AS OEM’s display their flagship ultra-longrange, purpose-built business jetsspecifically Bombardier’s Global 7500,Gulfstream’s G650ER, and Dassault’s Falcon 8X-this week at EBACE 2019, speculation stoked by the ma...AS OEM’s display their flagship ultra-longrange, purpose-built business jetsspecifically Bombardier’s Global 7500,Gulfstream’s G650ER, and Dassault’s Falcon 8X-this week at EBACE 2019, speculation stoked by the manufacturers themselves abounds on what comes next.When Gulfstream’s flagship G650 entered service in December 2012, the Savannah airframer decisively seized the mantle of largest dedicated business jet.展开更多
The article investigates the optimal energy management(OEM)problem for microgrids.To figure out the problem in fixed time and alleviate communication load with limited resources,this article devises a novel fixed-time...The article investigates the optimal energy management(OEM)problem for microgrids.To figure out the problem in fixed time and alleviate communication load with limited resources,this article devises a novel fixed-time stability lemma and an event-triggered(ET)fixed-time distributed OEM approach.Using Lyapunov stability theory,the distributed approach has been proven to converge in fixed time and the upper bound on convergence time can be derived without dependence on the initial states.The dynamic ET method is raised to dynamically adjust the triggering threshold and reduce communication redundancy.In addition,Zeno behavior is avoided.Simulations are given to show the effectiveness and advantage of the designed distributed OEM method.展开更多
文摘AS OEM’s display their flagship ultra-longrange, purpose-built business jetsspecifically Bombardier’s Global 7500,Gulfstream’s G650ER, and Dassault’s Falcon 8X-this week at EBACE 2019, speculation stoked by the manufacturers themselves abounds on what comes next.When Gulfstream’s flagship G650 entered service in December 2012, the Savannah airframer decisively seized the mantle of largest dedicated business jet.
基金supported by the National Natural Science Foundation of China(62473316,62073269)the Natural Science Foundation of Chongqing,China(CSTB2022NSCQ-MSX0963)+1 种基金Guangdong Basic and Applied Basic Research Foundation(2023A1515011220)Aeronautical Science Foundation of China(2020Z034053002)。
文摘The article investigates the optimal energy management(OEM)problem for microgrids.To figure out the problem in fixed time and alleviate communication load with limited resources,this article devises a novel fixed-time stability lemma and an event-triggered(ET)fixed-time distributed OEM approach.Using Lyapunov stability theory,the distributed approach has been proven to converge in fixed time and the upper bound on convergence time can be derived without dependence on the initial states.The dynamic ET method is raised to dynamically adjust the triggering threshold and reduce communication redundancy.In addition,Zeno behavior is avoided.Simulations are given to show the effectiveness and advantage of the designed distributed OEM method.
基金Supported by 863 Program of Chinese Science & Technology Ministry(2004AA2Z4120)and.by Scientific Research Foundation for Doctoral Discipline of Chinese Ministry(20040712018)
文摘结合中国现实国情,应用先进的单片机、G IS、GPS以及变量控制技术,设计了一种经济实用、先进的变量灌溉控制系统。系统设计采用AT 89C 51单片机作为系统微处理器,Jup iter GPS OEM二次开发作为GPS接收机,IC卡作为G IS数据传递媒体,并根据矢量法提出一种简单快速的田间定位和数据查询算法。灌溉机在田间工作时,系统可从GPS OEM得到位置信息,进行地块识别和位置判断;然后根据位置信息从IC卡的G IS信息中查询土壤属性数据或处方数据,结合机械行走速度、施水幅宽等进行运算,得出某一时刻的灌水量;最后向控制器发出指令,实现变量节水灌溉。田间和实验室模拟试验结果表明,自行研制的低成本GPS OEM接收机,可获得与A g GPS132相当的定位精度,控制系统能根据处方图的不同需水量,通过电磁阀驱动电路得到变化的输出,实现自动变量施水,系统也能根据需水量进行手动灌溉。