To adapt to the unique demand-supply features of accessory parking lots at passenger transport hubs,a mixed parking demand assignment method based on regression modeling is proposed.First,an optimal model aiming to mi...To adapt to the unique demand-supply features of accessory parking lots at passenger transport hubs,a mixed parking demand assignment method based on regression modeling is proposed.First,an optimal model aiming to minimize total time expenditure is constructed.It incorporates parking search time,walking time,and departure time,focusing on short-term parking features.Then,the information dimensions that the parking lot can obtain are evaluated,and three assignment strategies based on three types of regression models-linear regression(LR),extreme gradient boosting(XGBoost),and multilayer perceptron(MLP)-are proposed.A parking process simulation model is built using the traffic simulation package SUMO to facilitate data collection,model training,and case studies.Finally,the performance of the three strategies is com-pared,revealing that the XGBoost-based strategy performs the best in case parking lots,which reduces time expendi-ture by 29.3%and 37.2%,respectively,compared with the MLP-based strategy and LR-based strategy.This method offers diverse options for practical parking manage-ment.展开更多
Despite cities being recognized as being potential sources of microplastic pollution to the wider environment, most surveys of COVID-19 plastic-based litter have been undertaken through linear transects of marine beac...Despite cities being recognized as being potential sources of microplastic pollution to the wider environment, most surveys of COVID-19 plastic-based litter have been undertaken through linear transects of marine beaches. For the far fewer number of studies conducted on inland and urban locations, the site-specific focus has primarily been surveys along the length of streets. The present study is the first to specifically assess the standing stock (i.e., moment-in-time) of littered face masks for the entire surface area of urban parking lots. The density of face masks in 50 parking lots in a Canadian coastal town (0.00054 m2 ± 0.00051 m2) was found to be significantly greater than the background level of littering of town streets. Face mask density was significantly related to visitation “usage” of parking lots as gauged by the areal size of the lots and of their onsite buildings, as well as the number of vehicles present. Neither parking lot typology nor estimates of inferred export (various measures of wind exposure) and entrapment (various metrics of obstruction) of face masks had a significant influence on the extent of whole-lot littering. In consequence, modelling of the potential input of mask-derived microplastics to the marine environment from coastal communities can use the areal density of face masks found here in association with the total surface area of lots for individual municipalities as determined through GIS analysis.展开更多
In the future smart cities,parking lots(PLs)can accommodate hundreds of electric vehicles(EVs)at the same time.This trend creates an opportunity for PLs to serve as a potential flexibility resource,considering growing...In the future smart cities,parking lots(PLs)can accommodate hundreds of electric vehicles(EVs)at the same time.This trend creates an opportunity for PLs to serve as a potential flexibility resource,considering growing penetration of EVs and integration of distributed energy resources DER(such as photovoltaic and energy storages).Given this background,this paper proposes a comprehensive evaluation framework to investigate the potential role of DER-integrated PLs(DPL)with the capability of vehicle-to-grid(V2G)in improving the reliability of the distribution network.For this aim,first,an overview for the distribution system with DPLs is provided.Then,a generic model for the available generation capacity(AGC)of DPLs with consideration of EV scheduling strategy is developed.On the above basis,an iterative-based algorithm leveraging sequential Monte Carlo simulation is presented to quantify the contribution of DPLs to the reliability of the system.In order to verify the effectiveness of the proposed method,a series of numerical studies are carried out.The simulation results show that the integration of DPLs with the V2G capability could help to improve the reliability performance of distribution grid to a great extent and reduce the adverse impact incurred by EV accommodation,if utilized properly.展开更多
Last October, the Nanjing-based aiwan, Hongkong, Macao and verseas Chinese Literature Society went to Wulong Pool. Zhang Chao, vice-chairman of the society, invited me to go to see the place with him. We went eastward...Last October, the Nanjing-based aiwan, Hongkong, Macao and verseas Chinese Literature Society went to Wulong Pool. Zhang Chao, vice-chairman of the society, invited me to go to see the place with him. We went eastward out of Longpanli along bustling and seething Guangzhou Avenue. by the side of the high Suolong Bridge, we found a garden gate with flower-展开更多
