In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management ...In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management of the contract, can promote the reasonable and balanced investment cost allocation in the quality and safety and other aspects of the project, so that the construction project can obtain higher added value, and to further promote China' s economic construction and accelerate the pace of the city. This paper first briefly elaborates our construction project cost of the contract management on the present situation, and some problems are analyzed and discussed, and then puts forward some suggestions on the measures and countermeasures for cost management of construction engineering contract.展开更多
Construction site contract management and risk control is an important part of the internal management of construction enterprises. In order to perfect the enterprise internal management system, improve the enterprise...Construction site contract management and risk control is an important part of the internal management of construction enterprises. In order to perfect the enterprise internal management system, improve the enterprise internal management means, it is necessary to explore the relevant measures. In view of the importance of contract management in construction engineering, this paper distinguishes the types of contract management risk on construction site, analyzes the main reasons of contract management risk, and puts forward the measures to strengthen contract management risk control in order to improve the implementation of enterprise system in all aspects.展开更多
In the construction of water conservancy and hydropower projects, plan changes will have an impact on the project schedule and cost. In order to ensure that the project can be completed on time and in quantity and pro...In the construction of water conservancy and hydropower projects, plan changes will have an impact on the project schedule and cost. In order to ensure that the project can be completed on time and in quantity and protect the legitimate interests of the construction party, it is necessary to do a good job in risk control for construction changes and improve the awareness of claims, so as to lay the foundation for reasonable claims and improve the economic benefits of project construction.展开更多
With the continuous improvement of the social and economic system, China's construction projects have also made higher requirements. In the process of carrying out specific work, relevant units must control the pr...With the continuous improvement of the social and economic system, China's construction projects have also made higher requirements. In the process of carrying out specific work, relevant units must control the project cost and manage the contract well, so as to ensure the construction effect of the project. Contract management is very important in every project, which can guarantee the progress of the project construction and whether the project can be successfully completed. If there are problems in the construction process, we have to solve them according to the construction contract, which is also a guarantee for the project, but there are many difficulties in the management of the construction contract. According to the above, this paper discusses and analyzes the difficulties and improvement strategies of municipal engineering construction contract management for reference.展开更多
In the current new form of social development, the relevant staff can effectively manage the contracts related to road and bridge construction cost, and put forward the corresponding analysis and countermeasures for t...In the current new form of social development, the relevant staff can effectively manage the contracts related to road and bridge construction cost, and put forward the corresponding analysis and countermeasures for the risks existing in its management center, so as to effectively control the overall construction cost to a certain extent, and at the same time, can also pre-judge the related risks that may occur in the process, so that the overall construction development presents a good development trend. In this regard, the relevant staff must form a comprehensive understanding of the relationship between road and bridge project cost and contract management under the new form, and analyze the risks and measures to a certain extent if they want to effectively achieve the above objectives.展开更多
In the context of deepening educational reforms,the significance of ideological and political education has become increasingly prominent,emerging as a crucial aspect of enhancing students’comprehensive qualities.To ...In the context of deepening educational reforms,the significance of ideological and political education has become increasingly prominent,emerging as a crucial aspect of enhancing students’comprehensive qualities.To ensure the orderly progress of ideological and political education in courses,it is essential to actively promote the integration of ideological and political elements within coursework.This integration aims to align professional course education with ideological and political education,fostering a collaborative educational model.Therefore,in the teaching of bidding and contract management courses,constructing a“micro-ideological and political”teaching model has emerged as a critical component.The implementation of this model facilitates the seamless integration of bidding and contract management coursework with ideological and political education,thereby elevating the teaching quality of these courses.Additionally,it leverages the synergistic role of coursework and ideology in educating students,ultimately enhancing the quality and level of talent cultivation.Hence,this paper proposes strategies for constructing a“microideological and political”model within the context of ideological and political teaching reforms in bidding and contract management courses,inviting discussion and exchange on this topic.展开更多
With introducting two testing indices of ECMRS,behavior modal of the contract enterprise and the state in ECMRS are in our paper,then two connive models of ECMRS are made by introducing an audit technique as a means o...With introducting two testing indices of ECMRS,behavior modal of the contract enterprise and the state in ECMRS are in our paper,then two connive models of ECMRS are made by introducing an audit technique as a means of acquiring information Moreover,a general rule which determines optimal strategy with perfect informtion is also given.展开更多
