期刊文献+
共找到3,484篇文章
< 1 2 175 >
每页显示 20 50 100
Application of coal mine roof rating in Chinese coal mines 被引量:4
1
作者 Wang Yongyin Taheri Abbas Xu Xianbi 《International Journal of Mining Science and Technology》 EI CSCD 2018年第3期491-497,共7页
The coal mine roof rating(CMRR) is a measure of roof quality or structure competency for bedded roof types typically of underground coal mines. The CMRR has been used widely in the US, South Africa,Canada and Australi... The coal mine roof rating(CMRR) is a measure of roof quality or structure competency for bedded roof types typically of underground coal mines. The CMRR has been used widely in the US, South Africa,Canada and Australia. In order to investigate the application of the CMRR system in Chinese coal mines,two coal mines in China located in Panjiang Coal Field in Guizhou Province were investigated. Field data were collected which is required to calculate the CMRR value based on underground exposure. The CMRR values of 11 locations in two coal mines were calculated. The investigations demonstrated that the chance of mine roof failure is very low if the CMRR value is more than 50, given adequate support is installed in mine. It was found that the CMRR guideline are useful to preliminarily investigate stability in Panjiang Coal Field mines. 展开更多
关键词 Coal mine roof rating Underground mine roof stability Panjiang coal field
在线阅读 下载PDF
Roof filling control technology and application to mine roadway damage in small pit goaf 被引量:5
2
作者 Weiyi Cai Zechao Chang +3 位作者 Dongsheng Zhang Xufeng Wang Wenhao Cao Yazhou Zhou 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2019年第3期477-482,共6页
To recover coal resources that have been damaged by traditional mining methods and ensure stability of the lower roadway in a small pit goaf,the goaf area must be filled and reinforced.In this research,the 1202 workin... To recover coal resources that have been damaged by traditional mining methods and ensure stability of the lower roadway in a small pit goaf,the goaf area must be filled and reinforced.In this research,the 1202 working face of the Hanzui mine is considered as an example for classifying the roof of the mining tunnel under the small kiln destruction zone,the effect of the goaf on the roadway is determined based on the radio tunnel penetration method,a mechanical