期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
象山港大桥建设对湾内潮流特性的影响 被引量:7
1
作者 张照举 张永良 余锡平 《水运工程》 北大核心 2005年第11期1-4,共4页
利用潮流数学模型,分析象山港大桥工程建设前后象山港内的潮流特性和工程建设对桥区潮流变化的影响。计算结果表明,大桥建设前后港内纳湖量基本不变,湾内高潮位略有下降,桥位区流速有所增加,港湾内整体流速有所减小,但改变幅度的相对值... 利用潮流数学模型,分析象山港大桥工程建设前后象山港内的潮流特性和工程建设对桥区潮流变化的影响。计算结果表明,大桥建设前后港内纳湖量基本不变,湾内高潮位略有下降,桥位区流速有所增加,港湾内整体流速有所减小,但改变幅度的相对值均不超过5%。除局部地区外,工程建设对湾内的潮流特征影响较小。 展开更多
关键词 feswms 潮流数学模型 象山港大桥
在线阅读 下载PDF
Case Study: Hydraulic Model Study for Abandoned Channel Restoration 被引量:2
2
作者 Changsung Kim Joongu Kang 《Engineering(科研)》 2013年第12期989-996,共8页
Recently, a paradigm of river restoration is recognized as the importance of flood plan involving abandoned channel. Hence, effort which abandoned channel area by improvement project will become the territory of river... Recently, a paradigm of river restoration is recognized as the importance of flood plan involving abandoned channel. Hence, effort which abandoned channel area by improvement project will become the territory of river area is trying. This study is a part of river restoration project. In this study, hydraulic model experiment and numerical simulation were performed to understand the flow characteristic and bed change for abandoned channel restoration. The target area of the hydraulic model was the midstream of the Hampyeong Stream (stream length: 1.3 km). Horizontal scale was 1/50 and vertical scale was 1/40. For numerical simulation, the FESWMS model was used. Cases of hydraulic and numerical models were frequency flood discharge (50 and 100 years) and channel formation discharge (100 m3/s and 120 m3/s). Flow characteristics were analyzed in fixed condition using hydraulic and numerical models. Bed change on abandoned channel restoration was analyzed on deposition trend using sediment supply from upstream in hydraulic model, and was compared with results of bed shear stress in numerical model. Results velocity profile and bed shear stress of numerical model were similar with trends of measured velocity and deposition of hydraulic model. The results of this study will be applied to restoration design of abandoned channels. 展开更多
关键词 Abandoned CHANNEL HYDRAULIC MODEL RMA2 feswms DEPOSITION
暂未订购
FST2DH模型在水流计算中的应用实例
3
作者 倪玮 林一楠 《浙江水利科技》 2009年第4期78-80,83,共4页
河道水流模拟和河床冲淤计算是河流模拟中经常遇到的问题。FST2DH模型是比较适用于水动力和泥沙计算的二维模型,对局部水工构筑物附近水流和泥沙运动的模拟更具优势,河流桥墩附近的水流模拟实例也说明该模型是方便和有效的。
关键词 FST2DH feswms 数学模型 二维水流模拟
在线阅读 下载PDF
温榆河机场南线高速公路段桥墩壅水数值模型计算 被引量:1
4
作者 王远航 杨淑慧 来海亮 《北京水务》 2007年第3期37-39,共3页
应用FESWMS二维水动力学数值模型,对温榆河机场南线高速公路段拟建桥墩壅水情况进行了模拟。结果表明,50a一遇洪水洪峰流量下,拟建温榆河大桥桥上水位较现状河道抬升达0.19m,且对上游较长河段水位均有影响;拟建桥梁主槽桥墩处流速较建... 应用FESWMS二维水动力学数值模型,对温榆河机场南线高速公路段拟建桥墩壅水情况进行了模拟。结果表明,50a一遇洪水洪峰流量下,拟建温榆河大桥桥上水位较现状河道抬升达0.19m,且对上游较长河段水位均有影响;拟建桥梁主槽桥墩处流速较建桥前有所增加;高速路桥河段主流位置明显改变。由于高速公路桥对河道行洪安全有明显影响,建议对拟建桥墩河段进行整治。 展开更多
关键词 feswms 二维数值模型 计算
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部