This paper studies the consensus control of multiagent systems with binary-valued observations.An algorithm alternating estimation and control is proposed.Each agent estimates the states of its neighbors based on a pr...This paper studies the consensus control of multiagent systems with binary-valued observations.An algorithm alternating estimation and control is proposed.Each agent estimates the states of its neighbors based on a projected empirical measure method for a holding time.Based on the estimates,each agent designs the consensus control with a constant gain at some skipping time.The states of the system are updated by the designed control,and the estimation and control design will be repeated.For the estimation,the projected empirical measure method is proposed for the binary-valued observations.The algorithm can ensure the uniform boundedness of the estimates and the mean square error of the estimation is proved to be at the order of the reciprocal of the holding time(the same order as that in the case of accurate outputs).For the consensus control,a constant gain is designed instead of the stochastic approximation based gain in the existing literature for binary-valued observations.And,there is no need to make modification for control since the uniform boundedness of the estimates ensures the uniform boundedness of the agents’states.Finally,the systems updated by the designed control are proved to achieve consensus and the consensus speed is faster than that in the existing literature.Simulations are given to demonstrate the theoretical results.展开更多
The resource constrained project scheduling problem (RCPSP) and a decision-making model based on multi-agent systems (MAS) and general equilibrium marketing are proposed. An algorithm leading to the resource allocatio...The resource constrained project scheduling problem (RCPSP) and a decision-making model based on multi-agent systems (MAS) and general equilibrium marketing are proposed. An algorithm leading to the resource allocation decision involved in RCPSP has also been developed. And this algorithm can be used in the multi-project scheduling field as well.Finally, an illustration is given.展开更多
Different from the organization structure of complex projects in Western countries, the Liang Zong hierarchical organization structure of complex projects in China has two different chains, the chief-engineer chain an...Different from the organization structure of complex projects in Western countries, the Liang Zong hierarchical organization structure of complex projects in China has two different chains, the chief-engineer chain and the general-director chain,to handle the trade-off between technical and management decisions. However, previous works on organization search have mainly focused on the single-chain hierarchical organization in which all decisions are regarded as homogeneous. The heterogeneity and the interdependency between technical decisions and management decisions have been neglected. A two-chain hierarchical organization structure mapped from a real complex project is constructed. Then, a discrete decision model for a Liang Zong two-chain hierarchical organization in an NK model framework is proposed. This model proves that this kind of organization structure can reduce the search space by a large amount and that the search process should reach a final stable state more quickly. For a more complicated decision mechanism, a multi-agent simulation based on the above NK model is used to explore the effect of the two-chain organization structure on the speed, stability, and performance of the search process. The results provide three insights into how, compared with the single-chain hierarchical organization, the two-chain organization can improve the search process: it can reduce the number of iterations efficiently; the search is more stable because the search space is a smoother hill-like fitness landscape; in general, the search performance can be improved.However, when the organization structure is very complicated, the performance of a two-chain organization is inferior to that of a single-chain organization. These findings about the efficiency of the unique Chinese-style organization structure can be used to guide organization design for complex projects.展开更多
In this paper,a zero-sum game Nash equilibrium computation problem with a common constraint set is investigated under two time-varying multi-agent subnetworks,where the two subnetworks have opposite payoff function.A ...In this paper,a zero-sum game Nash equilibrium computation problem with a common constraint set is investigated under two time-varying multi-agent subnetworks,where the two subnetworks have opposite payoff function.A novel distributed projection subgradient algorithm with random sleep scheme is developed to reduce the calculation amount of agents in the process of computing Nash equilibrium.In our algorithm,each agent is determined by an independent identically distributed Bernoulli decision to compute the subgradient and perform the projection operation or to keep the previous consensus estimate,it effectively reduces the amount of computation and calculation time.Moreover,the traditional assumption of stepsize adopted in the existing methods is removed,and the stepsizes in our algorithm are randomized diminishing.Besides,we prove that all agents converge to Nash equilibrium with probability 1 by our algorithm.Finally,a simulation example verifies the validity of our algorithm.展开更多