In order to solve the contradiction between the rapid growth of urban motor vehicles and the lack of road traffic resources to fundamentally improve the problem of "difficult driving and difficult parking", ...In order to solve the contradiction between the rapid growth of urban motor vehicles and the lack of road traffic resources to fundamentally improve the problem of "difficult driving and difficult parking", it is necessary to carry out scientific planning and design of urban parking lots. The study analyzed the main problems of urban parking, discussed the planning principles and countermeasures of parking lot planning, and briefly introduced the practical experience of the special parking lot planning of the central urban area in Xiajiang County, Ji’an City, Jiangxi Province. It is hoped that through parking lot planning, the contradiction between supply and demand of urban parking can be effectively alleviated and the urban traffic environment can be improved.展开更多
This work addresses bi-objective hybrid flow shop scheduling problems considering consistent sublots(Bi-HFSP_CS).The objectives are to minimize the makespan and total energy consumption.First,the Bi-HFSP_CS is formali...This work addresses bi-objective hybrid flow shop scheduling problems considering consistent sublots(Bi-HFSP_CS).The objectives are to minimize the makespan and total energy consumption.First,the Bi-HFSP_CS is formalized,followed by the establishment of a mathematical model.Second,enhanced version of the artificial bee colony(ABC)algorithms is proposed for tackling the Bi-HFSP_CS.Then,fourteen local search operators are employed to search for better solutions.Two different Q-learning tactics are developed to embed into the ABC algorithm to guide the selection of operators throughout the iteration process.Finally,the proposed tactics are assessed for their efficacy through a comparison of the ABC algorithm,its three variants,and three effective algorithms in resolving 95 instances of 35 different problems.The experimental results and analysis showcase that the enhanced ABC algorithm combined with Q-learning(QABC1)demonstrates as the top performer for solving concerned problems.This study introduces a novel approach to solve the Bi-HFSP_CS and illustrates its efficacy and superior competitive strength,offering beneficial perspectives for exploration and research in relevant domains.展开更多
The efficiency of businesses is often hindered by the challenges encountered in traditional Supply Chain Manage-ment(SCM),which is characterized by elevated risks due to inadequate accountability and transparency.To a...The efficiency of businesses is often hindered by the challenges encountered in traditional Supply Chain Manage-ment(SCM),which is characterized by elevated risks due to inadequate accountability and transparency.To address these challenges and improve operations in green manufacturing,optimization algorithms play a crucial role in supporting decision-making processes.In this study,we propose a solution to the green lot size optimization issue by leveraging bio-inspired algorithms,notably the Stork Optimization Algorithm(SOA).The SOA draws inspiration from the hunting and winter migration strategies employed by storks in nature.The theoretical framework of SOA is elaborated and mathematically modeled through two distinct phases:exploration,based on migration simulation,and exploitation,based on hunting strategy simulation.To tackle the green lot size optimization issue,our methodology involved gathering real-world data,which was then transformed into a simplified function with multiple constraints aimed at optimizing total costs and minimizing CO_(2) emissions.This function served as input for the SOA model.Subsequently,the SOA model was applied to identify the optimal lot size that strikes a balance between cost-effectiveness and sustainability.Through extensive experimentation,we compared the performance of SOA with twelve established metaheuristic algorithms,consistently demonstrating that SOA outperformed the others.This study’s contribution lies in providing an effective solution to the sustainable lot-size optimization dilemma,thereby reducing environmental impact and enhancing supply chain efficiency.The simulation findings underscore that SOA consistently achieves superior outcomes compared to existing optimization methodologies,making it a promising approach for green manufacturing and sustainable supply chain management.展开更多
