Collisions between a moving mass and an anti-collision device increase structural responses and threaten structural safety.An active mass damper(AMD)with stroke limitations is often used to avoid collisions.However,a ...Collisions between a moving mass and an anti-collision device increase structural responses and threaten structural safety.An active mass damper(AMD)with stroke limitations is often used to avoid collisions.However,a strokelimited AMD control system with a fixed limited area shortens the available AMD stroke and leads to significant control power.To solve this problem,the design approach with variable gain and limited area(VGLA)is proposed in this study.First,the boundary of variable-limited areas is calculated based on the real-time status of the moving mass.The variable gain(VG)expression at the variable limited area is deduced by considering the saturation of AMD stroke.Then,numerical simulations of a stroke-limited AMD control system with VGLA are conducted on a high-rise building structure.These numerical simulations show that the proposed approach has superior strokelimitation performance compared with a stroke-limited AMD control system with a fixed limited area.Finally,the proposed approach is validated through experiments on a four-story steel frame.展开更多
To enable the experimental assessment of the seismic performance of full-scale nonstructural elements with multiple engineering parameters(EDPs),a three-layer testbed named Nonstructural Element Simulator on Shake Tab...To enable the experimental assessment of the seismic performance of full-scale nonstructural elements with multiple engineering parameters(EDPs),a three-layer testbed named Nonstructural Element Simulator on Shake Table(NEST)has been developed.The testbed consists of three consecutive floors of steel structure.The bottom two floors provide a space to accommodate a full-scale room.To fully explore the flexibility of NEST,we propose a novel control strategy to generate the required shake table input time histories for the testbed to track the target floor motions of the buildings of interest with high accuracy.The control strategy contains two parts:an inverse dynamic compensation via simulation of feedback control systems(IDCS)algorithm and an offline iteration procedure based on a refined nonlinear numerical model of the testbed.The key aspects of the control strategy were introduced in this paper.Experimental tests were conducted to simulate the seismic responses of a full-scale office room on the 21^(st)floor of a 42-story high-rise building.The test results show that the proposed control strategy can reproduce the target floor motions of the building of interest with less than 20%errors within the specified frequency range.展开更多
A probabilistic seismic loss assessment of RC high-rise(RCHR)buildings designed according to Eurocode 8 and located in the Southern Euro-Mediterranean zone is presented herein.The loss assessment methodology is based ...A probabilistic seismic loss assessment of RC high-rise(RCHR)buildings designed according to Eurocode 8 and located in the Southern Euro-Mediterranean zone is presented herein.The loss assessment methodology is based on a comprehensive simulation approach which takes into account ground motion(GM)uncertainty,and the random effects in seismic demand,as well as in predicting the damage states(DSs).The methodology is implemented on three RCHR buildings of 20-story,30-story and 40-story with a core wall structural system.The loss functions described by a cumulative lognormal probability distribution are obtained for two intensity levels for a large set of simulations(NLTHAs)based on 60 GM records with a wide range of magnitude(M),distance to source(R)and different site soil conditions(SS).The losses expressed in percent of building replacement cost for RCHR buildings are obtained.In the estimation of losses,both structural(S)and nonstructural(NS)damage for four DSs are considered.The effect of different GM characteristics(M,R and SS)on the obtained losses are investigated.Finally,the estimated performance of the RCHR buildings are checked to ensure that they fulfill limit state requirements according to Eurocode 8.展开更多
With rapid economic and social development in China, high-rise buildings have continuously sprung up since 2006. However, several big fire accidents in high-rise buildings such as the Beijing Television Cultural Cente...With rapid economic and social development in China, high-rise buildings have continuously sprung up since 2006. However, several big fire accidents in high-rise buildings such as the Beijing Television Cultural Center fire in 2009 and the Shanghai Jing'an District fire in 2010 etc. have claimed people's lives and caused huge amounts of economic and property losses,展开更多
Integrated wiring system is an important infrastructure in ultra-high-rise buildings. Only by ensuring the rationality of the design of integrated wiring system can the use function of ultra-high-rise buildings be ens...Integrated wiring system is an important infrastructure in ultra-high-rise buildings. Only by ensuring the rationality of the design of integrated wiring system can the use function of ultra-high-rise buildings be ensured. In this paper, the concept of ultra-high-rise building and integrated wiring system is briefly introduced at first, then the importance of integrated wiring system to ultra-high-rise building is clarified, then the design points of integrated wiring system of ultra-high-rise building are analyzed combined with actual projects, and finally the management optimization scheme of integrated wiring system of ultra-high-rise building is discussed.展开更多
