期刊文献+
共找到1,825篇文章
< 1 2 92 >
每页显示 20 50 100
Discussion on the Practice and Benefit of EPC Project Management in the Construction Industry
1
作者 LIURuoting YEYi +2 位作者 PANGJun WANGYulin SONGXin 《外文科技期刊数据库(文摘版)工程技术》 2022年第4期102-109,共8页
Compared with the traditional contract management mode in the construction industry, the EPC project management mode has many advantages, such as simplifying the owner management, single contractor, clear responsibili... Compared with the traditional contract management mode in the construction industry, the EPC project management mode has many advantages, such as simplifying the owner management, single contractor, clear responsibilities, resource integration, improving quality and efficiency, etc. This paper uses SWOT analysis method to analyze the advantages, disadvantages, opportunities and threats of the EPC management model in the construction industry, to plan how to better promote the EPC management model, and to introduce the value and benefits of the EPC management model in terms of quality improvement, cost control, smart construction and green construction in combination with all the EPC projects completed in the past, so as to provide certain reference for the future development of EPC projects. 展开更多
关键词 epc project management SWOT analysis QUALITY COST wisdom construction green construction
原文传递
Discussion on the Strategy of Cost Control of Value Engineering in the Design Stage of EPC Project
2
作者 WU Yinjiao 《外文科技期刊数据库(文摘版)工程技术》 2021年第5期265-267,共5页
With the rapid development of social economy, the application field of value engineering is gradually extensive. At present, the value engineering of advanced countries such as the United States, Britain, Germany, Jap... With the rapid development of social economy, the application field of value engineering is gradually extensive. At present, the value engineering of advanced countries such as the United States, Britain, Germany, Japan and South Korea has been very mature in its application in the design stage of EPC projects, and has also obtained many successful experiences in the cost control of the construction industry. However, China is still lagging behind in this aspect. Based on this, this paper will comprehensively analyze the meaning of value engineering in EPC projects, the direction of cost control and management in the design stage of EPC projects based on value engineering, the cost control and management system in the design stage of EPC projects based on value engineering, and the cost control methods in the design stage of value engineering in EPC projects, so as to promote the good practice and sustainable development of value engineering in China's EPC projects. 展开更多