Aiming at multi-agent coordinated scheduling problems in power systems under uncertainty,a generic projection and decomposition(P&D)approach is proposed in this letter.The canonical min-max-min two-stage robust op...Aiming at multi-agent coordinated scheduling problems in power systems under uncertainty,a generic projection and decomposition(P&D)approach is proposed in this letter.The canonical min-max-min two-stage robust optimization(TSRO)model with coupling constraints is equivalent to a concise robust optimization(RO)model in the version of mixed-integer linear programming(MILP)via feasible region projection.The decentralized decoupling of the non-convex MILP problem is realized through a dual decomposition algorithm,which ensures the fast convergence to a high-quality solution in the distributed optimization.Numerical tests verify the superior performance of the proposed P&D approach over the existing distributed TSRO method.展开更多
Over the past several decades natural resource issues have become highly controversial, even playing out on the national or international stage. While natural resource science has advanced, the controversy has not gon...Over the past several decades natural resource issues have become highly controversial, even playing out on the national or international stage. While natural resource science has advanced, the controversy has not gone away. If anything, it has gotten worse. The reality is that natural resource managers need to be as skilled at addressing public concerns as they are with resource science. Fortunately, over the same period the social sciences have produced useful tools that can aid natural resource managers. But resource managers need to know about these tools and be trained in their use. The purpose of this article is to provide an introduction to some of the social science tools or approaches that have proven to reduce political conflict over resource issues. When beginning a major project, resource managers can review this list to see which of these approaches might prevent or mitigate controversy. References are provided for each tool as a starting place for further exploration.展开更多
In this paper,a zero-sum game Nash equilibrium computation problem with event-triggered communication is investigated under an undirected weight-balanced multi-agent network.A novel distributed event-triggered project...In this paper,a zero-sum game Nash equilibrium computation problem with event-triggered communication is investigated under an undirected weight-balanced multi-agent network.A novel distributed event-triggered projection subgradient algorithm is developed to reduce the communication burden within the subnetworks.In the proposed algorithm,when the difference between the current state of the agent and the state of the last trigger time exceeds a given threshold,the agent will be triggered to communicate with its neighbours.Moreover,we prove that all agents converge to Nash equilibrium by the proposed algorithm.Finally,two simulation examples verify that our algorithm not only reduces the communication burden but also ensures that the convergence speed and accuracy are close to that of the time-triggered method under the appropriate threshold.展开更多
基金supported by the National Natural Science Foundation of China(61803370,61622309)the China Postdoctoral Science Foundation(2018M630216)the National Key Research and Development Program of China(2016YFB0901902)
文摘This paper studies the consensus control of multiagent systems with binary-valued observations.An algorithm alternating estimation and control is proposed.Each agent estimates the states of its neighbors based on a projected empirical measure method for a holding time.Based on the estimates,each agent designs the consensus control with a constant gain at some skipping time.The states of the system are updated by the designed control,and the estimation and control design will be repeated.For the estimation,the projected empirical measure method is proposed for the binary-valued observations.The algorithm can ensure the uniform boundedness of the estimates and the mean square error of the estimation is proved to be at the order of the reciprocal of the holding time(the same order as that in the case of accurate outputs).For the consensus control,a constant gain is designed instead of the stochastic approximation based gain in the existing literature for binary-valued observations.And,there is no need to make modification for control since the uniform boundedness of the estimates ensures the uniform boundedness of the agents’states.Finally,the systems updated by the designed control are proved to achieve consensus and the consensus speed is faster than that in the existing literature.Simulations are given to demonstrate the theoretical results.
文摘The resource constrained project scheduling problem (RCPSP) and a decision-making model based on multi-agent systems (MAS) and general equilibrium marketing are proposed. An algorithm leading to the resource allocation decision involved in RCPSP has also been developed. And this algorithm can be used in the multi-project scheduling field as well.Finally, an illustration is given.