2019年疫情爆发以来,全球经济形式错综复杂,经历了油价暴跌,供应链危机等一系列危机事件,对各国经济产生了深远影响。随着国家对环境治理的重视,各地加大了对环保园区的投入,出台了各类政策。目前国内建成了各种处理工艺的固废产业园区...2019年疫情爆发以来,全球经济形式错综复杂,经历了油价暴跌,供应链危机等一系列危机事件,对各国经济产生了深远影响。随着国家对环境治理的重视,各地加大了对环保园区的投入,出台了各类政策。目前国内建成了各种处理工艺的固废产业园区,便于产业链集聚,危废处理,企业监管。随着园区经济的不断发展,传统的粗放式管理已经难以为继,并且随着信息化技术,传感器技术,自动控制技术飞速发展,对于园区的管理以及运营带来了新的挑战,也带来了新的机会和商业价值。本文基于CIM、互联网技术、LOT技术搭建了一套综合管理平台,提升产业园区精细化管理能力。Since the outbreak of the Covid-19 epidemic in 2019, the global economic situation has been complicated and has experienced a series of crises such as the oil prices plummet and supply chain crisis, which have had a profound impact on the economies of various countries. Now China attaches more importance to environmental governance, and various local governments have increased their investment in environmental protection parks and introduced various policies. At present, various forms of solid waste industrial parks have been built in China to facilitate the aggregation of industrial chains, hazardous waste treatment, and enterprise supervision. With the continuous development of the park economy, traditional extensive management is no longer sustainable, and with the rapid development of information technology, sensor technology, and automatic control technology, new challenges have been brought to the management and operation of the park, as well as new opportunities and business value. We build a comprehensive management platform based on CIM, Internet technology, and LOT technology to improve the industrial park’s refined management capabilities.展开更多
In recent years,disorderly parking and difficult charging of electric bicycles have been challenges in urban management.The rapid growth of electric bicycles is in contradiction with the lack of dedicated parking spac...In recent years,disorderly parking and difficult charging of electric bicycles have been challenges in urban management.The rapid growth of electric bicycles is in contradiction with the lack of dedicated parking spaces and charging service facilities in towns and villages.To solve the issue of parking and charging electric bicycles in limited urban and rural spaces,prefabricated building technology is applied to the design of a multi-story electric bicycle parking lot.The multi-story prefabricated electric bicycle parking lot is utilized in urban and rural planning and design to upgrade parking facilities in old urban areas,land-constrained commercial areas,as well as counties,towns,and rural areas with inadequate municipal facilities.Multi-story prefabricated electric bicycle parking lots are the application exploration of industrial buildings,and promote the high-quality development planning and construction of towns and counties and villages.Compared with the single-story metal charging station,the multi-story assembled electric bicycle parking lot has the characteristics of integrating parking and charging,being more durable and safer in structure,accommodating a large number of vehicles,and improving the space utilization rate.展开更多
基金The National Natural Science Foundation of China(No.52302388)the Natural Science Foundation of Jiangsu Province(No.BK20230853).
文摘To adapt to the unique demand-supply features of accessory parking lots at passenger transport hubs,a mixed parking demand assignment method based on regression modeling is proposed.First,an optimal model aiming to minimize total time expenditure is constructed.It incorporates parking search time,walking time,and departure time,focusing on short-term parking features.Then,the information dimensions that the parking lot can obtain are evaluated,and three assignment strategies based on three types of regression models-linear regression(LR),extreme gradient boosting(XGBoost),and multilayer perceptron(MLP)-are proposed.A parking process simulation model is built using the traffic simulation package SUMO to facilitate data collection,model training,and case studies.Finally,the performance of the three strategies is com-pared,revealing that the XGBoost-based strategy performs the best in case parking lots,which reduces time expendi-ture by 29.3%and 37.2%,respectively,compared with the MLP-based strategy and LR-based strategy.This method offers diverse options for practical parking manage-ment.
文摘Despite cities being recognized as being potential sources of microplastic pollution to the wider environment, most surveys of COVID-19 plastic-based litter have been undertaken through linear transects of marine beaches. For the far fewer number of studies conducted on inland and urban locations, the site-specific focus has primarily been surveys along the length of streets. The present study is the first to specifically assess the standing stock (i.e., moment-in-time) of littered face masks for the entire surface area of urban parking lots. The density of face masks in 50 parking lots in a Canadian coastal town (0.00054 m2 ± 0.00051 m2) was found to be significantly greater than the background level of littering of town streets. Face mask density was significantly related to visitation “usage” of parking lots as gauged by the areal size of the lots and of their onsite buildings, as well as the number of vehicles present. Neither parking lot typology nor estimates of inferred export (various measures of wind exposure) and entrapment (various metrics of obstruction) of face masks had a significant influence on the extent of whole-lot littering. In consequence, modelling of the potential input of mask-derived microplastics to the marine environment from coastal communities can use the areal density of face masks found here in association with the total surface area of lots for individual municipalities as determined through GIS analysis.
