Background As information technology has advanced and been popularized,open pit mining has rapidly developed toward integration and digitization.The three-dimensional reconstruction technology has been successfully ap...Background As information technology has advanced and been popularized,open pit mining has rapidly developed toward integration and digitization.The three-dimensional reconstruction technology has been successfully applied to geological reconstruction and modeling of surface scenes in open pit mines.However,an integrated modeling method for surface and underground mine sites has not been reported.Methods In this study,we propose an integrated modeling method for open pit mines that fuses a real scene on the surface with an underground geological model.Based on oblique photography,a real-scene model was established on the surface.Based on the surface-stitching method proposed,the upper and lower surfaces and sides of the model were constructed in stages to construct a complete underground three-dimensional geological model,and the aboveground and underground models were registered together to build an integrated open pit mine model.Results The oblique photography method used reconstructed a surface model of an open pit mine using a real scene.The surface-stitching algorithm proposed was compared with the ball-pivoting and Poisson algorithms,and the integrity of the reconstructed model was markedly superior to that of the other two reconstruction methods.In addition,the surface-stitching algorithm was applied to the reconstruction of different formation models and showed good stability and reconstruction efficiency.Finally,the aboveground and underground models were accurately fitted after registration to form an integrated model.Conclusions The proposed method can efficiently establish an integrated open pit model.Based on the integrated model,an open pit auxiliary planning system was designed and realized.It supports the functions of mining planning and output calculation,assists users in mining planning and operation management,and improves production efficiency and management levels.展开更多
The goal of this research is to develop mine-scale discrete fracture network(DFN)models in which the influence of the spatial heterogeneity of fracture distributions may be investigated on the rock wedge stability of ...The goal of this research is to develop mine-scale discrete fracture network(DFN)models in which the influence of the spatial heterogeneity of fracture distributions may be investigated on the rock wedge stability of an open pit slope.For this purpose,spatially conditioned DFN models were developed for the pit walls at Tasiast mine using comprehensive structural data from the mine.Using Sequential Gaussian Simulation(SGS),volumetric fracture intensities(P32)were modeled across the entire mine site in the form of 3D block models.The simulated P32 block models were used as the input constraints for conditional DFN fracture generation,where the DFN grid dimension is the same as the SGS 3D blocks.The spatially constrained DFN models were further calibrated using aerial fracture intensities(P21)data from the pit walls,obtained by a survey of the pit walls using an unmanned aerial vehicle(UAV)and measured traces of joints from 3D point cloud data.The final DFN model is expected to honor the fracture intensities gathered through different means with optimal model accuracy.Finally,bench-scale and interramp scale rock wedge slope stability analyses were conducted using the calibrated conditional DFN models.This work proves the significance of conditioned DFN models in rock wedge stability analysis.Such models provide detailed information regarding rock wedge stability so that site monitoring and prevention plans can be conducted with higher efficiency.展开更多
Using GIS, GPS and GPRS, a dynamic management system of ore blending in an open pit mine has been designed and developed. A linear program was established in a practical application. The system is very good at automat...Using GIS, GPS and GPRS, a dynamic management system of ore blending in an open pit mine has been designed and developed. A linear program was established in a practical application. The system is very good at automatically drawing up a daily production plan of ore blending and monitors and controls the process of mining production in real time. Experiments under real conditions show that the performance of this system is stable and can satisfy production standards of ore blending in open pit mines.展开更多
According to the characteristics of opencast coal resources and dragline technology system application in China,the structure and shifting step of transport passage are optimized in this paper.Typical coal transport p...According to the characteristics of opencast coal resources and dragline technology system application in China,the structure and shifting step of transport passage are optimized in this paper.Typical coal transport passage is analyzed in aspects such as the internal dump occupation,dragline operation efficiency,coal transport distance,upper stripping distance and shifting quantities.The middle passage should be given priority in thick overburden open pit mine because the dragline system is only responsible for part stripping task.According to characteristics of middle passage,the transport passage is divided into parallel climbing,vertical climbing and horizontal transport.In addition,the transport passage structure optimization model and shifting distance optimization model are established in this paper.The case study in Heidaigou open pit mine shows that,the parallel climbing height is accounted for about 60%of the total height,and reasonable shifting distances of the first mining area and the second mining area are 240 and 320 m.Sensitivity analysis shows that,the total passage height has important influence on the shifting step,so it is with the stripping height and passage construction cost to the passage structure.展开更多
Rock slope hazard assessment is an important part of risk analysis for open pit mines.The main parameters that can lead to rock slope failures are the parameters traditionally used in geomechanical classifications,the...Rock slope hazard assessment is an important part of risk analysis for open pit mines.The main parameters that can lead to rock slope failures are the parameters traditionally used in geomechanical classifications,the slope geometrical parameters and external factors like rainfall and blasting.This paper presents a methodology for a hazard assessment system for open pit mine slopes based on 88 cases collated around the world using principal components analysis,discriminant analysis and confidence ellipses.The historical cases used in this study included copper,gold,iron,diamond,lead and zinc,platinum and claystone mines.The variables used in the assessment methodology are uniaxial compressive strength of intact rock;spacing,persistence,opening,roughness,infilling and orientation of the main discontinuity set;weathering of the rock mass;groundwater;blasting method;and height and inclination of the pit.While principal component analysis was used to quantify the data,the discriminant analysis was used to establish a rule to classify new slopes about its stability condition.To provide a practical hazard assessment system,confidence ellipses were used to propose a hazard graph and generate the HAS-Q.The discriminant rule developed in this research has a high discrimination capacity with an error rate of 11.36%.展开更多