Reponses of structures subjected to severe earthquakes sometimes significantly surpass what was considered in the design.It is important to investigate the failure mechanism and collapse margin of structures beyond de...Reponses of structures subjected to severe earthquakes sometimes significantly surpass what was considered in the design.It is important to investigate the failure mechanism and collapse margin of structures beyond design,especially for high-rise buildings.In this study,steel high-rise buildings using either square concrete-filled-tube(CFT) columns or steel tube columns are designed.A detailed three-dimensional(3 D) structural model is developed to analyze the seismic behavior of a steel high-rise towards a complete collapse.The effectiveness is verified by both component tests and a full-scale shaking table test.The collapse margin,which is defined as the ratio of PGA between the collapse level to the design major earthquake level(Level 2),is quantified by a series of numerical simulations using incremental dynamic analyses(IDA).The baseline building using CFT columns collapsed with a weak first story mechanism and presented a collapse margin ranging from 10 to 20.The significant variation in the collapse margin was caused by the different characteristics of the input ground motions.The building using equivalent steel columns collapsed earlier due to the significant shortening of the locally buckled columns,exhibiting only 57% of the collapse margin of the baseline building.The influence of reducing the height of the first story was quite significant.The shortened first story not only enlarged the collapse margin by 20%,but also changed the collapse mode.展开更多
Spectrum characteristics of different types of seismic waves and dynamic response characteristics of super high-rise building structures under long-period ground motions were comparatively analyzed. First, the ground ...Spectrum characteristics of different types of seismic waves and dynamic response characteristics of super high-rise building structures under long-period ground motions were comparatively analyzed. First, the ground response wave (named LS-R wave) of a soft soil site with deep deposit, taking long-period bedrock seismic record as input, was calculated by wave propagation method. After that, a TOMAKOMAI station long-period seismic record from the Tokachi-Oki earthquake and conventional E1-Centro wave were also chosen. Spectrum characteristics of these waves were analyzed and compared. Then, a series of shaking table tests were performed on a 1:50 scale super high-rise structural model under these seismic waves. Furthermore, numerical simulation of the prototype structure under these excitations was conducted, and structure damages under different intensive ground motions were discussed. The results show that: 1) Spectrum characteristics of ground response wave are significantly influenced by soft soil site with deep deposit, and the predominant period has an increasing trend. 2) The maximum acceleration amplification factor of the structure under the TOM wave is two times that under the E1-Centro wave; while the maximum displacement response of the structure under the TOM wave is 4.4 times that under the E1-Centro wave. Long-period ground motions show greater influences on displacement responses than acceleration responses for super high-rise building structures. 3) Most inelastic damage occurs at the upper 1/3 part of the super high-rise building when subjected to long-period ground motions.展开更多
Since serious fire occurred frequently in recent years, fire safety of high-rise building has attracted extensive attention. A National Basic Research Program (973 program) of China has been set up by Ministry of Sc...Since serious fire occurred frequently in recent years, fire safety of high-rise building has attracted extensive attention. A National Basic Research Program (973 program) of China has been set up by Ministry of Science and Technology (MOST) of China in 2012 to meet the research requirements of fire safety in high-rise buildings. This paper reviews the current state of art of research on fire dynamics of high-rise buildings, including the up-to-date progress of this project. The following three subjects on fire dynamics of high-rise buildings are addressed in this review: the ejected flame and fire plume behavior over facade out of the compartment window, the flame spread behavior over facade thermal insulation materiMs, and the buoyancy-driven smoke transportation characteristics along long vertical channels in high-rise buildings. Prospective future works are discussed and summarized.展开更多
For super high-rise buildings, the vibration period of the basic mode is several seconds, and it is very close to the period of the fluctuating wind. The damping of super high-rise buildings is low, so super high-rise...For super high-rise buildings, the vibration period of the basic mode is several seconds, and it is very close to the period of the fluctuating wind. The damping of super high-rise buildings is low, so super high-rise buildings are very sensitive to fluctuating wind. The wind load is one of the key loads in the design of super high-rise buildings. It is known that only the basic mode is needed in the wind-response analysis of tall buildings. However, for super high-rise buildings, especially for the acceleration response, because of the frequency amplification of the high modes, the high modes and the mode coupling may need to be considered. Three typical super high-rise projects with the SMPSS in wind tunnel tests and the random vibration theory method were used to analyze the effect of high modes on the wind-induced response. The conclusions can be drawn as follows. First, for the displacement response, the basic mode is dominant, and the high modes can be neglected. Second, for the acceleration response, the high modes and the mode coupling should be considered. Lastly, the strain energy of modes can only give the vibration energy distribution of the high-rise building, and it cannot describe the local wind-induced vibration of high-rise buildings, especially for the top acceleration response.展开更多
