Challenging in frequent jacking force surge in rock pipe jacking project:A case study in Guanjingkou,China
1
作者 Chao Li Zuliang Zhong +2 位作者 Xinrong Liu Yi Zhang Nanyun Wang 《Journal of Rock Mechanics and Geotechnical Engineering》 2025年第7期4559-4578,共20页
Previous studies have demonstrated that the surge in jacking force during the Guanjingkou project is caused by the contact conditions of the debris bentonite slurry outside the pipe.Therefore,this paper further system... Previous studies have demonstrated that the surge in jacking force during the Guanjingkou project is caused by the contact conditions of the debris bentonite slurry outside the pipe.Therefore,this paper further systematically investigates the influence of different debris slurry mass ratios(SLRs)and different particle size distributions(PSDs)on the pipe-rock friction characteristics using friction tests.The test results reveal that under the same PSD,an adequate amount of slurry(with an SLR of 1:4)consistently yields the lowest friction coefficient.When the SLR is between 1:2 and 1:3,the viscosity of the slurry reaches its peak,resulting in the highest friction coefficient.Additionally,when the PSD is 1:1:5 and 1:1:15,the friction coefficient is primarily governed by the plowing effect at the contact surface.When the PSD is 5:1:1 and 15:1:1,the friction coefficient is mainly controlled by the void ratio(VR)of debris.In the case of PSDs 1:5:1 and 1:15:1,the friction coefficient is jointly controlled by the adhesion effect of high-viscosity slurry and the plowing effect at the contact surface,and it gradually shifts towards being dominated by the VR as the amount of debris increases.Regardless of the SLRs and PSDs,the continuous deposition of debris and the injection of slurry incessantly exacerbate both the plowing and adhesion effects,creating a vicious cycle.This is the reason why the high-pressure water flushing method can not only fail to resolve the issue but also accelerate the occurrence of the surge in jacking force. 展开更多
关键词 Debris friction characteristic Friction test jacking force surge Mudcake Rock pipe jacking
在线阅读 下载PDF
A study of jacking force for a curved pipejacking 被引量:12
2
作者 K.J.Shou J.M.Jiang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE 2010年第4期298-304,共7页
For a pipejacking, the jacking force is critical to balance the resistance force and to move the pipe string forwards. The driving mechanism of a curved pipejacking is more complicated than a straight-line pipejacking... For a pipejacking, the jacking force is critical to balance the resistance force and to move the pipe string forwards. The driving mechanism of a curved pipejacking is more complicated than a straight-line pipejacking, and its jacking force is also more difficult to be determined. The paper theoretically studies the jacking force of a curved pipejacking by considering the static equilibrium of earth pressure, resistance at cutting face, friction at pipe surface, and the driving force behind the pipe string. The derived theoretical formula can be used to estimate the driving forces of a straight-line or a curved pipejacking. Case study was performed by applying the theoretical and empirical formulae. After calibration, the corrected formula is more accurate and more applicable. 展开更多
关键词 pipejacking curved pipejacking jacking force statics analysis
在线阅读 下载PDF
Application of ANSYS 3D FEM in Studies of Surface Deformation Caused by Pipe Jacking 被引量:10
3
作者 LI Fabin FANG Kun LI Hechao 《Wuhan University Journal of Natural Sciences》 CAS 2007年第4期633-637,共5页
