期刊文献+
共找到1,969篇文章
< 1 2 99 >
每页显示 20 50 100
Financing Model Decision of Inter-basin Water Transfer Projects 被引量:1
1
作者 Ji-wei Zhu Li-nan Zhou +1 位作者 Zhao Zhai Cong Wang 《Frontiers of Engineering Management》 2016年第4期396-403,共8页
Inter-basin Water Transfer Projects require the appropriate financing model to attract large amounts of social investment.Therefore,financing model decision becomes the key of engineering construction.In three aspects... Inter-basin Water Transfer Projects require the appropriate financing model to attract large amounts of social investment.Therefore,financing model decision becomes the key of engineering construction.In three aspects,such as the subject,the object and the target of the financing model,Grey Target Model is established in this paper.First,the complex financing mode decision problems of Inter-basin Water Transfer Projects are decomposed by using hierarchical decomposition method.Then Analytical Hierarchy Process(AHP) method is used to calculate the comprehensive weight of evaluation index.Experts' opinions financing model are transformed into the evaluation matrix based on the Dephi method.The Weighted Grey Target Model is used to calculate the approaching degree of financing model and assists financing mode decision.In addition,this paper takes the water diversion project from the Han to the Wei River of Shaanxi Province as a verification example for the model.For other water diversion projects,the evaluation results are also reliable and provide theoretical references for the financing model decision of Inter-basin Water Transfer Projects. 展开更多
关键词 inter-basin water transfer projects financing model Weighted Grey Target Model water diversion Han River Wei River
原文传递
Critical discharge at Datong for controlling operation of South-to-North Water Transfer Project in dry seasons 被引量:3
2
作者 Wang Yigang Huang Huiming Li Xi 《Water Science and Engineering》 EI CAS 2008年第2期47-58,共12页
Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will dec... Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will decrease due to the construction and operation of large water diversion projects, including the South-to-North Water Transfer Project, which will further exacerbate saltwater intrusion in the estuary. In this paper, a nested 1D river network model and a 2D saltwater numerical model are used to associate saltwater intrusion in the Yangtze Estuary with different values of discharge at Datong. It is concluded that 13 000 m3/s is the critical discharge at Datong for preventing saltwater intrusion and controlling the volume of water transferred by the South-to-North Water Transfer Project. Furthermore, based on the analysis of river discharge from Datong to Xuliujing and in consideration of the influence of all of the water diversion projects, operation schemes are proposed for the Eastern Route of the South-to-North Water Transfer Project for different hydrological years. 展开更多
关键词 saltwater intrusion critical discharge at Datong water diversion the South-to-North water transfer project
在线阅读 下载PDF
Evolution trend of the water quality in Dongping Lake after South-North Water Transfer Project in China 被引量:3
3
作者 HU Zun-fang KANG Feng-xin +4 位作者 ZOU An-de YU Lin-song LI Yang TIAN Tong-liang KANG Gui-ling 《Journal of Groundwater Science and Engineering》 2019年第4期333-339,共7页