model to determine the roof filling control mechanism was established,and the duct foaming system and roof filling process were designed.The results show that the scope and degree of influence of the goaf on the mining lane are large,but safe tunneling can be ensured through the use of a steel shed and advanced grouting techniques.When the roof conditions are not similar,materials with different filling heights and filling strengths can be used to control the roof filling of the roadway.By combining field experience and laboratory tests,it was determined that a high-foaming material with a water-cement ratio of 1:0.6,a suitable high-foaming additive,and a water volume ratio of 1:30 is cost-efficient for filling and meets the filling strength requirements.Finally,the reliability of the proposed technology was verified by field experiments,which provide a reference for filling operations in similar mines. 展开更多
关键词 Repeated MINING ROADWAY roof control High foam material FILLING MINING
在线阅读 下载PDF
Investigation of factors influencing roof stability at a Western U.S.longwall coal mine 被引量:3
3
作者 Meriel Young Gabriel Walton Elizabeth Holley 《International Journal of Mining Science and Technology》 EI CSCD 2019年第1期139-143,共5页
The coal mine roof rating(CMRR) was developed to bridge the gap between geological variation in underground coal mines and engineering design. The CMRR accounts for the compressive strength of the immediate roof, the ... The coal mine roof rating(CMRR) was developed to bridge the gap between geological variation in underground coal mines and engineering design. The CMRR accounts for the compressive strength of the immediate roof, the shear strength and intensity of any discontinuities present, and the moisture sensitivity of the immediate roof. The CMRR has been widely used and validated in Eastern US coal mines, but it has seen limited application in the Western US. This study focuses on roof behavior at a Western coal mine(Mine A). Mine A shows significant lateral geological variation, along with localized faulting and a laterally extensive sandstone channel network. The CMRR is not used to predict roof instability at the mine. It is, therefore, hypothesized that there are other factors that are correlated with roof instability in underground coal mines that could potentially