By using site observation data and establishing 3D model using ANSYS software, this paper has discussed the strain change of stratum stress during process of jacking-in and the impact of machine head on ground surface... By using site observation data and establishing 3D model using ANSYS software, this paper has discussed the strain change of stratum stress during process of jacking-in and the impact of machine head on ground surface under different frontal resistances. Analysis of the two cases shows that soil pressure reaches its maximum point when the soil is right above machine head, and soil stress will gradually decline when machine head passes over it. It also shows that impact brought by pipe-jacking construction on stress change of the surrounding soil is limited. The thesis suggest that road surface should be consolidated and soil condition be improved before construction to prevent loss and disaster caused by road surface deformation, jacking force can be increased so that jacking efficiency can be enhanced when ground stratum is well filled with soil, but the frontal resistance facing machine head should be equal to surrounding soil pressure in order to avoid rise of ground surface. 展开更多
关键词 trenchless technology pipe jacking finite element ground settlement
在线阅读 下载PDF
Behavior of Surrounding Soil during Construction and Its Countermeasures Using Pipe Jacking Method in Deep Strata 被引量:3
4
作者 Takashi Senda Hideki Shimada +1 位作者 Takashi Sasaoka Kikuo Matsui 《Open Journal of Geology》 2013年第2期44-48,共5页
In Japan when urban infrastructures need to be constructed, the difficulty of utilizing the ground or shallow strata will lead to a more frequent use of the deep strata. The common construction methods are open-cut, p... In Japan when urban infrastructures need to be constructed, the difficulty of utilizing the ground or shallow strata will lead to a more frequent use of the deep strata. The common construction methods are open-cut, pipe jacking, and shield methods. In recent years, a new pipe jacking method has been established that can be adapted to 20 m below the ground or more. Using this method, the drivage machine and the jacking pipe continue to move an underground until the completion of the driving. Therefore an over-cutting area (so-called tail-void) must be formed to lower the friction between the ground and the pipe. The tail-void is filled with lubrications. However, because the stress release from the ground continues to advance when the tail-void is formed, hence there are some challenges required to cope with the stability of the surrounding ground. In order to utilize the pipe jacking method in the deeper strata layers, the theory, analysis and installation of tail-void have to be systemized, and such systematic data must be stored. Therefore, the conditions of tail-void in the deep pipe jacking method are discussed using numerical analyses. 展开更多
关键词 Pipe jacking system DEEP STRATA Tail-Void
暂未订购
Effect of Application of Pipe Roof Method by Using Pipe Jacking on Behavior of Surrounding Soil 被引量:3
5
作者 Hideki Shimada Akihiro Hamanakal +2 位作者 Takashi Sasaoka Kikuo Matsui Toru Sato 《Journal of Physical Science and Application》 2013年第6期353-358,共6页
Tunnels in an urban area, in many cases, are constructed in soft ground which contains underground water, near existing facilities and structures. Structural stability for the tunnel and also the nearby structures and... Tunnels in an urban area, in many cases, are constructed in soft ground which contains underground water, near existing facilities and structures. Structural stability for the tunnel and also the nearby structures and facilities is vital in this kind of work. Slurry pipe jacking was firmly established as a special method for the non-disruptive construction of underground pipelines of sewage systems. This method utilizes mud slurry that is formed around the pipes in order to stabilize the surrounding soil. In the pipe roof method the tubing elements that are constructed by slurry pipe jacking are near each other longitudinally, and create a rigid and stable lining before the excavation of the main tunnel. This paper discusses 'the application of a slurry pipe jacking system on 'the pipe roof method by means of numerical analysis. Because of the rigid behavior of the lining, the results show little subsidence, making this method a reliable method of constructing large tunnels with small cover in an urban area. 展开更多
关键词 Pipe roof method pipe jacking TUNNEL Urban area.
