionally, mining industry relies on a deterministic view, where a unique mine plan is determined based on a single resource model. A major shortfall of this approach is the inability to assess the risk caused by the well-known geological uncertainty, i.e. the in situ grade and tonnage variability of the mineral deposit. Despite some recent attempts in developing stochastic mine planning models which have demonstrated promising results, the industry still remains sceptical about this innovative idea. With respect to unbiased linear estimation, kriging is the most popular and reliable deterministic interpolation technique for resource estimation and it appears to remain its popularity in the near future. This paper presents a new systematic framework to quantify the risk of kriging-based mining projects due to the geological uncertainties. Firstly, conditional simulation is implemented to generate a series of equally-probable orebody realisations and these realisations are then compared with the kriged resource model to analyse its geological uncertainty. Secondly, a production schedule over the life of mine is determined based on the kriged resource model. Finally, risk profiles of that production schedule, namely ore and waste tonnage production, blending grade and Net Present Value (NPV), are constructed using the orebody realisations. The proposed model was applied on a multi-element deposit and the result demonstrates that that the kriging-based mine plan is unlikely to meet the production targets. Especially, the kriging-based mine plan overestimated the expected NPV at a magnitude of 6.70% to 7.34% (135 M$ to 151 M$). A new multivariate conditional simulation framework was also introduced in this paper to cope with the multivariate nature of the deposit. Although an iron ore deposit is used to prove the concepts, the method can easily be adapted to other kinds of mineral deposits, including surface coal mine.展开更多
This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed acco...This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed according to the probability distributions associated to key variables affecting the NPV, like production level, ore grade, price of ore, and others, so as to see what if, in a gold open pit mine project of 3000 metric tons per day of ore. Two case scenarios were analyzed to simulate the NPV, one where there is low certainty data available, and the other where the information available is of high certainty. Results based on genetic algorithm metaheuristic simulations, which combine basically Montecarlo simulations provided by the Palisade Risk software, the O'Hara cost model, net smelter return and financial analysis tools offered by Excel are reported, in order to determine to which variables of the project is more sensitive the NPV.展开更多
A neighborhood search algorithm was proposed to simultaneously schedule the waste removal quantity and the equipment fleet profile over the mine life for open pit mines.An initial search domain was first defined and a...A neighborhood search algorithm was proposed to simultaneously schedule the waste removal quantity and the equipment fleet profile over the mine life for open pit mines.An initial search domain was first defined and a good schedule was obtained as the current best schedule by searching in this domain.Then,progressively narrower neighborhood search domains were constructed around the current best schedule to search for better schedules.The objective is to minimize the present value of waste removal costs over the mine life.The resulting schedule from this algorithm provides a complete fleet profile for each year over the mine life:the selected equipment models,the number of equipment units of each model,the age of each unit,as well as the quantity of waste removed.A numerical example of application was provided to demonstrate the feasibility and merits of the algorithm.展开更多
This research proposes the utilization of a geopolymer-based blasting sealing material to improve the profitability of coal sales and reduce the rate of coal fragmentation during blasting in open pit mines.The study f...This research proposes the utilization of a geopolymer-based blasting sealing material to improve the profitability of coal sales and reduce the rate of coal fragmentation during blasting in open pit mines.The study first focused on optimizing the strength of the sealant material and reducing curing time.This was achieved by regulating the slag doping and sodium silicate solution modulus.The findings demonstrated that increasing slag content and improving the material resulted in an early rise in strength while increasing the modulus of the sodium silicate solution extended the curing time.The slag doping level was fixed at 80 g,and the sodium silicate solution modulus was set at 1.5.To achieve a strength of 3.12 MPa,the water/gel ratio was set at 0.5.The initial setting time was determined to be 33 min,meeting the required field test duration.Secondly,the strength requirements for field implementation were assessed by simulating the action time and force destruction process of the sealing material during blasting using ANSYS/LS-DYNA software.The results indicated that the modified material meets these requirements.Finally,the