关键词 value engineering epc project cost control strategy analysis
原文传递
Accelerating the Cultivation of EPC Project Procurement Whole Process Management Ability
3
作者 WANG Xiaoli 《外文科技期刊数据库(文摘版)工程技术》 2021年第6期157-161,共8页
With the rapid development of society, China's contractors are increasingly competitive in the international market. EPC general contracting mode has become the mainstream of social development. General contractor... With the rapid development of society, China's contractors are increasingly competitive in the international market. EPC general contracting mode has become the mainstream of social development. General contractors need to improve their procurement management level, integrate and allocate the existing procurement resources, effectively shorten the construction period and reduce the cost, which also puts forward more strict requirements for the procurement management of the general contractor. 展开更多
关键词 epc project PURCHASE ADMINISTRATION
原文传递
Discussion on Risks Problems and Countermeasures of EPC Project Cost Management
4
作者 QI Ji 《外文科技期刊数据库(文摘版)工程技术》 2021年第12期1096-1100,共7页
Compared with traditional construction projects, EPC projects mostly adopt fixed total price pricing mode. Because it covers several stages of contracting in the process of project construction, there are many factors... Compared with traditional construction projects, EPC projects mostly adopt fixed total price pricing mode. Because it covers several stages of contracting in the process of project construction, there are many factors affecting the increase of cost, and the probability that the actual cost exceeds the contract price also increases greatly. Therefore, it is necessary to control the risks affecting the cost management of EPC project, so as to ensure the smooth realization of project progress, quality, safety and other objectives, as well as the realization of reasonable profit objectives of the project. Combined with the experience of cost control of several EPC projects, this paper studies the EPC project management, which has a certain reference significance. 展开更多
关键词 epc project cost control concrete measure
原文传递
光伏EPC总承包项目设计优化管控
5
作者 邓伯舜 《价值工程》 2026年第1期6-9,共4页
在新能源行业高速发展阶段,国内发电行业部分光伏项目也采用EPC总承包模式建设,并鼓励总承包商开展设计优化以节约投资。项目实践中,光伏EPC总承包项目通过设计优化节省了工程投资,但发承包双方对优化的认定、节省投资的分配争议较大,... 在新能源行业高速发展阶段,国内发电行业部分光伏项目也采用EPC总承包模式建设,并鼓励总承包商开展设计优化以节约投资。项目实践中,光伏EPC总承包项目通过设计优化节省了工程投资,但发承包双方对优化的认定、节省投资的分配争议较大,这对项目建设、结算推动等产生了不利影响。结合具体案例,文章针对可研完成后开展招标的光伏EPC项目设计优化管控及优化节约投资利益分成机制作了分析探讨,为发电企业光伏EPC项目建设管理提供一定的参考和借鉴。 展开更多
关键词 epc总承包 光伏项目 设计优化
在线阅读 下载PDF
重大水电工程EPC项目采购管理的适应性创新 被引量:3
6
作者 丁继勇 程星莉 +1 位作者 李啟常 丁竹青 《人民黄河》 北大核心 2025年第3期146-152,共7页