基金financially supported by the National Social Science Fund of China(No.19ZDA081)Fundamental Research Funds for the Central Universities(No.2020MS067).
文摘In the future smart cities,parking lots(PLs)can accommodate hundreds of electric vehicles(EVs)at the same time.This trend creates an opportunity for PLs to serve as a potential flexibility resource,considering growing penetration of EVs and integration of distributed energy resources DER(such as photovoltaic and energy storages).Given this background,this paper proposes a comprehensive evaluation framework to investigate the potential role of DER-integrated PLs(DPL)with the capability of vehicle-to-grid(V2G)in improving the reliability of the distribution network.For this aim,first,an overview for the distribution system with DPLs is provided.Then,a generic model for the available generation capacity(AGC)of DPLs with consideration of EV scheduling strategy is developed.On the above basis,an iterative-based algorithm leveraging sequential Monte Carlo simulation is presented to quantify the contribution of DPLs to the reliability of the system.In order to verify the effectiveness of the proposed method,a series of numerical studies are carried out.The simulation results show that the integration of DPLs with the V2G capability could help to improve the reliability performance of distribution grid to a great extent and reduce the adverse impact incurred by EV accommodation,if utilized properly.
文摘Last October, the Nanjing-based aiwan, Hongkong, Macao and verseas Chinese Literature Society went to Wulong Pool. Zhang Chao, vice-chairman of the society, invited me to go to see the place with him. We went eastward out of Longpanli along bustling and seething Guangzhou Avenue. by the side of the high Suolong Bridge, we found a garden gate with flower-
文摘In order to solve the contradiction between the rapid growth of urban motor vehicles and the lack of road traffic resources to fundamentally improve the problem of "difficult driving and difficult parking", it is necessary to carry out scientific planning and design of urban parking lots. The study analyzed the main problems of urban parking, discussed the planning principles and countermeasures of parking lot planning, and briefly introduced the practical experience of the special parking lot planning of the central urban area in Xiajiang County, Ji’an City, Jiangxi Province. It is hoped that through parking lot planning, the contradiction between supply and demand of urban parking can be effectively alleviated and the urban traffic environment can be improved.
基金supported by the National Natural Science Foundation of China(No.62173356)Science and Technology Development Fund(FDCT),Macao SAR(No.0019/2021/A)+2 种基金Zhuhai Industry-University-Research Project with Hongkong and Macao(No.ZH22017002210014PWC)Guangdong Basic and Applied Basic Research Foundation(No.2023A1515011531)Key Technologies for Scheduling and Optimization of Complex Distributed Manufacturing Systems(No.22JR10KA007).
文摘This work addresses bi-objective hybrid flow shop scheduling problems considering consistent sublots(Bi-HFSP_CS).The objectives are to minimize the makespan and total energy consumption.First,the Bi-HFSP_CS is formalized,followed by the establishment of a mathematical model.Second,enhanced version of the artificial bee colony(ABC)algorithms is proposed for tackling the Bi-HFSP_CS.Then,fourteen local search operators are employed to search for better solutions.Two different Q-learning tactics are developed to embed into the ABC algorithm to guide the selection of operators throughout the iteration process.Finally,the proposed tactics are assessed for their efficacy through a comparison of the ABC algorithm,its three variants,and three effective algorithms in resolving 95 instances of 35 different problems.The experimental results and analysis showcase that the enhanced ABC algorithm combined with Q-learning(QABC1)demonstrates as the top performer for solving concerned problems.This study introduces a novel approach to solve the Bi-HFSP_CS and illustrates its efficacy and superior competitive strength,offering beneficial perspectives for exploration and research in relevant domains.
