期刊文献+
共找到12篇文章
< 1 >
每页显示 20 50 100
Mechanism and control technology of strong ground pressure behaviour induced by high-position hard roofs in extra-thick coal seam mining 被引量:13
1
作者 Chao Pan Binwei Xia +2 位作者 Yujun Zuo Bin Yu Changnan Ou 《International Journal of Mining Science and Technology》 SCIE EI CAS CSCD 2022年第3期499-511,共13页
This work aimed at revealing the mechanism of strong ground pressure behaviour(SGPB)induced by high-position hard roof(HHR).Based on the supporting structures model of HHR,a modified voussoir beam mechanical model for... This work aimed at revealing the mechanism of strong ground pressure behaviour(SGPB)induced by high-position hard roof(HHR).Based on the supporting structures model of HHR,a modified voussoir beam mechanical model for HHR was established by considering the gangue support coefficient,through which the modified expressions of limit breaking span and breaking energy of HHR were deduced.Combined with the relationship between the dynamic-static loading stress of supporting body(hydraulic support and coal wall)and its comprehensive supporting strength,the criteria of ground pressure behaviour(GPB)induced by HHR were discussed.The types of Ⅰ_(1),Ⅰ_(2),Ⅱ_(1),andⅡ_(2) of GPB were interpreted.Results showed that types Ⅰ_(1) and Ⅰ_(2) were the main forms of SGPB in extra-thick coal seam mining.The main manifestation of SGPB was static stress,which was mainly derived from the instability of HHR rather than fracture.Accordingly,an innovative control technology was proposed,which can weaken static load by vertical-well separated fracturing HHR.The research results have been successfully applied to the 8101 working face in Tashan coal mine,Shanxi Province,China.The results of a digital borehole camera observation and stress monitoring proved the rationality of the GPB criteria.The control technology was successful,paving the way for new possibilities to HHR control for safety mining. 展开更多
关键词 Extra thick coal seam high-position hard roof Strong ground pressure behaviour Supporting structures Criteria of ground pressure behaviour Controlling effects
在线阅读 下载PDF
Breaking process and mining stress evolution characteristics of a high-position hard and thick stratum 被引量:6
2
作者 Wang Pu Jiang Jinquan +1 位作者 Zhang Peipeng Wu Quanlin 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第4期563-569,共7页
Based on the boundary support conditions of overlying high-position,hard and thick strata,a Winkler foundation beam mechanical model was built.Computational expressions for the characteristics and position of the bend... Based on the boundary support conditions of overlying high-position,hard and thick strata,a Winkler foundation beam mechanical model was built.Computational expressions for the characteristics and position of the bending moment for high-position,hard and thick strata were constructed by theoretical analysis,and the