Constrained long-term production scheduling problem(CLTPSP) of open pit mines has been extensively studied in the past few decades due to its wide application in mining projects and the computational challenges it pos...Constrained long-term production scheduling problem(CLTPSP) of open pit mines has been extensively studied in the past few decades due to its wide application in mining projects and the computational challenges it poses become an NP-hard problem.This problem has major practical significance because the effectiveness of the schedules obtained has strong economical impact for any mining project.Despite of the rapid theoretical and technical advances in this field,heuristics is still the only viable approach for large scale industrial applications.This work presents an approach combining genetic algorithms(GAs) and Lagrangian relaxation(LR) to optimally determine the CLTPSP of open pit mines.GAs are stochastic,parallel search algorithms based on the natural selection and the process of evolution.LR method is known for handling large-scale separable problems; however,the convergence to the optimal solution can be slow.The proposed Lagrangian relaxation and genetic algorithms(LR-GAs) combines genetic algorithms into Lagrangian relaxation method to update the Lagrangian multipliers.This approach leads to improve the performance of Lagrangian relaxation method in solving CLTPSP.Numerical results demonstrate that the LR method using GAs to improve its performance speeding up the convergence.Subsequently,highly near-optimal solution to the CLTPSP can be achieved by the LR-GAs.展开更多
Conventionally, mining industry relies on a deterministic view, where a unique mine plan is determined based on a single resource model. A major shortfall of this approach is the inability to assess the risk caused by...Conventionally, mining industry relies on a deterministic view, where a unique mine plan is determined based on a single resource model. A major shortfall of this approach is the inability to assess the risk caused by the well-known geological uncertainty, i.e. the in situ grade and tonnage variability of the mineral deposit. Despite some recent attempts in developing stochastic mine planning models which have demonstrated promising results, the industry still remains sceptical about this innovative idea. With respect to unbiased linear estimation, kriging is the most popular and reliable deterministic interpolation technique for resource estimation and it appears to remain its popularity in the near future. This paper presents a new systematic framework to quantify the risk of kriging-based mining projects due to the geological uncertainties. Firstly, conditional simulation is implemented to generate a series of equally-probable orebody realisations and these realisations are then compared with the kriged resource model to analyse its geological uncertainty. Secondly, a production schedule over the life of mine is determined based on the kriged resource model. Finally, risk profiles of that production schedule, namely ore and waste tonnage production, blending grade and Net Present Value (NPV), are constructed using the orebody realisations. The proposed model was applied on a multi-element deposit and the result demonstrates that that the kriging-based mine plan is unlikely to meet the production targets. Especially, the kriging-based mine plan overestimated the expected NPV at a magnitude of 6.70% to 7.34% (135 M$ to 151 M$). A new multivariate conditional simulation framework was also introduced in this paper to cope with the multivariate nature of the deposit. Although an iron ore deposit is used to prove the concepts, the method can easily be adapted to other kinds of mineral deposits, including surface coal mine.展开更多
This paper primarily concerns the effective coordination of the procedures and methods employed in open pit mining operations under the background of river management.The central objective of this study is to identify...This paper primarily concerns the effective coordination of the procedures and methods employed in open pit mining operations under the background of river management.The central objective of this study is to identify a viable approach for ensuring rational and efficient development of open pit mineral resources while simultaneously protecting and restoring the ecological environment of the river.This approach should facilitate the realization of a harmonious symbiosis between mining and river management.The intricate mutual influence relationship between river management and open pit mining is first analyzed in depth,which provides a solid foundation for the subsequent coordination strategy development.In light of the aforementioned considerations,a set of coordination procedures for open pit mining based on river management conditions is proposed.These procedures emphasize the integration of river protection into the overall layout of mining at the planning stage.The implementation of scientific mining schemes,accompanied by rigorous control of the scope and depth of mining operations,has proven to be an effective means of reducing the impact of mining activities on river environments.This approach has also facilitated the achievement of a balance and coordination between mining and river management.展开更多
Reserve estimation is a key to find the correct NPV in a mining project. The most important factor in reserve estimation is the metal price. Metal price fluctuations in recent years were exaggerated, and imposed a hig...Reserve estimation is a key to find the correct NPV in a mining project. The most important factor in reserve estimation is the metal price. Metal price fluctuations in recent years were exaggerated, and imposed a high degree of uncertainty to the reserve estimation, and in consequence to the whole mine planning procedure. Real option approach is an efficient method of decision making in the uncertain conditions. This approach has been used for evaluation of defined natural resources projects until now. This study considering the metal price uncertainty used real option approach to prepare a methodology for reserve estimation in open pit mines. This study was done on a copper cylindrical deposit, but the achieved methodology can be adjusted for all kinds of deposits. This methodology was comprehensively described through the examples in such a manner that can be used by the mine planners.展开更多
The main purpose of blasting in open pit mines is to produce the feed for crushing stage with the optimum dimensions from in situ rocks. The size distribution of muck pile indicates the efficiency of blasting pattern ...The main purpose of blasting in open pit mines is to produce the feed for crushing stage with the optimum dimensions from in situ rocks. The size distribution of muck pile indicates the efficiency of blasting pattern to reach the required optimum sizes. Nevertheless, there is no mature model to predict fragmentation distribution to date that can be used in various open pit mines. Therefore, a new framework to evaluate and predict fragmentation distribution is presented based on the image analysis approach. For this purpose, the data collected from Jajarm bauxite mine in Iran were used as the sources in this study. The image analysis process was performed by Split-Desktop software to find out fragmentation distribution, uniformity index and average size of the fragmented rocks. Then, two different approaches including the multivariate regression method and the decision-making trial and evaluation laboratory(DEMATEL) technique were incorporated to develop new models of the uniformity index and the average size to improve the Rosin-Rammler function. The performances of the proposed models were evaluated in four blasting operation sites. The results obtained indicate that the regression model possesses a better performance in prediction of the uniformity index and the average size and subsequently the fragmentation distribution in comparison with DEMATEL and conventional Rosin-Rammler models.展开更多