在线阅读 下载PDF
Discussion on the Application of Pipe Jacking Construction Technology in Municipal Road Drainage Projects 被引量:1
6
作者 Liang Liu Lizhao Zhao 《Journal of Architectural Research and Development》 2023年第6期29-35,共7页
In the construction of municipal road drainage projects,pipe jacking construction is a relatively common construction method.This construction technology can avoid a large amount of excavation work,improve drainage co... In the construction of municipal road drainage projects,pipe jacking construction is a relatively common construction method.This construction technology can avoid a large amount of excavation work,improve drainage construction efficiency,avoid large-scale damage to the road surface,and exert small traffic impact.Therefore,it is currently widely used in drainage construction,but judging from the current actual application situation,there are still many problems that require further improvement.This article mainly analyzes the advantages of and current technical problems in pipe jacking construction technology in detail,explores corresponding solutions,and lays a foundation for the optimization of municipal road drainage engineering construction. 展开更多
关键词 Municipal roads Drainage projects Pipe jacking construction Advantages
在线阅读 下载PDF
Long-Distance Pipe Jacking in Complex Urban Geological Environment 被引量:1
7
作者 Yi Gong Yang Liu Qigao Li 《Journal of Architectural Research and Development》 2022年第1期7-12,共6页
A steel underground pipeline with a diameter of 2.4 m and a total length of 3,617 m(plate thickness of 26 mm)has been constructed in a city in central Hubei,and the engineering,procurement,and construction(EPC)project... A steel underground pipeline with a diameter of 2.4 m and a total length of 3,617 m(plate thickness of 26 mm)has been constructed in a city in central Hubei,and the engineering,procurement,and construction(EPC)project has been lifted from the upstream channel to supplement water to the downstream lake inside the city.Through preliminary geological survey data,site topographic and geomorphic survey,urban construction,as well as the requirements of the construction party,the preliminary arrangement of working wells and receiving wells as well as the selection and customization of pipe jacking machines have been proposed.Frequency conversion motor and remote monitoring technology are adopted for geotechnical change and long-distance pipe jacking.Through detailed survey,the rock and soil change section as well as gradual change conditions have been determined,the accuracy of construction mechanics calculation and construction operation control have improved,the basis and analysis basis are provided,and some experiences in construction operation are summarized. 展开更多
关键词 Long-distance pipe jacking Complex geology Urban area New technology
在线阅读 下载PDF
Numerical simulation of frost jacking response of a single pile considering hydro-thermo-mechanical coupling