基金supported by the National Natural Science Foundation of China(7157105771390522)the Key Lab for Public Engineering Audit of Jiangsu Province,Nanjing Audit University(GGSS2016-08)
文摘Different from the organization structure of complex projects in Western countries, the Liang Zong hierarchical organization structure of complex projects in China has two different chains, the chief-engineer chain and the general-director chain,to handle the trade-off between technical and management decisions. However, previous works on organization search have mainly focused on the single-chain hierarchical organization in which all decisions are regarded as homogeneous. The heterogeneity and the interdependency between technical decisions and management decisions have been neglected. A two-chain hierarchical organization structure mapped from a real complex project is constructed. Then, a discrete decision model for a Liang Zong two-chain hierarchical organization in an NK model framework is proposed. This model proves that this kind of organization structure can reduce the search space by a large amount and that the search process should reach a final stable state more quickly. For a more complicated decision mechanism, a multi-agent simulation based on the above NK model is used to explore the effect of the two-chain organization structure on the speed, stability, and performance of the search process. The results provide three insights into how, compared with the single-chain hierarchical organization, the two-chain organization can improve the search process: it can reduce the number of iterations efficiently; the search is more stable because the search space is a smoother hill-like fitness landscape; in general, the search performance can be improved.However, when the organization structure is very complicated, the performance of a two-chain organization is inferior to that of a single-chain organization. These findings about the efficiency of the unique Chinese-style organization structure can be used to guide organization design for complex projects.
文摘In this paper,a zero-sum game Nash equilibrium computation problem with a common constraint set is investigated under two time-varying multi-agent subnetworks,where the two subnetworks have opposite payoff function.A novel distributed projection subgradient algorithm with random sleep scheme is developed to reduce the calculation amount of agents in the process of computing Nash equilibrium.In our algorithm,each agent is determined by an independent identically distributed Bernoulli decision to compute the subgradient and perform the projection operation or to keep the previous consensus estimate,it effectively reduces the amount of computation and calculation time.Moreover,the traditional assumption of stepsize adopted in the existing methods is removed,and the stepsizes in our algorithm are randomized diminishing.Besides,we prove that all agents converge to Nash equilibrium with probability 1 by our algorithm.Finally,a simulation example verifies the validity of our algorithm.
基金supported in part by the National Research Foundation(NRF)of Singapore,Intra-CREATE(No.NRF2022-ITS010-0005)Ministry of Education Singapore under its Award Ac RF TIER 1 RG60/22the NRF of Singapore,Energy Market Authority under its Energy Programme(EP Award EMAEP004-EKJGC-0003)。
文摘Aiming at multi-agent coordinated scheduling problems in power systems under uncertainty,a generic projection and decomposition(P&D)approach is proposed in this letter.The canonical min-max-min two-stage robust optimization(TSRO)model with coupling constraints is equivalent to a concise robust optimization(RO)model in the version of mixed-integer linear programming(MILP)via feasible region projection.The decentralized decoupling of the non-convex MILP problem is realized through a dual decomposition algorithm,which ensures the fast convergence to a high-quality solution in the distributed optimization.Numerical tests verify the superior performance of the proposed P&D approach over the existing distributed TSRO method.
文摘Over the past several decades natural resource issues have become highly controversial, even playing out on the national or international stage. While natural resource science has advanced, the controversy has not gone away. If anything, it has gotten worse. The reality is that natural resource managers need to be as skilled at addressing public concerns as they are with resource science. Fortunately, over the same period the social sciences have produced useful tools that can aid natural resource managers. But resource managers need to know about these tools and be trained in their use. The purpose of this article is to provide an introduction to some of the social science tools or approaches that have proven to reduce political conflict over resource issues. When beginning a major project, resource managers can review this list to see which of these approaches might prevent or mitigate controversy. References are provided for each tool as a starting place for further exploration.
文摘In this paper,a zero-sum game Nash equilibrium computation problem with event-triggered communication is investigated under an undirected weight-balanced multi-agent network.A novel distributed event-triggered projection subgradient algorithm is developed to reduce the communication burden within the subnetworks.In the proposed algorithm,when the difference between the current state of the agent and the state of the last trigger time exceeds a given threshold,the agent will be triggered to communicate with its neighbours.Moreover,we prove that all agents converge to Nash equilibrium by the proposed algorithm.Finally,two simulation examples verify that our algorithm not only reduces the communication burden but also ensures that the convergence speed and accuracy are close to that of the time-triggered method under the appropriate threshold.