This research proposes the utilization of a geopolymer-based blasting sealing material to improve the profitability of coal sales and reduce the rate of coal fragmentation during blasting in open pit mines.The study f...This research proposes the utilization of a geopolymer-based blasting sealing material to improve the profitability of coal sales and reduce the rate of coal fragmentation during blasting in open pit mines.The study first focused on optimizing the strength of the sealant material and reducing curing time.This was achieved by regulating the slag doping and sodium silicate solution modulus.The findings demonstrated that increasing slag content and improving the material resulted in an early rise in strength while increasing the modulus of the sodium silicate solution extended the curing time.The slag doping level was fixed at 80 g,and the sodium silicate solution modulus was set at 1.5.To achieve a strength of 3.12 MPa,the water/gel ratio was set at 0.5.The initial setting time was determined to be 33 min,meeting the required field test duration.Secondly,the strength requirements for field implementation were assessed by simulating the action time and force destruction process of the sealing material during blasting using ANSYS/LS-DYNA software.The results indicated that the modified material meets these requirements.Finally,the Shengli Open Pit Coal Mine served as the site for the field test.It was observed that the hole-sealing material’s hydration reaction created a laminated and flocculated gel inside it.This enhanced the density of the modified material.Additionally,the pregelatinized starch,functioning as an organic binder,filled the gaps between the gels,enhancing the cohesion and bonding coefficient of the material.Upon analyzing the post-blasting shooting effect diagram using the Split-Desktop software,it was determined that the utilization of the modified blast hole plugging material resulted in a decrease in the rate of coal fragmentation from 33.2%to 21.1%.This reduction exhibited a minimal error of 1.63%when compared to the field measurement,thereby providing further confirmation of the exceptional plugging capabilities of the modified material.This study significantly contributes to establishing a solid theoretical basis for enhancing the blasting efficiency of open pit mines and,in turn,enhancing their economic advantages.展开更多
The classical physics theory respectively obeys the three famous conservation laws referred to as charge conjugation, parity and time reverse, and the open pit block model is equal to a Newtonian mechanics system. Con...The classical physics theory respectively obeys the three famous conservation laws referred to as charge conjugation, parity and time reverse, and the open pit block model is equal to a Newtonian mechanics system. Consequently, there would exist some correspondent symmetry principles and conservation laws within the 3D fixed block model of the deposit and the theory for the optimum design of the open pit mine. Reversing a series of relevant fundamental concepts, several conservation laws, which the theory for the optimum design of open pit mines should obey, as block weight conjugation, block model parity and combined symmetry of the both, were expounded. From the symmetry principle, the theoretic significance for a series of the current optimum techniques was discussed and explained, and a kind of conjugate heuristics which can check the error of itself was presented and demonstrated. Thus it is shown that the symmetry principle lays the foundations and opens up the prospects for the further research with mine design and scheduling problem.展开更多
Mining globally contributes to the growth of many economies of the world. Since its inception, the Zambian mining industry has contributed largely to the country’s economy. The various developments both in technology...Mining globally contributes to the growth of many economies of the world. Since its inception, the Zambian mining industry has contributed largely to the country’s economy. The various developments both in technology and knowledge have contributed to the scale at which mining is being done. Challenges in such a setting arise due to the socio-economic and environmental impacts of mining, which create multidimensional problems. The study investigated the importance of engaging stakeholders in progressive rehabilitation programs for large-scale open pit mines, using a case study of the Lumwana Mine and its host community, Manyama. A qualitative approach was used, and data was collected through one-on-one interviews. A combination of convenient and quota sampling was used to engage with host community leaders, professionals and academicians from various fields and institutions. Results showed that most participants had agreed that stakeholder engagement is important for progressive rehabilitation, but the challenge was that the host community and municipal council representatives were not aware of any progressive rehabilitation efforts at Lumwana Mine. This was attributed to a lack of stakeholder engagement and communication of mitigation progress activities by the Lumwana Mine. Results also revealed that the lack of environmental impact assessment regulations to compel companies to involve stakeholders throughout the entire life of the mine other than just at the pre-mining stage led to a lack of compliance and accountability in rehabilitation.展开更多
Blasting is considered an indispensable process in mining excavation opera-tions.Generally,only a small percentage of the total energy of blasting is con-sumed in the fragmentation and displacement of the rock,and the...Blasting is considered an indispensable process in mining excavation opera-tions.Generally,only a small percentage of the total energy of blasting is con-sumed in the fragmentation and displacement of the rock,and the rest of the energy is transmitted to the structures and environment surrounding the mined area.The air overpressure(AOp)induced by explosions in open-cast mines has unavoidable environmental and safety consequences,but can be minimized to an acceptable threshold to limit environmental damage and the impact on the sustainability of mining activities.The development of numer-ical predictive models of AOp was the main objective of this study.Thus,the methodology used to achieve this main objective was articulated around six parts:knowledge of the study area,processing and statistical analysis of the data collected,development of both numerical and empirical prediction mod-els,and evaluation of model performance of the numerical model parameters.The results show that only numerical models are suitable for predicting AOp.Moreover,numerical models generally perform better than empirical models in predicting this phenomenon.Among these AI models,the results show that the DT model is the best suited for predicting AOp in this study,with remark-able performance results(RRSE of 0.08,RAE of 0.05,RMSE of 0.29,MAE of 0.37,MAPE of 0.07,and an R2 of 0.994).This could therefore justify its appli-cation in practical engineering to predict blast-induced AOp in open-cast mines to reduce undesirable environmental effects.展开更多