8
作者 XingYu Wang Dan Chang JianKun Liu 《Research in Cold and Arid Regions》 CSCD 2022年第5期307-316,共10页
Permafrost is widely distributed in China and around the world.In permafrost regions,soil frost heave and thawing are severe and frequent,and can destabilize pile foundations.To this end,a finite element model of a si... Permafrost is widely distributed in China and around the world.In permafrost regions,soil frost heave and thawing are severe and frequent,and can destabilize pile foundations.To this end,a finite element model of a single pile in frozen soil is established to investigate the frost heave and frost jacking response to ensure its safety in the Qinghai-Tibet Plateau.Firstly,a hydro-thermal coupling model of a single pile in frozen soil is established based on coupling parameters and initial and boundary conditions.Then the temperature and moisture distributions are analyzed through the established coupling model.A hydro-thermo-mechanical coupling model is developed by importing the ice content and temperature results.Simulation results indicate that the amount of frost heave is greater at locations closer to the ground surface,and the displacement is smaller for frozen soil that is closer to the side of the pile.The results on frost jacking behavior of piles from this study can serve as a reference for the design,construction and maintenance of foundations. 展开更多
关键词 Single pile Frozen soil Hydro-thermo-mechanical coupling Frost jacking
在线阅读 下载PDF
Finite Element Analysis Study of Box Culvert Jacking-Out Construction under Existing Railway Line
9
作者 Senqiang Lu Yating Sun Qiaowen Hu 《Engineering(科研)》 CAS 2023年第3期196-206,共11页
To shorten the existing box culvert demolition construction period and ensure the normal operation of the railway, the jacking-out construction method was adopted. The ABAQUS finite element software was used to establ... To shorten the existing box culvert demolition construction period and ensure the normal operation of the railway, the jacking-out construction method was adopted. The ABAQUS finite element software was used to establish a three-dimensional model of the box culvert and soil body of the relying project, and three excavation thickness (0m, 1 m, 2 m) were used as the main variation parameters for numerical analysis and research, and the change law of the box culvert itself and soil body stress during the culvert jacking out process was obtained. The results show that the jacking force-displacement curves of the three working conditions can be divided into two stages, and the jacking force reaches the maximum value at the moment when the static friction turns into sliding friction at the end of the first stage. The stress distribution at the bottom slab of the box culvert in the jacking process is approximately normal, and the stress decreases with the increase of the roadbed excavation thickness. The increase of the roadbed excavation thickness can reduce the soil pressure on the side of the box culvert and effectively reduce the deformation of the roadbed in the jacking-out process. The deformation of the roadbed during the jacking process can be reduced by increasing the thickness of the roadbed excavation. 展开更多