To investigate the evolution trend of water quality in Dongping Lake after South-North Water Transfer Project operation as well as to ensure the safe usage of the water receiving areas, water samples were collected an... To investigate the evolution trend of water quality in Dongping Lake after South-North Water Transfer Project operation as well as to ensure the safe usage of the water receiving areas, water samples were collected and determined before and after water delivery in different hydrological seasons. Then, comprehensive pollution index method, comprehensive nutrition state index method and health risk assessment model were utilized to evaluate the quality, nutrition, and health risk of Dongping Lake water. Results showed that the quality of Dongping Lake water still met level Ⅲ (light pollution) no matter before or after water delivery. The nutrition state was improved from light eutropher before water delivery to mesotropher after water delivery. The health risk level was reduced from high-medium before water delivery to medium level after water delivery. In summary, the operation of the eastern route of South-North Water Transfer Project is beneficial for water environment improvement of Dongping Lake. 展开更多
关键词 South-North water transfer project Dongping LAKE water quality NUTRITION Health risk
在线阅读 下载PDF
Geological conditions and key rock mechanics issues in the Western Route of South-to-North Water Transfer Project 被引量:2
4
作者 XuechaoWang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE 2011年第3期234-243,共10页
In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel... In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel boring machine (TBM). The classification standard of surrounding rocks is put forward on the basis of physical simulations and engineering practices. Damage, deformation and evolution of surrounding rocks induced by TBM excavation are discussed. Meanwhile, the long-term deformation mechanisms and stability of surrounding rocks are also studied. On this basis, a three-dimensional constitutive model for interbedded sandstone slate and a fiat shell-joint element-foundation system for calculating internal forces of segment lining are established. The deformation features of surrounding rocks of deep and steep interbedded sandstone slate and their influences on internal forces of segment lining are presented. Finally, the design methods of segment lining constructed in deep and steep flysch are proposed. 展开更多
关键词 the Western Route of South-to-North water transfer project rock mechanics issues classification of surrounding rocks stability of surrounding rocks excavation-induced damage lining design
在线阅读 下载PDF
Forecasting Loss of Ecosystem Service Value Using a BP Network: A Case Study of the Impact of the South-to-north Water Transfer Project on the Ecological Environmental in Xiangfan, Hubei Province, China 被引量:1
5
作者 YUN-FENG CHEN, JING-XUAN ZHOU, JIE XIAO, AND YAN-PING LIEnvironmental Science and Engineering College, Huazhong University of Science and Technology, Wuhan 430074, Hubei, China 《Biomedical and Environmental Sciences》 SCIE CAS CSCD 2003年第4期379-391,共13页
Objective To recognize and assess the impact of the South-to-north Water Transfer Project (SNWTP) on the ecological environment of Xiangfan, Hubei Province, situated in the water-out area, and develop sound scientific... Objective To recognize and assess the impact of the South-to-north Water Transfer Project (SNWTP) on the ecological environment of Xiangfan, Hubei Province, situated in the water-out area, and develop sound scientific countermeasures. Methods A three-layer BP network was built to simulate topology and process of the eco-economy system of Xiangfan. Historical data of ecological environmental factors and socio-economic factors as inputs, and corresponding historical data of ecosystem service value (ESV) and GDP as target outputs, were presented to train and test the network. When predicted input data after 2001 were presented to trained network as generalization sets, ESVs and GDPs of 2002, 2003, 2004... till 2050 were simulated as output in succession. Results Up to 2050, the area would have suffered an accumulative total ESV loss of RMB 104.9 billion, which accounted for 37.36% of the present ESV. The coinstantaneous GDP would change asynchronously with ESV, it would go through an up-to-down process and finally lose RMB89.3 billion, which accounted for 18.71% of 2001. Conclusions The simulation indicates that ESV loss means damage to the capability of socio-economic sustainable development, and suggests that artificial neural networks (ANNs) provide a feasible and effective method and have an important potential in ESV modeling. 展开更多