initial breaking position of high-position,hard and thick strata was also analyzed.The breaking process and evolution law of mining stress in high-position,hard and thick strata were studied by similar material simulation tests.Studies show that:due to the foundation deformation effect of the lower strata,the initial break position in high-position,hard thick layers is in the middle of goaf;vertical tension fractures first occur under the middle surface,then tilt tension fractures form at both sides and a non-uniform thickness of the fracture structure forms and produces subsidence deformation;behind the coal wall tilt fractures extend and eventually complete the migration.Mining stress produces obvious changes before and after the breakage of the high,hard and thick stratum;high stress concentration forms in front of the coal wall before breakage and fracture stress concentration significantly reduces after migration.Coal seam mining under high-position,hard thick strata can easily induce dynamic phenomena. 展开更多
关键词 high-position hard and thick strata Elastic foundationInitial breaking Breaking process Mining-induced stress
在线阅读 下载PDF
高速铁路接触网定位器服役特性研究
3
作者 陈兴 陈龙 +2 位作者 宋洋 刘志刚 王续凡 《振动与冲击》 北大核心 2025年第21期230-239,共10页
定位器是接触网系统中的关键零部件,其服役性能的稳定直接决定弓网系统能否安全稳定运行。针对400 km/h高铁运行过程中,定位器所受载荷特性及其疲劳性能开展研究。首先,通过弓网动力学仿真获取了300 km/h、350 km/h和400 km/h工况下的... 定位器是接触网系统中的关键零部件,其服役性能的稳定直接决定弓网系统能否安全稳定运行。针对400 km/h高铁运行过程中,定位器所受载荷特性及其疲劳性能开展研究。首先,通过弓网动力学仿真获取了300 km/h、350 km/h和400 km/h工况下的接触网振动位移,将其代入腕臂-定位器模型进行分析,明确定位器为关键薄弱点;然后,基于定位器精确有限元模型,计算了动态运行过程中定位器的应力分布;之后,基于核密度估计和Monte Carlo法对应力进行外推,并编制了其二维应力谱;最后,采用Miner线性累积损伤理论对定位器的疲劳寿命进行计算。结果表明,在300 km/h、350 km/h和400 km/h三种工况下,定位器最大应力值分别为152.53 MPa、191.01 MPa和260.48 MPa,定位器能承受的受电弓架次分别为845630次、392041次和82951次。 展开更多
关键词 高速铁路 定位器 载荷谱 疲劳寿命 Miner理论
在线阅读 下载PDF
Characteristics and triggering mechanism of Xinmo landslide on 24 June 2017 in Sichuan, China 被引量:26
4
作者 SU Li-jun HU Kai-heng +6 位作者 ZHANG Wei-feng WANG Jiao LEI Yu ZHANG Chong-lei CUI Peng Alessandro PASUTO ZHENG Quan-hong 《Journal of Mountain Science》 SCIE CSCD 2017年第9期1689-1700,共12页
At 5: 39 AM on 24 June 2017, a huge landslide-debris avalanche occurred on Fugui Mountain at Xinmo village, Diexi town, Maoxian county, Sichuan province, China. The debris blocked the Songpinggou River for about 2 km,... At 5: 39 AM on 24 June 2017, a huge landslide-debris avalanche occurred on Fugui Mountain at Xinmo village, Diexi town, Maoxian county, Sichuan province, China. The debris blocked the Songpinggou River for about 2 km, resulting in a heavy loss of both human lives and properties(10 deaths, 3 injuries, 73 missing, and 103 houses completely destroyed). The objectives of this paper are to understand the overall process and triggering factors of this landslide and to explore the affecting factors for its long term evolution before failure. Post event surveys were carried out the day after the