This paper presents a multi-objective production planning model for a factory operating under a multi-product, and multi-period environment using the lexicographic (pre-emptive) procedure. The model objectives are to ...This paper presents a multi-objective production planning model for a factory operating under a multi-product, and multi-period environment using the lexicographic (pre-emptive) procedure. The model objectives are to maximize the profit, minimize the total cost, and maximize the Overall Service Level (OSL) of the customers. The system consists of three potential suppliers that serve the factory to serve three customers/distributors. The performance of the developed model is illustrated using a verification example. Discussion of the results proved the efficacy of the model. Also, the effect of the deviation percentages on the different objectives is discussed.展开更多
Constrained reentry trajectory optimization for hypersonic vehicles is a challenging job. In particular, this problem becomes more difficult when several objectives with preemptive priorities are expected for differen...Constrained reentry trajectory optimization for hypersonic vehicles is a challenging job. In particular, this problem becomes more difficult when several objectives with preemptive priorities are expected for different purposes. In this paper, a fuzzy satisfactory goal programming method is proposed to solve the multi-objective reentry trajectory optimization problem. Firstly, direct collocation approach is used to discretize the reentry trajectory optimal-control problem with nonlinear constraints into nonlinear multiobjective programming problem with preemptive priorities, where attack angles and bank angles at nodes and collocation nodes are selected as control variables. Secondly, the preemptive priorities are transformed into the relaxed order of satisfactory degrees according to the principle that the objective with higher priority has higher satisfactory degree. Then the fuzzy satisfactory goal programming model is proposed. The balance between optimization and priorities is realized by regulating parameter λ, such that the satisfactory reentry trajectory can be acquired. The simulation demonstrates that the proposed method is effective for the multi-objective reentry trajectory optimization of hypersonic vehicles.展开更多
This paper presents a novel approach to find optimum locations and capacity of flexible alternating current transmission system (FACTS) devices in a power system using a multi-objective optimization function. Thyristo...This paper presents a novel approach to find optimum locations and capacity of flexible alternating current transmission system (FACTS) devices in a power system using a multi-objective optimization function. Thyristor controlled series compensators (TCSCs) and static var compensators (SVCs) are the utilized FACTS devices. Our objectives are active power loss reduction, newly introduced FACTS devices cost reduction, voltage deviation reduction, and increase on the robustness of the security margin against voltage collapse. The operational and controlling constraints, as well as load constraints, were considered in the optimum allocation. A goal attainment method based on the genetic algorithm (GA) was used to approach the global optimum. The estimated annual load profile was utilized in a sequential quadratic programming (SQP) optimization sub-problem to the optimum siting and sizing of FACTS devices. Fars Regional Electric Network was selected as a practical system to validate the performance and effectiveness of the proposed method. The entire investment of the FACTS devices was paid off and an additional 2.4% savings was made. The cost reduction of peak point power generation implies that power plant expansion can be postponed.展开更多
In this paper, a fish farm was modeled using the Lexicographic linear goal programming approach due to incommensurability in objectives. The study considered the fish farming plan with two sizes of catfish from stocki...In this paper, a fish farm was modeled using the Lexicographic linear goal programming approach due to incommensurability in objectives. The study considered the fish farming plan with two sizes of catfish from stocking to harvesting at four-month intervals. The multi-objective goals developed are required raw materials feed, water, light (resource utilization), sales revenue, profit realized, labor utilization, production costs, and pond utilization. The developed model was tested using related data collected from the farm records with the use of TORA 2007 software. The compromised solution from the results showed that the developed model is an efficient tool for decision-making process in the fish farm business organization.展开更多
The intuitionistic fuzzy set(I-fuzzy set)plays an effective role in game theory when players face‘neither this nor that’situation to set their goals.This study presents a maxmin–minmax solution to multi-objective t...The intuitionistic fuzzy set(I-fuzzy set)plays an effective role in game theory when players face‘neither this nor that’situation to set their goals.This study presents a maxmin–minmax solution to multi-objective two person zero-sum matrix games with I-fuzzy goals.In this article,a class of piecewise linear membership and non-membership functions for I-fuzzy goals is constructed.These functions are more effective in real games because marginal rate of increase(decrease)of such membership functions(non-membership functions)is different in different intervals of tolerance errors.Finally,one numerical example is given to examine the effectiveness and advantages of the proposed results.展开更多
Telecommuting is a Transportation Demand Management strategy to partially or completely replace the daily commute with telecommunication technologies. Research has revealed that telecommuting can be effectively done f...Telecommuting is a Transportation Demand Management strategy to partially or completely replace the daily commute with telecommunication technologies. Research has revealed that telecommuting can be effectively done from special places provided for this purpose called telecenters. In telecenter-based telecommuting, trip lengths are shortened due to change in the location of work places. Thus suitable locations of telecenters play an important role in increasing the beneficial impacts of telecommuting in the transportation systems. In this research, a mathematical optimization model for finding optimal location and capacity of telecenters is proposed. This model is a bi-objective linear program, and a Fuzzy Goal Programming method with a preemptive structure is used to solve it. Telecommuting demand is classified into three groups of telecommuters and a priority structure that assigns the higher priority class to the closer telecenters is also incorporated into the model. The proposed model is implemented in a case study of finding optimal location of telecenters for government employees in Tehran (capital of Iran) metropolitan area. The base model is solved and its sensitivity to different parameters has been analyzed based on which, an optimal model is selected. The solution of this model is an optimal pattern for distribution of telecommuting capacities and yields the most system-wide benefits from implementation of telecommuting.展开更多
supported by the Taishan Scholar Construction Engineering by Shandong Government the National Natural Science Foundation of China under Grant Nos.61120106011 and 61203029
文摘This paper presents a multi-objective production planning model for a factory operating under a multi-product, and multi-period environment using the lexicographic (pre-emptive) procedure. The model objectives are to maximize the profit, minimize the total cost, and maximize the Overall Service Level (OSL) of the customers. The system consists of three potential suppliers that serve the factory to serve three customers/distributors. The performance of the developed model is illustrated using a verification example. Discussion of the results proved the efficacy of the model. Also, the effect of the deviation percentages on the different objectives is discussed.
