CO_(2) capture is an important carbon management route to mitigate the greenhouse gas emission in power sector.In recent years,China Huaneng Group(CHNG)has paid more attention on CO_(2)capture technology development a...CO_(2) capture is an important carbon management route to mitigate the greenhouse gas emission in power sector.In recent years,China Huaneng Group(CHNG)has paid more attention on CO_(2)capture technology development and launched a series of R&D and demonstration projects.In the area of pre-combustion CO_(2) capture technology,GreenGen project initiated by CHNG is the first integrated gasification combined cycle(IGCC)power plant in China.Located in Tianjin,GreenGen aims at the development,demonstration and promotion of a near-zero emissions power plant.An IGCC plant of 250 MW has successfully passed full-scale trial operation.In the next phase,a pre-combustion CO_(2) capture unit will be integrated into the system.Pre-combustion process based on coal chemical process has been developed with lower costs successfully.Regarding to post-combustion CO_(2) capture(PCC),in 2008,CHNG built a 3,000 tpa CO_(2) capture plant,which was the first CO_(2) capture demonstration plant in China.In 2009,CHNG launched a PCC project in Shanghai with a capture capacity of 120,000 tpa CO_(2).Recently,Huaneng Clean Energy Research Institute(CERI)and Powerspan formed a joint venture,Huaneng-CERI-Powerspan(HCP).HCP has completed the technology qualification program to supply carbon capture technology for the CO_(2)capture Mongstad project.Besides these activities mentioned above,feasibility studies and system design for large scale PCC system,have been undertaken by CERI and its partners from Australia,US and Europe.展开更多
文摘CO_(2) capture is an important carbon management route to mitigate the greenhouse gas emission in power sector.In recent years,China Huaneng Group(CHNG)has paid more attention on CO_(2)capture technology development and launched a series of R&D and demonstration projects.In the area of pre-combustion CO_(2) capture technology,GreenGen project initiated by CHNG is the first integrated gasification combined cycle(IGCC)power plant in China.Located in Tianjin,GreenGen aims at the development,demonstration and promotion of a near-zero emissions power plant.An IGCC plant of 250 MW has successfully passed full-scale trial operation.In the next phase,a pre-combustion CO_(2) capture unit will be integrated into the system.Pre-combustion process based on coal chemical process has been developed with lower costs successfully.Regarding to post-combustion CO_(2) capture(PCC),in 2008,CHNG built a 3,000 tpa CO_(2) capture plant,which was the first CO_(2) capture demonstration plant in China.In 2009,CHNG launched a PCC project in Shanghai with a capture capacity of 120,000 tpa CO_(2).Recently,Huaneng Clean Energy Research Institute(CERI)and Powerspan formed a joint venture,Huaneng-CERI-Powerspan(HCP).HCP has completed the technology qualification program to supply carbon capture technology for the CO_(2)capture Mongstad project.Besides these activities mentioned above,feasibility studies and system design for large scale PCC system,have been undertaken by CERI and its partners from Australia,US and Europe.