Shengli Open Pit Coal Mine served as the site for the field test.It was observed that the hole-sealing material’s hydration reaction created a laminated and flocculated gel inside it.This enhanced the density of the modified material.Additionally,the pregelatinized starch,functioning as an organic binder,filled the gaps between the gels,enhancing the cohesion and bonding coefficient of the material.Upon analyzing the post-blasting shooting effect diagram using the Split-Desktop software,it was determined that the utilization of the modified blast hole plugging material resulted in a decrease in the rate of coal fragmentation from 33.2%to 21.1%.This reduction exhibited a minimal error of 1.63%when compared to the field measurement,thereby providing further confirmation of the exceptional plugging capabilities of the modified material.This study significantly contributes to establishing a solid theoretical basis for enhancing the blasting efficiency of open pit mines and,in turn,enhancing their economic advantages.展开更多
Using GIS, GPS, GPRS and RFID, a dynamic information management system of digital mining in an open pit was designed and developed.A linear programming model was set up in a practical application.By the model, the sys...Using GIS, GPS, GPRS and RFID, a dynamic information management system of digital mining in an open pit was designed and developed.A linear programming model was set up in a practical application.By the model, the system can automatically draw up production plan of ore blending well every day.The system can monitor and dispatch open-pit trucks and shovels well, and can play back their historical paths.It can monitor and control the process of mining production in real time.By RFID, the system can also count the number of trucks'delivery and shovels'loading automatically.Experiments on real scenes show that the performance of this system is stable and can satisfy production standards of mining in open pits.展开更多
The present study reflects upon the results of substantial program of two-dimensional Finite Element Method (FEM) numerical analyses of the open pit that links to slope angle optimization associated with the safety ...The present study reflects upon the results of substantial program of two-dimensional Finite Element Method (FEM) numerical analyses of the open pit that links to slope angle optimization associated with the safety factor of the pit slope of a coal mine in Bangladesh. In the present analyses, two types of models have been presented. The first model estimates safety factor without seismic effect on the overall pit slope of the model; the second model incorporates safety factor with seismic stability of the model. The calculated optimum slope angle of the first model is 31% with a rational safety factor of 1.51, prior to the seismic effect. However, the value is reduced to 0.93, 0.82, and 0.72, after we applies the seismic effect in the second model with M6, M6.5, and M7, respectively. Finally, our modeling results emphasize that for the case of the proposed Phulbari coalmine, there is extremely high prospect for causing massive slope failure along the optimum pit slope angle with 31% if the mine area felt seismic shaking, like the Sikkim (in northern India) earthquake with M6.9 on September 18, 2011.展开更多
Underground mining is an economically viable option for exploiting ore reserves deemed uneconomic after open pit mining. However, underground development can have adverse effects on the above existing open pit slope w...Underground mining is an economically viable option for exploiting ore reserves deemed uneconomic after open pit mining. However, underground development can have adverse effects on the above existing open pit slope walls. As a goal of this paper, identification and assessment of potential slope instabilities prior to underground development is crucial for safe and sustainable mining. Towards goal achieving, this paper gives a comprehensive parametric study to investigate the influence of sublevel open stope (SLOS) underground mining on the surface and open pit slope walls. By means of numerical simulation, the SLOS design is tried against the existing open pit followed by adjustments of important slope parameters which are overall slope height (OSH) and overall slope angle (OSA). We found that underground mining may induce slope failure, particularly on the hangingwall side of the pit. Subsidence is prominent on the hanging wall and the surface, whereas, the uplift dominates the footwall and pit bottom. Pit wall closure is observed during underground mining. Although the assigned dimensions in the parametric study show a negligible effect of OSH and OSA, the high OSH experience low subsidence in comparison with low OSH. Overall, the results demonstrate that the slope walls on the hanging wall side are mostly affected by the underground mining and high-stress concentration prevails near slope toes and pit bottom. Additionally, slope deformation decrease from pit bottom towards the slope crest and surface. The results of this study add knowledge to open pit and underground mining interaction.展开更多
基金Supported by Liaoning Province Science and Technology Research Project(2021JH1/10400011)National Natural Science Foundation of China(61971118).