关键词 Artificial neural network BP Ecosystem service value South-to-north water transfer project
在线阅读 下载PDF
Optioning Water Rights:A Potential Alternative to the Hanjiang-Weihe River Water Transfer Project,China 被引量:1
6
作者 HE Xiaoying KANG Hong +1 位作者 GU Yaopeng SONG Yuanliang 《Chinese Geographical Science》 SCIE CSCD 2020年第6期1039-1051,共13页
China has started shifting from relying on supply management to demand management strategy in addressing its water shortage problems.Water option,a financial derivative for water commodity,has been utilized to manage ... China has started shifting from relying on supply management to demand management strategy in addressing its water shortage problems.Water option,a financial derivative for water commodity,has been utilized to manage water demands in the United States and Europe since the 1990 s but is still novel to China.In this study we analyzed the pros and cons of China’s existing system for water rights transfers and proposed an alternative,flexible trading instrument-water options for China.Incorporating the uncertainty to water option pricing,this study first conducted an empirical analysis of the water option in the water-receiving area of the Hanjiang-Weihe River Transfer Project of China,and then evaluated the benefits of the water option applications.Results show that water option trading can bring water cost saving and increase the potential industrially added value for industrial enterprises in the receiving area,and trading of short-and-medium term water options is more favorable than the long-term water options trading.The novel water option trading proposed in this study,once verified through pilot studies,will be helpful in addressing water shortage problems in China. 展开更多
关键词 water shortage demand management water rights transfer water options water diversion project
在线阅读 下载PDF
Eco-environmental benefit assessment of China's South-North Water Transfer Scheme——the middle route project
7
作者 DUANGuang-ming ZHAOJing-zhu LIUGuo-hua KEBing XIAOHan WUGang DENGHong-bing 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 2004年第2期308-315,共8页
This paper assess the eco-environmental benefits that may come from the middle route project of China's South-North Water Transfer Scheme(SNWT) with principles and methods of eco-economics and planning reports of ... This paper assess the eco-environmental benefits that may come from the middle route project of China's South-North Water Transfer Scheme(SNWT) with principles and methods of eco-economics and planning reports of SNWT's middle route project. Some benefits were calculated in monetary units. To make sure that the results can be comparable with normal monetary indices, concrete assessment objects and the parameters are prudently selected according to the major characteristics of the project and its water import region. Primary assessment revealed that in different project construction stages, the benefit could be more than 13 07 billion RMB Yuan in 2010 and 19 79 billion RMB Yuan in 2030, respectively. The monetary value tends to increase with social-economic development. To realize these potential benefits, however, calls for more endeavors. 展开更多
关键词 China's South-North water transfer Scheme(SNWT) the middle route project of South-North water transfer(MRPSNWT) assessment ecosystem services monetary indices
在线阅读 下载PDF
Price Analysis of Water Supply for South-to-North Water Transfer Project
8
作者 QIU Zhong enProfessor, Design Institute, Changjiang Water Resources Commission, Wuhan 430010, China Tan Chang liSenior Engineer, Design Institute, Changjiang Water Resources Commission, Wuhan 430010, China ZHU Qin Engineer, Design Institute, Chan 《人民长江》 北大核心 2001年第S1期29-32,共4页