At the present stage, our country is in the process of continuous reform of the market economy system and continuous changes in the social market economy environment. This social phenomenon can bring many opportunitie...At the present stage, our country is in the process of continuous reform of the market economy system and continuous changes in the social market economy environment. This social phenomenon can bring many opportunities for the future development of our state-owned enterprises. An important opportunity for the rapid development of China's state-owned enterprises is to build a unique competitive advantage from the internal system. In this development process, internal system control plays a very key leading role. Before that, we formulated new requirements and standards. Actively adapt to the development trend of the times, adapt to the increasingly strict management requirements, the focus of contract management of state-owned enterprises gradually turned to analyze the existing problems and specific preventive measures. At the same time, since most companies operate in accordance with the law, the more effective the contract management is, the fewer economic disputes will be, and the better the long-term development of the company will be. Under this background, it is of great macro-realistic significance to study some problems in the current labor contract risk management of state-owned enterprises and relevant preventive measures.展开更多
The status quo and significance of contract and management right transfer of rural land are analyzed,and major problems existed in contract and management right transfer of rural land in Anhui Province are studied,con...The status quo and significance of contract and management right transfer of rural land are analyzed,and major problems existed in contract and management right transfer of rural land in Anhui Province are studied,containing unsound transfer market,insufficient flow demand motion,single transfer form,non-standard register,right determination and certificate issuing. On this basis,several policies and suggestions are proposed,such as combining practical use with suitable use of land right determination and certificate issuing,establishing multilayer rural social security system and expanding land management range.展开更多
The paper argues that labor contracts between employees and organization includes two facets, i.e. economic contracts and psychological contracts, and along with enterprise competition becoming fierce increasingly and...The paper argues that labor contracts between employees and organization includes two facets, i.e. economic contracts and psychological contracts, and along with enterprise competition becoming fierce increasingly and labor force becoming diversified all the more, the psychological contracts have crucial effects on employees' attitudes, behaviors and performances. We also argue that, under the challenging organization context, if managers want to make strategic partnership with employees, they must link employees with hearts, pay attention to the management of psychological contracts before, during and after signing labor contracts, and keep dynamic equilibrium of psychological contracts.展开更多
In terms of general contracting management, it is necessary to carry out real-time division of labor for each professional system of the construction project, formulate corresponding management systems, and ensure tha...In terms of general contracting management, it is necessary to carry out real-time division of labor for each professional system of the construction project, formulate corresponding management systems, and ensure that each professional system has a clear code of conduct, so as to reduce the difficulty of the project and ensure the smooth development of the project.When controlling the implementation of the project plan, provide effective services and control to ensure the good operation of the project general contracting management system. Based on this, this paper mainly analyzes the formulation and key and difficult points of construction project general contracting management for reference.展开更多
Regarding the technical management during construction of Thailand PTA Co-generation, there are some problems due to the typical method in electric power construction in China, which show the differences between inter...Regarding the technical management during construction of Thailand PTA Co-generation, there are some problems due to the typical method in electric power construction in China, which show the differences between international methods and ours. In order to do the technical management in the project for export contract, it is necessary to do the work based on the Contract, to know the related laws and regulations, and national conditions, to coordinate the relationship among various parties well, and to carry out the management ahead of time.展开更多
This paper tries to demonstrate that the principle of the risk allocation based on the balance is the most effective way to resolve the risk allocation problems of public-private partnership (PPP) contracts and pres...This paper tries to demonstrate that the principle of the risk allocation based on the balance is the most effective way to resolve the risk allocation problems of public-private partnership (PPP) contracts and presents suggestions how to carry out this principle. For PPP projects, it is necessary to set up a workable and commercially viable risk sharing mechanism to satisfy the different interests and the objectives of both the public sector and the private sector. An effective risk allocation mechanism is not only an important part in preparing project documents, but also an essential part in the success of PPP contracts. Risk allocation can be represented in a risk matrix. The more balanced the risk allocation is, the lower the risk degree of PPP contracts is. Therefore, the most effective risk allocation of PPP contracts is that the public sector and the private sector take part in risk management together in all the stages of the project and allocate the balanced risks. The outcomes of this paper can be used by both the public sector and the private sector to make a good choice of the PPP contract form.展开更多