文摘Background As information technology has advanced and been popularized,open pit mining has rapidly developed toward integration and digitization.The three-dimensional reconstruction technology has been successfully applied to geological reconstruction and modeling of surface scenes in open pit mines.However,an integrated modeling method for surface and underground mine sites has not been reported.Methods In this study,we propose an integrated modeling method for open pit mines that fuses a real scene on the surface with an underground geological model.Based on oblique photography,a real-scene model was established on the surface.Based on the surface-stitching method proposed,the upper and lower surfaces and sides of the model were constructed in stages to construct a complete underground three-dimensional geological model,and the aboveground and underground models were registered together to build an integrated open pit mine model.Results The oblique photography method used reconstructed a surface model of an open pit mine using a real scene.The surface-stitching algorithm proposed was compared with the ball-pivoting and Poisson algorithms,and the integrity of the reconstructed model was markedly superior to that of the other two reconstruction methods.In addition,the surface-stitching algorithm was applied to the reconstruction of different formation models and showed good stability and reconstruction efficiency.Finally,the aboveground and underground models were accurately fitted after registration to form an integrated model.Conclusions The proposed method can efficiently establish an integrated open pit model.Based on the integrated model,an open pit auxiliary planning system was designed and realized.It supports the functions of mining planning and output calculation,assists users in mining planning and operation management,and improves production efficiency and management levels.
基金Kinross Gold and MITACS for their financial support(Grant No.FR42880).
文摘The goal of this research is to develop mine-scale discrete fracture network(DFN)models in which the influence of the spatial heterogeneity of fracture distributions may be investigated on the rock wedge stability of an open pit slope.For this purpose,spatially conditioned DFN models were developed for the pit walls at Tasiast mine using comprehensive structural data from the mine.Using Sequential Gaussian Simulation(SGS),volumetric fracture intensities(P32)were modeled across the entire mine site in the form of 3D block models.The simulated P32 block models were used as the input constraints for conditional DFN fracture generation,where the DFN grid dimension is the same as the SGS 3D blocks.The spatially constrained DFN models were further calibrated using aerial fracture intensities(P21)data from the pit walls,obtained by a survey of the pit walls using an unmanned aerial vehicle(UAV)and measured traces of joints from 3D point cloud data.The final DFN model is expected to honor the fracture intensities gathered through different means with optimal model accuracy.Finally,bench-scale and interramp scale rock wedge slope stability analyses were conducted using the calibrated conditional DFN models.This work proves the significance of conditioned DFN models in rock wedge stability analysis.Such models provide detailed information regarding rock wedge stability so that site monitoring and prevention plans can be conducted with higher efficiency.
基金Project(50974041)supported by the National Natural Science Foundation of ChinaProject(NCET-11-0073)supported by Program for New Century Excellent Talents in University of Ministry of Education of China+1 种基金Project(201102065)supported by the Natural Science Foundation of Liaoning Province,ChinaProject(2012921075)supported by the Ten Million Talent Project of Liaoning Province,China
文摘The ecological costs of open pit metal mining are quantified, which include lost value of direct eco-services, lost value of indirect eco-services, prevention and restoration costs, and cost of carbon emission from energy consumption. These ecological costs are incorporated in an iterative ultimate pit optimization algorithm. A case study is presented to demonstrate the influence of ecological costs on pit design outcome. The results show that it is possible to internalize ecological costs in mine designs. The pit optimization outcome shifts considerably to the conservative side and the profitability decreases substantially when ecological costs are accounted for.
基金funding support provided by the Laurentian University Research Fund for the compilation of this report
文摘Near-surface deposits that extend to considerable depths are often amenable to both open pit mining and/or underground mining.This paper investigates the strategy of mining options for an orebody using a Mixed Integer Linear Programming(MILP)optimization framework.The MILP formulation maximizes the Net Present Value(NPV)of the reserve when extracted with(i)open pit mining,(ii)underground mining,and(iii)concurrent open pit and underground mining.Comparatively,implementing open pit mining generates a higher NPV than underground mining.However considering the investment required for these mining options,underground mining generates a better return on investment than open pit mining.Also,in the concurrent open pit and underground mining scenario,the optimizer prefers extracting blocks using open pit mining.Although the underground mine could access ore sooner,the mining cost differential for open pit mining is more than compensated for by the discounting benefits associated with earlier underground mining.