关键词 Existing Box Culvert jacking-Out Construction Excavation Thickness jacking Force
在线阅读 下载PDF
Brief Introduction of Shallow Soil Jacking Construction Method of Large Section Rectangular Pipe Jacking Machine
10
作者 CHAIJianping 《外文科技期刊数据库(文摘版)工程技术》 2022年第3期065-069,共5页
The first permanent magnet driven rectangular pipe jacking machine independently developed in China is used for the construction of pedestrian passage in Banxuegang Science and Technology City area of Shenzhen. The re... The first permanent magnet driven rectangular pipe jacking machine independently developed in China is used for the construction of pedestrian passage in Banxuegang Science and Technology City area of Shenzhen. The rectangular pipe jacking machine occupies a small area during the initial excavation. It is suitable for shallow soil covering and short-distance excavation. It is more economical and applicable than shield machine and has high construction efficiency. During the construction process, technical measures such as attitude measurement and adjustment of pipe jacking machine, surrounding rock grouting and friction reduction can effectively ensure the smooth construction of pipe jacking machine, and provide reference for large section pipe jacking machine in shallow soil construction. 展开更多
关键词 large section rectangular pipe jacking machine shallow overburden construction method
原文传递
Application Strategies of Pipe Jacking Technology in Municipal Rainwater Pipeline Engineering
11
作者 Yao Tong Xiaoqing Hu +1 位作者 Yuwenhui Guo Minjun Gao 《Journal of Architectural Research and Development》 2024年第6期5-10,共6页
Traditional construction techniques have a significant impact on the environment and are associated with long construction durations in the construction of municipal rainwater pipelines.Pipe jacking technology,a new t... Traditional construction techniques have a significant impact on the environment and are associated with long construction durations in the construction of municipal rainwater pipelines.Pipe jacking technology,a new type of pipeline construction method,enables non-excavation construction and can address the shortcomings of traditional pipeline construction.This article analyzes the concept and application advantages of pipe jacking technology.Combining engineering examples,it explores the application strategies of pipe jacking technology in the construction process of municipal rainwater pipelines for reference. 展开更多
关键词 Municipal engineering Rainwater pipeline Pipe jacking construction
在线阅读 下载PDF
Effective Application of Pipe Jacking Construction Technology in Municipal Water Supply and Drainage Construction
12