also be considered in conjunction with the CMRR.This hypothesis was tested by collecting 30 CMRR measurements at Mine A. At each measurement location, a binary record of the roof condition(stable or unstable) was made, and other parameters such as depth of cover, presence of faulting, and sandstone channels were also recorded. ANOVA tests showed that the CMRR values and the roof conditions were not strongly correlated, indicating that the CMRR input criteria are not fully predictive of roof stability at this mine. The CMRR values showed statistically significant correlations(p less than 0.05) with faulting as well as with location at an intersection. For areas that had previously experienced roof fall but were currently stable, faulting was correlated with roof condition(p less than 0.05) only when the condition was classified as unstable. 展开更多
关键词 COAL mine roof stability CMRR WESTERN U.S.coal Case study
在线阅读 下载PDF
实用矿山压力控制理论研究进展与突破的重点
4
作者 宋振骐 郝建 +2 位作者 蒋宇静 李恩来 边华 《采矿与岩层控制工程学报》 北大核心 2026年第1期1-26,共26页
与岩层运动有关的重大灾害在煤矿事故灾害中占主导地位,建立并完善矿山压力控制理论是控制相关灾害的基础。在回顾矿山压力理论发展历程的基础上,总结凝练了以上覆岩层运动为中心的“实用矿山压力控制理论”的内涵,从理论、技术、装备... 与岩层运动有关的重大灾害在煤矿事故灾害中占主导地位,建立并完善矿山压力控制理论是控制相关灾害的基础。在回顾矿山压力理论发展历程的基础上,总结凝练了以上覆岩层运动为中心的“实用矿山压力控制理论”的内涵,从理论、技术、装备方面总结了实用矿山压力控制理论的突破。在理论方面:构建了显示覆岩运动和支承压力分布发展变化规律的采场动态结构力学模型,确定不同采动条件下模型的动态发展规律;建立了两个应力场理论,揭示了内应力场实现的条件;构建了以位态方程为核心的工作面顶板控制力学模型,建立了工作面顶板控制(支架受力)与岩梁位态之间的关系。在装备方面:研发了三维相似材料模拟试验台、矿压机械模拟试验台等装备,实现了矿山岩层运动规律和支承压力分布规律反演模拟;研制了大量程(200~300 mm)、高精度(0.01 mm)顶板动态仪等监测仪器,形成了岩层动态成套监测装备和平台;搭建了覆岩运动仿真模拟系统,将力学模型以计算机的形式进行展示,实现了矿山压力的仿真与决策。在技术方面:提出了井下岩层动态观测技术,实现了基本顶来压预测预报;提出小煤柱沿空掘巷技术,将回采巷道布置在稳定的内应力场中,成功控制了传统大煤柱护巷诱发的冲击地压、瓦斯突出等动力灾害。最后,凝练了该理论的思维内核,兼具哲学战略性、功能导向性、效果实用性及风险回避性,并指出理论应重点突破的五大前沿方向为采动条件极端化、岩层运动调控化、采动应力调控化、矿山压力利用化与无为化。 展开更多
关键词 矿山压力 岩层运动 支承压力 顶板控制 位态
在线阅读 下载PDF
充填开采坚硬顶板工作面冲击地压动静载控制机制及防治技术研究
5
作者 李家卓 杨晓东 +6 位作者 谭文峰 佟朋 阚吉亮 任文涛 李增强 王剑 李崧岳 《煤炭工程》 北大核心 2026年第2期126-135,共10页
工作面回采过程中坚硬顶板破断产生的强动载和大埋深导致的高应力叠加是冲击地压的主要诱因,为探究充填开采对冲击地压动静载源头控制效应,通过理论计算和现场监测的方法,研究了工作面在不同充实率下顶板破断高度演化规律与支承压力分... 工作面回采过程中坚硬顶板破断产生的强动载和大埋深导致的高应力叠加是冲击地压的主要诱因,为探究充填开采对冲击地压动静载源头控制效应,通过理论计算和现场监测的方法,研究了工作面在不同充实率下顶板破断高度演化规律与支承压力分布特征,提出了针对充填开采的冲击地压分类防治技术,并在古城煤矿深部坚硬顶板工作面进行了应用,通过现场微震监测检验了防冲效果。研究结果表明:充填工作面存在最优充实率且达到最优充实率后,坚硬顶板运动模式由周期性破断转变为弯曲下沉使顶板破断动载大幅度减小,顶板破断高度降低使支承压力峰值减小。古城煤矿1123工作面未达到最优充实率,采取坚硬顶板预裂爆破、顶煤支护、厚顶煤高压注浆和大直径钻孔措施;1^(#)工作面达到最优充实率,取消爆破断顶卸压措施,仅采取煤体大直径钻孔及对特殊区域的卸压措施。两工作面采取卸压措施后,1123工作面充实率由70%逐渐提高至90%,工作面顶板微震事件由“低频次、高能量”转变为“高频次、低能量”;1^(#)工作面顶板微震事件呈“低频次、低能量”特征。 展开更多
