期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
A Fault-tolerance Estimating Method for Ionosphere Corrections in Satellite Navigation System 被引量:2
1
作者 GAO Shuliang LI Rui HUANG Zhigang 《Chinese Journal of Aeronautics》 SCIE EI CAS CSCD 2011年第6期749-755,共7页
Aiming to the reliable estimates of the ionosphere differential corrections for the satellite navigation system in the presence of the ionosphere anomaly, a fault-tolerance estimating method, which is based on the dis... Aiming to the reliable estimates of the ionosphere differential corrections for the satellite navigation system in the presence of the ionosphere anomaly, a fault-tolerance estimating method, which is based on the distributed Kalman filtering, is proposed. The method utilizes the parallel sub-filters for estimating the ionosphere differential corrections. Meanwhile, an infinite norm (IN) method is proposed for the detection of the ionosphere irregularity in the filter processing. Once the anomaly is detected, the sub-filter contaminated by the anomaly measurements will be excluded to ensure the reliability of the estimates. The simulation is conducted to validate the method and the results indicate that the anomaly can be found timely due to the novel fault detection method based on the infinite norm. Because of the parallel sub-filter architecture, the measurements are classified by the spatial distribution so that the ionosphere anomaly can be positioned and excluded more easily. Thus, the method can provide the robust and accurate ionosphere differential corrections. 展开更多
关键词 differential corrections ionosphere anomaly Kalman filter fault-tolerance fault detection
原文传递
Exploration and Reflection on Fault Tolerance and Correction Mechanism in State-owned Enterprises
2
作者 GE Hao 《外文科技期刊数据库(文摘版)经济管理》 2021年第1期224-229,共6页
Through thinking about the fault tolerance and correction mechanism, the establishment of the fault tolerance and correction system is closely combined with the actual development of the enterprise. And the listing pr... Through thinking about the fault tolerance and correction mechanism, the establishment of the fault tolerance and correction system is closely combined with the actual development of the enterprise. And the listing promotion method is explored. The standard of fault tolerance and correction and six positive and eight negative preconditions are defined, the bottom line and the interval are marked, the implementation of fault tolerance and correction in the state-owned enterprises is promoted, and the political ecology of "clean the air, start a business, reform and innovation" is created, so that the majority of cadres are willing to work, dare to work, and be able to accomplish things. 展开更多
关键词 fault tolerance and correction clarification protection political ecosystem
原文传递
Measures and results of prevention and control on casing deformation and frac-hit in deep shale gas wells in southern Sichuan Basin
3
作者 Cheng Shen Jianfa Wu +4 位作者 Bo Zeng Yi Song Zhiguang Yao Yan Dong Yurou Du 《Natural Gas Industry B》 2024年第3期262-273,共12页
Casing deformation and frac-hit pose significant challenges to the development of deep shale gas in southern Sichuan Basin.By analyzing the mechanism and main control factors of casing deformation and frac-hit,two kin... Casing deformation and frac-hit pose significant challenges to the development of deep shale gas in southern Sichuan Basin.By analyzing the mechanism and main control factors of casing deformation and frac-hit,two kinds of risk assessment methods were defined,and the overall prevention and control concept and practice were formulated.The results show that initial stress,pore pressure,fault development and large scale fracturing in local block are the main factors leading to the deformation.The development of fracture through well group and uncontrolled fracturing fluid volume are the main factors leading to pressure channeling.Based on this,the risk classification technology of casing deformation and frac-hit is established,and the dual-optimal,dual-control concept and technology are formed.In terms of the prevention and control of casing deformation,the formation of small-diameter bridge plug fracturing,large section combined fracturing,glass beads cementing,singlewell staggered and platform straddle fracturing mode,dual-dimension controlled and lift fracturing,hyperbolic diagnosis,etc.Frac-hit prevention and control formed pump sequence optimization mode,physical and chemical temporary plugging and other methods.The above technology achieved casing deformation rate decreased from 50.4%to 25.4%,frac-hit rate decreased from 58.6%to 33.9%,and the average well kilometer EUR reached 0.52e0.7 million square meters,an increase of 7.7%compared with the previous research,with remarkable results. 展开更多
关键词 Casing deformation Frac-hit Deep shale gas fault correction Dual dimensional Physical-chemical temporary plugging
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部