The factors influencing the water supply price of a hydraulic project include natural conditions and economic policies. This paper thoroughly demonstrates the water price of South-to-North Water Transfer Project from ... The factors influencing the water supply price of a hydraulic project include natural conditions and economic policies. This paper thoroughly demonstrates the water price of South-to-North Water Transfer Project from the viewpoint of economic policies. It is considered that if the project is assigned as a profitable one and built depending on commercial loan from bank completely or mostly, the water price will be too high to be undertaken by users,and if the project places the public good at first while considering the economic benefit, its investment mainly relies on the state (national or local governments) appropriation and self-raised funds and a little from the bank loan on favorable terms, the price determined according to the principle of satisfying the cost and reasonable profit will be relatively lower and can be undertaken by the users in the North China where water shortage is serious. The problem of higher water price of agricultural irrigation to the north of the Yellow River can be tackled by taking measures such as "compensating agriculture by industry" according to foreign practical experiences and relevant suggestions. 展开更多
关键词 PRICE of water supply water PRICE estimation FUND RAISING schemes water transfer cost Middle-Route project of South-to-North water transfer
在线阅读 下载PDF
Preliminary Study on Strategic Water Transfer Project in Western China
9
作者 WU Li gongEngineer, Design Institute, Changjiang Water Resources Commission, Wuhan 430010,China 《人民长江》 北大核心 2001年第S1期33-36,共4页
Strategic Water Transfer Project of Western China will transfer water from the Dadu river, the Yalong river, the Jinsha river, the Lancang river and the Nujiang river to the Daliushu project as head work of main canal... Strategic Water Transfer Project of Western China will transfer water from the Dadu river, the Yalong river, the Jinsha river, the Lancang river and the Nujiang river to the Daliushu project as head work of main canal on the Yellow river. And then,the water will be diverted to Neimongol and Xinjiang Uygur autonomous regions,with transfered annual volume of water 80 billion m\+3. The project possesses great comprehensive benefit. The construction of the project will not only change the appearance of the whole Northwest China, but also open up a wide way for the sustainable development of China in future. 展开更多
关键词 transbasin water DIVERSION water resources utilization NORTHWEST region S-N water transfer project
在线阅读 下载PDF
Analysis of Asynchronism-Synchronism of Regional Precipitation in Inter-Basin Water Transfer Areas
10
作者 张强 王本德 李慧赟 《Transactions of Tianjin University》 EI CAS 2012年第5期384-392,共9页
The local characteristics of multi-dimensional modeling method of multivariate copula. A new modeling remedy this defect. Different types of copula distribution random variables are seldom considered in the general me... The local characteristics of multi-dimensional modeling method of multivariate copula. A new modeling remedy this defect. Different types of copula distribution random variables are seldom considered in the general method, called pair-copula construction, is introduced to functions are allowed to be introduced in this method. Correspondingly, the related characteristics of complex multivariate can be described by a cascade of pair-copula acting on two variables at a time. In the analysis of asynchronism-synchronism of regional precipitation in WED inter- basin water transfer areas, the pair-copula construction method is compared with the general modeling method of