关键词 冲击地压 坚硬顶板 充填开采 充实率 动静载源头 分类防治
在线阅读 下载PDF
Undersea safety mining of the large gold deposit in Xinli District of Sanshandao Gold Mine 被引量:14
6
作者 Zhi-xiang Liu Wen-gang Dang Xian-qun He 《International Journal of Minerals,Metallurgy and Materials》 SCIE EI CAS CSCD 2012年第7期574-583,共10页
The exploration of undersea resources becomes popular as land resources decrease. Researches were conducted with emphasis on the safety and efficiency of undersea mining of the large gold deposit in Xinli District of ... The exploration of undersea resources becomes popular as land resources decrease. Researches were conducted with emphasis on the safety and efficiency of undersea mining of the large gold deposit in Xinli District of Sanshandao Gold Mine. A series of tests for the physical and mechanical characteristics of rock mass were carried out, and the three-dimensional geo-stress distribution was tested in the mining area. Further, a similar experimental simulation platform, which revealed the mechanism of water inrush and ascertained the reason- able thickness of the safety isolate layer, was established for the undersea mining. Meanwhile, the feasibility of cancelling the ore pillars and the safety conditions was checked by numerical simulation. The simulation results show that it is safe to exploit the ore body below the -85 m level (presently, the exploitation level is below -160 m in Xinli District), and the ore pillars can be cancelled below the -560 m level. Fur- thermore, a novel backfill method was designed to reduce the rock strata disturbance and settlement, and the settlement of roof strata was monitored during the mining process. Engineering practice shows that the settlement of roof strata was small and that no disaster happened. This indicates that the undersea safety mining technology of the large gold deposit is achieved in Xinli District. 展开更多
关键词 undersea mining gold deposits rock mechanics mine roof control computer simulation
在线阅读 下载PDF
浅埋煤层大采高工作面覆岩结构研究
7
作者 黄庆享 高锦龙 韦业豪 《煤炭学报》 北大核心 2026年第1期224-238,共15页
