Taking the Gaoshangpu-Liuzan geothermal field in the Nanpu sag of the Bohai Bay Basin as the research object, this paper discusses the geological conditions and potential of the geothermal resources of the Guantao For...Taking the Gaoshangpu-Liuzan geothermal field in the Nanpu sag of the Bohai Bay Basin as the research object, this paper discusses the geological conditions and potential of the geothermal resources of the Guantao Formation in the study area, and introduces the development practice of geothermal energy heating in Caofeidian. The average buried depth of the Guantao Formation is 1500–2500 m, the lithology is dominated by sandy conglomerate, and the average thickness of thermal reservoir is 120–300 m. The average porosity of thermal reservoir is 28%–35%, the permeability is(600–2000)×10^(-3) μm^(2), and the temperature of thermal reservoir is 70–110 ℃. The formation has total geothermal resources of 13.79×10^(18) J, equivalent to 4.70×10^(8) t of standard coal. Based on a large amount of seismic and drilling data from oil and gas exploration, this study carried out high quality target area selection, simulation of sandstone thermal reservoir, and production and injection in the same layer. The geothermal heating project with distributed production and injection well pattern covering an area of 230×10^(4) m^(2) was completed in the new district of Caofeidian in 2018. The project has been running steadily for two heating seasons, with an average annual saving of 6.06×10^(4) t of standard coal and a reduction of 15.87×10^(4) t of carbon dioxide, achieving good economic and social benefits. This project has proved that the Neogene sandstone geothermal reservoir in eastern China can achieve sustainable large-scale development by using the technology of "balanced production and injection in the same layer". It provides effective reference for the exploration and development of geothermal resource in oil and gas-bearing basins in eastern China.展开更多
Direct measurements of the intrinsic torque profile in L-mode plasmas on the EAST tokamak have been performed using the balanced neutral beam injection.Co-and counter-current neutral beams are modulated to balance the...Direct measurements of the intrinsic torque profile in L-mode plasmas on the EAST tokamak have been performed using the balanced neutral beam injection.Co-and counter-current neutral beams are modulated to balance the intrinsic and externally injected torques, which result in the rotation profile close to zero and flat.The experimental results show that the intrinsic torque derived from momentum balance equations is found to be in the co-current direction, peaked in the plasma edge and negligibly small in the core.展开更多
Metal halide perovskite light emitting diodes(PeLEDs)have recently experienced rapid development due to the tunable emission wavelengths,narrow emission linewidth and low material cost.To achieve stateof-the-art perfo...Metal halide perovskite light emitting diodes(PeLEDs)have recently experienced rapid development due to the tunable emission wavelengths,narrow emission linewidth and low material cost.To achieve stateof-the-art performance,the high photoluminescence quantum yield(PLQY)of the active emission layer,the balanced charge injection,and the optimized optical extraction should be considered simultaneously.Multiple chemical passivation strategies have been provided as controllable and efficient methods to improve the PLQY of the perovskite layer.However,high luminance under large injection current and high external quantum efficiency(EQE)can hardly be achieved due to Auger recombination at high carrier density.Here,we decreased the electron injection barrier by tuning the Fermi-level of the perovskite,leading to a reduced turn on voltage.Through molecular doping of the hole injection material,a more balanced hole injection was achieved.At last,a device with modified charge injection realizes high luminance and quantum efficiency simultaneously.The best device exhibits luminance of 55,000 cd m^-2 EQE of 8.02%at the working voltage of 2.65 V,current density of 115 mA cm^-2,and shows EQE T50 stability around 160 min at 100 mA cm^-2 injection current density.展开更多
基金This study was supported and helped by Professor Yan Jiahong with China Petroleum Exploration and Development Research Institute,Yao Yanhua,Chief Geologist of the Hydrology Institute of PetroChina Liaohe Oilfield Company,and Dr.Kong Yanlong with the Institute of Geology and Geophysics,Chinese Academy of Sciences.