mul- tivariate copula. The results show that the local dependence structure would exist among hydrologic variables even in three-dimensional cases. In this situation, the general modeling method of multivariate copula would face difficulties in fitting distribution. However, the pair-copula construction method could capture the local information of hydrologic variables efficiently by introducing different types of copula distribution functions. Moreover, the compensation ca- pacity of water resources is strong in different hydrological areas of WED water transfer project. The asynchronous frequency of wetness and dryness is 69.64% and the favorable frequency for water transfer is 46.15%. 展开更多
关键词 PAIR-COPULA inter-basin water transfer asynchronism-synchronism of regional precipitation frequency analysis
在线阅读 下载PDF
Estimating minimum ecological water required of the western route first stage project of China's south-to-north water transfer scheme for water exporting rivers
11
作者 MEN Bao-hui 《Journal of Environmental Science and Engineering》 2007年第1期19-24,共6页
It is well known that there is abundant water resources in basin of the Yangtze River, the first largest river in China, which is mainly located in Southern China. However, water resources is very scarce in the basin ... It is well known that there is abundant water resources in basin of the Yangtze River, the first largest river in China, which is mainly located in Southern China. However, water resources is very scarce in the basin of the Yellow River, which is mainly located in Northern China. So the western route project of south-north water transfer scheme (WRP-SNWTS) aims to transfer water from the Yangtze River to the Yellow River. The area of WRP-SNWT, located in the upper reaches of the Yangtze River and the main areas of Sichuan and the marginal areas of the Qinghai-Tibet Plateau, has sufficient water resources but fragile ecology and environment. Therefore, it is necessary for WRP-SNWT to analyze the ecology water required. Based on the planning principles of from low elevation to high elevation, from small to large, from short to long and from easy to difficulty, the WRP-SNWT will be constructed through three stage projects. The western route first stage project of the south-north water transfer scheme (WRFST-SNWTS) is planned to transfer 4×10^9m^3/a from six tributaries of the Yalong river and from Dadu river to Jiaqu of Yellow River.. Daqu river and Niqu river are the branches of Xianshui river. Sequ river, Duke river, Make river and Ake river are the branches of Dadu river, which account for 65-70% of the total river run-off. It need more research and the rest run-off can satisfy channel ecology water required. According to analysis ecological water required which mainly satisfy for aquicolous biology in water-exporting region, such as low air temperature. Fish and aquicolous biology main living from May to August, and rivers are iced up from December to March of next year, ecology water required mainly for fish and aquicolous biology. The flow criterion of Tennant method is modified. The ecology water required of WRFSP-SNWTS is estimated by the flow data of Zhuwo gauging station, Zhuba gauging station, Chuosijia gauging station and Zumuzu gauging station. The result show that the ecology water required calculated by modified Tennant less 1 l percent than that of Tennant. This estimating result can supply more water resources for transferring to Yellow River. Meanwhile, this can supply gist for research transferring water of WRFSP-SNWTS. 展开更多
关键词 Yangtze River Yellow River western route first stage project of the south-north water transfer scheme minimum ecological water required Tennant method
在线阅读 下载PDF
LONG AND DEEP DIVERSION TUNNELS OF 1^(ST) STAGE PROJECT IN WEST ROUTE OF SOUTH-NORTH WATER TRANSFER PROJECT
12