The design code for each country is revised and updated based on an expected zone’s seismic intensities,geotechnical site classifications,structural systems,construction materials and methods of construction in order...The design code for each country is revised and updated based on an expected zone’s seismic intensities,geotechnical site classifications,structural systems,construction materials and methods of construction in order to provide more realistic considerations of seismic demand,seismic response,and seismic capacity.Based on the aforementioned provisions,structures designed according to different seismic codes may yield different performances for the same level of hazard.This study aims to investigate and compare the induced responses related to the earthquake-resistant design of reinforced concrete(RC)buildings according to the Saudi building code(SBC-301),American code(ASCE-7),uniform building code(UBC-97),and European code(EC-8).In order to account for the provision regarding the hazard specification and its effect on the induced seismic responses,four regions in the Kingdom of Saudi Arabia with different seismic levels are selected.The code provisions related to the specification of site classification and its effect on the induced design base shear are investigated as well.Significant differences are observed in the induced responses with the variation in seismic design codes for the considered seismic hazards and site classifications.展开更多
This paper based on Reynolds-averaged Navier-Stokes equations standard ?model [1];the surface pressure on the wind field around two adjacent high-rise buildings was numerically simulated with software Fluent. The resu...This paper based on Reynolds-averaged Navier-Stokes equations standard ?model [1];the surface pressure on the wind field around two adjacent high-rise buildings was numerically simulated with software Fluent. The results show that with the influence of adjacent high-rise building, numerical simulation is a good way to study the wind field around high-rise building and the distribution of wind pressure on building’ surface. The pressures on the windward surface are positive with the maximum at 2/3 H height and have lower values on the top and bottom. The pressures on the leeward surface and two sides were negative. Due to the serious flow separation at the corner of building’s windward, the wind field has a high turbulent kinetic energy.展开更多
The sol-gel method is used to prepare a new nano-alumina aerogel structure and the thermal properties of this nanomaterial are investigated comprehensively using electron microscope scanning,thermal analysis,X-ray and...The sol-gel method is used to prepare a new nano-alumina aerogel structure and the thermal properties of this nanomaterial are investigated comprehensively using electron microscope scanning,thermal analysis,X-ray and infrared spectrometer analysis methods.It is found that the composite aerogel alumina material has a multi-level porous nano-network structure.When employed for the thermal insulation of high-rise buildings,the alumina nanocomposite aerogel material can lead to effective energy savings in winter.However,it has almost no energy-saving effect on buildings where energy is consumed for cooling in summer.展开更多
To improve the performance of an active mass damper control system,the controller should be designed based on a reduced-order model. An improved method based on balanced truncation method was proposed to reduce the di...To improve the performance of an active mass damper control system,the controller should be designed based on a reduced-order model. An improved method based on balanced truncation method was proposed to reduce the dimension of high-rise buildings,and was compared with other widely used reduction methods by using a framework with ten floors. This optimized method has improvement of reduction process and choice of the order. Based on the reduced-order model obtained by the improved method and pole-assignment algorithm,a controller was designed. Finally,a comparative analysis of structural responses,transfer functions,and poles was conducted on an actual high-rise building. The results show the effectiveness of the improved method.展开更多
The pressurization smoke control system has been commonly used as a smoke control system at the emergency stairs of high-rise buildings. However, a higher possibility of overpressure between the lobby and the accommod...The pressurization smoke control system has been commonly used as a smoke control system at the emergency stairs of high-rise buildings. However, a higher possibility of overpressure between the lobby and the accommodation or pressure drop in the lobby could lead to failure in achievement of the purpose of pressurization system, particularly when supplying the leakage and supplementary air flow through one air-supply path at a time. To improve this particular issue, the devise configurations, as well as the different ways to supply the leakage and supplementary air flow through the different flow passages have been proposed. The performance of the trial product was evaluated on the test bed, ultimately providing a safe evacuation environment if high-rise buildings fired.展开更多
