A cabled ocean observatory system that can provide abundant power and broad bandwidth communication for undersea instruments is developed. A 10 kV direct current (kVDC) with up to 10 kW power, along with l Gigabit/s...A cabled ocean observatory system that can provide abundant power and broad bandwidth communication for undersea instruments is developed. A 10 kV direct current (kVDC) with up to 10 kW power, along with l Gigabit/sec Ethemet communication, can be transmitted from the shore to the seafloor through an umbilical armored cable. A subsea junction box is fixed at a cable terminal, enabling the extension of up to nine connections. The box consists of three main pressure vessels that perform power conversion, power distribution, and real-time communication functions. A method of stacking modules is used to design the power conversion system in order to reduce the 10 kV voltage to levels that can power the attached instruments. A power distribution system and an Ethemet communication system are introduced to control the power supply and transmit data or commands between the terminals and the shore station, respectively. Specific validations of all sections were qualified in a laboratory environment prior to the sea trial. The ocean observatory system was then deployed at the coast of the East China Sea along with three in situ instruments for a 14-day test. The results show that this high voltage-powered observatory system is effective for subsea long-term and real-time observations.展开更多
Due to the shortage of suitable research methods for real-time and long-term observation of oceans,an innovative approach that can provide abundant power and wide bandwidth is being developed worldwide for undersea in...Due to the shortage of suitable research methods for real-time and long-term observation of oceans,an innovative approach that can provide abundant power and wide bandwidth is being developed worldwide for undersea instruments.In this paper,we develop a direct current(DC) power system which is applied to a multi-node cabled ocean observatory system named ZERO(Zhejiang University Experimental and Research Observatory).The system addresses significant issues ranging from terrestrial facility to subsea infrastructure,and focuses on using appropriate methods to deal with several key challenges,including delivery,conversion,distribution,and management of power,and heat dissipation in pressure vessels.A basic laboratory platform consisting of a shore station,a primary node in a water tank,and a secondary node in a deep-sea simulation chamber under 42 MPa pressure was built and fully tested.An improved secondary node was deployed in Monterey Bay in California for a deep-sea trial.An 11-day laboratory test and a half-year sea trial proved that the DC power system based on our proposed methods is viable for the underwater multi-node observatory system.展开更多
Cabled seafloor observatories play an important role in ocean exploration for its long-term, real-time, and in-situ observation characteristics. In establishing a permanent, reliable, and robust seafloor observatory, ...Cabled seafloor observatories play an important role in ocean exploration for its long-term, real-time, and in-situ observation characteristics. In establishing a permanent, reliable, and robust seafloor observatory, a highly reliable cable switching and fault isolation method is essential. After reviewing the advantages and disadvantages of existing switching methods, we propose a novel active switching method for network configuration. Without additional communication path requirements, the switching method provides a way to communicate with a shore station through an existing power transmission path. A coded voltage signal with a distinct sequence is employed as the communication medium to transmit commands. The analysis of the maximum bit frequency of the voltage signals guarantees the accuracy of command recognition. A prototype based on the switching method is built and tested in a laboratory environment, which validated the functionality and reliability of the method.展开更多
Cabled ocean networks with tree or ring topologies play an important role in real-time ocean exploration. Due to the time-consuming need for field maintenance, cable switching technology that can actively switch the p...Cabled ocean networks with tree or ring topologies play an important role in real-time ocean exploration. Due to the time-consuming need for field maintenance, cable switching technology that can actively switch the power on/off on certain branches of the network becomes essential for enhancing the reliability and availability of the network. In this paper, a novel switching-control method is proposed, in which we invert the power transmission polarity and use the current on the power line as the digital signal at low frequency to broadcast information with the address and commands to the network, and the corresponding branching unit (BU) can decode and execute the switching commands. The cable's parasitic parameters, the network scale, and the number of BUs, as the influencing factors of the communication frequency on the power line, are theoretically studied and sim-ulated. An optimized frequency that balances the executing accuracy and rate is calculated and proved on a simulated prototype. The results showed that the cable switching technology with optimized frequency can enhance the switching accuracy and con-figuring rate.展开更多