The definition of relational contents which outsourcer and outsourcee arrange and formalize inside a contract is one of the critical success factors of the outsourcing choice. The contract criticality is greater if th...The definition of relational contents which outsourcer and outsourcee arrange and formalize inside a contract is one of the critical success factors of the outsourcing choice. The contract criticality is greater if the outsourcing aim is made of highly strategic activities, functions, or processes and if the real aim is not the cost saving but the sharing of added value resources, skills, and knowledge. That is, this paper aims to provide some conceptual insights about the role of the contract with a specific reference to the strategic outsourcing, which is the kind of outsourcing where the relationship between the outsourcer and outsourcee is set inside the "partnership-based" logic. In particular the remarks proposed concern the role of the contract as a tool to face the risk and manage the relationship.展开更多
The construction contract can control the implementation of the whole project. The effective conclusion and management of construction contracts will directly affect the interests of both parties to the contract, and ...The construction contract can control the implementation of the whole project. The effective conclusion and management of construction contracts will directly affect the interests of both parties to the contract, and even affect the timely completion of the project. Therefore, railway construction contract management is not only an important part of enterprise management, but also the core of railway project implementation management. Specifically, the objectives of railway project management include two aspects: Firstly, the cost, duration and quality objectives of the project and the need for a corresponding contractual basis for control. Secondly, the results of contract formation, execution and management are directly related to the efficiency and social reputation of the enterprise. Therefore, strengthening contract management and internal risk control requires effective risk management models and countermeasures, which are crucial to avoid or reduce corporate risks, improve project quality and reasonably reduce transportation costs.展开更多
Huanxiling Oil Production Plant belongs to Liaohe Oil Field Company. In order to ensure the compliance of the enterprise management regulations and standards of the oil production plant, it started with the change of ...Huanxiling Oil Production Plant belongs to Liaohe Oil Field Company. In order to ensure the compliance of the enterprise management regulations and standards of the oil production plant, it started with the change of procurement negotiation mode and timely adjustment of the work plan. The contract approval process is set strictly in accordance with the system requirements. For legal dispute cases, communicate with relevant units immediately, learn about the case in various aspects, collect relevant evidence in a timely manner, sort out the case process and seek solutions. Timely grasp the laws and regulations involved in the oil production plant business, the revision of the system of the oil field company and the dynamic adjustment of the oil production plant organization. Through strengthening basic management and optimizing work processes, coordination meetings attended by heads of engineering departments and grass-roots units were convened several times for the implementation and promotion of the 19 projects of "increasing storage and production, reducing costs and increasing efficiency". Through mutual discussion and communication with heads of engineering departments and grass-roots units, face-to-face discussion and coordination of the indicators and safeguard measures of the plans, unnecessary processes were reduced. Through the compliance management of enterprise management laws and regulations, various indicators of the oil production plant have been successfully completed with remarkable results.展开更多
Construction claims are in the implementation of the contract. The parties to the contract's provisions and practices are not because of its fault, but because of the other party in the contract who bears the resp...Construction claims are in the implementation of the contract. The parties to the contract's provisions and practices are not because of its fault, but because of the other party in the contract who bears the responsibility, the actual cause, and the correct economic loss or damage to the other party Ask for financial compensation or time. In recent years, the construction industry has developed faster and faster, and construction claims have become an important part of project contract management, and project cost management has also received more attention. The skill of claim is also mastered and familiar by more and more people.展开更多
The benefits claimed for involvement approaches, a new management style, are not easily obtained in reality. This paper reviews literature on employee beliefs about entitlement and aspirations as consequences of the e...The benefits claimed for involvement approaches, a new management style, are not easily obtained in reality. This paper reviews literature on employee beliefs about entitlement and aspirations as consequences of the execution of involvement management in organizations. Some suggestions are also advanced for companies to prompt involvement management and gain advantages.展开更多
文摘In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management of the contract, can promote the reasonable and balanced investment cost allocation in the quality and safety and other aspects of the project, so that the construction project can obtain higher added value, and to further promote China' s economic construction and accelerate the pace of the city. This paper first briefly elaborates our construction project cost of the contract management on the present situation, and some problems are analyzed and discussed, and then puts forward some suggestions on the measures and countermeasures for cost management of construction engineering contract.
文摘Construction site contract management and risk control is an important part of the internal management of construction enterprises. In order to perfect the enterprise internal management system, improve the enterprise internal management means, it is necessary to explore the relevant measures. In view of the importance of contract management in construction engineering, this paper distinguishes the types of contract management risk on construction site, analyzes the main reasons of contract management risk, and puts forward the measures to strengthen contract management risk control in order to improve the implementation of enterprise system in all aspects.