This study aims to propose a method for quantitatively evaluating the influence which the obstruction of sea breezes by clusters of high-rise buildings has on the urban heat island effect using a weather simulation mo...This study aims to propose a method for quantitatively evaluating the influence which the obstruction of sea breezes by clusters of high-rise buildings has on the urban heat island effect using a weather simulation model and Geographic Information Systems (GIS). Specifically, a method of evaluating the influence of the obstruction of sea breeze by high-rise buildings on the urban heat island effect was proposed. In the method, two scenarios that imagine urban forms which differ with regard to whether or not they contain high-rise buildings are created and weather simulation is conducted, and the results of the simulations are comparatively analyzed focusing on temperature and wind speed. Evaluation was conducted in two stages, and Shiodome of Minato City in the Tokyo Metropolis was selected as the region for evaluation. In two stages of evaluation, a rise in temperature of approximately 0.3 K and a reduction in wind speed of approximately 1 m/s were observed in a region approximately five to ten kilometers square downwind of high-rise buildings in the period 6 PM to 9 PM, and a higher temperature caused by the obstruction of sea breeze by high-rise buildings was identified. The fact that such a higher temperature was confirmed in the time period from 6 PM onwards, in which the temperature decreases, reveals that obstruction of sea breeze by high-rise buildings dulls the decrease in temperature which occurs from evening onwards, and influences nighttime urban heat island formation.展开更多
With the continuous and healthy development of China's economy, urbanization has become the mainstream of current social development. Low-rise buildings are no longer suitable for the living needs of the broad mas...With the continuous and healthy development of China's economy, urbanization has become the mainstream of current social development. Low-rise buildings are no longer suitable for the living needs of the broad masses of the people, and the advantages of high-rise buildings are gradually revealed. Due to the complicated accommodation structure of high-rise buildings, it is easy to cause fire hazard. Therefore, in the daily life process, how to safely set fire hydrants is an extremely important practical topic. As the geographical location and building style of each high-rise building will change according to the actual situation, this also puts forward new development requirements for fire hydrant system design. Based on the actual process of fire hydrant system work in high-rise buildings, this paper will continuously find out and solve the actual problems in the process of fire fighting, analyze and solve the problems in depth, and at the same time, improve the fire safety awareness of the masses. Ensure the safety of the actual accommodation of high-rise buildings, thus laying a solid foundation for the safety of daily life of the residents.展开更多
The development of the construction sector is rapidly growing,which induce competition at global level.In order to achieve the current economic development,more high-rise buildings construction projects were commenced...The development of the construction sector is rapidly growing,which induce competition at global level.In order to achieve the current economic development,more high-rise buildings construction projects were commenced without considering importance of the land to human and other living organism.On the other hand,the quality and safety aspect of the engineering technology used must be analyzed carefully and to be the primary aim for engineers to reduce any risk of harm in future.Many of the high-rise buildings in China consist of a frame or skeleton of reinforced concrete wall which need to be strengthened with shear walls to improve the stability and safety of the structures.According to practical work experience and relevant theoretical knowledge,the researcher introduced the reinforcement construction technology of frame-shear wall for high-rise buildings in depth from aspects like the arrangement of steel bar,construction preparation,steel bar anchorage,precautions to follow for the related work in future.展开更多
The rapid development of economy promotes the continuous development of China's construction industry. Therefore, most construction enterprises are constantly increasing their competitive strength.Therefore, in or...The rapid development of economy promotes the continuous development of China's construction industry. Therefore, most construction enterprises are constantly increasing their competitive strength.Therefore, in order to have a certain competitive strength in the more competitive market and have a certain development space in the future development, many enterprises are making their own adjustments.However, for the housing construction project, the planning, design and construction of the structure is one of the important factors. Therefore, in the process of research and analysis, the improvement and optimization of the structural design can also be used to promote the quality of the housing construction project and further ensure the improvement of the economic benefits of the construction enterprise.展开更多