The main cable is the primary load-bearing component of a suspension bridge,continuously exposed to harsh environmental conditions,such as wind and rain,throughout the year.These adverse conditions contribute to varyi...The main cable is the primary load-bearing component of a suspension bridge,continuously exposed to harsh environmental conditions,such as wind and rain,throughout the year.These adverse conditions contribute to varying degrees of degradation and damage to the main cable,necessitating regular inspections to prevent catastrophic failures.Traditional manual inspection methods not only suffer from low efficiency but also pose significant safety risks to personnel.To address these challenges and ensure the safe and effective inspection of suspension bridge main cables,this study introduces a novel cooperative climbing robot,designated as Main Cable Robot Version II(CCRobot-M-II),inspired by the locomotion of the inchworm.The robot employs an alternating opening and closing mechanism of four gripper sets,mimicking the inchworm's movement to achieve efficient crawling along the suspension bridge handrails.This paper provides a comprehensive analysis of the structural design,key components,and motion mechanisms of CCRobot-M-II.A detailed force analysis of the robot's crawling process is also presented,followed by the design of the control system and the development of an efficient motion control algorithm.Laboratory experiments demonstrate that the robot achieves a positional error of 00.64%during crawling,with a maximum average crawling speed of 7.6 m/min.Furthermore,the biomimetic design enables the robot to overcome obstacles up to 30 mm in height and possess the capability to handle suspension bridge cables with spans ranging from 740 to 1100 mm.Finally,CCRobot-M-II successfully conducted an inspection of the main cable on a suspension bridge,marking the world's first successful deployment of a climbing robot for main cable inspection on a suspension bridge.展开更多
This study investigates the performance of high-strength cable bolts under impact loading conditions representative of rock bursts in underground environments.Although widely used,the dynamic behaviour of these cable ...This study investigates the performance of high-strength cable bolts under impact loading conditions representative of rock bursts in underground environments.Although widely used,the dynamic behaviour of these cable bolts has received limited experimental attention,and their effectiveness in seismically active zones remains a subject of ongoing debate.To address this gap,a reverse pull-out test machine integrated with a drop hammer rig was employed.Tests were conducted on 70-t SUMO bulbed and non-bulbed cable bolts with encapsulation lengths of 300 and 450 mm,subjected to an impact energy of 14.52 k J.Results indicate that non-bulbed cables,despite showing lower initial peak loads(average 218 vs.328 k N for bulbed cables at 300 mm encapsulation),demonstrated superior energy absorption(average 11.26 vs.8.75 k J)and displacement capacity(average 48.40 vs.36.25 mm).Increasing the encapsulation length for bulbed cables led to a reduction in initial peak load but improved displacement and energy absorption.The dominant failure mechanism was debonding at the cable-grout interface,characterised by frictional sliding and cable rotation.These findings provide new insights into the energy dissipation mechanisms of cables and support the development of more resilient ground support systems for dynamically active conditions.展开更多
In-situ enlargement of super-large-span tunnels can intensify excavation-induced unloading in the surrounding rock,increasing deformation demand and failure risk during construction.This study combines laboratory mode...In-situ enlargement of super-large-span tunnels can intensify excavation-induced unloading in the surrounding rock,increasing deformation demand and failure risk during construction.This study combines laboratory model tests with FLAC3D simulations to evaluate the stabilizing role of prestressed anchor cables and to establish an energy-balance framework for support optimization.Comparative model tests of existing and enlarged tunnel sections,with and without anchors,show that reinforcement increases load-carrying capacity,reduces displacement,and confines damage to more localized zones.The numerical simulations reproduce displacement fields,shear-strain localization,and plastic-zone evolution with good agreement against the experimental observations.The energy framework is implemented in the in-situ simulations by quantifying unloading-related energy release in the rock mass and reinforcement work contributed by the anchors,and by introducing an energy release–reinforcement ratio as a stability indicator.Parametric analyses indicate that anchor length,spacing,and prestress influence stability in a nonlinear manner,with diminishing returns once reinforcement extends beyond the mechanically dominant deformation zone.An efficient parameter window is identified that improves deformation and yielding control while avoiding unnecessary reinforcement.The results provide an energy-consistent and design-oriented basis for prestressed anchorage selection in large-span tunnel expansion.展开更多