基金This research is funded by the Science Committee of the Ministry of Science and Higher Education of the Republic of Kazakhstan,Grant No.AP19674517.
文摘The efficiency of businesses is often hindered by the challenges encountered in traditional Supply Chain Manage-ment(SCM),which is characterized by elevated risks due to inadequate accountability and transparency.To address these challenges and improve operations in green manufacturing,optimization algorithms play a crucial role in supporting decision-making processes.In this study,we propose a solution to the green lot size optimization issue by leveraging bio-inspired algorithms,notably the Stork Optimization Algorithm(SOA).The SOA draws inspiration from the hunting and winter migration strategies employed by storks in nature.The theoretical framework of SOA is elaborated and mathematically modeled through two distinct phases:exploration,based on migration simulation,and exploitation,based on hunting strategy simulation.To tackle the green lot size optimization issue,our methodology involved gathering real-world data,which was then transformed into a simplified function with multiple constraints aimed at optimizing total costs and minimizing CO_(2) emissions.This function served as input for the SOA model.Subsequently,the SOA model was applied to identify the optimal lot size that strikes a balance between cost-effectiveness and sustainability.Through extensive experimentation,we compared the performance of SOA with twelve established metaheuristic algorithms,consistently demonstrating that SOA outperformed the others.This study’s contribution lies in providing an effective solution to the sustainable lot-size optimization dilemma,thereby reducing environmental impact and enhancing supply chain efficiency.The simulation findings underscore that SOA consistently achieves superior outcomes compared to existing optimization methodologies,making it a promising approach for green manufacturing and sustainable supply chain management.
文摘2019年疫情爆发以来,全球经济形式错综复杂,经历了油价暴跌,供应链危机等一系列危机事件,对各国经济产生了深远影响。随着国家对环境治理的重视,各地加大了对环保园区的投入,出台了各类政策。目前国内建成了各种处理工艺的固废产业园区,便于产业链集聚,危废处理,企业监管。随着园区经济的不断发展,传统的粗放式管理已经难以为继,并且随着信息化技术,传感器技术,自动控制技术飞速发展,对于园区的管理以及运营带来了新的挑战,也带来了新的机会和商业价值。本文基于CIM、互联网技术、LOT技术搭建了一套综合管理平台,提升产业园区精细化管理能力。Since the outbreak of the Covid-19 epidemic in 2019, the global economic situation has been complicated and has experienced a series of crises such as the oil prices plummet and supply chain crisis, which have had a profound impact on the economies of various countries. Now China attaches more importance to environmental governance, and various local governments have increased their investment in environmental protection parks and introduced various policies. At present, various forms of solid waste industrial parks have been built in China to facilitate the aggregation of industrial chains, hazardous waste treatment, and enterprise supervision. With the continuous development of the park economy, traditional extensive management is no longer sustainable, and with the rapid development of information technology, sensor technology, and automatic control technology, new challenges have been brought to the management and operation of the park, as well as new opportunities and business value. We build a comprehensive management platform based on CIM, Internet technology, and LOT technology to improve the industrial park’s refined management capabilities.
文摘In recent years,disorderly parking and difficult charging of electric bicycles have been challenges in urban management.The rapid growth of electric bicycles is in contradiction with the lack of dedicated parking spaces and charging service facilities in towns and villages.To solve the issue of parking and charging electric bicycles in limited urban and rural spaces,prefabricated building technology is applied to the design of a multi-story electric bicycle parking lot.The multi-story prefabricated electric bicycle parking lot is utilized in urban and rural planning and design to upgrade parking facilities in old urban areas,land-constrained commercial areas,as well as counties,towns,and rural areas with inadequate municipal facilities.Multi-story prefabricated electric bicycle parking lots are the application exploration of industrial buildings,and promote the high-quality development planning and construction of towns and counties and villages.Compared with the single-story metal charging station,the multi-story assembled electric bicycle parking lot has the characteristics of integrating parking and charging,being more durable and safer in structure,accommodating a large number of vehicles,and improving the space utilization rate.