The ecological costs of open pit metal mining are quantified, which include lost value of direct eco-services, lost value of indirect eco-services, prevention and restoration costs, and cost of carbon emission from en...The ecological costs of open pit metal mining are quantified, which include lost value of direct eco-services, lost value of indirect eco-services, prevention and restoration costs, and cost of carbon emission from energy consumption. These ecological costs are incorporated in an iterative ultimate pit optimization algorithm. A case study is presented to demonstrate the influence of ecological costs on pit design outcome. The results show that it is possible to internalize ecological costs in mine designs. The pit optimization outcome shifts considerably to the conservative side and the profitability decreases substantially when ecological costs are accounted for.展开更多
The geological structure of the Changshanhao open-pit mine in Urad Middle Banner,Inner Mongolia,China is extremely complicated,and slope instability has frequently occurred in various forms,such as wedge sliding,beddi...The geological structure of the Changshanhao open-pit mine in Urad Middle Banner,Inner Mongolia,China is extremely complicated,and slope instability has frequently occurred in various forms,such as wedge sliding,bedding sliding,and toppling failure.In order to study the failure mechanisms of these slopes,the geological structure and mechanical rock properties were investigated based on field investigations and laboratory tests.Numerical models for the present mining area and final mining area of the original scheme were established to analyze slope stability.The results showed that the unique geomorphological characteristics of the mining area were generated by geological tectonism,and the north side of the stope is an anti-dip layered rock slope and the south side is a dip layered rock slope.Slope failure is the consequence of endogenic and exogenic integration,including physical and mechanical properties of the rock mass,geological structures such as faults and joints,and human-caused factors such as blasting and excavation disturbances.Then the original excavation scheme was redesigned mainly by optimizing the slope angle and decreasing the final mining depth to maintain slope stability.Finally,the Monte Carlo method was used to analyze the reliability of the slope angle optimization scheme.The open-pit mine excavation plan that meets the stability requirements was obtained eventually.展开更多
As the first step of mine production, blasting has a vital influence on the safety and smoothness of mine production, the correctness and quality of blade filling and transportation operation, as well as the mine prod...As the first step of mine production, blasting has a vital influence on the safety and smoothness of mine production, the correctness and quality of blade filling and transportation operation, as well as the mine production efficiency. Considering that the effective reduction of detonation velocity and depth is an important scientific research project in the mining industry, given the close relationship between high detonation velocity on the one hand and the size of the base and the quality of the explosion on the other, there are many factors in the process of exposed wing blasting, which lead to the formation of root block and deep block. The related factors of the large block and deep block need to be studied more deeply, effectively and scientifically.展开更多
This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed acco...This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed according to the probability distributions associated to key variables affecting the NPV, like production level, ore grade, price of ore, and others, so as to see what if, in a gold open pit mine project of 3000 metric tons per day of ore. Two case scenarios were analyzed to simulate the NPV, one where there is low certainty data available, and the other where the information available is of high certainty. Results based on genetic algorithm metaheuristic simulations, which combine basically Montecarlo simulations provided by the Palisade Risk software, the O'Hara cost model, net smelter return and financial analysis tools offered by Excel are reported, in order to determine to which variables of the project is more sensitive the NPV.展开更多
The present study reflects upon the results of substantial program of two-dimensional Finite Element Method (FEM) numerical analyses of the open pit that links to slope angle optimization associated with the safety ...The present study reflects upon the results of substantial program of two-dimensional Finite Element Method (FEM) numerical analyses of the open pit that links to slope angle optimization associated with the safety factor of the pit slope of a coal mine in Bangladesh. In the present analyses, two types of models have been presented. The first model estimates safety factor without seismic effect on the overall pit slope of the model; the second model incorporates safety factor with seismic stability of the model. The calculated optimum slope angle of the first model is 31% with a rational safety factor of 1.51, prior to the seismic effect. However, the value is reduced to 0.93, 0.82, and 0.72, after we applies the seismic effect in the second model with M6, M6.5, and M7, respectively. Finally, our modeling results emphasize that for the case of the proposed Phulbari coalmine, there is extremely high prospect for causing massive slope failure along the optimum pit slope angle with 31% if the mine area felt seismic shaking, like the Sikkim (in northern India) earthquake with M6.9 on September 18, 2011.展开更多
In order to increase production efficiency at open-pit mines, on the basis oflinear programming, a practical mathematical model for optimizing truck flow was developed, whichimproved the traditional fixed manual sched...In order to increase production efficiency at open-pit mines, on the basis oflinear programming, a practical mathematical model for optimizing truck flow was developed, whichimproved the traditional fixed manual schedule method. The model has advantages from linearprogramming and objective programming, makes most handling points working at full capacity and keepsan optimized ratio between trucks and excavators. For ensuring feasibility of the model inpractical production, four standards for feasibility test were proposed. The model satisfied all thestandards. The application in a large scale open-pit iron mine indicated that the model reduced thenumber of required trucks by 10 percent compared with the fixed manual schedule method.展开更多
基金Supported by Liaoning Province Science and Technology Research Project(2021JH1/10400011)National Natural Science Foundation of China(61971118).