To investigate the impact of temporary structures on the mechanical behavior of shaped bridge towers during the construction process,the Dianbu River Special Bridge was selected as the engineering background.A finite ...To investigate the impact of temporary structures on the mechanical behavior of shaped bridge towers during the construction process,the Dianbu River Special Bridge was selected as the engineering background.A finite element model of the middle tower column during the construction stage was established using ABAQUS to analyze the effects of key parameters,including the angle and pretension of temporary cables,as well as the wall thickness and diameter of temporary diagonal braces.The study examines how these parameters influence the stresses at the towergirder consolidation.The results indicate that the angle of temporary cables significantly affects the tensile stresses at the tower-girder consolidation,while its impact on compressive stresses is minimal.Among all parameters,the pretension of temporary cables has the most pronounced effect on the stresses at the tower-girder consolidation.In contrast,the wall thickness of temporary diagonal braces has only a minor influence,whereas the diameter of temporary diagonal braces has an almost negligible impact.These findings provide valuable insights for optimizing the design and arrangement of temporary support structures in similar bridge construction projects.展开更多
To investigate the wind⁃induced vibration re⁃sponse characteristics of multispan double⁃layer cable photo⁃voltaic(PV)support structures,wind tunnel tests using an aeroelastic model were carried out to obtain the wind⁃...To investigate the wind⁃induced vibration re⁃sponse characteristics of multispan double⁃layer cable photo⁃voltaic(PV)support structures,wind tunnel tests using an aeroelastic model were carried out to obtain the wind⁃induced vibration response data of a three⁃span four⁃row double⁃layer cable PV support system.The wind⁃induced vibration characteristics with different PV module tilt angles,wind speeds,and wind direction angles were analyzed.The results showed that the double⁃layer cable large⁃span flexible PV support can effectively control the wind⁃induced vibration response and prevent the occur⁃rence of flutter under strong wind conditions.The maxi⁃mum value of the wind⁃induced vibration displacement of the flexible PV support system occurs in the windward first row.The upstream module has a significant shading effect on the downstream module,with a maximum effect of 23%.The most unfavorable wind direction angles of the structure are 0°and 180°.The change of the wind direction angle in the range of 0°to 30°has little effect on the wind vi⁃bration response.The change in the tilt angle of the PV modules has a greater impact on the wind vibration in the downwind direction and a smaller impact in the upwind di⁃rection.Special attention should be paid to the structural wind⁃resistant design of such systems in the upwind side span.展开更多
Research on the mechanical–electrical properties is crucial for designing and preparing high-temperature superconducting(HTS)cables.Various winding core structures can influence the mechanical–electrical behavior of...Research on the mechanical–electrical properties is crucial for designing and preparing high-temperature superconducting(HTS)cables.Various winding core structures can influence the mechanical–electrical behavior of cables,but the impact of alterations in the winding core structure on the mechanical–electrical behavior of superconducting cables remains unclear.This paper presents a 3D finite element model to predict the performance of three cables with different core structures when subjected to transverse compression and axial tension.The three cables analyzed are CORC(conductor-on-round-core),CORT(conductor-on-round-tube),and HFRC(conductor-on-spiral-tube).A parametric analysis is carried out by varying the core diameter and inner-to-outer diameter ratio.Results indicate that the CORT cable demonstrates better performance in transverse compression compared to the CORC cable,aligning with experimental data.Among the three cables,the HFRC cables exhibit the weakest resistance to transverse deformation.However,the HFRC cable demonstrates superior tensile deformation resistance compared to the CORT cable,provided that the transverse compression properties are maintained.Finite element results also show that the optimum inner-to-outer diameter ratios for achieving the best transverse compression performance are approximately 0.8 for CORT cables and 0.6 for HFRC cables.Meanwhile,the study explores the effect of structural changes in HTS cable winding cores on their electromagnetic properties.It recommends utilizing small tape gaps,lower frequencies,and spiral core construction to minimize eddy losses.The findings presented in this paper offer valuable insights for the commercialization and practical manufacturing of HTS cables.展开更多