基于神东和陕北煤炭基地的覆岩条件,通过对大采高工作面实测来压特征和覆岩垮落高度统计分析,结合物理相似模拟,研究了大采高工作面覆岩垮落特征,提出了大采高工作面等效直接顶的定义。根据等效直接顶对采空区的充填程度,将顶板结构分... 基于神东和陕北煤炭基地的覆岩条件,通过对大采高工作面实测来压特征和覆岩垮落高度统计分析,结合物理相似模拟,研究了大采高工作面覆岩垮落特征,提出了大采高工作面等效直接顶的定义。根据等效直接顶对采空区的充填程度,将顶板结构分为充分充填型和非充分充填型,分析了等效直接顶短悬臂梁结构对工作面支架的静载。研究得出:大采高工作面覆岩单一关键层一般形成“高位斜台阶岩梁”结构,该结构滑落失稳是工作面强来压的主要原因。大采高工作面覆岩双关键层下组关键层破断后可以形成稳定的“砌体梁”结构或易发生滑落失稳的“斜台阶岩梁”结构,上组关键层一般形成“砌体梁”结构,即覆岩双关键层形成“双砌体梁”结构或“斜台阶岩梁-砌体梁”结构,常见的是来压较强烈的“斜台阶岩梁-砌体梁”结构。上、下2组关键层关键块的同步与异步失稳是工作面大小周期来压的原因。根据大采高工作面“斜台阶岩梁-砌体梁”顶板结构模型,给出了工作面支架工作阻力理论计算方法,并通过了实例验证,可为大采高工作面顶板控制和支架选型提供理论依据。 展开更多
关键词 大采高工作面 等效直接顶 基本顶关键层 高位斜台阶岩梁结构 支护阻力
在线阅读 下载PDF
多层厚硬顶板大采高综放面强矿压特征及防控技术
8
作者 张震 《中国煤炭》 北大核心 2026年第1期22-35,共14页
为解决榆神矿区多层厚硬顶板大采高综放面开采期间强矿压带来的支架压架、立柱受冲击严重损坏的难题,采用压力传感器和位移传感器对曹家滩煤矿122108大采高综放开采面进行系统性监测,明确了多层厚硬顶板大采高综放面矿压显现宏观特征,... 为解决榆神矿区多层厚硬顶板大采高综放面开采期间强矿压带来的支架压架、立柱受冲击严重损坏的难题,采用压力传感器和位移传感器对曹家滩煤矿122108大采高综放开采面进行系统性监测,明确了多层厚硬顶板大采高综放面矿压显现宏观特征,分析了多层厚硬顶板覆岩破断动载冲击特征,明确了矿压作用机理,提出了以弱化中低层位岩层、增大充填空间、缩小高层位顶板的活动空间为目标的井下水力区域压裂顶板弱化技术。研究结果表明,多层厚硬顶板大采高综放面矿压显现异常强烈,表现为来压步距大、持续时间长、动载系数高、支架大幅下缩的特点,工作面平均周期来压步距18.4 m,来压持续距离11.5 m,来压平均动载系数1.45,支架下缩量聚集于0.4~1.0 m;多层厚硬顶板大采高综放面来压呈现出强动载来压期间多次连续性或短距间断性大周期来压的新特征,煤层上覆100 m范围内中高位厚硬岩层破断失稳对工作面具有较强的冲击作用,随厚硬岩层距煤层距离继续增加,其周期破断不再对工作面产生矿压作用,下位厚硬岩层的破断一定程度上加速了上位顶板断裂;井下水力区域压裂顶板弱化技术有效减缓了工作面的强矿压显现,压裂后周期来压步距最大值由64 m降至35 m,工作面平均周期来压持续距离由11.5 m降至8.4 m,来压动载系数1.4以上的比例由85.27%降至9.80%,能量104 J以上微震事件个数下降54.02%。 展开更多
关键词 多层厚硬顶板 矿压显现特征 水力区域压裂顶板弱化技术 矿压作用机理 围岩控制
在线阅读 下载PDF
金属地下矿山顶板分级下巷道差异化支护技术研究
9
作者 朱佳汉 鲍江荣 +4 位作者 徐志国 赵鹏翔 周勇胜 王琨 董星亮 《中国矿山工程》 2026年第1期16-24,共9页
针对金属地下矿山顶板稳定性控制问题,以安徽某铜矿为背景,应用Ⅰ、Ⅱ、Ⅲ三级顶板分级指标体系,针对不同等级顶板,采用无支护、锚网喷和锚网架喷的差异化支护方案。通过FLAC3D数值模拟系统分析了不同支护条件下巷道围岩的塑性区分布、... 针对金属地下矿山顶板稳定性控制问题,以安徽某铜矿为背景,应用Ⅰ、Ⅱ、Ⅲ三级顶板分级指标体系,针对不同等级顶板,采用无支护、锚网喷和锚网架喷的差异化支护方案。通过FLAC3D数值模拟系统分析了不同支护条件下巷道围岩的塑性区分布、位移场及应力状态。研究结果表明,随顶板等级降低,塑性区深度及表面位移显著增大,不同部位位移量表现为拱顶>底板>巷帮>拱脚。垂直应力在无支护巷道两帮形成对称的、从拱顶延伸至底角的“月牙状”应力集中区,而差异化支护可有效控制围岩变形量降低80%左右,降低应力集中24%左右。并在-658m中段沿脉巷道和回风巷道进行现场工业试验,验证了差异化支护方案对巷道的良好应用效果,保障了金属矿山巷道围岩稳定性和掘进安全。 展开更多
关键词 金属地下矿山 顶板分级 差异化支护 数值模拟 围岩稳定性
在线阅读 下载PDF
15109综采工作面采煤与顶板控制技术分析
10
作者 杨帆 《能源与节能》 2026年第2期240-243,共4页
对15109综采工作面工程地质特征进行了分析,从综合机械化采煤工艺参数设计、液压支架组合配置、顶板动态支护技术及特殊工况应对策略等方面进行了论述。提出“主动支护+动态调控+应急处置”的顶板控制技术链,并开展系统性研究。研究解... 对15109综采工作面工程地质特征进行了分析,从综合机械化采煤工艺参数设计、液压支架组合配置、顶板动态支护技术及特殊工况应对策略等方面进行了论述。提出“主动支护+动态调控+应急处置”的顶板控制技术链,并开展系统性研究。研究解决了厚煤层一次采全高工艺中顶板破碎、片帮冒顶等技术难题,达到抑制顶板事故风险、实现年产量超百万吨高效安全生产的效果,为同类地质条件工作面提供了技术参考。 展开更多
关键词 综采工作面 采煤 顶板控制
在线阅读 下载PDF
迎采对掘巷道分区破坏演化机理与卸压-顶帮底联动控制技术研究
11
作者 任强 曹闯 +3 位作者 谢正正 武文君 杨勇 向喜伟 《煤炭工程》 北大核心 2026年第1期59-67,共9页