landslide occurrence. Information was gathered from literature and on-site investigation and measurement. Topography, landforms, lithology, geological setting, earthquake history, meteorological and hydrological data of the area were analysed. Aerial photographs and other remote sensing information were used for evaluation and discussion. Eye witnesses also provided a lot of helpful information for us to understand the process of initiation, development and deposition. The depositional characteristics of the moving material as well as the traces of the movement,the structural features of the main scarp and the seismic waves induced by the slide are presented and discussed in detail in this paper. The results show that the mechanism of the landslide is a sudden rupture of the main block caused by the instability of a secondary block at a higher position. After the initiation, the failed rock mass at higher position overloaded the main block at the lower elevation and collapsed in tandem. Fragmentation of the rock mass occurred later, thus forming a debris avalanche with high mobility. This landslide case indicates that such seismic events could influence geological hazards for over 80 years and this study provides reference to the long term susceptibility and risk assessment of secondary geological hazards from earthquake. 展开更多
关键词 high-position landslide Xinmo landslide Landslide mechanism Earthquake effects Rock fall Debris avalanche
原文传递
作为开环系统的高精度定位装置 被引量:1
5
作者 叶庆泰 叶勇 +1 位作者 陈劲松 朱正 《光学精密工程》 EI CAS CSCD 1994年第3期74-79,共6页
作者分析了闭环及开环控制系统各自的优缺点,提出了利用计算机高速大容量的特点进行离线检测、在线补偿的可能性,以及在实施过程中必须解决的关键问题。最后附有实测数据。该系统在25mm行程中示值误差≤1μm、回程误差≤0.3... 作者分析了闭环及开环控制系统各自的优缺点,提出了利用计算机高速大容量的特点进行离线检测、在线补偿的可能性,以及在实施过程中必须解决的关键问题。最后附有实测数据。该系统在25mm行程中示值误差≤1μm、回程误差≤0.3μm、分辨率为0.1μm,结构简单、可靠、价格低廉。已获得专利。 展开更多
关键词 定位装置 高精度 开环系统 自动检测系统
在线阅读 下载PDF
地铁车站盖挖逆作法钢管柱施工技术 被引量:14
6
作者 李彪 《施工技术》 CAS 北大核心 2008年第S2期80-83,共4页
介绍了地铁车站盖挖逆作法的关键构件钢管柱(中间柱)施工方法、工艺要求和措施。
关键词 钢管柱 自动定位器 高抛混凝土
在线阅读 下载PDF
智能阀门定位器控制系统设计 被引量:13
7
作者 汪川 《自动化仪表》 CAS 2020年第6期77-79,共3页
在工业生产过程控制中,有些传统仪表必须进行现场调整来适应生产要求。为改变这一状况,必须迅速、准确地掌握阀门的工作状况。对气动阀门定位器的工作特性和控制算法进行了研究。采用比例-积分-微分(PID)控制算法,实现了阀门控制参数的... 在工业生产过程控制中,有些传统仪表必须进行现场调整来适应生产要求。为改变这一状况,必须迅速、准确地掌握阀门的工作状况。对气动阀门定位器的工作特性和控制算法进行了研究。采用比例-积分-微分(PID)控制算法,实现了阀门控制参数的自整定。设计以低功耗MSP430单片机为核心,采集现场的电流、反馈、速度等参数;以阀位反馈和液晶显示为辅助控制单元,结合PID控制算法对工业数据进行处理、运算和显示,完成了阀门控制系统中阀门位置的精确、快速控制。介绍了智能阀门定位器控制系统的硬件设计和软件流程。试验结果表明,该系统定位准确、操作方便、功耗低,完全满足生产定位控制的要求。该定位器工作稳定、可靠性高,调节阀的响应速度和定位器控制精度等技术性能明显优于传统的阀门定位器。该设计提高了阀门的自动化管理水平,为进一步实现复杂的智能控制提供了便利条件。 展开更多
关键词 MSP430 PID算法 阀门定位器 高可靠性 智能控制
在线阅读 下载PDF
白鹤林小区顶板机电预埋套管定位器技术 被引量:1
8
作者 雷鸣 张净涛 +1 位作者 巨江华 王立彬 《施工技术》 CAS 2020年第S01期978-980,共3页
白鹤林小区项目采用了顶板预埋套管定位器进行定位施工。此技术是为了解决顶板混凝土浇筑完成后机电预埋套管出现偏位而引起的后期机电管道安装问题。针对此问题,研究介绍了顶板预埋套管定位器的技术说明、实施流程和积极效果。结论表明... 白鹤林小区项目采用了顶板预埋套管定位器进行定位施工。此技术是为了解决顶板混凝土浇筑完成后机电预埋套管出现偏位而引起的后期机电管道安装问题。针对此问题,研究介绍了顶板预埋套管定位器的技术说明、实施流程和积极效果。结论表明,此技术充分考虑了传统顶板机电预埋套管在施工过程中的偏位现象,实现了顶板机电预埋套管的定位施工,保证了机电预埋套管的定位精度和再利用,不仅成本低,而且操作方便,便于现场施工和使用。 展开更多