文摘Taking the Gaoshangpu-Liuzan geothermal field in the Nanpu sag of the Bohai Bay Basin as the research object, this paper discusses the geological conditions and potential of the geothermal resources of the Guantao Formation in the study area, and introduces the development practice of geothermal energy heating in Caofeidian. The average buried depth of the Guantao Formation is 1500–2500 m, the lithology is dominated by sandy conglomerate, and the average thickness of thermal reservoir is 120–300 m. The average porosity of thermal reservoir is 28%–35%, the permeability is(600–2000)×10^(-3) μm^(2), and the temperature of thermal reservoir is 70–110 ℃. The formation has total geothermal resources of 13.79×10^(18) J, equivalent to 4.70×10^(8) t of standard coal. Based on a large amount of seismic and drilling data from oil and gas exploration, this study carried out high quality target area selection, simulation of sandstone thermal reservoir, and production and injection in the same layer. The geothermal heating project with distributed production and injection well pattern covering an area of 230×10^(4) m^(2) was completed in the new district of Caofeidian in 2018. The project has been running steadily for two heating seasons, with an average annual saving of 6.06×10^(4) t of standard coal and a reduction of 15.87×10^(4) t of carbon dioxide, achieving good economic and social benefits. This project has proved that the Neogene sandstone geothermal reservoir in eastern China can achieve sustainable large-scale development by using the technology of "balanced production and injection in the same layer". It provides effective reference for the exploration and development of geothermal resource in oil and gas-bearing basins in eastern China.
基金supported by the National Key Research and Development Program of China(Nos.2017YFE0301300 and 2017YFE0302000)Key Program of Research and Development of Hefei Science Center,CAS(No.2017HSCKPRD002)+2 种基金Distinguished Young Scholar of Anhui Provincial Natural Science Foundation(1908085J01)the Key Projects of Hunan Provincial Department of Education(18A238)the Key Laboratory of Magnetic Confinement Nuclear Fusion Research in Hengyang(2018KJ108)。
文摘Direct measurements of the intrinsic torque profile in L-mode plasmas on the EAST tokamak have been performed using the balanced neutral beam injection.Co-and counter-current neutral beams are modulated to balance the intrinsic and externally injected torques, which result in the rotation profile close to zero and flat.The experimental results show that the intrinsic torque derived from momentum balance equations is found to be in the co-current direction, peaked in the plasma edge and negligibly small in the core.
基金in part supported by Research Grants Council of Hong Kong,particularly,via Grant Nos.Ao E/P-03/08,T23-407/13-N,Ao E/P-02/12,14207515,14204616CUHK Group Research Scheme,and ITS/088/17 by Innovation and Technology Commission,Hong Kong SAR Governmentthe National Natural Science Foundation of China for the support,particularly,via Grant No.61229401。
文摘Metal halide perovskite light emitting diodes(PeLEDs)have recently experienced rapid development due to the tunable emission wavelengths,narrow emission linewidth and low material cost.To achieve stateof-the-art performance,the high photoluminescence quantum yield(PLQY)of the active emission layer,the balanced charge injection,and the optimized optical extraction should be considered simultaneously.Multiple chemical passivation strategies have been provided as controllable and efficient methods to improve the PLQY of the perovskite layer.However,high luminance under large injection current and high external quantum efficiency(EQE)can hardly be achieved due to Auger recombination at high carrier density.Here,we decreased the electron injection barrier by tuning the Fermi-level of the perovskite,leading to a reduced turn on voltage.Through molecular doping of the hole injection material,a more balanced hole injection was achieved.At last,a device with modified charge injection realizes high luminance and quantum efficiency simultaneously.The best device exhibits luminance of 55,000 cd m^-2 EQE of 8.02%at the working voltage of 2.65 V,current density of 115 mA cm^-2,and shows EQE T50 stability around 160 min at 100 mA cm^-2 injection current density.