作者 ZHANGGongyu 《外文科技期刊数据库(文摘版)工程技术》 2022年第1期075-079,共5页
In the municipal engineering construction, with the promotion of mechanized construction mode and the increasingly mature and perfect construction technical conditions, the pipe jacking construction gradually develops... In the municipal engineering construction, with the promotion of mechanized construction mode and the increasingly mature and perfect construction technical conditions, the pipe jacking construction gradually develops and progresses in the exploration of construction. In the municipal water supply and drainage construction, we should pay more attention to the application of pipe jacking technology, strictly implement various construction plans, improve the construction effect of water supply and drainage, and give full play to the application value and advantages of pipe jacking technology, which is beneficial to the healthy and stable development of municipal construction in China. 展开更多
关键词 pipe jacking construction MUNICIPAL water supply and drainage
原文传递
基于Jack与NSGA-Ⅱ的井下工程机械人机布局优化设计
13
作者 李博 任重熙 +1 位作者 刘玉荣 薛艳敏 《机械设计》 北大核心 2025年第10期211-217,共7页
针对井下工程机械作业环境限制导致驾驶员承受较高精神与身体负荷问题,提出一种基于Jack软件与NSGA-Ⅱ算法的驾驶室人机布局优化设计流程。以井下铲运机为例,参考相关标准与调研结果,在Jack软件中创建虚拟“人-机-环境”仿真系统,对不... 针对井下工程机械作业环境限制导致驾驶员承受较高精神与身体负荷问题,提出一种基于Jack软件与NSGA-Ⅱ算法的驾驶室人机布局优化设计流程。以井下铲运机为例,参考相关标准与调研结果,在Jack软件中创建虚拟“人-机-环境”仿真系统,对不同体型驾驶员的可视性、可达性与舒适性进行分析,将减少视野遮挡、优化控制元件布局、提升坐姿舒适度设定为优化设计的3个方向;通过NSGA-Ⅱ求解,参考Pareto最优解制订优化方案,并进行二次迭代仿真验证。结果表明:采用该设计流程可使井下铲运机驾驶室显示器与控制元件均在驾驶员舒适操作范围内,右手控制元件均位于第5百分位驾驶员舒适可达域内,Krist舒适度评分提升9.84%,可为其他井下工程机械驾驶室人机布局优化设计提供参考。 展开更多
关键词 人机工程 JACK NSGA-Ⅱ 井下铲运机 优化设计
原文传递
面向银龄老人的移动医疗检测装备人机分析与设计优化
14
作者 卢颖 申正义 +2 位作者 马宇昆 解全娜 张岚 《包装工程》 北大核心 2025年第12期349-356,共8页
目的为改善银龄老人的移动医疗检测环境,提高银龄老人在医疗检测过程中的舒适性和检测效率。方法通过对银龄老人移动医疗检测装备的分析,确立银龄老人的医疗检测姿态;选择JACK仿真分析软件,对银龄老人在移动医疗检测过程中的可视域、可... 目的为改善银龄老人的移动医疗检测环境,提高银龄老人在医疗检测过程中的舒适性和检测效率。方法通过对银龄老人移动医疗检测装备的分析,确立银龄老人的医疗检测姿态;选择JACK仿真分析软件,对银龄老人在移动医疗检测过程中的可视域、可达域以及舒适度进行仿真研究。根据仿真分析结果,对移动医疗检测装备座舱进行设计改进。结果经过改进设计方案的仿真分析验证,银龄老人的体检舒适度和体检效率得到了显著提高,满足银龄老人个体差异性的需求。结论通过JACK仿真分析软件,对银龄老人移动医疗检测装备座舱进行仿真分析,能够有效识别现有设计中的人机缺陷,提高方案中的人机设计合理性,为今后移动医疗检测装备的设计提供了理论依据和实践参考。 展开更多
关键词 人机分析 移动医疗检测装备 JACK 银龄老人
在线阅读 下载PDF
下肢康复外骨骼机器人的膝关节人机舒适度优化研究
15
作者 孙许方 刘灿奎 +3 位作者 胡茜雯 付晓莉 郭梦豪 马宁宁 《包装工程》 北大核心 2025年第22期24-35,共12页
目的通过设计提升脑卒中患者下肢康复训练的舒适度,增强康复效果和患者的训练体验。方法采用数显尺对患者的膝关节角度和舒适度进行精确测量,结合Jack仿真软件,对患者坐姿状态下的下肢关节受力和整体舒适度进行详细分析。通过实验数据,... 目的通过设计提升脑卒中患者下肢康复训练的舒适度,增强康复效果和患者的训练体验。方法采用数显尺对患者的膝关节角度和舒适度进行精确测量,结合Jack仿真软件,对患者坐姿状态下的下肢关节受力和整体舒适度进行详细分析。通过实验数据,确定最佳的膝关节运动角度区间及外骨骼机器人的尺寸设计,以实现个体化适配。结果当膝关节运动角度区间在0°~30°时,患者L4/L5脊柱压缩力低于标准值(3400N),躯干弯曲和剪切力低于400N,且训练姿势等级评分为1级,表明在此角度范围内,患者进行坐姿下肢康复训练时感到最为舒适。结论实验测量与Jack仿真软件的分析结果高度一致,证实了结合人机工程学原理和虚拟仿真技术在确定外骨骼机器人膝关节最佳运动角度方面的有效性。本研究不仅为下肢康复外骨骼机器人的设计提供了科学依据,还为康复训练产品的舒适度设计提供了有效的数据支撑,有助于未来开发更加人性化、高效的康复设备。 展开更多
关键词 人机工程学 下肢康复 外骨骼机器人 JACK仿真 舒适度
在线阅读 下载PDF
基于Jack仿真的超载作业工位人机工程设计研究
16
作者 严波 鲁雅楠 郑镇华 《机械设计》 北大核心 2025年第3期180-186,共7页
