In this paper,we derive the strong approximations for a four-class two station multi-class queuing network(Kumar-Seidman network) under a priority service discipline.Within a group,jobs are served in the order of ar...In this paper,we derive the strong approximations for a four-class two station multi-class queuing network(Kumar-Seidman network) under a priority service discipline.Within a group,jobs are served in the order of arrival,that is,a first-in-first-out disciple,and among groups,jobs are served under a pre-emptiveresume priority disciple.We show that if the input data(i.e.,the arrival and service processe) satisfy an approximation(such as the functional law-of-iterated logarithm approximation or the strong approximation),the output data(the departure processes) and the performance measures(such as the queue length,the work load and the sojourn time process) satisfy a similar approximation.展开更多
确定土体动剪切模量的常用方法有规范法、Kumar法和自相关函数法,确定相应阻尼比的方法有规范法、Das and Luo法、Kokusho法、Kumar法和互相关函数法,为了分析不同方法所产生差异,实现定量化对比分析,笔者以福建标准砂(粒径为0.5~1.0 mm...确定土体动剪切模量的常用方法有规范法、Kumar法和自相关函数法,确定相应阻尼比的方法有规范法、Das and Luo法、Kokusho法、Kumar法和互相关函数法,为了分析不同方法所产生差异,实现定量化对比分析,笔者以福建标准砂(粒径为0.5~1.0 mm)为研究对象,采用不排水的应力控制动三轴试验,探讨不同的确定土体动剪切模量和阻尼比方法的差异性,并给出了不同土体条件建议选用的方法。结果表明:1)3种方法确定动剪切模量的结果有一定的差异,随剪应变的增大结果的差异逐渐增大,有效围压对结果的差异性有所影响,当剪应变为4×10^(-3),有效围压为100 kPa时,3种方法差异显著,相对误差最大接近20%;2)而5种方法确定阻尼比的结果差异显著,随着剪应变的增大,5种方法确定的阻尼比相对误差大体上均在迅速减小,只有规范法在有效围压为100 kPa时,其相对误差有较小的增大趋势;5种方法中,Kumar法确定的阻尼比最接近平均阻尼比,互相关函数法远高于平均阻尼比,Das and Luo法和Kokusho法确定的阻尼比基本一致但低于平均阻尼比。建议以后的工程应用中,加载方式为应力控制时,可采用自相关函数法确定动剪切模量,采用Kumar法确定阻尼比,二者确定的动剪切模量和阻尼比均最接近平均值。展开更多
The equation of Patwardhan and Kumar for water activities of mixed electrolyte solutions is extended to aqueous solutions containing non-electrolytes. This equation and the linear isopiestic relation are used to predi...The equation of Patwardhan and Kumar for water activities of mixed electrolyte solutions is extended to aqueous solutions containing non-electrolytes. This equation and the linear isopiestic relation are used to predict water activities of 56 ternary aqueous solutions in terms of the data of their binary subsystems. Both equation of Patwardhan and Kumar and the linear isopiestic relation can provide good predictions for water activities of the present 40 electrolyte solutions, and the linear isopiestic relation generally yields better predictions. The predictions of the extended equation of Patwardhan and Kumar and the linear isopiestic relation are in general quite reasonable for the present 8 ternary solutions of electrolytes and non-electrolytes, and the results of the linear isopiestic relation are usually better. The predictions of these two methods generally agree well with the experimental data for the 8 non-electrolyte mixtures being studied, and the linear isopiestic relation is better.展开更多
This paper proposes a case study in the control of a heavy oil pyrolysis/cracking furnace with a newly extended U-model based pole placement controller(U-PPC). The major work of the paper includes: 1) establishing a c...This paper proposes a case study in the control of a heavy oil pyrolysis/cracking furnace with a newly extended U-model based pole placement controller(U-PPC). The major work of the paper includes: 1) establishing a control oriented nonlinear dynamic model with Naphtha cracking and thermal dynamics; 2) analysing a U-model(i.e., control oriented prototype) representation of various popular process model sets; 3)designing the new U-PPC to enhance the control performance in pole placement and stabilisation; 4) taking computational bench tests to demonstrate the control system design and performance with a user-friendly step by step procedure.展开更多
文摘In this paper,we derive the strong approximations for a four-class two station multi-class queuing network(Kumar-Seidman network) under a priority service discipline.Within a group,jobs are served in the order of arrival,that is,a first-in-first-out disciple,and among groups,jobs are served under a pre-emptiveresume priority disciple.We show that if the input data(i.e.,the arrival and service processe) satisfy an approximation(such as the functional law-of-iterated logarithm approximation or the strong approximation),the output data(the departure processes) and the performance measures(such as the queue length,the work load and the sojourn time process) satisfy a similar approximation.