Beishan Rock Carvings in Chongqing,a renowned cultural heritage site in China,flourished during the Tang and Song dynasties and are often referred to as the“Stone Carving Art Museum of the Tang and Song Dynasties.”C...Beishan Rock Carvings in Chongqing,a renowned cultural heritage site in China,flourished during the Tang and Song dynasties and are often referred to as the“Stone Carving Art Museum of the Tang and Song Dynasties.”Cave 168 is a key component of the Beishan Rock Carvings.At present,several through-going cracks have developed in the roof of Cave 168,severely compromising the structural stability of the grotto.The early internal steel plate supports have suffered severe corrosion and can no longer provide effective reinforcement.In addition,the presence of steel columns obstructs visitor access and negatively affects the viewing experience.A new reinforcement method is urgently needed.Therefore,studying the deformation patterns of the structure is of critical importance.This study analyzes the stratigraphic parameters and fracture distribution of Cave 168,considering key influencing factors such as rainfall,self-weight,and the overlying Quaternary soil.On-site monitoring and physical model experiments were conducted to evaluate the changes in roof crack width and displacement before and after reinforcement with negative Poisson's ratio(NPR)anchor cables.The results reveal that the roof of Cave 168 contains several through-going cracks and numerous microcracks,which serve as infiltration channels for surface water.These accelerate the softening of the mudstone and pose a significant threat to the cave's structural safety.During the experiment,the main change in the crack exhibited a“semi-archshaped”propagation pattern.In the first ten minutes,as the rock transitioned from dry to moist conditions,a slight crack closure was observed.As rainfall continued,crack propagation accelerated.After rainfall ceased,crack width remained stable over a short period.Under NPR anchor support,the influence of rainfall on roof settlement was effectively mitigated,ensuring the safety and stability of the roof.The NPR anchors successfully limited the roof settlement to within 0.3 mm and provided effective control over both total and differential settlement.These findings offer valuable insights into the application of NPR anchor cables in the conservation of grotto heritage structures.展开更多
This paper reviews the existing testing techniques for high voltage direct current(HVDC)cable systems,following as a backbone the structure of CIGRE Technical Brochure(TB)852:2021‘Recommendations for testing DC extru...This paper reviews the existing testing techniques for high voltage direct current(HVDC)cable systems,following as a backbone the structure of CIGRE Technical Brochure(TB)852:2021‘Recommendations for testing DC extruded cable systems for power transmission at a rated voltage up to 800 kV’because it has a fairly similar structure to CIGRE TB 853:2021 for lapped DC cables,and especially because of the impressive spread of HVDC extruded cables experienced worldwide in the last 25 years.The review considers development tests,pre-qualification tests,extension of qualification test,type tests(with hints at IEEE 1732-2017 for space charge measurements in the qualification of HVDC extruded cables),routine tests(with hints at IEEE 2862-2020 for routine tests of HVDC extruded cable system joints),sample tests and after installation tests.The review also analyses CIGRE TB 853 for lapped HVDC cable systems,as these cables remain unbeaten for submarine applications at the highest sea depths.The main novelties of CIGRE TB 852 and 853 with respect to previous standards for HVDC cable systems(mainly CIGRE TB 496 and IEC 62895 for extruded cables and CIGRE Electra 189:2000 for lapped cables)are put under the spotlight-with focus on the so-called temporary over-voltage tests-together with the limits and gaps of CIGRE TB 852.The main HVDC cable system testing equipment that is usually employed for electro-thermal tests is also treated.Emphasis is given to CIGRE TB 490 to treat the peculiarities of submarine cable systems,as well as to mechanical tests,having CIGRE TB 623 as a reference,with particular focus on the special sea trial tests.An example of an innovative sea trial testing procedure is shown,which is the outcome of a fruitful partnership between a cable manufacturer and the national Transmission System Operator in Italy.展开更多