作者 Shen Fengsheng,Liu Xin (Reconnaissance,Planning,Design and Research Institute,Yellow River Construction Commission, Ministry of Water Resources, Zhengzhou 450003 China) 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2003年第9期1527-1532,共6页
West Route of South-North Water Transfer Project,situated in southeastern Qinghai-Tibet Plateau,is a giant project,which will deliver 17 billion m3 of water from the main stream and tributaries upstream of the Yangtze... West Route of South-North Water Transfer Project,situated in southeastern Qinghai-Tibet Plateau,is a giant project,which will deliver 17 billion m3 of water from the main stream and tributaries upstream of the Yangtze River to the upper reaches of the Yellow River. It is to be constructed in 3 stages, of which the 1st stage project includes delivering 4 billion m3 of water by gravity from two tributaries of Yalong River and three tributaries of Dadu River. The project consists of 5 dams,7 tunnels and a channel in series,with the dam height of 63~123 m and water transfer length of 260.3 km,of which the tunnels measure 244.1 km. The special climatic,environmental and geologic conditions make the project much more complicated in construction,especially 3 tunnels with the length longer than 50 km each create challenges to the technical requirements of engineering survey,design and construction. 展开更多
关键词 南水北调工程 西线工程 引水隧洞 TBM
在线阅读 下载PDF
Water Security Situation in Haihe River Basin after South-to-North Water Transfer Project
13
作者 JIA Shaofeng YAN Tingting LÜAifeng 《Bulletin of the Chinese Academy of Sciences》 2012年第1期92-98,共7页
The over-exploitation of water resources in the Haihe River Basin(HRB)has now become a serious problem.This is clearly evidenced by the fact that many local rivers and lakes are drying up and the total amount of over-... The over-exploitation of water resources in the Haihe River Basin(HRB)has now become a serious problem.This is clearly evidenced by the fact that many local rivers and lakes are drying up and the total amount of over-exploited groundwater has reached over 1000×10^8m^3.It is important to note that the exploitation of water resources in HRB was reasonable before 1979.After 1980,however,over-exploitation happened with an annual average amount of 40×10^8m^3.Both the dry season and rapid economic growth in HRB took place at the same time.Therefore,the over-exploitation of water in HRB was actually the negative result of the conjunction of a continuous dry season and rapid economic growth.So the over-exploitation would not be as serious as it is today if either of the above two stopped.After the first stage of south-to-north water transfer project,the water shortage problem in HRB could be eased for the following reasons:firstly,water transfer project will bring to the Basin 60x108m3 water resources;secondly,a wet season will come back eventually according to natural law of climate variability;finally,its agricultural and industrial use and total water consumption all have decreased from the peak value,so that the groundwater table will raise certainly and ecological water in rivers and lakes that were dried-up will be partly restored.In the future,the main problem of water resources security in HRB will include water pollution,operation risk of the south-to-north water transfer project,groundwater pollution and engineering geological hazards that may be brought by groundwater rise.The proposed countermeasures are as follows:keeping strengthening water demand management,raising water price as well as subsidies for the low-income family and improving other water related policies,preventing and dealing with water pollution seriously and getting fully prepared for the operation of south-to-north water transfer project. 展开更多
关键词 Haihe River Basin south-to-north water transfer project water resource security
在线阅读 下载PDF
洪泽洪和骆马湖北调水位控制对南水北调东线工程江苏段水量调度的影响
14