文摘Background As information technology has advanced and been popularized,open pit mining has rapidly developed toward integration and digitization.The three-dimensional reconstruction technology has been successfully applied to geological reconstruction and modeling of surface scenes in open pit mines.However,an integrated modeling method for surface and underground mine sites has not been reported.Methods In this study,we propose an integrated modeling method for open pit mines that fuses a real scene on the surface with an underground geological model.Based on oblique photography,a real-scene model was established on the surface.Based on the surface-stitching method proposed,the upper and lower surfaces and sides of the model were constructed in stages to construct a complete underground three-dimensional geological model,and the aboveground and underground models were registered together to build an integrated open pit mine model.Results The oblique photography method used reconstructed a surface model of an open pit mine using a real scene.The surface-stitching algorithm proposed was compared with the ball-pivoting and Poisson algorithms,and the integrity of the reconstructed model was markedly superior to that of the other two reconstruction methods.In addition,the surface-stitching algorithm was applied to the reconstruction of different formation models and showed good stability and reconstruction efficiency.Finally,the aboveground and underground models were accurately fitted after registration to form an integrated model.Conclusions The proposed method can efficiently establish an integrated open pit model.Based on the integrated model,an open pit auxiliary planning system was designed and realized.It supports the functions of mining planning and output calculation,assists users in mining planning and operation management,and improves production efficiency and management levels.
基金Kinross Gold and MITACS for their financial support(Grant No.FR42880).
文摘The goal of this research is to develop mine-scale discrete fracture network(DFN)models in which the influence of the spatial heterogeneity of fracture distributions may be investigated on the rock wedge stability of an open pit slope.For this purpose,spatially conditioned DFN models were developed for the pit walls at Tasiast mine using comprehensive structural data from the mine.Using Sequential Gaussian Simulation(SGS),volumetric fracture intensities(P32)were modeled across the entire mine site in the form of 3D block models.The simulated P32 block models were used as the input constraints for conditional DFN fracture generation,where the DFN grid dimension is the same as the SGS 3D blocks.The spatially constrained DFN models were further calibrated using aerial fracture intensities(P21)data from the pit walls,obtained by a survey of the pit walls using an unmanned aerial vehicle(UAV)and measured traces of joints from 3D point cloud data.The final DFN model is expected to honor the fracture intensities gathered through different means with optimal model accuracy.Finally,bench-scale and interramp scale rock wedge slope stability analyses were conducted using the calibrated conditional DFN models.This work proves the significance of conditioned DFN models in rock wedge stability analysis.Such models provide detailed information regarding rock wedge stability so that site monitoring and prevention plans can be conducted with higher efficiency.
文摘Using GIS, GPS and GPRS, a dynamic management system of ore blending in an open pit mine has been designed and developed. A linear program was established in a practical application. The system is very good at automatically drawing up a daily production plan of ore blending and monitors and controls the process of mining production in real time. Experiments under real conditions show that the performance of this system is stable and can satisfy production standards of ore blending in open pit mines.
基金Financial support from the National High-Tech Research and Development Program of China(No.2012AA062004)the National Natural Science Foundation of China(No.51034005)
文摘According to the characteristics of opencast coal resources and dragline technology system application in China,the structure and shifting step of transport passage are optimized in this paper.Typical coal transport passage is analyzed in aspects such as the internal dump occupation,dragline operation efficiency,coal transport distance,upper stripping distance and shifting quantities.The middle passage should be given priority in thick overburden open pit mine because the dragline system is only responsible for part stripping task.According to characteristics of middle passage,the transport passage is divided into parallel climbing,vertical climbing and horizontal transport.In addition,the transport passage structure optimization model and shifting distance optimization model are established in this paper.The case study in Heidaigou open pit mine shows that,the parallel climbing height is accounted for about 60%of the total height,and reasonable shifting distances of the first mining area and the second mining area are 240 and 320 m.Sensitivity analysis shows that,the total passage height has important influence on the shifting step,so it is with the stripping height and passage construction cost to the passage structure.