文摘In the construction of water conservancy and hydropower projects, plan changes will have an impact on the project schedule and cost. In order to ensure that the project can be completed on time and in quantity and protect the legitimate interests of the construction party, it is necessary to do a good job in risk control for construction changes and improve the awareness of claims, so as to lay the foundation for reasonable claims and improve the economic benefits of project construction.
文摘With the continuous improvement of the social and economic system, China's construction projects have also made higher requirements. In the process of carrying out specific work, relevant units must control the project cost and manage the contract well, so as to ensure the construction effect of the project. Contract management is very important in every project, which can guarantee the progress of the project construction and whether the project can be successfully completed. If there are problems in the construction process, we have to solve them according to the construction contract, which is also a guarantee for the project, but there are many difficulties in the management of the construction contract. According to the above, this paper discusses and analyzes the difficulties and improvement strategies of municipal engineering construction contract management for reference.
文摘In the current new form of social development, the relevant staff can effectively manage the contracts related to road and bridge construction cost, and put forward the corresponding analysis and countermeasures for the risks existing in its management center, so as to effectively control the overall construction cost to a certain extent, and at the same time, can also pre-judge the related risks that may occur in the process, so that the overall construction development presents a good development trend. In this regard, the relevant staff must form a comprehensive understanding of the relationship between road and bridge project cost and contract management under the new form, and analyze the risks and measures to a certain extent if they want to effectively achieve the above objectives.
文摘In the context of deepening educational reforms,the significance of ideological and political education has become increasingly prominent,emerging as a crucial aspect of enhancing students’comprehensive qualities.To ensure the orderly progress of ideological and political education in courses,it is essential to actively promote the integration of ideological and political elements within coursework.This integration aims to align professional course education with ideological and political education,fostering a collaborative educational model.Therefore,in the teaching of bidding and contract management courses,constructing a“micro-ideological and political”teaching model has emerged as a critical component.The implementation of this model facilitates the seamless integration of bidding and contract management coursework with ideological and political education,thereby elevating the teaching quality of these courses.Additionally,it leverages the synergistic role of coursework and ideology in educating students,ultimately enhancing the quality and level of talent cultivation.Hence,this paper proposes strategies for constructing a“microideological and political”model within the context of ideological and political teaching reforms in bidding and contract management courses,inviting discussion and exchange on this topic.
文摘With introducting two testing indices of ECMRS,behavior modal of the contract enterprise and the state in ECMRS are in our paper,then two connive models of ECMRS are made by introducing an audit technique as a means of acquiring information Moreover,a general rule which determines optimal strategy with perfect informtion is also given.
文摘At the present stage, our country is in the process of continuous reform of the market economy system and continuous changes in the social market economy environment. This social phenomenon can bring many opportunities for the future development of our state-owned enterprises. An important opportunity for the rapid development of China's state-owned enterprises is to build a unique competitive advantage from the internal system. In this development process, internal system control plays a very key leading role. Before that, we formulated new requirements and standards. Actively adapt to the development trend of the times, adapt to the increasingly strict management requirements, the focus of contract management of state-owned enterprises gradually turned to analyze the existing problems and specific preventive measures. At the same time, since most companies operate in accordance with the law, the more effective the contract management is, the fewer economic disputes will be, and the better the long-term development of the company will be. Under this background, it is of great macro-realistic significance to study some problems in the current labor contract risk management of state-owned enterprises and relevant preventive measures.
文摘The status quo and significance of contract and management right transfer of rural land are analyzed,and major problems existed in contract and management right transfer of rural land in Anhui Province are studied,containing unsound transfer market,insufficient flow demand motion,single transfer form,non-standard register,right determination and certificate issuing. On this basis,several policies and suggestions are proposed,such as combining practical use with suitable use of land right determination and certificate issuing,establishing multilayer rural social security system and expanding land management range.
文摘The paper argues that labor contracts between employees and organization includes two facets, i.e. economic contracts and psychological contracts, and along with enterprise competition becoming fierce increasingly and labor force becoming diversified all the more, the psychological contracts have crucial effects on employees' attitudes, behaviors and performances. We also argue that, under the challenging organization context, if managers want to make strategic partnership with employees, they must link employees with hearts, pay attention to the management of psychological contracts before, during and after signing labor contracts, and keep dynamic equilibrium of psychological contracts.
文摘In terms of general contracting management, it is necessary to carry out real-time division of labor for each professional system of the construction project, formulate corresponding management systems, and ensure that each professional system has a clear code of conduct, so as to reduce the difficulty of the project and ensure the smooth development of the project.When controlling the implementation of the project plan, provide effective services and control to ensure the good operation of the project general contracting management system. Based on this, this paper mainly analyzes the formulation and key and difficult points of construction project general contracting management for reference.
