The state of Cameroon, faced with the situation the electricity deficits, is promoting the development of renewable energies in general and to meet rural electrification needs in particular. The purpose of this work i...The state of Cameroon, faced with the situation the electricity deficits, is promoting the development of renewable energies in general and to meet rural electrification needs in particular. The purpose of this work is to study the feasibility of the MHP of Batcheu, to show its contribution to sustainable development in this locality and to prove that it is a profitable project. After study, it appears that the waterfall of Batcheu is favourable to the establishment of a MHP with an installed power of 260 kW with an operating diagram corresponding to a Francis turbine. Given that it is a renewable energy that can supply more than 800 households in rural areas, its contribution to sustainable development is obvious. Its investment cost is estimated at 171,465,396 FCFA. It is a profitable project with a payback time of 7 years and 2 months.展开更多
MHPPs (micro hydro power plants) have become prominent in hydropower plants as a solution to provide the energy demands of the grid. In this study, a new hybrid renewable energy based DC excitation system for synchr...MHPPs (micro hydro power plants) have become prominent in hydropower plants as a solution to provide the energy demands of the grid. In this study, a new hybrid renewable energy based DC excitation system for synchronous generator in the developed MHPP system is introduced. Proposed hybrid DC excitation system consists of solar & hydrogen energy based power generating systems. Hybrid renewable energy based system is used for the excitation of the synchronous generator in the MHPP test system. The renewables are used as a secondary energy source to provide the excitation current to a synchronous generator that generates energy in MHPP. A PV (photovoltaic) array is used as the main source of excitation, and a FC (fuel cell) stack is used for DC excitation in the lack of sunshine. In the experimental setup, an electrical control card is developed, and a microcontroller is used to perform the proposed excitation system. All experimental results obtained from 5 kW rated power MHHP test system. Experimental results show that, the proposed method provides the continuous excitation current, and the operation of the synchronous generator is uninterrupted. The proposed method is also practical and easily implemented for MHPP systems.展开更多
Of all the precious metals buried in the Cameroonian subsoil, gold is certainly the longest exploited. It has longtime been the subject of artisanal exploitation. In 2014, the monthly national production was estimated...Of all the precious metals buried in the Cameroonian subsoil, gold is certainly the longest exploited. It has longtime been the subject of artisanal exploitation. In 2014, the monthly national production was estimated at around 170 kg. In these mining areas, people still live in a screaming precariousness of which one of the main causes is often the lack of electricity, because of the distance of these localities to the national electricity network. Cameroon has a great hydroelectric potential, but the access rate to electricity is still very low in isolate or rural areas of this country. The objective of this work is to show that it is possible to efficiently exploit gold in isolated areas and contribute to the sustainable development of these localities through the development of micro hydro power (MHP). The mining community of Tikondi in the East Region of Cameroon is the practical case study for an illustration. The results of this study show that the development of the MHP project can be developed with installed power of 87 kW, where the Banki-Michell turbine is recommended according to the Sulzer-Escher Wyss diagram. The investment cost evaluated at 79,832,775 FCFA (1 Euro = 656 FCFA). It is a profitable project with a maximum payback period of 8 years. This project can be easily funded by gold mining activity. That Tikondi’s MHP can make this village becoming attractive for others activities, improving the quality of education of children (there is not any school and lots of them do not go to school), the building of health centers and the quality of life in that locality and therefore contribute to their sustainable development too.展开更多
The differential pricing for peak hours encourages industrial consumers to look for independent power supplies for the period from 19 to 22 hours. This paper presents a study to identify the optimal solution for a rec...The differential pricing for peak hours encourages industrial consumers to look for independent power supplies for the period from 19 to 22 hours. This paper presents a study to identify the optimal solution for a recycled paper mill that also intends to work in that period. The factory is located in Rio Grande do Sul, in southern Brazil, and considers the use of a diesel gen set, a micro hydro power plant and possibly PV modules. Two micro hydro power plants were considered in the study, an old plant to be renewed and another to be fully implemented. The software Homer was used as a tool to determine the most feasible combination of components considered in the study. The sale of surplus power to the energy system appears as a key to viability of alternatives that are not based solely on diesel generators. The optimal solution consists of a combination of diesel generators and micro hydro power plant, in one case, and only on hydroelectric power plant in another, with a significant penetration of PV modules if its cost is reduced to 12% of the current price, selling an amount of energy equal to that which is bought. The annual water availability in one of the sites requires diesel supplement, while the other, more abundant, this supplement is not necessary.展开更多
文摘The state of Cameroon, faced with the situation the electricity deficits, is promoting the development of renewable energies in general and to meet rural electrification needs in particular. The purpose of this work is to study the feasibility of the MHP of Batcheu, to show its contribution to sustainable development in this locality and to prove that it is a profitable project. After study, it appears that the waterfall of Batcheu is favourable to the establishment of a MHP with an installed power of 260 kW with an operating diagram corresponding to a Francis turbine. Given that it is a renewable energy that can supply more than 800 households in rural areas, its contribution to sustainable development is obvious. Its investment cost is estimated at 171,465,396 FCFA. It is a profitable project with a payback time of 7 years and 2 months.