文摘Using GIS, GPS and GPRS, a dynamic management system of ore blending in an open pit mine has been designed and developed. A linear program was established in a practical application. The system is very good at automatically drawing up a daily production plan of ore blending and monitors and controls the process of mining production in real time. Experiments under real conditions show that the performance of this system is stable and can satisfy production standards of ore blending in open pit mines.
文摘Using GIS,GPS and GPRS,an intelligent monitoring and dispatch system of trucks and shovels in an open pit has been designed and developed.The system can monitor and dispatch open-pit trucks and shovels and play back their historical paths.An intelligent data algorithm is proposed in a practical application.The algorithm can count the times of deliveries of trucks and load- ings of shovels.Experiments on real scenes show that the performance of this system is stable and can satisfy production standards in open pits.
基金Project(2010CB732003) supported by the National Basic Research Program of ChinaProjects(50725931,50779050 and 50909077) supported by the National Natural Science Foundation of China
文摘The measured data of vibrations induced by excavation of deep-buried cavern and open pit with method of bench blasting were analyzed by Fourier Transform and Wavelet Transform,and the characteristics of vibrations induced under these two circumstances were studied.It is concluded that with the similar rock condition and drilling-blasting parameters,vibration induced by bench blasting in deep-buried cavern has a higher main frequency and more scattered energy distribution than that in open pit.The vibration induced by bench blasting in open pit is mainly originated from the blast load,while the vibration induced by bench blasting in deep-buried cavern is the superposition of vibrations induced by blast load and transient release of in-situ stress.The vibration induced by transient release of in-situ stress increases with the stress level.
基金Projects(51204206,41272304,41372278) supported by the National Natural Science Foundation of China
文摘A laser technique based scanning system was employed to make a comprehensive scanning through borehole forunmapped cavity under open pit bench,then the three-dimensional data will be obtained,and these data were used for theoreticalanalysis and numerical simulation to analyze the stability of cap rock.Acoustic emission techniques were also adopted to carry outlong term real time rupture monitoring in cap rock.Therefore,a complete safety evaluation system for the cap rock was establishedto ensure safe operation of subsequent blasting processes.The ideal way of eliminating collapse hazard of such cavity is cap rockcaving through deep-hole blasting,thus,two deep-hole blasting schemes named as vertical deep-hole blasting scheme and one-timeraise driving integrated with deep-hole bench blasting scheme were proposed.The vertical deep-hole blasting scheme has moreexplosive consumption,but the relatively simple blasting net work structure can greatly reduce workloads.However,the one-timeraise driving integrated with deep-hole bench blasting scheme can obviously reduce explosive consumption,but the higher technicalrequirements on drilling,explosive charging and blasting network will increase workloads.
文摘Reserve estimation is a key to find the correct NPV in a mining project. The most important factor in reserve estimation is the metal price. Metal price fluctuations in recent years were exaggerated, and imposed a high degree of uncertainty to the reserve estimation, and in consequence to the whole mine planning procedure. Real option approach is an efficient method of decision making in the uncertain conditions. This approach has been used for evaluation of defined natural resources projects until now. This study considering the metal price uncertainty used real option approach to prepare a methodology for reserve estimation in open pit mines. This study was done on a copper cylindrical deposit, but the achieved methodology can be adjusted for all kinds of deposits. This methodology was comprehensively described through the examples in such a manner that can be used by the mine planners.