At noon in March of the beginning of 2021, a building with a total height of 111.6 meters and 26 floors in Chang 'an District, Shijiazhuang, was not equipped with external thermal insulation materials with appropr...At noon in March of the beginning of 2021, a building with a total height of 111.6 meters and 26 floors in Chang 'an District, Shijiazhuang, was not equipped with external thermal insulation materials with appropriate combustion performance grade, which became the main reason for the rapid spread of open fire in floors above 20 floors. The fire was controlled under control by 13 PM and there were no casualties.With the continuous innovation of social economy, industry, culture and technology, new materials, new trends of thought, new development, as well as the continuous exploration of the contradiction between the increasing urban population, the shortage of land and the urban style, architecture, as the initial "shelter", began to gradually develop vertically. The industrial revolution and its products further acted on the new driving force of science and technology in the vertical dimension. Although high-rise buildings effectively meet the demand value of urban population and the representative value of urban economic appearance, the problem also comes, and the fire problem has become one of the most important prevention and control. For this reason, this paper discusses and analyzes the difficulties of firefighting, fire prevention of structural selection materials, internal structural measures and evacuation design of high-rise buildings for reference.展开更多
In recent years with the increasing number of super high-rise buildings and the ever-expanding scale the anti-smoke construction technology has attracted more and more attention.Based on this situation,this paper anal...In recent years with the increasing number of super high-rise buildings and the ever-expanding scale the anti-smoke construction technology has attracted more and more attention.Based on this situation,this paper analyzes the smoke control technology of super high-rise buildings.The paper analyzes the importance of the application of anti-smoke construction technology in super high-rise buildings,analyzes the problems in the construction of smoke control and super high-rise buildings.The anti-smoke construction technology was studied and I hope that it can benefit the application of anti-smoke construction technology in high-rise buildings.展开更多
基金This research was founded by the Funds for Creative Research Groups of National Natural Science Foundation of China(Grant No.51921006)the National Natural Science Foundations of China(Grant No.51978224)+2 种基金the National Major Scientific Research Instrument Development Program of China(Grant No.51827811)the National Natural Science Foundation of China,(Grant No.52008141)the Shenzhen Technology Innovation Program(Grant Nos.JCYJ20170811160003571,JCYJ20180508152238111 and JCYJ20200109112803851).
文摘Collisions between a moving mass and an anti-collision device increase structural responses and threaten structural safety.An active mass damper(AMD)with stroke limitations is often used to avoid collisions.However,a strokelimited AMD control system with a fixed limited area shortens the available AMD stroke and leads to significant control power.To solve this problem,the design approach with variable gain and limited area(VGLA)is proposed in this study.First,the boundary of variable-limited areas is calculated based on the real-time status of the moving mass.The variable gain(VG)expression at the variable limited area is deduced by considering the saturation of AMD stroke.Then,numerical simulations of a stroke-limited AMD control system with VGLA are conducted on a high-rise building structure.These numerical simulations show that the proposed approach has superior strokelimitation performance compared with a stroke-limited AMD control system with a fixed limited area.Finally,the proposed approach is validated through experiments on a four-story steel frame.
基金supported by the Natural Science Foundation of China(52122811)。
文摘To enable the experimental assessment of the seismic performance of full-scale nonstructural elements with multiple engineering parameters(EDPs),a three-layer testbed named Nonstructural Element Simulator on Shake Table(NEST)has been developed.The testbed consists of three consecutive floors of steel structure.The bottom two floors provide a space to accommodate a full-scale room.To fully explore the flexibility of NEST,we propose a novel control strategy to generate the required shake table input time histories for the testbed to track the target floor motions of the buildings of interest with high accuracy.The control strategy contains two parts:an inverse dynamic compensation via simulation of feedback control systems(IDCS)algorithm and an offline iteration procedure based on a refined nonlinear numerical model of the testbed.The key aspects of the control strategy were introduced in this paper.Experimental tests were conducted to simulate the seismic responses of a full-scale office room on the 21^(st)floor of a 42-story high-rise building.The test results show that the proposed control strategy can reproduce the target floor motions of the building of interest with less than 20%errors within the specified frequency range.
文摘A probabilistic seismic loss assessment of RC high-rise(RCHR)buildings designed according to Eurocode 8 and located in the Southern Euro-Mediterranean zone is presented herein.The loss assessment methodology is based on a comprehensive simulation approach which takes into account ground motion(GM)uncertainty,and the random effects in seismic demand,as well as in predicting the damage states(DSs).The methodology is implemented on three RCHR buildings of 20-story,30-story and 40-story with a core wall structural system.The loss functions described by a cumulative lognormal probability distribution are obtained for two intensity levels for a large set of simulations(NLTHAs)based on 60 GM records with a wide range of magnitude(M),distance to source(R)and different site soil conditions(SS).The losses expressed in percent of building replacement cost for RCHR buildings are obtained.In the estimation of losses,both structural(S)and nonstructural(NS)damage for four DSs are considered.The effect of different GM characteristics(M,R and SS)on the obtained losses are investigated.Finally,the estimated performance of the RCHR buildings are checked to ensure that they fulfill limit state requirements according to Eurocode 8.