基金Federal Agency for Support and Evaluation of Graduate Education (CAPES – Brazil, Grant ID 19/2016)Fondation for Research Support of Minas Gerais (FAPEMIG – Brazil)University of New South Wales (UNSW – Australia)
文摘Rock slope hazard assessment is an important part of risk analysis for open pit mines.The main parameters that can lead to rock slope failures are the parameters traditionally used in geomechanical classifications,the slope geometrical parameters and external factors like rainfall and blasting.This paper presents a methodology for a hazard assessment system for open pit mine slopes based on 88 cases collated around the world using principal components analysis,discriminant analysis and confidence ellipses.The historical cases used in this study included copper,gold,iron,diamond,lead and zinc,platinum and claystone mines.The variables used in the assessment methodology are uniaxial compressive strength of intact rock;spacing,persistence,opening,roughness,infilling and orientation of the main discontinuity set;weathering of the rock mass;groundwater;blasting method;and height and inclination of the pit.While principal component analysis was used to quantify the data,the discriminant analysis was used to establish a rule to classify new slopes about its stability condition.To provide a practical hazard assessment system,confidence ellipses were used to propose a hazard graph and generate the HAS-Q.The discriminant rule developed in this research has a high discrimination capacity with an error rate of 11.36%.
文摘Constrained long-term production scheduling problem(CLTPSP) of open pit mines has been extensively studied in the past few decades due to its wide application in mining projects and the computational challenges it poses become an NP-hard problem.This problem has major practical significance because the effectiveness of the schedules obtained has strong economical impact for any mining project.Despite of the rapid theoretical and technical advances in this field,heuristics is still the only viable approach for large scale industrial applications.This work presents an approach combining genetic algorithms(GAs) and Lagrangian relaxation(LR) to optimally determine the CLTPSP of open pit mines.GAs are stochastic,parallel search algorithms based on the natural selection and the process of evolution.LR method is known for handling large-scale separable problems; however,the convergence to the optimal solution can be slow.The proposed Lagrangian relaxation and genetic algorithms(LR-GAs) combines genetic algorithms into Lagrangian relaxation method to update the Lagrangian multipliers.This approach leads to improve the performance of Lagrangian relaxation method in solving CLTPSP.Numerical results demonstrate that the LR method using GAs to improve its performance speeding up the convergence.Subsequently,highly near-optimal solution to the CLTPSP can be achieved by the LR-GAs.
文摘Conventionally, mining industry relies on a deterministic view, where a unique mine plan is determined based on a single resource model. A major shortfall of this approach is the inability to assess the risk caused by the well-known geological uncertainty, i.e. the in situ grade and tonnage variability of the mineral deposit. Despite some recent attempts in developing stochastic mine planning models which have demonstrated promising results, the industry still remains sceptical about this innovative idea. With respect to unbiased linear estimation, kriging is the most popular and reliable deterministic interpolation technique for resource estimation and it appears to remain its popularity in the near future. This paper presents a new systematic framework to quantify the risk of kriging-based mining projects due to the geological uncertainties. Firstly, conditional simulation is implemented to generate a series of equally-probable orebody realisations and these realisations are then compared with the kriged resource model to analyse its geological uncertainty. Secondly, a production schedule over the life of mine is determined based on the kriged resource model. Finally, risk profiles of that production schedule, namely ore and waste tonnage production, blending grade and Net Present Value (NPV), are constructed using the orebody realisations. The proposed model was applied on a multi-element deposit and the result demonstrates that that the kriging-based mine plan is unlikely to meet the production targets. Especially, the kriging-based mine plan overestimated the expected NPV at a magnitude of 6.70% to 7.34% (135 M$ to 151 M$). A new multivariate conditional simulation framework was also introduced in this paper to cope with the multivariate nature of the deposit. Although an iron ore deposit is used to prove the concepts, the method can easily be adapted to other kinds of mineral deposits, including surface coal mine.
文摘This paper primarily concerns the effective coordination of the procedures and methods employed in open pit mining operations under the background of river management.The central objective of this study is to identify a viable approach for ensuring rational and efficient development of open pit mineral resources while simultaneously protecting and restoring the ecological environment of the river.This approach should facilitate the realization of a harmonious symbiosis between mining and river management.The intricate mutual influence relationship between river management and open pit mining is first analyzed in depth,which provides a solid foundation for the subsequent coordination strategy development.In light of the aforementioned considerations,a set of coordination procedures for open pit mining based on river management conditions is proposed.These procedures emphasize the integration of river protection into the overall layout of mining at the planning stage.The implementation of scientific mining schemes,accompanied by rigorous control of the scope and depth of mining operations,has proven to be an effective means of reducing the impact of mining activities on river environments.This approach has also facilitated the achievement of a balance and coordination between mining and river management.
文摘Reserve estimation is a key to find the correct NPV in a mining project. The most important factor in reserve estimation is the metal price. Metal price fluctuations in recent years were exaggerated, and imposed a high degree of uncertainty to the reserve estimation, and in consequence to the whole mine planning procedure. Real option approach is an efficient method of decision making in the uncertain conditions. This approach has been used for evaluation of defined natural resources projects until now. This study considering the metal price uncertainty used real option approach to prepare a methodology for reserve estimation in open pit mines. This study was done on a copper cylindrical deposit, but the achieved methodology can be adjusted for all kinds of deposits. This methodology was comprehensively described through the examples in such a manner that can be used by the mine planners.