基金Financial support from the National High-Tech Research and Development Program of China(No.2012AA062004)the National Natural Science Foundation of China(No.51034005)
文摘According to the characteristics of opencast coal resources and dragline technology system application in China,the structure and shifting step of transport passage are optimized in this paper.Typical coal transport passage is analyzed in aspects such as the internal dump occupation,dragline operation efficiency,coal transport distance,upper stripping distance and shifting quantities.The middle passage should be given priority in thick overburden open pit mine because the dragline system is only responsible for part stripping task.According to characteristics of middle passage,the transport passage is divided into parallel climbing,vertical climbing and horizontal transport.In addition,the transport passage structure optimization model and shifting distance optimization model are established in this paper.The case study in Heidaigou open pit mine shows that,the parallel climbing height is accounted for about 60%of the total height,and reasonable shifting distances of the first mining area and the second mining area are 240 and 320 m.Sensitivity analysis shows that,the total passage height has important influence on the shifting step,so it is with the stripping height and passage construction cost to the passage structure.
基金Federal Agency for Support and Evaluation of Graduate Education (CAPES – Brazil, Grant ID 19/2016)Fondation for Research Support of Minas Gerais (FAPEMIG – Brazil)University of New South Wales (UNSW – Australia)
文摘Rock slope hazard assessment is an important part of risk analysis for open pit mines.The main parameters that can lead to rock slope failures are the parameters traditionally used in geomechanical classifications,the slope geometrical parameters and external factors like rainfall and blasting.This paper presents a methodology for a hazard assessment system for open pit mine slopes based on 88 cases collated around the world using principal components analysis,discriminant analysis and confidence ellipses.The historical cases used in this study included copper,gold,iron,diamond,lead and zinc,platinum and claystone mines.The variables used in the assessment methodology are uniaxial compressive strength of intact rock;spacing,persistence,opening,roughness,infilling and orientation of the main discontinuity set;weathering of the rock mass;groundwater;blasting method;and height and inclination of the pit.While principal component analysis was used to quantify the data,the discriminant analysis was used to establish a rule to classify new slopes about its stability condition.To provide a practical hazard assessment system,confidence ellipses were used to propose a hazard graph and generate the HAS-Q.The discriminant rule developed in this research has a high discrimination capacity with an error rate of 11.36%.
基金The authors are grateful for the financial supports from the National Natural Science Foundation of China(Nos.52074061,51974060,U1903216)Northeastern University Doctoral Basal Research Fund,China(No.N2001006).
文摘Pit limit design has,up to date,focused mainly on maximization of economic profit alone,with environmental and social issues largely ignored.This paper focuses on incorporating both environmental and social issues in the pit limit design process and provides an approach to pit limit optimization that is in compliance with sustainable development.The case study demonstrates that ecological costs have a substantial down-sizing effect and social benefits have a substantial up-sizing effect on the optimal pit limit.When the ecological costs are factored in,the optimal pit limit is 37.5%smaller than the economically optimal pit limit.However,when the social benefits are factored in,the optimal pit limit is 48.3%larger than the economically optimal one.The overall optimal pit limit,with the economic profit,ecological costs and social benefits simultaneously considered,is a result of balancing conflicting goals of maximizing economic profit,minimizing ecological cost,and maximizing social benefit.
文摘Constrained long-term production scheduling problem(CLTPSP) of open pit mines has been extensively studied in the past few decades due to its wide application in mining projects and the computational challenges it poses become an NP-hard problem.This problem has major practical significance because the effectiveness of the schedules obtained has strong economical impact for any mining project.Despite of the rapid theoretical and technical advances in this field,heuristics is still the only viable approach for large scale industrial applications.This work presents an approach combining genetic algorithms(GAs) and Lagrangian relaxation(LR) to optimally determine the CLTPSP of open pit mines.GAs are stochastic,parallel search algorithms based on the natural selection and the process of evolution.LR method is known for handling large-scale separable problems; however,the convergence to the optimal solution can be slow.The proposed Lagrangian relaxation and genetic algorithms(LR-GAs) combines genetic algorithms into Lagrangian relaxation method to update the Lagrangian multipliers.This approach leads to improve the performance of Lagrangian relaxation method in solving CLTPSP.Numerical results demonstrate that the LR method using GAs to improve its performance speeding up the convergence.Subsequently,highly near-optimal solution to the CLTPSP can be achieved by the LR-GAs.