文摘MHPPs (micro hydro power plants) have become prominent in hydropower plants as a solution to provide the energy demands of the grid. In this study, a new hybrid renewable energy based DC excitation system for synchronous generator in the developed MHPP system is introduced. Proposed hybrid DC excitation system consists of solar & hydrogen energy based power generating systems. Hybrid renewable energy based system is used for the excitation of the synchronous generator in the MHPP test system. The renewables are used as a secondary energy source to provide the excitation current to a synchronous generator that generates energy in MHPP. A PV (photovoltaic) array is used as the main source of excitation, and a FC (fuel cell) stack is used for DC excitation in the lack of sunshine. In the experimental setup, an electrical control card is developed, and a microcontroller is used to perform the proposed excitation system. All experimental results obtained from 5 kW rated power MHHP test system. Experimental results show that, the proposed method provides the continuous excitation current, and the operation of the synchronous generator is uninterrupted. The proposed method is also practical and easily implemented for MHPP systems.
文摘Of all the precious metals buried in the Cameroonian subsoil, gold is certainly the longest exploited. It has longtime been the subject of artisanal exploitation. In 2014, the monthly national production was estimated at around 170 kg. In these mining areas, people still live in a screaming precariousness of which one of the main causes is often the lack of electricity, because of the distance of these localities to the national electricity network. Cameroon has a great hydroelectric potential, but the access rate to electricity is still very low in isolate or rural areas of this country. The objective of this work is to show that it is possible to efficiently exploit gold in isolated areas and contribute to the sustainable development of these localities through the development of micro hydro power (MHP). The mining community of Tikondi in the East Region of Cameroon is the practical case study for an illustration. The results of this study show that the development of the MHP project can be developed with installed power of 87 kW, where the Banki-Michell turbine is recommended according to the Sulzer-Escher Wyss diagram. The investment cost evaluated at 79,832,775 FCFA (1 Euro = 656 FCFA). It is a profitable project with a maximum payback period of 8 years. This project can be easily funded by gold mining activity. That Tikondi’s MHP can make this village becoming attractive for others activities, improving the quality of education of children (there is not any school and lots of them do not go to school), the building of health centers and the quality of life in that locality and therefore contribute to their sustainable development too.
文摘The differential pricing for peak hours encourages industrial consumers to look for independent power supplies for the period from 19 to 22 hours. This paper presents a study to identify the optimal solution for a recycled paper mill that also intends to work in that period. The factory is located in Rio Grande do Sul, in southern Brazil, and considers the use of a diesel gen set, a micro hydro power plant and possibly PV modules. Two micro hydro power plants were considered in the study, an old plant to be renewed and another to be fully implemented. The software Homer was used as a tool to determine the most feasible combination of components considered in the study. The sale of surplus power to the energy system appears as a key to viability of alternatives that are not based solely on diesel generators. The optimal solution consists of a combination of diesel generators and micro hydro power plant, in one case, and only on hydroelectric power plant in another, with a significant penetration of PV modules if its cost is reduced to 12% of the current price, selling an amount of energy equal to that which is bought. The annual water availability in one of the sites requires diesel supplement, while the other, more abundant, this supplement is not necessary.