基金supported by National Natural Science Foundation of China(No.61074064)Natural Science Foundation of Tianjin(No.12JCZDJC30300)
文摘Constrained reentry trajectory optimization for hypersonic vehicles is a challenging job. In particular, this problem becomes more difficult when several objectives with preemptive priorities are expected for different purposes. In this paper, a fuzzy satisfactory goal programming method is proposed to solve the multi-objective reentry trajectory optimization problem. Firstly, direct collocation approach is used to discretize the reentry trajectory optimal-control problem with nonlinear constraints into nonlinear multiobjective programming problem with preemptive priorities, where attack angles and bank angles at nodes and collocation nodes are selected as control variables. Secondly, the preemptive priorities are transformed into the relaxed order of satisfactory degrees according to the principle that the objective with higher priority has higher satisfactory degree. Then the fuzzy satisfactory goal programming model is proposed. The balance between optimization and priorities is realized by regulating parameter λ, such that the satisfactory reentry trajectory can be acquired. The simulation demonstrates that the proposed method is effective for the multi-objective reentry trajectory optimization of hypersonic vehicles.
文摘This paper presents a novel approach to find optimum locations and capacity of flexible alternating current transmission system (FACTS) devices in a power system using a multi-objective optimization function. Thyristor controlled series compensators (TCSCs) and static var compensators (SVCs) are the utilized FACTS devices. Our objectives are active power loss reduction, newly introduced FACTS devices cost reduction, voltage deviation reduction, and increase on the robustness of the security margin against voltage collapse. The operational and controlling constraints, as well as load constraints, were considered in the optimum allocation. A goal attainment method based on the genetic algorithm (GA) was used to approach the global optimum. The estimated annual load profile was utilized in a sequential quadratic programming (SQP) optimization sub-problem to the optimum siting and sizing of FACTS devices. Fars Regional Electric Network was selected as a practical system to validate the performance and effectiveness of the proposed method. The entire investment of the FACTS devices was paid off and an additional 2.4% savings was made. The cost reduction of peak point power generation implies that power plant expansion can be postponed.
文摘In this paper, a fish farm was modeled using the Lexicographic linear goal programming approach due to incommensurability in objectives. The study considered the fish farming plan with two sizes of catfish from stocking to harvesting at four-month intervals. The multi-objective goals developed are required raw materials feed, water, light (resource utilization), sales revenue, profit realized, labor utilization, production costs, and pond utilization. The developed model was tested using related data collected from the farm records with the use of TORA 2007 software. The compromised solution from the results showed that the developed model is an efficient tool for decision-making process in the fish farm business organization.
文摘The intuitionistic fuzzy set(I-fuzzy set)plays an effective role in game theory when players face‘neither this nor that’situation to set their goals.This study presents a maxmin–minmax solution to multi-objective two person zero-sum matrix games with I-fuzzy goals.In this article,a class of piecewise linear membership and non-membership functions for I-fuzzy goals is constructed.These functions are more effective in real games because marginal rate of increase(decrease)of such membership functions(non-membership functions)is different in different intervals of tolerance errors.Finally,one numerical example is given to examine the effectiveness and advantages of the proposed results.
文摘Telecommuting is a Transportation Demand Management strategy to partially or completely replace the daily commute with telecommunication technologies. Research has revealed that telecommuting can be effectively done from special places provided for this purpose called telecenters. In telecenter-based telecommuting, trip lengths are shortened due to change in the location of work places. Thus suitable locations of telecenters play an important role in increasing the beneficial impacts of telecommuting in the transportation systems. In this research, a mathematical optimization model for finding optimal location and capacity of telecenters is proposed. This model is a bi-objective linear program, and a Fuzzy Goal Programming method with a preemptive structure is used to solve it. Telecommuting demand is classified into three groups of telecommuters and a priority structure that assigns the higher priority class to the closer telecenters is also incorporated into the model. The proposed model is implemented in a case study of finding optimal location of telecenters for government employees in Tehran (capital of Iran) metropolitan area. The base model is solved and its sensitivity to different parameters has been analyzed based on which, an optimal model is selected. The solution of this model is an optimal pattern for distribution of telecommuting capacities and yields the most system-wide benefits from implementation of telecommuting.
基金supported by the National Natural Science Foundation of China under Grant Nos.71125005,70871108,and 70810107020Outstanding Talents Funds of Organization Department,Beijing Committee of CPC
文摘supported by the Taishan Scholar Construction Engineering by Shandong Government the National Natural Science Foundation of China under Grant Nos.61120106011 and 61203029