重大水电工程EPC项目采购作为核心环节之一,对设计意图实现、工程顺利实施至关重要。在国内建筑市场规范性程度和EPC模式应用水平均相对较低的情况下,迫切需要结合重大水电工程EPC项目的复杂性开展采购管理的适应性创新。主要从采购任... 重大水电工程EPC项目采购作为核心环节之一,对设计意图实现、工程顺利实施至关重要。在国内建筑市场规范性程度和EPC模式应用水平均相对较低的情况下,迫切需要结合重大水电工程EPC项目的复杂性开展采购管理的适应性创新。主要从采购任务本身重要性及复杂性、实施过程中采购主体双重委托代理问题两个层面分析了重大水电工程EPC项目采购管理创新动因。在此基础上,按照分类分主体实施采购的总体原则,采用Kraljic模型将重大水电工程采购货物划分为杠杆货物、战略货物、一般货物和瓶颈货物4类。依据不同类别货物采购的特点,建立了采购管理创新路径。两个工程案例分析显示,差异化的采购管理模式有利于业主把控主要设备物资的质量和成本,提升采购效率的同时助力工程高质量完成。 展开更多
关键词 项目采购管理 重大水电工程 epc Kraljic模型 适应性创新 实施路径
在线阅读 下载PDF
浅谈海外EPC项目的设计管理工作
7
作者 齐川 王宝奎 《轻金属》 2025年第3期53-58,共6页
EPC总承包项目是指工程总承包方承担该工程的设计,采购,施工,试运行等工作,最终完成交钥匙工程。其中,设计环节是海外EPC项目的核心。工程设计方不仅要完成项目的基本设计和详细设计,还在项目招投标阶段开始负责投标方案及概算的编制;... EPC总承包项目是指工程总承包方承担该工程的设计,采购,施工,试运行等工作,最终完成交钥匙工程。其中,设计环节是海外EPC项目的核心。工程设计方不仅要完成项目的基本设计和详细设计,还在项目招投标阶段开始负责投标方案及概算的编制;在项目实施阶段,需协助采购部门编写设备及材料的招标文件,协助施工部门处理施工问题,并解答海外业主提出的各种技术方案类问题。因此,EPC项目的设计管理工作贯穿项目始终,其工作内容复杂,协调方众多。本文以印度尼西亚某氧化铝EPC项目为例,介绍了项目设计管理工作的流程及注意事项,对类似项目的设计管理具有一定的参考价值。 展开更多
关键词 氧化铝 设计管理 海外epc项目
在线阅读 下载PDF
基于SNA的未来社区EPC项目设计阶段成本风险控制
8
作者 杨玉胜 刘玉婷 喻兰 《工程研究——跨学科视野中的工程》 2025年第4期446-460,共15页
为强化总承包商的成本风险管控能力,提升企业竞争力,推动实现高质量高效益的社区建设目标,本文基于文献研究、专家访谈及案例分析,提取未来社区工程总承包(EPC)项目设计阶段的成本风险因素,构建风险网络模型。利用社会网络分析法(SNA),... 为强化总承包商的成本风险管控能力,提升企业竞争力,推动实现高质量高效益的社区建设目标,本文基于文献研究、专家访谈及案例分析,提取未来社区工程总承包(EPC)项目设计阶段的成本风险因素,构建风险网络模型。利用社会网络分析法(SNA),从整体网络和个体网络两个层面对风险网络进行可视化定量分析,确定关键风险和关键路径,最后实施风险控制措施并进行效果检测。结果表明:风险管控中应重点关注行业规范和设计原则变更、关键合同条款与合同技术条款不严格、新产品与技术的不合理应用等7项关键风险;应重点关注政府对未来社区项目的推广与扶持程度低→场景应用存在地区差异和适配性等3项关键路径;采取风险控制措施后,网络中风险因素之间联系的紧密程度、聚集程度、关联性都显著降低,高效阻隔了风险在网络中的传导,从而为总承包商在未来社区EPC项目中实现成本风险可控化提供了策略参考。 展开更多
关键词 未来社区 工程总承包项目 设计阶段 成本风险 社会网络分析法
在线阅读 下载PDF
设计单位作为铁路EPC项目联合体牵头方的项目管理
9
作者 陈磊 《工程建设与设计》 2025年第17期261-263,共3页
目前,铁路EPC模式以“联合体模式”和“总分包模式”两种合同模式为主。论文依托天津港某铁路工程EPC总承包项目,通过阐述本项目采取的EPC联合体管理模式及联合体牵头单位在安全管理上的实践,对EPC模式下的设计单位牵头的项目管理进行... 目前,铁路EPC模式以“联合体模式”和“总分包模式”两种合同模式为主。论文依托天津港某铁路工程EPC总承包项目,通过阐述本项目采取的EPC联合体管理模式及联合体牵头单位在安全管理上的实践,对EPC模式下的设计单位牵头的项目管理进行深入探讨。 展开更多
关键词 铁路工程 epc模式 联合体 项目管理
在线阅读 下载PDF
基于SEM的EPC联合体内部关系对项目管理绩效的影响研究
10
作者 万冬君 刘新悦 苌思宇 《工程管理学报》 2025年第3期122-126,共5页
为研究EPC联合体承包商内部关系对项目管理绩效的作用机制,建立影响因素评价体系进行专家修正,并运用结构方程模型分析各变量间的作用关系。研究显示:项目管理、合作关系、合同关系对项目管理绩效的总效应分别为0.177、0.320、0.251,均... 为研究EPC联合体承包商内部关系对项目管理绩效的作用机制,建立影响因素评价体系进行专家修正,并运用结构方程模型分析各变量间的作用关系。研究显示:项目管理、合作关系、合同关系对项目管理绩效的总效应分别为0.177、0.320、0.251,均与项目管理绩效成明显正相关,其中合作关系影响最大。此外,合作关系和合同关系不仅可以直接影响项目管理绩效,因子变量间还存有链式传递关系,可以通过作用于项目管理,对项目管理绩效产生间接影响。 展开更多
关键词 epc联合体 内部关系 结构方程模型 项目管理绩效
在线阅读 下载PDF
Research on Delay Risks of EPC Hydropower Construction Projects in Vietnam 被引量:2
11
作者 Mai Sy Hung Jianqiong Wang 《Journal of Power and Energy Engineering》 2016年第4期9-16,共8页