文摘With rapid economic and social development in China, high-rise buildings have continuously sprung up since 2006. However, several big fire accidents in high-rise buildings such as the Beijing Television Cultural Center fire in 2009 and the Shanghai Jing'an District fire in 2010 etc. have claimed people's lives and caused huge amounts of economic and property losses,
文摘Integrated wiring system is an important infrastructure in ultra-high-rise buildings. Only by ensuring the rationality of the design of integrated wiring system can the use function of ultra-high-rise buildings be ensured. In this paper, the concept of ultra-high-rise building and integrated wiring system is briefly introduced at first, then the importance of integrated wiring system to ultra-high-rise building is clarified, then the design points of integrated wiring system of ultra-high-rise building are analyzed combined with actual projects, and finally the management optimization scheme of integrated wiring system of ultra-high-rise building is discussed.
基金Heilongjiang Province Application Technology Research and Development under Grant No.GX16C007National Key Research and Development Program of China under Grant No.2017YFC1500605
文摘Reponses of structures subjected to severe earthquakes sometimes significantly surpass what was considered in the design.It is important to investigate the failure mechanism and collapse margin of structures beyond design,especially for high-rise buildings.In this study,steel high-rise buildings using either square concrete-filled-tube(CFT) columns or steel tube columns are designed.A detailed three-dimensional(3 D) structural model is developed to analyze the seismic behavior of a steel high-rise towards a complete collapse.The effectiveness is verified by both component tests and a full-scale shaking table test.The collapse margin,which is defined as the ratio of PGA between the collapse level to the design major earthquake level(Level 2),is quantified by a series of numerical simulations using incremental dynamic analyses(IDA).The baseline building using CFT columns collapsed with a weak first story mechanism and presented a collapse margin ranging from 10 to 20.The significant variation in the collapse margin was caused by the different characteristics of the input ground motions.The building using equivalent steel columns collapsed earlier due to the significant shortening of the locally buckled columns,exhibiting only 57% of the collapse margin of the baseline building.The influence of reducing the height of the first story was quite significant.The shortened first story not only enlarged the collapse margin by 20%,but also changed the collapse mode.
基金Project(50978198) supported by the National Natural Science Foundation of ChinaProject(SLDRCE08-B-03) supported by the Ministry of Science and Technology of China
文摘Spectrum characteristics of different types of seismic waves and dynamic response characteristics of super high-rise building structures under long-period ground motions were comparatively analyzed. First, the ground response wave (named LS-R wave) of a soft soil site with deep deposit, taking long-period bedrock seismic record as input, was calculated by wave propagation method. After that, a TOMAKOMAI station long-period seismic record from the Tokachi-Oki earthquake and conventional E1-Centro wave were also chosen. Spectrum characteristics of these waves were analyzed and compared. Then, a series of shaking table tests were performed on a 1:50 scale super high-rise structural model under these seismic waves. Furthermore, numerical simulation of the prototype structure under these excitations was conducted, and structure damages under different intensive ground motions were discussed. The results show that: 1) Spectrum characteristics of ground response wave are significantly influenced by soft soil site with deep deposit, and the predominant period has an increasing trend. 2) The maximum acceleration amplification factor of the structure under the TOM wave is two times that under the E1-Centro wave; while the maximum displacement response of the structure under the TOM wave is 4.4 times that under the E1-Centro wave. Long-period ground motions show greater influences on displacement responses than acceleration responses for super high-rise building structures. 3) Most inelastic damage occurs at the upper 1/3 part of the super high-rise building when subjected to long-period ground motions.
基金supported by National Basic Research Program of China (2012CB719702)
文摘Since serious fire occurred frequently in recent years, fire safety of high-rise building has attracted extensive attention. A National Basic Research Program (973 program) of China has been set up by Ministry of Science and Technology (MOST) of China in 2012 to meet the research requirements of fire safety in high-rise buildings. This paper reviews the current state of art of research on fire dynamics of high-rise buildings, including the up-to-date progress of this project. The following three subjects on fire dynamics of high-rise buildings are addressed in this review: the ejected flame and fire plume behavior over facade out of the compartment window, the flame spread behavior over facade thermal insulation materiMs, and the buoyancy-driven smoke transportation characteristics along long vertical channels in high-rise buildings. Prospective future works are discussed and summarized.