关键词 顶板预埋套管 定位器 高精度 再利用
在线阅读 下载PDF
接触网碳纤维复合材料定位器的研制 被引量:1
9
作者 蒋文杰 《现代制造技术与装备》 2022年第4期37-39,共3页
将碳纤维复合材料应用于高速铁路接触网零部件中的限位定位器和高速铁路接触网零部件,大幅提高了其零部件的强度及其耐疲劳、耐腐蚀性能,同时缩短了生产周期,使其应用于极寒、强腐蚀地区成为可能。因此,研发了一种新型定位装置,在力学... 将碳纤维复合材料应用于高速铁路接触网零部件中的限位定位器和高速铁路接触网零部件,大幅提高了其零部件的强度及其耐疲劳、耐腐蚀性能,同时缩短了生产周期,使其应用于极寒、强腐蚀地区成为可能。因此,研发了一种新型定位装置,在力学性能方面有所突破。 展开更多
关键词 碳纤维复合材料 定位器 高速铁路接触网
在线阅读 下载PDF
气凝胶型海洋保温管道 被引量:1
10
作者 蒋晓斌 相政乐 +1 位作者 张晓灵 顾艳 《管道技术与设备》 CAS 2011年第4期52-54,共3页
随着深水和超深水领域勘探作业的开展,对于保温材料的耐高温性能、导热性能以及保温管道系统的总传热系数指标提出了更高的要求。气凝胶型海洋保温管道就是在这种情况下产生的。文中简要介绍气凝胶型管中管海洋保温管道的结构与构成,主... 随着深水和超深水领域勘探作业的开展,对于保温材料的耐高温性能、导热性能以及保温管道系统的总传热系数指标提出了更高的要求。气凝胶型海洋保温管道就是在这种情况下产生的。文中简要介绍气凝胶型管中管海洋保温管道的结构与构成,主要讨论气凝胶海洋保温管道系统中气凝胶保温材料、中心定位器、防水封堵器以及支撑架的作用。详细介绍气凝胶型海洋保温管道的安装施工工艺流程。可以看出,气凝胶保温材料因其良好的保温性能在超高温高压海洋管道中以及边际油田的开发中将有更加广泛的应用前景。 展开更多
关键词 气凝胶 中心定位器 管中管 超高温高压 海洋管道
在线阅读 下载PDF
高铁接触网曲线段定位器坡度优化调整研究——以贵广高铁提质改造工程为例
11
作者 李彬 《现代工程科技》 2024年第21期101-104,共4页
决定高铁运行水平的关键因素就是接触网和受电弓之间的动态性能,如果高铁接触网弓网关系不够稳定,会给高铁的供电能力造成一定程度的影响。深入探讨了贵广高铁接触网曲线段定位器坡度优化调整策略,针对定位器既有的坡度问题,提出了一系... 决定高铁运行水平的关键因素就是接触网和受电弓之间的动态性能,如果高铁接触网弓网关系不够稳定,会给高铁的供电能力造成一定程度的影响。深入探讨了贵广高铁接触网曲线段定位器坡度优化调整策略,针对定位器既有的坡度问题,提出了一系列创新性的优化方案,提升了列车运行平稳性、安全性及接触网系统整体性能,保障高铁安全高效运行。 展开更多
关键词 贵广高铁 接触网 曲线段 定位器坡度 优化调整 运行平稳性
在线阅读 下载PDF
Dispersion compensation using high-positive dispersive optical fibers
12
作者 Mohammand Hadi Farokh Marvasti Mohammad Reza Pakravan 《Chinese Optics Letters》 SCIE EI CAS CSCD 2017年第3期64-68,共5页
The common and traditional method for optical dispersion compensation is concatenating the transmitting optical fiber by a compensating optical fiber having a high-negative dispersion coefficient. In this Letter, we t... The common and traditional method for optical dispersion compensation is concatenating the transmitting optical fiber by a compensating optical fiber having a high-negative dispersion coefficient. In this Letter, we take the opposite direction and show how an optical fiber with a high-positive dispersion coefficient is used for dispersion compensation. Our optical dispersion compensating structure is the optical implementation of an iterative algorithm in signal processing. The proposed dispersion compensating system is constructed by cascading a number of compensating sub-systems, and its compensation capability is improved by increasing the number of embedded sub-systems. We also show that the compensation capability is a trade-off between the transmission length and bandwidth. We use the simulation results to validate the performance of the introduced dispersion compensating module. Photonic crystal fibers with high-positive dispersion coefficients can be used for constructing the proposed optical dispersion compensating module. 展开更多
关键词 Dispersion compensation using high-positive dispersive optical fibers HIGH
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部