为解决迎采对掘巷道多重叠加应力扰动而产生大变形的问题,以红一煤矿1150403工作面回风巷为工程背景,结合钻孔窥视与数值模拟,对试验巷道采动影响下的四种分区破坏特征进行了系统研究。研究表明:强采动应力、软岩赋存、支护结构不合理... 为解决迎采对掘巷道多重叠加应力扰动而产生大变形的问题,以红一煤矿1150403工作面回风巷为工程背景,结合钻孔窥视与数值模拟,对试验巷道采动影响下的四种分区破坏特征进行了系统研究。研究表明:强采动应力、软岩赋存、支护结构不合理等是巷道产生分区破坏的关键因素。因此,提出了“切顶应力调控+分区治理+注浆重构+多级协同加固”的巷道控制策略,形成了卸压-顶帮底联动控制技术。模拟与现场监测表明:直切顶卸压-顶帮底联动控制方案降低了巷道应力峰值10.29%以上,减少了应力集中面积54.25%以上,顶底板和两帮移进量分别减少了79.2%和53.8%,显著提升了围岩控制效果。 展开更多
关键词 迎采对掘 分区破坏 切顶卸压 注浆重构 围岩控制
在线阅读 下载PDF
某铜镍矿高品位底柱超前回采与人工假顶构筑研究
12
作者 冯福康 杨甜滋 +2 位作者 刘东锐 盖向阳 马磊 《矿业研究与开发》 北大核心 2026年第1期79-89,共11页
针对某铜镍矿因备采中段和采场数量不足、出矿品位波动大等导致的高品位底柱回采难题,提出了3种回采技术方案:盘区机械化上向进路充填采矿法、下向进路充填采矿法、上向进路+分条中深孔联合采矿法,通过综合对比分析各方案优缺点及技术... 针对某铜镍矿因备采中段和采场数量不足、出矿品位波动大等导致的高品位底柱回采难题,提出了3种回采技术方案:盘区机械化上向进路充填采矿法、下向进路充填采矿法、上向进路+分条中深孔联合采矿法,通过综合对比分析各方案优缺点及技术经济指标,确定盘区机械化上向进路充填采矿法为最优方案。基于古典杨森散体压力理论计算底柱压覆荷载,并采用简支梁、软支弱板力学模型分析人工假顶厚度与最大压应力之间的关系。综合考虑人工假顶构筑形式和胶凝材料力学性能,确定了人工假顶的充填构筑参数:假顶厚度7.0 m,充填体28 d强度为4.5 MPa。针对人工假顶构筑中存在的质量、安全与成本问题,通过优化构筑方案,确定当人工假顶作为下部采场10 m顶柱的直接顶板时(优化方案一)为最佳方案,人工假顶采用底筋-腰筋-顶筋组合的配筋设计方案。应用结果表明,该底柱回采方案切实可行,底柱采场盘区生产能力提升至276 t/d,矿柱回采率达82%,采场地压活动稳定,人工假顶构筑工艺操作性强、安全可靠,实现了底柱资源的安全高效回采,为同类矿山底柱回采工作提供了技术借鉴。 展开更多
关键词 高品位底柱 超前回采 人工假顶 力学模型 方案优化 配筋设计
原文传递
Detection Research and Control Evaluation of Seam Roof Water Yield Property in Yulin-Hengshan Southern Mining Area 被引量:23
13
作者 方刚 《矿业安全与环保》 北大核心 2017年第5期98-102,共5页
在线阅读 下载PDF
XV2315综采工作面顶板支护方案研究
14
作者 霍锋斌 《能源与节能》 2026年第2期236-239,共4页
基于XV2315综采工作面复杂地质条件,对顶板支护进行分析。依据巷道顶板跨界高效长锚固技术进行设计,开展巷道顶板位移及离层状况监测研究,结果显示顶板变形量小、稳定性高。实践证明,该方案有效控制了顶板离层与变形,解决了复杂地质条... 基于XV2315综采工作面复杂地质条件,对顶板支护进行分析。依据巷道顶板跨界高效长锚固技术进行设计,开展巷道顶板位移及离层状况监测研究,结果显示顶板变形量小、稳定性高。实践证明,该方案有效控制了顶板离层与变形,解决了复杂地质条件下综采工作面顶板支护问题,对提升复杂地质条件下煤矿巷道支护技术水平、保障矿井高效安全开采具有重要的工程实践意义。 展开更多
关键词 综采工作面 顶板 支护方案
在线阅读 下载PDF
复采工作面过空巷群顶板稳定性分析
15
作者 王立阳 高帅 王昕 《陕西煤炭》 2026年第1期1-6,共6页
【目的】基于煤矿资源高效回收与矿井长期安全稳定生产的迫切工程需求,且复杂地质条件下复采工作面面临的问题愈发严重。【方法】针对复采工作面过空巷群顶板稳定性问题,采用FLAC3D模拟再现了复采工作面推进过空巷群过程,研究了工作面... 【目的】基于煤矿资源高效回收与矿井长期安全稳定生产的迫切工程需求,且复杂地质条件下复采工作面面临的问题愈发严重。【方法】针对复采工作面过空巷群顶板稳定性问题,采用FLAC3D模拟再现了复采工作面推进过空巷群过程,研究了工作面顶板的应力和塑性区变化规律,在此基础上分析了空巷预充填率对工作面顶板最大悬顶长度的影响,探讨了复采工作面过空巷群基本顶的超前断裂力学机理。【结果】研究表明,当复采工作面距空巷群距离从100 m推进至0 m时,围岩压力会向空巷群两侧煤柱转移并产生应力集中的现象,应力集中系数从1.81增至2.18,进而影响基本顶的断裂步距和来压特性,复采工作面来压步距约为12~25 m。随着工作面推进,工作面顶板塑性区逐渐向预充空巷群扩展延伸,预充空巷两侧围岩塑性区呈“X”型分布,导致弹性支承区域减小,围岩变形高速增长。【结论】空巷预充填率为0%、86.4%和100%时,工作面距顶板上次发生垮落的步距分别为36 m、26 m、15 m。空巷群煤柱宽度小于临界值时,易导致复采工作面顶板失稳而悬臂长度骤增,固支端剪切力和弯矩增大,从而引发基本顶超前断裂。 展开更多