作者 钟华昱 方国华 +3 位作者 闻昕 李鑫 颜敏 周冰逸 《水资源保护》 北大核心 2026年第1期49-58,212,共11页
为量化洪泽洪和骆马湖北调水位约束对南水北调东线工程江苏段调度效益的影响,构建了考虑该约束(工况S1)与不考虑该约束(工况S2)的河、湖、闸、泵多目标联合优化调度模型,以最小化受水区综合缺水率与总抽水量为目标,并引入供水基尼系数... 为量化洪泽洪和骆马湖北调水位约束对南水北调东线工程江苏段调度效益的影响,构建了考虑该约束(工况S1)与不考虑该约束(工况S2)的河、湖、闸、泵多目标联合优化调度模型,以最小化受水区综合缺水率与总抽水量为目标,并引入供水基尼系数保障各受水区间的供水均衡性。结果表明:在保障相同供水水平下,工况S2可显著减少总抽水量、弃水量和抽江水量,提升湖泊调蓄能力与水资源综合利用效率;丰水年,工况S2相较于S1抽水量减少34.9%,弃水量下降5.9%,抽江水量下降34.7%,洪泽湖和骆马湖的供水量分别增加1.69亿m^(3)和1.86亿m^(3),泵站抽水入湖水量分别减少85.1%和50.3%;在保障湖泊安全供水的前提下,不考虑湖泊北调水位约束可增强区域水资源保障能力,提升工程水量调度能力。 展开更多
关键词 梯级泵站群 跨流域调水 水资源调度 多目标优化 南水北调东线工程
在线阅读 下载PDF
南水北调工程驱动下华北平原地下水储量变化
15
作者 赵一凡 翟嘉欣 +2 位作者 王梓函 张玥 周超凡 《南水北调与水利科技(中英文)》 北大核心 2026年第1期20-30,共11页
为明晰华北平原地下水储量变化规律,指导地下水资源合理开发利用,基于2002-2022年GRACE重力卫星数据,选取华北平原地下水储量变化为研究对象,重点分析地下水储量的时空变化特征及其驱动因素。以南水北调工程实施为时间节点,探究工程实... 为明晰华北平原地下水储量变化规律,指导地下水资源合理开发利用,基于2002-2022年GRACE重力卫星数据,选取华北平原地下水储量变化为研究对象,重点分析地下水储量的时空变化特征及其驱动因素。以南水北调工程实施为时间节点,探究工程实施前后的地下水储量动态变化差异;结合降水量(P)、蒸散发量(E)、归一化植被指数(normalized difference vegetation index,NDVI)、人为灌溉用水量数据(irrigation,IR)和城市人口数(population,POP),研究地下水长期趋势性变化特征的环境响应关系。结果表明:华北平原地下水储量异常值在2002-2015年呈减少趋势(-0.03124 mm/a),2015-2020年减少趋势加剧(-0.07307 mm/a),2021-2022年地下水呈缓慢增长趋势(0.2424 mm/a)。南水北调工程的实施使人为影响因素对华北平原地下水储量变化的贡献率有所减小。研究揭示华北平原20年来地下水储量的时空变化规律及其对自然和人为驱动因素的响应,为评估大型水利工程的生态与资源效益提供实证依据。 展开更多
关键词 南水北调工程 地下水储量 时空特征 随机森林
在线阅读 下载PDF
融合引调水工程的抽水蓄能电站与光伏联合运行短期优化调度模型
16
作者 龙鑫 罗彬 +3 位作者 陈永灿 陈刚 聂状 史华勃 《电网技术》 北大核心 2026年第1期112-121,I0068-I0070,I0072,I0073,共15页
为解决“双碳”背景下我国西部部分地区同时面临水资源空间分布不均及新能源消纳的双重难题,提出将引调水工程、抽水蓄能电站及光伏电站三者统筹开发运行。基于此背景,提出了一种三者联合运行的短期优化调度模型。首先,采用改进蚁群聚... 为解决“双碳”背景下我国西部部分地区同时面临水资源空间分布不均及新能源消纳的双重难题,提出将引调水工程、抽水蓄能电站及光伏电站三者统筹开发运行。基于此背景,提出了一种三者联合运行的短期优化调度模型。首先,采用改进蚁群聚类算法处理光伏不确定性,构建光伏出力场景;其次,以联合体期望收益最大为目标,以机组为最小调度单元,对抽蓄电站、抽蓄机组、引调水工程以及电网约束进行精细化建模;然后,将原模型经线性化处理转化为混合整数线性规划模型并通过商业求解器CPLEX进行求解;最后,通过算例分析表明,所提模型不仅实现了水资源的跨地域空间调配,还通过抽蓄快速调节能力实现光伏的全额消纳以及平稳送出并提高了联合体收益,又在峰谷平电价的引导下,有效降低了电网峰谷差。 展开更多
关键词 抽水蓄能电站 引调水工程 光伏不确定性 整体期望收益最大 混合整数线性规划
原文传递
世界他国调水工程对我国国家水网工程的启示
17
作者 杨睿 《海河水利》 2026年第1期81-85,共5页
全球范围内,修建调水工程已成为缓解水资源时空分布失衡、协调区域间经济共同提质增效的重要手段之一。通过收集并梳理世界其他国家已建、在建及规划建设的跨流域调水工程的有关情况,分析其建造目的、工程线路、成功经验与面临问题,利... 全球范围内,修建调水工程已成为缓解水资源时空分布失衡、协调区域间经济共同提质增效的重要手段之一。通过收集并梳理世界其他国家已建、在建及规划建设的跨流域调水工程的有关情况,分析其建造目的、工程线路、成功经验与面临问题,利用比较分析方法从法律体制机制、生态环境保护、供水合同签订、业务融合发展等角度总结形成对构建我国国家水网工程体系的启示,旨在为相关从业人员实现我国现代水网工程安全韧性发展提供参考。 展开更多
关键词 调水工程 跨流域调水 水资源配置 工程管理
在线阅读 下载PDF
滇中引水工程水资源管理研究
18
作者 何萌 马显莹 王永德 《水利水电快报》 2026年第1期8-12,共5页
为缓解滇中地区水资源短缺与经济社会发展矛盾,分析了滇中地区水资源现状与挑战,并介绍了滇中引水工程概况及其在水资源管理中发挥的作用。结果表明:滇中引水工程引入NSGA-Ⅲ多目标优化配置模型,其与动态调整机制可最大化满足各用水主... 为缓解滇中地区水资源短缺与经济社会发展矛盾,分析了滇中地区水资源现状与挑战,并介绍了滇中引水工程概况及其在水资源管理中发挥的作用。结果表明:滇中引水工程引入NSGA-Ⅲ多目标优化配置模型,其与动态调整机制可最大化满足各用水主体整体效益,实现水资源高效利用;通过生态流量保障措施,滇池等湖泊水质有效改善,生态系统功能逐步恢复,生物多样性得到提升;信息化管理平台可提高水资源管理透明度和科学性,提升决策效率。工程实施后将大大改善滇中地区水资源供需平衡,从根本上缓解水资源供需矛盾,城镇生活和工业用水供水保证率提高至95%,农业灌溉年保证率达到75%。至2030年,该工程可有效改善河流生态环境,提升河流生态系统稳定性和生物多样性,为区域经济、社会和生态协调发展提供重要支撑。 展开更多
关键词 滇中引水工程 水资源管理 跨流域调水 生态流量 信息化管理
在线阅读 下载PDF
胶东调水工程泵站机组故障应急响应时间分析
19
作者 马健 于明英 +1 位作者 夏松伟 刘大伟 《海河水利》 2026年第2期105-112,共8页
胶东调水工程是缓解胶东地区水资源供需矛盾,改善当地生态环境的重要水利基础设施。泵站突发机组故障是调水工程易发事件,为保障工程安全,针对胶东调水工程宋庄分水闸-灰埠泵站、灰埠泵站-东宋泵站、东宋泵站-辛庄泵站和辛庄泵站-黄水... 胶东调水工程是缓解胶东地区水资源供需矛盾,改善当地生态环境的重要水利基础设施。泵站突发机组故障是调水工程易发事件,为保障工程安全,针对胶东调水工程宋庄分水闸-灰埠泵站、灰埠泵站-东宋泵站、东宋泵站-辛庄泵站和辛庄泵站-黄水河泵站4个渠段建立一维水动力模型,对建模区域进行模拟与验证。假设当灰埠、东宋、辛庄、黄水河4座泵站发生故障时,计算不同上下游流量和泵站停泵流量的不同工况下渠段的应急响应时间。结果表明,各个渠段的最短应急响应时间均出现在渠段下游泵站站前,分别为64、130、57和76 min,同时上游流量大小、泵站停泵时间与应急时间长短成反比。 展开更多
关键词 胶东调水工程 一维水动力模型 泵站突发故障 应急响应时间
在线阅读 下载PDF
山西小浪底引黄入涑工程多目标优化调度算法研究
20
作者 范鹏飞 《吉林水利》 2026年第3期64-70,共7页
针对黄河中下游资源型缺水与生态恶化问题,本文以小浪底引黄入涑工程为例,构建基于RVEA算法的多目标优化调度模型,协调供水安全、运行成本与生态环境的博弈关系。模型以供水缺水率平方和最小、泵站运行成本最低、生态流量满足度最高为目... 针对黄河中下游资源型缺水与生态恶化问题,本文以小浪底引黄入涑工程为例,构建基于RVEA算法的多目标优化调度模型,协调供水安全、运行成本与生态环境的博弈关系。模型以供水缺水率平方和最小、泵站运行成本最低、生态流量满足度最高为目标,约束包括水量平衡与分水比例等。运城市典型缺水年(P=75%)算例显示,RVEA算法求解该高维非线性问题表现优异,Pareto解集揭示三目标间的非线性权衡。因工程吨水成本高昂,研究建议建立“以工补农”交叉补贴及生态补偿机制。本研究可为该跨流域调水工程的科学调度与决策提供理论支撑。 展开更多
关键词 跨流域调水 多目标优化 RVEA算法 涑水河 小浪底引黄工程
在线阅读 下载PDF
上一页 1 2 99 下一页 到第
使用帮助 返回顶部