In recent years, in Vietnam, economy has been developing rapidly. To ensure rapid and sustainable economic growth, strong support from the energy sector is required. Governments in Vietnam have invested in numerous hy... In recent years, in Vietnam, economy has been developing rapidly. To ensure rapid and sustainable economic growth, strong support from the energy sector is required. Governments in Vietnam have invested in numerous hydropower projects, many of which employ the EPC (Engineering, Procurement and Construction) contract. However, the EPC general contractors are facing many difficulties, resulting in schedule delays and considerable losses. This research is conducted to highlight the main risk factors in the delays of hydropower construction projects in Vietnam. The research employs the method of statistical calculations and risk analysis to obtain feedback from experts participating in similar projects. The research outcomes are as follows: identifying the risks that can cause delays in EPC hydroelectric construction projects in Vietnam;calculating and classifying the degree of impact of each risk to the progress of the construction. The practical significance of this study is to ensure the timely completion of projects, benefits for the investors, and the EPC general contractors. 展开更多
关键词 ENGINEERING Procurement and Construction (epc) Risk Research epc Hydropower project Construction projects
在线阅读 下载PDF
Research on Quality Risk of EPC Hydropower Projects in Vietnam 被引量:1
12
作者 Sy Hung Mai Jianqiong Wang 《World Journal of Engineering and Technology》 2017年第2期299-308,共10页
Engineering, procurement and construction (EPC) contracts are on the way to become the most usual form of contracting applied by the private sector to undertake construction works on large scale Hydropower projects. I... Engineering, procurement and construction (EPC) contracts are on the way to become the most usual form of contracting applied by the private sector to undertake construction works on large scale Hydropower projects. If EPC contract management is not implemented and controlled properly. Quality is the first important factor for any contractors who involve in the hydropower project execution. The purpose of this study is to investigate and evaluate risks causing not good quality of EPC hydropower projects in Vietnam. In addition, the study also provided the recommendations for project practitioners to mitigate the impacts of those identified risks. The findings of this study can be a good managerial reference for project management teams who are working in other countries that have similar economic and investment environments to Vietnam to get their EPC construction project completed on quality, thus will ensuring the benefits to the government, the investors, the contractors, and the parties involved. 展开更多
关键词 epc HYDROPOWER project RISK Analysis and Evaluation RISK Control PREVENT RISKS
暂未订购