文摘The main purpose of blasting in open pit mines is to produce the feed for crushing stage with the optimum dimensions from in situ rocks. The size distribution of muck pile indicates the efficiency of blasting pattern to reach the required optimum sizes. Nevertheless, there is no mature model to predict fragmentation distribution to date that can be used in various open pit mines. Therefore, a new framework to evaluate and predict fragmentation distribution is presented based on the image analysis approach. For this purpose, the data collected from Jajarm bauxite mine in Iran were used as the sources in this study. The image analysis process was performed by Split-Desktop software to find out fragmentation distribution, uniformity index and average size of the fragmented rocks. Then, two different approaches including the multivariate regression method and the decision-making trial and evaluation laboratory(DEMATEL) technique were incorporated to develop new models of the uniformity index and the average size to improve the Rosin-Rammler function. The performances of the proposed models were evaluated in four blasting operation sites. The results obtained indicate that the regression model possesses a better performance in prediction of the uniformity index and the average size and subsequently the fragmentation distribution in comparison with DEMATEL and conventional Rosin-Rammler models.
基金financially supported by the National Natural Science Foundation of China (No. 52174131)
文摘This research proposes the utilization of a geopolymer-based blasting sealing material to improve the profitability of coal sales and reduce the rate of coal fragmentation during blasting in open pit mines.The study first focused on optimizing the strength of the sealant material and reducing curing time.This was achieved by regulating the slag doping and sodium silicate solution modulus.The findings demonstrated that increasing slag content and improving the material resulted in an early rise in strength while increasing the modulus of the sodium silicate solution extended the curing time.The slag doping level was fixed at 80 g,and the sodium silicate solution modulus was set at 1.5.To achieve a strength of 3.12 MPa,the water/gel ratio was set at 0.5.The initial setting time was determined to be 33 min,meeting the required field test duration.Secondly,the strength requirements for field implementation were assessed by simulating the action time and force destruction process of the sealing material during blasting using ANSYS/LS-DYNA software.The results indicated that the modified material meets these requirements.Finally,the Shengli Open Pit Coal Mine served as the site for the field test.It was observed that the hole-sealing material’s hydration reaction created a laminated and flocculated gel inside it.This enhanced the density of the modified material.Additionally,the pregelatinized starch,functioning as an organic binder,filled the gaps between the gels,enhancing the cohesion and bonding coefficient of the material.Upon analyzing the post-blasting shooting effect diagram using the Split-Desktop software,it was determined that the utilization of the modified blast hole plugging material resulted in a decrease in the rate of coal fragmentation from 33.2%to 21.1%.This reduction exhibited a minimal error of 1.63%when compared to the field measurement,thereby providing further confirmation of the exceptional plugging capabilities of the modified material.This study significantly contributes to establishing a solid theoretical basis for enhancing the blasting efficiency of open pit mines and,in turn,enhancing their economic advantages.
文摘The classical physics theory respectively obeys the three famous conservation laws referred to as charge conjugation, parity and time reverse, and the open pit block model is equal to a Newtonian mechanics system. Consequently, there would exist some correspondent symmetry principles and conservation laws within the 3D fixed block model of the deposit and the theory for the optimum design of the open pit mine. Reversing a series of relevant fundamental concepts, several conservation laws, which the theory for the optimum design of open pit mines should obey, as block weight conjugation, block model parity and combined symmetry of the both, were expounded. From the symmetry principle, the theoretic significance for a series of the current optimum techniques was discussed and explained, and a kind of conjugate heuristics which can check the error of itself was presented and demonstrated. Thus it is shown that the symmetry principle lays the foundations and opens up the prospects for the further research with mine design and scheduling problem.
文摘Mining globally contributes to the growth of many economies of the world. Since its inception, the Zambian mining industry has contributed largely to the country’s economy. The various developments both in technology and knowledge have contributed to the scale at which mining is being done. Challenges in such a setting arise due to the socio-economic and environmental impacts of mining, which create multidimensional problems. The study investigated the importance of engaging stakeholders in progressive rehabilitation programs for large-scale open pit mines, using a case study of the Lumwana Mine and its host community, Manyama. A qualitative approach was used, and data was collected through one-on-one interviews. A combination of convenient and quota sampling was used to engage with host community leaders, professionals and academicians from various fields and institutions. Results showed that most participants had agreed that stakeholder engagement is important for progressive rehabilitation, but the challenge was that the host community and municipal council representatives were not aware of any progressive rehabilitation efforts at Lumwana Mine. This was attributed to a lack of stakeholder engagement and communication of mitigation progress activities by the Lumwana Mine. Results also revealed that the lack of environmental impact assessment regulations to compel companies to involve stakeholders throughout the entire life of the mine other than just at the pre-mining stage led to a lack of compliance and accountability in rehabilitation.
文摘Blasting is considered an indispensable process in mining excavation opera-tions.Generally,only a small percentage of the total energy of blasting is con-sumed in the fragmentation and displacement of the rock,and the rest of the energy is transmitted to the structures and environment surrounding the mined area.The air overpressure(AOp)induced by explosions in open-cast mines has unavoidable environmental and safety consequences,but can be minimized to an acceptable threshold to limit environmental damage and the impact on the sustainability of mining activities.The development of numer-ical predictive models of AOp was the main objective of this study.Thus,the methodology used to achieve this main objective was articulated around six parts:knowledge of the study area,processing and statistical analysis of the data collected,development of both numerical and empirical prediction mod-els,and evaluation of model performance of the numerical model parameters.The results show that only numerical models are suitable for predicting AOp.Moreover,numerical models generally perform better than empirical models in predicting this phenomenon.Among these AI models,the results show that the DT model is the best suited for predicting AOp in this study,with remark-able performance results(RRSE of 0.08,RAE of 0.05,RMSE of 0.29,MAE of 0.37,MAPE of 0.07,and an R2 of 0.994).This could therefore justify its appli-cation in practical engineering to predict blast-induced AOp in open-cast mines to reduce undesirable environmental effects.