基金National Natural Science Foundation of China Under Grant No.50908044 Jiangsu Provincial Natural Science Foundation of China Under Grant No.SBK201123270 a Project Funded by the Priority Academic Program Development of Jiangsu Higher Education Institutions and StateKey Lab of Subtropical Building Science,South China University of Technology Under Grant No.2011KA05
文摘For super high-rise buildings, the vibration period of the basic mode is several seconds, and it is very close to the period of the fluctuating wind. The damping of super high-rise buildings is low, so super high-rise buildings are very sensitive to fluctuating wind. The wind load is one of the key loads in the design of super high-rise buildings. It is known that only the basic mode is needed in the wind-response analysis of tall buildings. However, for super high-rise buildings, especially for the acceleration response, because of the frequency amplification of the high modes, the high modes and the mode coupling may need to be considered. Three typical super high-rise projects with the SMPSS in wind tunnel tests and the random vibration theory method were used to analyze the effect of high modes on the wind-induced response. The conclusions can be drawn as follows. First, for the displacement response, the basic mode is dominant, and the high modes can be neglected. Second, for the acceleration response, the high modes and the mode coupling should be considered. Lastly, the strain energy of modes can only give the vibration energy distribution of the high-rise building, and it cannot describe the local wind-induced vibration of high-rise buildings, especially for the top acceleration response.
文摘The design code for each country is revised and updated based on an expected zone’s seismic intensities,geotechnical site classifications,structural systems,construction materials and methods of construction in order to provide more realistic considerations of seismic demand,seismic response,and seismic capacity.Based on the aforementioned provisions,structures designed according to different seismic codes may yield different performances for the same level of hazard.This study aims to investigate and compare the induced responses related to the earthquake-resistant design of reinforced concrete(RC)buildings according to the Saudi building code(SBC-301),American code(ASCE-7),uniform building code(UBC-97),and European code(EC-8).In order to account for the provision regarding the hazard specification and its effect on the induced seismic responses,four regions in the Kingdom of Saudi Arabia with different seismic levels are selected.The code provisions related to the specification of site classification and its effect on the induced design base shear are investigated as well.Significant differences are observed in the induced responses with the variation in seismic design codes for the considered seismic hazards and site classifications.
文摘This paper based on Reynolds-averaged Navier-Stokes equations standard ?model [1];the surface pressure on the wind field around two adjacent high-rise buildings was numerically simulated with software Fluent. The results show that with the influence of adjacent high-rise building, numerical simulation is a good way to study the wind field around high-rise building and the distribution of wind pressure on building’ surface. The pressures on the windward surface are positive with the maximum at 2/3 H height and have lower values on the top and bottom. The pressures on the leeward surface and two sides were negative. Due to the serious flow separation at the corner of building’s windward, the wind field has a high turbulent kinetic energy.
文摘The sol-gel method is used to prepare a new nano-alumina aerogel structure and the thermal properties of this nanomaterial are investigated comprehensively using electron microscope scanning,thermal analysis,X-ray and infrared spectrometer analysis methods.It is found that the composite aerogel alumina material has a multi-level porous nano-network structure.When employed for the thermal insulation of high-rise buildings,the alumina nanocomposite aerogel material can lead to effective energy savings in winter.However,it has almost no energy-saving effect on buildings where energy is consumed for cooling in summer.
文摘To improve the performance of an active mass damper control system,the controller should be designed based on a reduced-order model. An improved method based on balanced truncation method was proposed to reduce the dimension of high-rise buildings,and was compared with other widely used reduction methods by using a framework with ten floors. This optimized method has improvement of reduction process and choice of the order. Based on the reduced-order model obtained by the improved method and pole-assignment algorithm,a controller was designed. Finally,a comparative analysis of structural responses,transfer functions,and poles was conducted on an actual high-rise building. The results show the effectiveness of the improved method.
文摘The pressurization smoke control system has been commonly used as a smoke control system at the emergency stairs of high-rise buildings. However, a higher possibility of overpressure between the lobby and the accommodation or pressure drop in the lobby could lead to failure in achievement of the purpose of pressurization system, particularly when supplying the leakage and supplementary air flow through one air-supply path at a time. To improve this particular issue, the devise configurations, as well as the different ways to supply the leakage and supplementary air flow through the different flow passages have been proposed. The performance of the trial product was evaluated on the test bed, ultimately providing a safe evacuation environment if high-rise buildings fired.