Research on Subcontractor Risk of EPC Hydropower Project in Vietnam 被引量:1
13
作者 Dinh Bui Sy Hung Mai Huu Hai Vu 《World Journal of Engineering and Technology》 2019年第1期54-67,共14页
Engineering, procurement and construction (EPC) contracts are becoming the most popular form to undertake construction works on large-scale hydropower projects.?The EPC general contractors in Vietnam have been coped w... Engineering, procurement and construction (EPC) contracts are becoming the most popular form to undertake construction works on large-scale hydropower projects.?The EPC general contractors in Vietnam have been coped with lots of difficulties during the construction phase of hydropower projects, resulting in significant schedule delays and cost overrun. One of the reasons is poor Subcontractors capacity.?In order to overcome above, the current study attempts?to research on identification and control Subcontractors risks of delay process of EPC hydropower project in Vietnam.?Through summarizing international research achievements of previous researches relating on EPC hydropower projects combining with analysis characteristics of developing construction of EPC hydropower projects in Vietnam, the current study pointed out all kinds of subcontractor risk of delay process of EPC hydropower project in Vietnam;?a questionnaire with 18 risk elements was designed and then delivered to experts in EPC hydropower project management area. Based on the risk model, 11 main risk elements were identified which can be categorized into 3 groups.?Lastly, the current study proposed suggestions to reduce or avoid risks as well as approach to control risks.?Furthermore, the findings of this study can be a good managerial reference for project management teams who are working in other countries that have similar economic and investment environment to Vietnam to get their EPC construction project completed on schedule, thus ensuring the benefits to the government, the investor, the contractor, and the parties involved. 展开更多
关键词 epc HYDROPOWER project RISK Analysis and Evaluation RISK Control Prevent RISKS
暂未订购
基于博弈论组合赋权—模糊综合评价法的铁路EPC项目进度影响因素研究 被引量:4
14
作者 庞银萍 李帅 +1 位作者 刘浩 戎密仁 《铁道标准设计》 北大核心 2025年第2期51-59,118,共10页
为确定铁路EPC项目进度影响关键因素与最佳权重值,结合邯郸某铁路EPC项目设计、采购和施工等三阶段的构成特征,借助文献综述法、问卷调查法及专家修正法,提出铁路EPC项目进度影响因素和建立相应指标体系;在定性层次分析法和定量熵权法... 为确定铁路EPC项目进度影响关键因素与最佳权重值,结合邯郸某铁路EPC项目设计、采购和施工等三阶段的构成特征,借助文献综述法、问卷调查法及专家修正法,提出铁路EPC项目进度影响因素和建立相应指标体系;在定性层次分析法和定量熵权法权重分析结果基础上,采用博弈论进行组合赋权得到最优值;采用模糊综合评价法进行铁路EPC项目进度影响因素分析与验证。研究结果表明:铁路EPC项目的技术、管理、组织协调、环境、政策、其他等6个维度20观测点组成的关键影响因素能够客观、准确反映项目进度;组合赋权能将定性、定量权重进行合理组合与优化;铁路EPC项目设计阶段和施工阶段的权重分别为3.3821、3.3759,对项目进度影响较为明显。全过程施工技术难度在3个阶段对项目进度影响程度均较大,设计阶段权重0.6298最大、施工阶段权重0.3959次之、采购阶段权重0.1039最小;设备、材料的质量及供货及时性问题在采购阶段权重0.4925较其他因素大。综合来看,博弈论得到的铁路EPC项目进度影响因素权重较为合理;建议控制铁路EPC项目进度时,重点关注设计和施工两个阶段,尤其是全过程施工技术难度以及提出变更设计、增加工程建设内容对项目进度的影响。 展开更多