关键词 复采工作面 空巷群 顶板稳定性 数值模拟 预充填率
在线阅读 下载PDF
迎采动压巷道切顶卸压围岩变形关键控制技术研究
16
作者 李志刚 刘冲 +1 位作者 孙英杰 李海龙 《煤》 2026年第3期20-25,共6页
为解决迎采对掘巷道矿压显现强烈、形变量大的问题,文章以新元矿9111工作面回风巷的地质资料为背景,运用理论分析、数值模拟、现场实测等方法,分析了切顶卸压工艺实施前后对迎采动压巷道围岩应力场的影响,得出结论如下:受工作面超前支... 为解决迎采对掘巷道矿压显现强烈、形变量大的问题,文章以新元矿9111工作面回风巷的地质资料为背景,运用理论分析、数值模拟、现场实测等方法,分析了切顶卸压工艺实施前后对迎采动压巷道围岩应力场的影响,得出结论如下:受工作面超前支承压力影响,9111回风采帮的垂直应力大于煤柱帮,峰值应力出现在滞后回采工作面15 m的位置;切顶卸压工艺能有效减少关键层的悬顶距,煤柱帮、采帮侧的应力增量较切顶前分别降低了22.9%、13.3%;切顶卸压工艺实施后巷道围岩变形整体可控,观测周期内顶底板及两帮移近量分别为278.6 mm、231.8 mm. 展开更多
关键词 迎采巷道 切顶卸压 围岩变形 数值模拟
在线阅读 下载PDF
煤矿综采工作面顶板管理技术
17
作者 孟应杰 《凿岩机械气动工具》 2026年第2期121-123,共3页
为提升综采工作面顶板管理的精准性与安全性,借助地质力学参数原位测试精准识别顶板岩性结构,分析综采工作面顶板核心支护技术,包括主动支护技术、被动支护技术及特殊工况下的顶板联合支护技术,搭建多参数监测系统并构建失稳预警模型,... 为提升综采工作面顶板管理的精准性与安全性,借助地质力学参数原位测试精准识别顶板岩性结构,分析综采工作面顶板核心支护技术,包括主动支护技术、被动支护技术及特殊工况下的顶板联合支护技术,搭建多参数监测系统并构建失稳预警模型,以期为综采工作面安全、高效生产提供技术保障。 展开更多
关键词 综采工作面 顶板管理技术 多参数监测系统 失稳预警模型
在线阅读 下载PDF
采煤工作面顶板探放水设计与施工技术研究
18
作者 罗袁鹏 《能源与节能》 2026年第1期143-146,共4页
在煤矿开采中,采煤工作面顶板因井下巷道及自身稳定性不足,在矿山压力等外力作用下易发生垮落。若顶板水处理不当,将对煤矿安全生产构成重大威胁。为此,开展了采煤工作面顶板探放水设计与施工技术研究。在巷道5个低洼点分别设置水仓,并... 在煤矿开采中,采煤工作面顶板因井下巷道及自身稳定性不足,在矿山压力等外力作用下易发生垮落。若顶板水处理不当,将对煤矿安全生产构成重大威胁。为此,开展了采煤工作面顶板探放水设计与施工技术研究。在巷道5个低洼点分别设置水仓,并安设2趟DN273mm型排水管连接贯通,在水仓排水管留设三通以便后期安装水泵。在布置探放水钻孔时,最终孔位置布设于工作面内的1/3和1/4处。使用孔旋转钻机钻孔,安装孔管后连接特殊灌浆泵进行高压灌浆操作。实验结果表明:钻孔稳定水压值为1.45 MPa,验证了探放水工程实施效果良好;5^(#)、6^(#)探放水钻孔的施工与观测表明,钻孔最大排水能力可使水量维持在60000 m3。表明探放水区域积水基本疏放完毕,钻孔表现出良好的性能,成功实现了对工作面顶板水的有效排疏放。 展开更多
关键词 采煤工作面 顶板 探放水 施工 设计
在线阅读 下载PDF
铜矿中段顶柱回采工艺优化研究
19
作者 兰瑞 《资源信息与工程》 2026年第1期61-64,共4页
为解决铜矿中段顶柱回采的顶板不稳定、资源浪费及成本偏高问题,以L铜矿为研究对象,结合UDEC数值模拟,从进路宽度与充填方式两方面优化回采工艺。结果表明:单个进路宽度应控制在5.0 m以内,其中进路宽度为3.0 m时应预留3个进路不充填或... 为解决铜矿中段顶柱回采的顶板不稳定、资源浪费及成本偏高问题,以L铜矿为研究对象,结合UDEC数值模拟,从进路宽度与充填方式两方面优化回采工艺。结果表明:单个进路宽度应控制在5.0 m以内,其中进路宽度为3.0 m时应预留3个进路不充填或仅充填无胶结尾矿砂,进路宽度为5.0 m时应在中部预留1~2个不充填进路;推荐采用4#进路不充填(或充填无胶结尾矿砂)的方式。该方案在L铜矿-245 m中段应用后,矿石回收率显著提升,充填成本降低,回采周期缩短7~10 d,效果良好。 展开更多
关键词 铜矿中段 顶柱回采 进路充填 顶板稳定
在线阅读 下载PDF
采煤工作面破碎顶板控制技术分析
20
作者 时巨辉 《能源与节能》 2026年第2期198-201,共4页
工作面破碎顶板的稳定性对煤矿安全生产至关重要。详细分析了工作面破碎顶板的影响因素,深入探讨了常见的控制技术及其优化与发展趋势,并结合实际对顶板矿压显现规律进行了研究,以期为煤矿安全生产提供有效的技术参考,保障工作面的稳定... 工作面破碎顶板的稳定性对煤矿安全生产至关重要。详细分析了工作面破碎顶板的影响因素,深入探讨了常见的控制技术及其优化与发展趋势,并结合实际对顶板矿压显现规律进行了研究,以期为煤矿安全生产提供有效的技术参考,保障工作面的稳定作业环境,提高煤炭开采效率和安全性。 展开更多
关键词 煤矿 工作面 破碎顶板 控制技术 矿压显现
在线阅读 下载PDF
上一页 1 2 175 下一页 到第
使用帮助 返回顶部