文摘This study aims to propose a method for quantitatively evaluating the influence which the obstruction of sea breezes by clusters of high-rise buildings has on the urban heat island effect using a weather simulation model and Geographic Information Systems (GIS). Specifically, a method of evaluating the influence of the obstruction of sea breeze by high-rise buildings on the urban heat island effect was proposed. In the method, two scenarios that imagine urban forms which differ with regard to whether or not they contain high-rise buildings are created and weather simulation is conducted, and the results of the simulations are comparatively analyzed focusing on temperature and wind speed. Evaluation was conducted in two stages, and Shiodome of Minato City in the Tokyo Metropolis was selected as the region for evaluation. In two stages of evaluation, a rise in temperature of approximately 0.3 K and a reduction in wind speed of approximately 1 m/s were observed in a region approximately five to ten kilometers square downwind of high-rise buildings in the period 6 PM to 9 PM, and a higher temperature caused by the obstruction of sea breeze by high-rise buildings was identified. The fact that such a higher temperature was confirmed in the time period from 6 PM onwards, in which the temperature decreases, reveals that obstruction of sea breeze by high-rise buildings dulls the decrease in temperature which occurs from evening onwards, and influences nighttime urban heat island formation.
文摘With the continuous and healthy development of China's economy, urbanization has become the mainstream of current social development. Low-rise buildings are no longer suitable for the living needs of the broad masses of the people, and the advantages of high-rise buildings are gradually revealed. Due to the complicated accommodation structure of high-rise buildings, it is easy to cause fire hazard. Therefore, in the daily life process, how to safely set fire hydrants is an extremely important practical topic. As the geographical location and building style of each high-rise building will change according to the actual situation, this also puts forward new development requirements for fire hydrant system design. Based on the actual process of fire hydrant system work in high-rise buildings, this paper will continuously find out and solve the actual problems in the process of fire fighting, analyze and solve the problems in depth, and at the same time, improve the fire safety awareness of the masses. Ensure the safety of the actual accommodation of high-rise buildings, thus laying a solid foundation for the safety of daily life of the residents.
文摘The development of the construction sector is rapidly growing,which induce competition at global level.In order to achieve the current economic development,more high-rise buildings construction projects were commenced without considering importance of the land to human and other living organism.On the other hand,the quality and safety aspect of the engineering technology used must be analyzed carefully and to be the primary aim for engineers to reduce any risk of harm in future.Many of the high-rise buildings in China consist of a frame or skeleton of reinforced concrete wall which need to be strengthened with shear walls to improve the stability and safety of the structures.According to practical work experience and relevant theoretical knowledge,the researcher introduced the reinforcement construction technology of frame-shear wall for high-rise buildings in depth from aspects like the arrangement of steel bar,construction preparation,steel bar anchorage,precautions to follow for the related work in future.
文摘The rapid development of economy promotes the continuous development of China's construction industry. Therefore, most construction enterprises are constantly increasing their competitive strength.Therefore, in order to have a certain competitive strength in the more competitive market and have a certain development space in the future development, many enterprises are making their own adjustments.However, for the housing construction project, the planning, design and construction of the structure is one of the important factors. Therefore, in the process of research and analysis, the improvement and optimization of the structural design can also be used to promote the quality of the housing construction project and further ensure the improvement of the economic benefits of the construction enterprise.
文摘At noon in March of the beginning of 2021, a building with a total height of 111.6 meters and 26 floors in Chang 'an District, Shijiazhuang, was not equipped with external thermal insulation materials with appropriate combustion performance grade, which became the main reason for the rapid spread of open fire in floors above 20 floors. The fire was controlled under control by 13 PM and there were no casualties.With the continuous innovation of social economy, industry, culture and technology, new materials, new trends of thought, new development, as well as the continuous exploration of the contradiction between the increasing urban population, the shortage of land and the urban style, architecture, as the initial "shelter", began to gradually develop vertically. The industrial revolution and its products further acted on the new driving force of science and technology in the vertical dimension. Although high-rise buildings effectively meet the demand value of urban population and the representative value of urban economic appearance, the problem also comes, and the fire problem has become one of the most important prevention and control. For this reason, this paper discusses and analyzes the difficulties of firefighting, fire prevention of structural selection materials, internal structural measures and evacuation design of high-rise buildings for reference.
文摘In recent years with the increasing number of super high-rise buildings and the ever-expanding scale the anti-smoke construction technology has attracted more and more attention.Based on this situation,this paper analyzes the smoke control technology of super high-rise buildings.The paper analyzes the importance of the application of anti-smoke construction technology in super high-rise buildings,analyzes the problems in the construction of smoke control and super high-rise buildings.The anti-smoke construction technology was studied and I hope that it can benefit the application of anti-smoke construction technology in high-rise buildings.