关键词 铁路 epc项目 影响因素 博弈论 模糊综合评价 权重
在线阅读 下载PDF
利用Project软件进行水泥工厂EPC总承包工程进度控制 被引量:2
15
作者 陈骁 华慧 《江苏建材》 2021年第5期64-65,共2页
从软件控制方法、程序执行方法两方面,阐述了利用Project软件进行水泥生产线EPC项目进度控制的具体操作流程。
关键词 project软件 epc 进度控制
在线阅读 下载PDF
基于SVN的EPC项目价值共创行为网络分析及驱动路径研究 被引量:1
16
作者 梁晓琴 宋洁茹 《土木工程学报》 北大核心 2025年第1期126-136,共11页
EPC项目的实施涉及多方主体,从全过程和多元主体角度对建筑领域EPC项目各方主体的关系及其价值共创行为(VCCB)进行研究探索,是实现项目价值、充分发挥EPC模式优势的一种有效路径。由此,基于价值共创理论和利益相关者价值网络(SVN)分析方... EPC项目的实施涉及多方主体,从全过程和多元主体角度对建筑领域EPC项目各方主体的关系及其价值共创行为(VCCB)进行研究探索,是实现项目价值、充分发挥EPC模式优势的一种有效路径。由此,基于价值共创理论和利益相关者价值网络(SVN)分析方法,以采用设计单位牵头的设计施工联合体模式的EPC项目作为研究对象,分析价值共创行为在利益相关者之间的价值传递与交换情况,构建了包含五类价值共创行为、六类利益相关者和70条价值流的VCCB-SVN定性模型,基于此进一步对模型量化,从而确定了关键行为、关键价值路径以及各类价值共创行为的执行效果。根据模型分析结果提出EPC项目价值共创行为的驱动路径及相应对策建议,为实现建筑领域EPC项目的价值共创提供新的视角。 展开更多
关键词 epc项目 价值共创行为 利益相关者价值网络 驱动路径
原文传递
分布式光伏发电EPC项目成本管控的探讨 被引量:3
17
作者 黄长斌 《工程建设与设计》 2025年第2期225-227,共3页
针对目前EPC建设模式下的光伏发电项目存在的成本管控难度大、投资风险高等问题,论文通过分析分布式光伏发电项目的建设特点,并对多个分布式光伏发电EPC工程进行分析总结,论述了项目EPC总承包商在项目设计、招标、采购、建设等环节所采... 针对目前EPC建设模式下的光伏发电项目存在的成本管控难度大、投资风险高等问题,论文通过分析分布式光伏发电项目的建设特点,并对多个分布式光伏发电EPC工程进行分析总结,论述了项目EPC总承包商在项目设计、招标、采购、建设等环节所采用的成本管控策略,其结果表明,经优化后项目成本均有不同程度的降低。 展开更多
关键词 光伏发电 epc项目 成本管控
在线阅读 下载PDF
基于风险管控的EPC项目三维质量体系研究 被引量:2
18
作者 刘建波 封官斌 《工程管理学报》 2025年第1期83-88,共6页
尽管EPC总承包模式被电力工程项目广泛采用,但建设中仍存在诸多问题和潜在风险。基于三维立体模型,创造性地构建了涵盖项目公司、监理单位、EPC总承包商三位一体的全员、全过程、全方位和全要素的综合质量管控体系。该体系通过基于资源... 尽管EPC总承包模式被电力工程项目广泛采用,但建设中仍存在诸多问题和潜在风险。基于三维立体模型,创造性地构建了涵盖项目公司、监理单位、EPC总承包商三位一体的全员、全过程、全方位和全要素的综合质量管控体系。该体系通过基于资源要素的三级质量保证QA、基于流程监督的四级质量监督QS,以及基于过程管理的五级质量控制QC,全面覆盖了EPC模式下工程项目基建过程所有质量活动,确保EPC项目在QASC体系下的管理线、责任线和任务线都得到有效控制,并对如何从制度层面确保质量体系的建立健全、从管理层面保障质量体系的有效运作及从组织层面推动质量体系的有效落地进行了有益的探索和实践。 展开更多
关键词 epc项目 质量风险 三维模型 质量管控体系
在线阅读 下载PDF
设计牵头EPC项目组织架构建设管理模式研究 被引量:3
19
作者 廖志强 刘启友 +1 位作者 裴卫昶 黄喜明 《建筑施工》 2025年第2期335-338,共4页
推行EPC模式既符合工程项目组织实施方式改革的要求,又符合我国建筑业转型的发展趋势。因此,以哈尔滨工业大学(深圳)国际设计学院项目为例,探讨设计牵头EPC建设管理模式组织架构设计。基于深圳市工务署统筹的组织架构,结合项目的特色与... 推行EPC模式既符合工程项目组织实施方式改革的要求,又符合我国建筑业转型的发展趋势。因此,以哈尔滨工业大学(深圳)国际设计学院项目为例,探讨设计牵头EPC建设管理模式组织架构设计。基于深圳市工务署统筹的组织架构,结合项目的特色与重难点,采用典型项目导向型运作模式,构建以设计为核心、建筑师为主导的项目组织架构,并创新建立类SPV融合一体化项目部。实践表明,采用此建设管理模式有效地将项目管理团队与现场管理团队融入建设单位的管理团队,实施扁平化综合管理,能充分发挥EPC工程总承包模式的管理实效和专业优势。 展开更多
关键词 设计牵头 epc 组织架构 管理模式 类SPV融合一体化项目部
在线阅读 下载PDF
建筑工程EPC总承包项目协同信息管理 被引量:1
20
作者 孙燕丽 《科学与信息化》 2025年第8期187-189,共3页
各行各业都在不断向数字化、智能化转型,建筑行业也需通过信息化管理提高其工程项目的执行效率和质量控制水平,EPC总承包方必须要灵活运用信息化管理手段,最大化EPC模式的协同效应,实现项目管理的数字化转型,提升工程管理的智能化水平... 各行各业都在不断向数字化、智能化转型,建筑行业也需通过信息化管理提高其工程项目的执行效率和质量控制水平,EPC总承包方必须要灵活运用信息化管理手段,最大化EPC模式的协同效应,实现项目管理的数字化转型,提升工程管理的智能化水平。本文总结了建筑工程RPC项目信息化管理工作的重要意义,并从管理架构、管理内容两个方面,基于EPC项目管理模式的特点,结合信息管理,详细分析了二者系统的具体工作流程。 展开更多
关键词 建筑工程 epc 项目协同 信息管理
在线阅读 下载PDF
上一页 1 2 92 下一页 到第
使用帮助 返回顶部