文摘采用静态法测试了乙二醇单甲醚、乙二醇单丁醚在超临界二氧化碳中的溶解度,测试温度分别为313,323,333,343,353和363 K,压力为8.2~18.3 MPa;利用2种半经验公式Bartle和Chrastil对溶解度进行了计算和关联,结果表明:溶解度的实验值与理论值具有良好的一致性,其平均相对偏差范围分别为8.88%~16.72%和6.00%~7.84%;根据Kumar and Johnston理论,由溶解度数据计算不同温度下2种物质在超临界CO2中的偏摩尔体积V珔2.
文摘确定土体动剪切模量的常用方法有规范法、Kumar法和自相关函数法,确定相应阻尼比的方法有规范法、Das and Luo法、Kokusho法、Kumar法和互相关函数法,为了分析不同方法所产生差异,实现定量化对比分析,笔者以福建标准砂(粒径为0.5~1.0 mm)为研究对象,采用不排水的应力控制动三轴试验,探讨不同的确定土体动剪切模量和阻尼比方法的差异性,并给出了不同土体条件建议选用的方法。结果表明:1)3种方法确定动剪切模量的结果有一定的差异,随剪应变的增大结果的差异逐渐增大,有效围压对结果的差异性有所影响,当剪应变为4×10^(-3),有效围压为100 kPa时,3种方法差异显著,相对误差最大接近20%;2)而5种方法确定阻尼比的结果差异显著,随着剪应变的增大,5种方法确定的阻尼比相对误差大体上均在迅速减小,只有规范法在有效围压为100 kPa时,其相对误差有较小的增大趋势;5种方法中,Kumar法确定的阻尼比最接近平均阻尼比,互相关函数法远高于平均阻尼比,Das and Luo法和Kokusho法确定的阻尼比基本一致但低于平均阻尼比。建议以后的工程应用中,加载方式为应力控制时,可采用自相关函数法确定动剪切模量,采用Kumar法确定阻尼比,二者确定的动剪切模量和阻尼比均最接近平均值。
基金the National Natural Science Foundation of China (No. 20276037, No. 20006010).
文摘The equation of Patwardhan and Kumar for water activities of mixed electrolyte solutions is extended to aqueous solutions containing non-electrolytes. This equation and the linear isopiestic relation are used to predict water activities of 56 ternary aqueous solutions in terms of the data of their binary subsystems. Both equation of Patwardhan and Kumar and the linear isopiestic relation can provide good predictions for water activities of the present 40 electrolyte solutions, and the linear isopiestic relation generally yields better predictions. The predictions of the extended equation of Patwardhan and Kumar and the linear isopiestic relation are in general quite reasonable for the present 8 ternary solutions of electrolytes and non-electrolytes, and the results of the linear isopiestic relation are usually better. The predictions of these two methods generally agree well with the experimental data for the 8 non-electrolyte mixtures being studied, and the linear isopiestic relation is better.
基金partially supported by the National Natural Science Foundation of China(61273188,61473312)Taishan Scholar Construction Engineering Special Funding of Shandong
文摘This paper proposes a case study in the control of a heavy oil pyrolysis/cracking furnace with a newly extended U-model based pole placement controller(U-PPC). The major work of the paper includes: 1) establishing a control oriented nonlinear dynamic model with Naphtha cracking and thermal dynamics; 2) analysing a U-model(i.e., control oriented prototype) representation of various popular process model sets; 3)designing the new U-PPC to enhance the control performance in pole placement and stabilisation; 4) taking computational bench tests to demonstrate the control system design and performance with a user-friendly step by step procedure.