为降低流水线车间操作工人肌肉骨骼疾病(Musculoskeletal Disorders,MSDs)的风险,提出一种融合MSDs评价和Jack仿真的作业工位人机改良设计方法。以M公司超载作业工位为例,采用自我评价和快速上肢评估(Rapid Upper Limb Assessment,RULA... 为降低流水线车间操作工人肌肉骨骼疾病(Musculoskeletal Disorders,MSDs)的风险,提出一种融合MSDs评价和Jack仿真的作业工位人机改良设计方法。以M公司超载作业工位为例,采用自我评价和快速上肢评估(Rapid Upper Limb Assessment,RULA)分析法,发现操作工人的腰部是受MSDs影响最大的部位,其次是颈部和右肩。以此为依据对作业工位中工作台、超载机和工位布局进行针对性改良设计。通过Jack仿真软件验证了改良方案中操作工人的可视域与可达域良好,且在6个关键动作中有4个动作的RULA等级降低1级,证明改良方案的人机工程性能良好,可有效降低操作工人的MSDs患病风险。通过超载作业工位的人机改良设计案例,证明MSDs评价和Jack仿真的结合在车间作业工位设计中的实用性和可行性。 展开更多
关键词 人机工程 作业工位 Jack虚拟仿真 快速上肢评估法 肌肉骨骼疾病
原文传递
基于FMEA与JACK的野外陆地救援担架创新设计
17
作者 王秋惠 马露源 《工业设计》 2025年第1期144-147,共4页
为有效设计符合人机工程原理的陆地救援担架,降低救援人员在使用救援担架中引发骨骼肌肉损伤的风险,研究采用潜在失效模式与效应分析(FMEA)、JACK人机工程学仿真相结合的方法。首先,计算出风险优先级数(RPN),从而确定救援担架潜在失效... 为有效设计符合人机工程原理的陆地救援担架,降低救援人员在使用救援担架中引发骨骼肌肉损伤的风险,研究采用潜在失效模式与效应分析(FMEA)、JACK人机工程学仿真相结合的方法。首先,计算出风险优先级数(RPN),从而确定救援担架潜在失效模式的比重。然后,通过JACK仿真数据对比分析P5和P95救援人员的肌肉骨骼疲劳程度,如下背部分析(LBA)、静态强度预测(SSP)等,并制定相应的改进措施。最后,使用JACK仿真和FMEA分析验证改进设计后的救援担架。FMEA与JACK仿真结合可精准挖掘影响人机关系的关键因素,仿真数据表明,通过改进设计,救援人员的肌肉骨骼疲劳程度均得到了有效控制,且使下担架过程更加稳定。 展开更多
关键词 工业设计 陆地救援担架 FMEA JACK仿真 计算机辅助设计
在线阅读 下载PDF
穿刺手术机器人虚拟仿真与人因工效研究 被引量:1
18
作者 王帅 张芳兰 +2 位作者 侯雨雷 闫江涛 陈国强 《机械设计》 北大核心 2025年第2期83-91,共9页
为解决穿刺手术机器人设计中的空间配置、姿态干涉及人机交互等复杂问题,文中提出了一种基于失效模式与影响分析(FMEA)、JACK人机工程仿真工具和UE5实时渲染技术的综合评估与优化策略。首先,运用FMEA深入挖掘穿刺手术机器人关键结构的... 为解决穿刺手术机器人设计中的空间配置、姿态干涉及人机交互等复杂问题,文中提出了一种基于失效模式与影响分析(FMEA)、JACK人机工程仿真工具和UE5实时渲染技术的综合评估与优化策略。首先,运用FMEA深入挖掘穿刺手术机器人关键结构的潜在失效模式,据此制订出针对性的优化设计方案;其次,基于JACK软件构建数字化人体模型,精准模拟医师在执行关键手术任务时的动作与姿态,全面评估人机交互中的碰撞干涉、可视域与可达域、工作姿势及上肢与下背部舒适度等关键指标;随后,采用UE5构建高精度机器人动态结构模型,使其与数字人体模型的关键手术动作形成动态交互映射关系。经FMEA评估后,优化设计的各项结构组件的风险优先级数(RPN)显著降低且均未超过阈值125,有力证明了该研究方法的有效性和实用性。采用FMEA方法能有效识别并改进穿刺手术机器人的人因工效问题,整合JACK和UE5的虚拟仿真体系,成功实现了对人体工作姿态与机器人可动结构的同步验证,增强了仿真过程的可视化表现,从而大大降低了样机试制阶段的潜在风险。 展开更多
关键词 穿刺手术机器人 人因工效学 虚拟仿真 FMEA JACK UE5
原文传递
响应面优化猴耳环中总黄酮和没食子酸的超声波辅助提取工艺 被引量:2
19
作者 肖妮洁 邓丽丽 +1 位作者 陈硕 史艳财 《湖北农业科学》 2025年第1期109-118,211,共11页
以猴耳环(Pithecellobium clypearia(Jack)Benth.)茎叶为试材,采用超声波辅助提取法提取总黄酮和没食子酸,在单因素试验的基础上,用响应面法对提取工艺进行优化。结果表明,猴耳环总黄酮提取工艺中各因素影响大小顺序为料液比>超声功... 以猴耳环(Pithecellobium clypearia(Jack)Benth.)茎叶为试材,采用超声波辅助提取法提取总黄酮和没食子酸,在单因素试验的基础上,用响应面法对提取工艺进行优化。结果表明,猴耳环总黄酮提取工艺中各因素影响大小顺序为料液比>超声功率>超声时间>乙醇浓度,猴耳环总黄酮最佳提取工艺为料液比1∶90,乙醇浓度75%,超声功率170 W,超声时间40 min,此条件下总黄酮得率为2.29%(理论值2.37%);没食子酸提取工艺中各因素影响大小顺序为乙醇浓度>料液比>超声时间,没食子酸最佳提取工艺为料液比1∶70,乙醇浓度65%,超声时间60 min,此条件下没食子酸提取率为5.98%(理论值6.04%)。本研究构建的模型拟合效果好,试验值与拟合值高度相关,对猴耳环中总黄酮和没食子酸提取具有较强的指导性,可为其后续研究提供科学依据。 展开更多
关键词 猴耳环(Pithecellobium clypearia(Jack)Benth.) 总黄酮 没食子酸 超声波辅助法 响应面优化
暂未订购
自走式灌木平茬机驾驶室人机分析与改进设计
20
作者 徐佩佩 赵卫国 +2 位作者 王坤 王雪 江艳林 《机械设计》 北大核心 2025年第5期218-224,共7页
为改善自走式灌木平茬机驾驶环境,提升驾驶员整体舒适度及作业效率,结合作业任务动素分析法确定驾驶员典型作业姿势;采用人机工程仿真软件Jack对驾驶员的可视性、可达域及舒适度进行仿真分析,并基于分析结果对驾驶室外形、仪表台、脚踏... 为改善自走式灌木平茬机驾驶环境,提升驾驶员整体舒适度及作业效率,结合作业任务动素分析法确定驾驶员典型作业姿势;采用人机工程仿真软件Jack对驾驶员的可视性、可达域及舒适度进行仿真分析,并基于分析结果对驾驶室外形、仪表台、脚踏板及控制部件布局进行改进设计。对改进方案分析后发现:驾驶员观察割台的视野盲区减小,常用控制部件位于驾驶员舒适可达范围内,整体舒适度及作业效率得到明显提升。通过人机仿真技术对平茬机驾驶员典型作业姿势进行合理分析,可较准确地发现驾驶室存在的人机设计缺陷,为相关车辆驾驶室空间布局设计提供参考。 展开更多
关键词 人机工程 灌木平茬机驾驶室 仿真分析 JACK 典型作业姿势
原文传递