期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Study on Factors Influencing the Reliability of the Organization Management Chain of the Large and Medium-Sized Project in the Construction Period
1
作者 Jingchun Feng Yao Qian +1 位作者 Zhanjun Liu Haiyang Li 《Journal of Water Resource and Protection》 2011年第2期131-139,共9页
On the basis of analyzing the reliability of the organization’ management chain of the large and medium- sized project in the construction period, the paper studies the factors influencing the reliability of the orga... On the basis of analyzing the reliability of the organization’ management chain of the large and medium- sized project in the construction period, the paper studies the factors influencing the reliability of the organi-zation management chain, which, corresponding to four elements of management chain – “Management Loop”, “Management Link”, “Management Chain”, and “Management Network”, can be summarized as project main body, interface management, connection sequence and management model. The paper then re-searches on the specific influencing factors from the above-mentioned four aspects. 展开更多
关键词 The LARGE and MEDIUM Sized PROJECT The Reliability of the Organizaton Management CHAIN in-fluencing FACTOR
暂未订购
上一页 1 下一页 到第
使用帮助 返回顶部