文摘Conventionally, mining industry relies on a deterministic view, where a unique mine plan is determined based on a single resource model. A major shortfall of this approach is the inability to assess the risk caused by the well-known geological uncertainty, i.e. the in situ grade and tonnage variability of the mineral deposit. Despite some recent attempts in developing stochastic mine planning models which have demonstrated promising results, the industry still remains sceptical about this innovative idea. With respect to unbiased linear estimation, kriging is the most popular and reliable deterministic interpolation technique for resource estimation and it appears to remain its popularity in the near future. This paper presents a new systematic framework to quantify the risk of kriging-based mining projects due to the geological uncertainties. Firstly, conditional simulation is implemented to generate a series of equally-probable orebody realisations and these realisations are then compared with the kriged resource model to analyse its geological uncertainty. Secondly, a production schedule over the life of mine is determined based on the kriged resource model. Finally, risk profiles of that production schedule, namely ore and waste tonnage production, blending grade and Net Present Value (NPV), are constructed using the orebody realisations. The proposed model was applied on a multi-element deposit and the result demonstrates that that the kriging-based mine plan is unlikely to meet the production targets. Especially, the kriging-based mine plan overestimated the expected NPV at a magnitude of 6.70% to 7.34% (135 M$ to 151 M$). A new multivariate conditional simulation framework was also introduced in this paper to cope with the multivariate nature of the deposit. Although an iron ore deposit is used to prove the concepts, the method can easily be adapted to other kinds of mineral deposits, including surface coal mine.
基金the Mine Planning Research Group–GIPLAMIN-of the Mines Faculty,National University of Colombia
文摘This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed according to the probability distributions associated to key variables affecting the NPV, like production level, ore grade, price of ore, and others, so as to see what if, in a gold open pit mine project of 3000 metric tons per day of ore. Two case scenarios were analyzed to simulate the NPV, one where there is low certainty data available, and the other where the information available is of high certainty. Results based on genetic algorithm metaheuristic simulations, which combine basically Montecarlo simulations provided by the Palisade Risk software, the O'Hara cost model, net smelter return and financial analysis tools offered by Excel are reported, in order to determine to which variables of the project is more sensitive the NPV.
基金Projects(51474049,51674062)supported by the National Natural Science Foundation of ChinaProject(51604061)supported by the National Science Foundation for Young Scientists of China+3 种基金Projects(201202075,2014020040)supported by the Liaoning Natural Science Founds,ChinaProject(LZ2014020)supported by the Liaoning Province’s Key Laboratory Construction,ChinaProject(20130042110012)supported by the Specialized Research Fund for the Doctoral Program of Higher Education of ChinaProject(F14-231-1-07)supported by the Shenyang Technical Plan Project,China
文摘A neighborhood search algorithm was proposed to simultaneously schedule the waste removal quantity and the equipment fleet profile over the mine life for open pit mines.An initial search domain was first defined and a good schedule was obtained as the current best schedule by searching in this domain.Then,progressively narrower neighborhood search domains were constructed around the current best schedule to search for better schedules.The objective is to minimize the present value of waste removal costs over the mine life.The resulting schedule from this algorithm provides a complete fleet profile for each year over the mine life:the selected equipment models,the number of equipment units of each model,the age of each unit,as well as the quantity of waste removed.A numerical example of application was provided to demonstrate the feasibility and merits of the algorithm.