基金Project(50974041)supported by the National Natural Science Foundation of ChinaProject(NCET-11-0073)supported by Program for New Century Excellent Talents in University of Ministry of Education of China+1 种基金Project(201102065)supported by the Natural Science Foundation of Liaoning Province,ChinaProject(2012921075)supported by the Ten Million Talent Project of Liaoning Province,China
文摘The ecological costs of open pit metal mining are quantified, which include lost value of direct eco-services, lost value of indirect eco-services, prevention and restoration costs, and cost of carbon emission from energy consumption. These ecological costs are incorporated in an iterative ultimate pit optimization algorithm. A case study is presented to demonstrate the influence of ecological costs on pit design outcome. The results show that it is possible to internalize ecological costs in mine designs. The pit optimization outcome shifts considerably to the conservative side and the profitability decreases substantially when ecological costs are accounted for.
基金supported by the National Key Research and Development Program of China Grant NO. 2016YFC0600901the Fundamental Research Funds for the Central Universities Grant NO. 2015QB02。
文摘The geological structure of the Changshanhao open-pit mine in Urad Middle Banner,Inner Mongolia,China is extremely complicated,and slope instability has frequently occurred in various forms,such as wedge sliding,bedding sliding,and toppling failure.In order to study the failure mechanisms of these slopes,the geological structure and mechanical rock properties were investigated based on field investigations and laboratory tests.Numerical models for the present mining area and final mining area of the original scheme were established to analyze slope stability.The results showed that the unique geomorphological characteristics of the mining area were generated by geological tectonism,and the north side of the stope is an anti-dip layered rock slope and the south side is a dip layered rock slope.Slope failure is the consequence of endogenic and exogenic integration,including physical and mechanical properties of the rock mass,geological structures such as faults and joints,and human-caused factors such as blasting and excavation disturbances.Then the original excavation scheme was redesigned mainly by optimizing the slope angle and decreasing the final mining depth to maintain slope stability.Finally,the Monte Carlo method was used to analyze the reliability of the slope angle optimization scheme.The open-pit mine excavation plan that meets the stability requirements was obtained eventually.
文摘As the first step of mine production, blasting has a vital influence on the safety and smoothness of mine production, the correctness and quality of blade filling and transportation operation, as well as the mine production efficiency. Considering that the effective reduction of detonation velocity and depth is an important scientific research project in the mining industry, given the close relationship between high detonation velocity on the one hand and the size of the base and the quality of the explosion on the other, there are many factors in the process of exposed wing blasting, which lead to the formation of root block and deep block. The related factors of the large block and deep block need to be studied more deeply, effectively and scientifically.
基金the Mine Planning Research Group–GIPLAMIN-of the Mines Faculty,National University of Colombia
文摘This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed according to the probability distributions associated to key variables affecting the NPV, like production level, ore grade, price of ore, and others, so as to see what if, in a gold open pit mine project of 3000 metric tons per day of ore. Two case scenarios were analyzed to simulate the NPV, one where there is low certainty data available, and the other where the information available is of high certainty. Results based on genetic algorithm metaheuristic simulations, which combine basically Montecarlo simulations provided by the Palisade Risk software, the O'Hara cost model, net smelter return and financial analysis tools offered by Excel are reported, in order to determine to which variables of the project is more sensitive the NPV.
文摘The present study reflects upon the results of substantial program of two-dimensional Finite Element Method (FEM) numerical analyses of the open pit that links to slope angle optimization associated with the safety factor of the pit slope of a coal mine in Bangladesh. In the present analyses, two types of models have been presented. The first model estimates safety factor without seismic effect on the overall pit slope of the model; the second model incorporates safety factor with seismic stability of the model. The calculated optimum slope angle of the first model is 31% with a rational safety factor of 1.51, prior to the seismic effect. However, the value is reduced to 0.93, 0.82, and 0.72, after we applies the seismic effect in the second model with M6, M6.5, and M7, respectively. Finally, our modeling results emphasize that for the case of the proposed Phulbari coalmine, there is extremely high prospect for causing massive slope failure along the optimum pit slope angle with 31% if the mine area felt seismic shaking, like the Sikkim (in northern India) earthquake with M6.9 on September 18, 2011.
基金This work was financially supported by the National Key Technologies RD Program in the 10th five-year plan (No.2001BA609A-08).
文摘In order to increase production efficiency at open-pit mines, on the basis oflinear programming, a practical mathematical model for optimizing truck flow was developed, whichimproved the traditional fixed manual schedule method. The model has advantages from linearprogramming and objective programming, makes most handling points working at full capacity and keepsan optimized ratio between trucks and excavators. For ensuring feasibility of the model inpractical production, four standards for feasibility test were proposed. The model satisfied all thestandards. The application in a large scale open-pit iron mine indicated that the model reduced thenumber of required trucks by 10 percent compared with the fixed manual schedule method.