The Palongzangbu River Basin contains the highest number of maritime province glaciers in China. There are 130 glacial lakes, 64 snow avalanche sites and 28 glacial debris flow gullies distributed within the basin. Sn...The Palongzangbu River Basin contains the highest number of maritime province glaciers in China. There are 130 glacial lakes, 64 snow avalanche sites and 28 glacial debris flow gullies distributed within the basin. Snow disasters play a controlling role in the Sichuan-Tibet Highway construction, due to the terrain’s special characteristics of high altitude and large height differential. Segmentation mitigation countermeasures for the Sichuan-Tibet Highway are presented based on snow disaster severity level and damage mode of the road. In the Ranwu to Midui section, snow avalanches are regional disasters, so the line should be placed in sunny slopes. In the Midui Gully to Yupu section, the line should be placed in shady slopes and at higher elevations to reduce the risk of glacial lake outburst. In the Yupu to Guxiang section, all three snow disasters are minimal. In the Guxiang to Tongmai section, glacier debris flows are the major threat, thus the road should be placed in shady slopes.展开更多
Much progress has been made in the research of breeding new rice line through gene engineering by Life Science College of Fudan Univ, Shanghai, and the Plant Science Res Inst of Shanghai Acad of Agri. It was the first...Much progress has been made in the research of breeding new rice line through gene engineering by Life Science College of Fudan Univ, Shanghai, and the Plant Science Res Inst of Shanghai Acad of Agri. It was the first time internationally that the research adopted a man-combined gene, taking agrobacterium as car-展开更多
The failure modes and effects analysis (FMEA) is widely applied in manufacturing industries in various phases of the product life cycle to evaluate the system, its design and processes for failures that can occur. T...The failure modes and effects analysis (FMEA) is widely applied in manufacturing industries in various phases of the product life cycle to evaluate the system, its design and processes for failures that can occur. The FMEA team often demonstrates different opinions and these different types of opinions are very difficult to incorporate into the FMEA by the traditional risk priority number model. In this paper, for each of the Occurrence, Severity and Detectivity parameters a fuzzy set is defined and the opinion of each FMEA team members is considered. These opinions are considered simultaneously with weights that are given to each individual based on their skills and experience levels. In addition, the opinion of the costumer is considered for each of the FMEA parameters. Then, the Risk Priority Numbers (RPN) is calculated using a Multi Input Single Output (MISO) fuzzy expert system. The proposed model is applied for prioritizing the failures of Peugeot 206 Engine assembly line in IKCo (Iran Khodro Company).展开更多
With the rapid development of the society, the development of the railway transportation industry is accelerating. Many places have begun to expand the railway, which can not only bring greater convenience to the tran...With the rapid development of the society, the development of the railway transportation industry is accelerating. Many places have begun to expand the railway, which can not only bring greater convenience to the transportation, but also to speed up the communication between regions. For the current development of railway transportation industry, railway construction can promote the development of transportation industry to a large extent, it is necessary to pay attention to ensure the stability and safety of railway construction. At present, there are some problems of maintenance quality in some railway engineering lines, which affect the operation utility of railway. This paper analyzes the factors endangering the safety of railway engineering lines and the existing maintenance problems, and puts forward the corresponding maintenance measures to improve the overall quality of railway.展开更多
基金financially supported by the general project of Natural Science Foundation of China (No. 41571004)Scientific and technological research and development plan of China Railway Corporation (No. 2015G002-N)General project of Natural Science Foundation of China (No. 41172321)
文摘The Palongzangbu River Basin contains the highest number of maritime province glaciers in China. There are 130 glacial lakes, 64 snow avalanche sites and 28 glacial debris flow gullies distributed within the basin. Snow disasters play a controlling role in the Sichuan-Tibet Highway construction, due to the terrain’s special characteristics of high altitude and large height differential. Segmentation mitigation countermeasures for the Sichuan-Tibet Highway are presented based on snow disaster severity level and damage mode of the road. In the Ranwu to Midui section, snow avalanches are regional disasters, so the line should be placed in sunny slopes. In the Midui Gully to Yupu section, the line should be placed in shady slopes and at higher elevations to reduce the risk of glacial lake outburst. In the Yupu to Guxiang section, all three snow disasters are minimal. In the Guxiang to Tongmai section, glacier debris flows are the major threat, thus the road should be placed in shady slopes.
文摘Much progress has been made in the research of breeding new rice line through gene engineering by Life Science College of Fudan Univ, Shanghai, and the Plant Science Res Inst of Shanghai Acad of Agri. It was the first time internationally that the research adopted a man-combined gene, taking agrobacterium as car-
文摘The failure modes and effects analysis (FMEA) is widely applied in manufacturing industries in various phases of the product life cycle to evaluate the system, its design and processes for failures that can occur. The FMEA team often demonstrates different opinions and these different types of opinions are very difficult to incorporate into the FMEA by the traditional risk priority number model. In this paper, for each of the Occurrence, Severity and Detectivity parameters a fuzzy set is defined and the opinion of each FMEA team members is considered. These opinions are considered simultaneously with weights that are given to each individual based on their skills and experience levels. In addition, the opinion of the costumer is considered for each of the FMEA parameters. Then, the Risk Priority Numbers (RPN) is calculated using a Multi Input Single Output (MISO) fuzzy expert system. The proposed model is applied for prioritizing the failures of Peugeot 206 Engine assembly line in IKCo (Iran Khodro Company).
文摘With the rapid development of the society, the development of the railway transportation industry is accelerating. Many places have begun to expand the railway, which can not only bring greater convenience to the transportation, but also to speed up the communication between regions. For the current development of railway transportation industry, railway construction can promote the development of transportation industry to a large extent, it is necessary to pay attention to ensure the stability and safety of railway construction. At present, there are some problems of maintenance quality in some railway engineering lines, which affect the operation utility of railway. This paper analyzes the factors endangering the safety of railway engineering lines and the existing maintenance problems, and puts forward the corresponding maintenance measures to improve the overall quality of railway.