基金financially supported by the National Natural Science Foundation of China (No. 52174131)
文摘This research proposes the utilization of a geopolymer-based blasting sealing material to improve the profitability of coal sales and reduce the rate of coal fragmentation during blasting in open pit mines.The study first focused on optimizing the strength of the sealant material and reducing curing time.This was achieved by regulating the slag doping and sodium silicate solution modulus.The findings demonstrated that increasing slag content and improving the material resulted in an early rise in strength while increasing the modulus of the sodium silicate solution extended the curing time.The slag doping level was fixed at 80 g,and the sodium silicate solution modulus was set at 1.5.To achieve a strength of 3.12 MPa,the water/gel ratio was set at 0.5.The initial setting time was determined to be 33 min,meeting the required field test duration.Secondly,the strength requirements for field implementation were assessed by simulating the action time and force destruction process of the sealing material during blasting using ANSYS/LS-DYNA software.The results indicated that the modified material meets these requirements.Finally,the Shengli Open Pit Coal Mine served as the site for the field test.It was observed that the hole-sealing material’s hydration reaction created a laminated and flocculated gel inside it.This enhanced the density of the modified material.Additionally,the pregelatinized starch,functioning as an organic binder,filled the gaps between the gels,enhancing the cohesion and bonding coefficient of the material.Upon analyzing the post-blasting shooting effect diagram using the Split-Desktop software,it was determined that the utilization of the modified blast hole plugging material resulted in a decrease in the rate of coal fragmentation from 33.2%to 21.1%.This reduction exhibited a minimal error of 1.63%when compared to the field measurement,thereby providing further confirmation of the exceptional plugging capabilities of the modified material.This study significantly contributes to establishing a solid theoretical basis for enhancing the blasting efficiency of open pit mines and,in turn,enhancing their economic advantages.
基金Supported by Shannxi Leading Academic Discipline ProjectShannxi Science and Technology Project(the Key Industries R&D Programme)(2009K08-25)
文摘Using GIS, GPS, GPRS and RFID, a dynamic information management system of digital mining in an open pit was designed and developed.A linear programming model was set up in a practical application.By the model, the system can automatically draw up production plan of ore blending well every day.The system can monitor and dispatch open-pit trucks and shovels well, and can play back their historical paths.It can monitor and control the process of mining production in real time.By RFID, the system can also count the number of trucks'delivery and shovels'loading automatically.Experiments on real scenes show that the performance of this system is stable and can satisfy production standards of mining in open pits.
文摘The present study reflects upon the results of substantial program of two-dimensional Finite Element Method (FEM) numerical analyses of the open pit that links to slope angle optimization associated with the safety factor of the pit slope of a coal mine in Bangladesh. In the present analyses, two types of models have been presented. The first model estimates safety factor without seismic effect on the overall pit slope of the model; the second model incorporates safety factor with seismic stability of the model. The calculated optimum slope angle of the first model is 31% with a rational safety factor of 1.51, prior to the seismic effect. However, the value is reduced to 0.93, 0.82, and 0.72, after we applies the seismic effect in the second model with M6, M6.5, and M7, respectively. Finally, our modeling results emphasize that for the case of the proposed Phulbari coalmine, there is extremely high prospect for causing massive slope failure along the optimum pit slope angle with 31% if the mine area felt seismic shaking, like the Sikkim (in northern India) earthquake with M6.9 on September 18, 2011.
文摘Underground mining is an economically viable option for exploiting ore reserves deemed uneconomic after open pit mining. However, underground development can have adverse effects on the above existing open pit slope walls. As a goal of this paper, identification and assessment of potential slope instabilities prior to underground development is crucial for safe and sustainable mining. Towards goal achieving, this paper gives a comprehensive parametric study to investigate the influence of sublevel open stope (SLOS) underground mining on the surface and open pit slope walls. By means of numerical simulation, the SLOS design is tried against the existing open pit followed by adjustments of important slope parameters which are overall slope height (OSH) and overall slope angle (OSA). We found that underground mining may induce slope failure, particularly on the hangingwall side of the pit. Subsidence is prominent on the hanging wall and the surface, whereas, the uplift dominates the footwall and pit bottom. Pit wall closure is observed during underground mining. Although the assigned dimensions in the parametric study show a negligible effect of OSH and OSA, the high OSH experience low subsidence in comparison with low OSH. Overall, the results demonstrate that the slope walls on the hanging wall side are mostly affected by the underground mining and high-stress concentration prevails near slope toes and pit bottom. Additionally, slope deformation decrease from pit bottom towards the slope crest and surface. The results of this study add knowledge to open pit and underground mining interaction.