文摘Regarding the technical management during construction of Thailand PTA Co-generation, there are some problems due to the typical method in electric power construction in China, which show the differences between international methods and ours. In order to do the technical management in the project for export contract, it is necessary to do the work based on the Contract, to know the related laws and regulations, and national conditions, to coordinate the relationship among various parties well, and to carry out the management ahead of time.
文摘This paper tries to demonstrate that the principle of the risk allocation based on the balance is the most effective way to resolve the risk allocation problems of public-private partnership (PPP) contracts and presents suggestions how to carry out this principle. For PPP projects, it is necessary to set up a workable and commercially viable risk sharing mechanism to satisfy the different interests and the objectives of both the public sector and the private sector. An effective risk allocation mechanism is not only an important part in preparing project documents, but also an essential part in the success of PPP contracts. Risk allocation can be represented in a risk matrix. The more balanced the risk allocation is, the lower the risk degree of PPP contracts is. Therefore, the most effective risk allocation of PPP contracts is that the public sector and the private sector take part in risk management together in all the stages of the project and allocate the balanced risks. The outcomes of this paper can be used by both the public sector and the private sector to make a good choice of the PPP contract form.
文摘The definition of relational contents which outsourcer and outsourcee arrange and formalize inside a contract is one of the critical success factors of the outsourcing choice. The contract criticality is greater if the outsourcing aim is made of highly strategic activities, functions, or processes and if the real aim is not the cost saving but the sharing of added value resources, skills, and knowledge. That is, this paper aims to provide some conceptual insights about the role of the contract with a specific reference to the strategic outsourcing, which is the kind of outsourcing where the relationship between the outsourcer and outsourcee is set inside the "partnership-based" logic. In particular the remarks proposed concern the role of the contract as a tool to face the risk and manage the relationship.
文摘The construction contract can control the implementation of the whole project. The effective conclusion and management of construction contracts will directly affect the interests of both parties to the contract, and even affect the timely completion of the project. Therefore, railway construction contract management is not only an important part of enterprise management, but also the core of railway project implementation management. Specifically, the objectives of railway project management include two aspects: Firstly, the cost, duration and quality objectives of the project and the need for a corresponding contractual basis for control. Secondly, the results of contract formation, execution and management are directly related to the efficiency and social reputation of the enterprise. Therefore, strengthening contract management and internal risk control requires effective risk management models and countermeasures, which are crucial to avoid or reduce corporate risks, improve project quality and reasonably reduce transportation costs.
文摘Huanxiling Oil Production Plant belongs to Liaohe Oil Field Company. In order to ensure the compliance of the enterprise management regulations and standards of the oil production plant, it started with the change of procurement negotiation mode and timely adjustment of the work plan. The contract approval process is set strictly in accordance with the system requirements. For legal dispute cases, communicate with relevant units immediately, learn about the case in various aspects, collect relevant evidence in a timely manner, sort out the case process and seek solutions. Timely grasp the laws and regulations involved in the oil production plant business, the revision of the system of the oil field company and the dynamic adjustment of the oil production plant organization. Through strengthening basic management and optimizing work processes, coordination meetings attended by heads of engineering departments and grass-roots units were convened several times for the implementation and promotion of the 19 projects of "increasing storage and production, reducing costs and increasing efficiency". Through mutual discussion and communication with heads of engineering departments and grass-roots units, face-to-face discussion and coordination of the indicators and safeguard measures of the plans, unnecessary processes were reduced. Through the compliance management of enterprise management laws and regulations, various indicators of the oil production plant have been successfully completed with remarkable results.
文摘Construction claims are in the implementation of the contract. The parties to the contract's provisions and practices are not because of its fault, but because of the other party in the contract who bears the responsibility, the actual cause, and the correct economic loss or damage to the other party Ask for financial compensation or time. In recent years, the construction industry has developed faster and faster, and construction claims have become an important part of project contract management, and project cost management has also received more attention. The skill of claim is also mastered and familiar by more and more people.
文摘The benefits claimed for involvement approaches, a new management style, are not easily obtained in reality. This paper reviews literature on employee beliefs about entitlement and aspirations as consequences of the execution of involvement management in organizations. Some suggestions are also advanced for companies to prompt involvement management and gain advantages.