High-voltage direct current(HVDC)cables are growing rapidly all over the world due to the development of offshore wind power interconnections,cross-island power interconnections,etc.Extensive research has been conduct...High-voltage direct current(HVDC)cables are growing rapidly all over the world due to the development of offshore wind power interconnections,cross-island power interconnections,etc.Extensive research has been conducted and many achievements have been made in the study of theoretical issues of HVDC insulation,structural design and manufacture of HVDC cables with the corresponding accessories,as well as in condition monitoring technology.展开更多
The ocean holds abundant petroleum,natural gas,and mineral resources that form an essential material foundation for the sustainable development of modern society.The safe and efficient exploitation of these resources ...The ocean holds abundant petroleum,natural gas,and mineral resources that form an essential material foundation for the sustainable development of modern society.The safe and efficient exploitation of these resources depends heavily on various slender,composite,flexible structures,including umbilical cables,dynamic power cables for offshore wind turbines,petroleum pipelines(both bonded and unbonded),deep-sea mining risers,and LNG cryogenic flexible hoses.These structures feature highly complex configurations and incur substantial design and manufacturing costs,while operating in environments far more severe and variable than those of onshore pipelines.They must withstand multisource stochastic loads generated by the combined action of wind,waves,currents,and tides,and maintain robustness under extreme conditions such as typhoons,earthquakes,and explosions.展开更多
The actively heated fiber-optic(AHFO)technology has emerged as a frontier and hotspot in soil water content measurement,offering advantages such as easy installation,large-scale distributed measurement capability,and ...The actively heated fiber-optic(AHFO)technology has emerged as a frontier and hotspot in soil water content measurement,offering advantages such as easy installation,large-scale distributed measurement capability,and resistance to electromagnetic interference.However,current AHFO water content sensors fail to simultaneously achieve high precision,applicability for deep soil,and automated real-time monitoring,thereby limiting their development and application.Therefore,this study introduces a novel actively heated fiber Bragg grating(AH-FBG)cable.Laboratory tests were conducted to assess the heating uniformity of the AH-FBG cable and to establish the temperature characteristic value(T_(t))-soil water content(θ)calibration formula for water content measurement.Subsequently,AH-FBG cables were deployed for in situ soil water content monitoring in a test pit on the Loess Plateau.Through two-year monitoring data verified the accuracy of the AH-FBG cable and elucidated the spatiotemporal distribution of in situ loess water content.Laboratory results demonstrated superior heating uniformity of AHFBG cable,with a T_(t) standard deviation of approximately 0.3℃.In the field,the AH-FBG cable exhibited excellent performance in soil water content measurement,achieving a high accuracy of 0.023 cm^(3)/cm^(3).Further analysis revealed that the θ fluctuation predominantly occurred within a 10 m depth from the soil surface,with an overall upward trend over the two-year monitoring period;the response of shallow θ to precipitation was significant but exhibited increasing hysteresis with depth;frequent precipitation significantly enhanced water infiltration depth.This study provides technical guidance for highprecision,quasi-distributed,automated and real-time water content measurement of deep soil.展开更多
The impacts of natural boulders carried by debris flows pose serious risks to the safety and reliability of structures and buildings.Natural boulders can be highly random and unpredictable.Consequently,boulder control...The impacts of natural boulders carried by debris flows pose serious risks to the safety and reliability of structures and buildings.Natural boulders can be highly random and unpredictable.Consequently,boulder control during debris flows is crucial but difficult.Herein,an eco-friendly control system featuring anchoring natural boulders(NBs)with(negative Poisson's ratio)NPR anchor cables is proposed to form an NB-NPR baffle.A series of flume experiments are conducted to verify the effect of NB-NPR baffles on controlling debris flow impact.The deployment of NB-NPR baffles substantially influences the kinematic behavior of a debris flow,primarily in the form of changes in the depositional properties and impact intensities.The results show that the NB-NPR baffle matrix successfully controls boulder mobility and exhibits positive feedback on solid particle deposition.The NB-NPR baffle group exhibits a reduction in peak impact force ranging from 29%to 79%compared to that of the control group in the basic experiment.The NPR anchor cables play a significant role in the NB-NPR baffle by demonstrating particular characteristics,including consistent resistance,large deformation,and substantial energy absorption.The NB-NPR baffle innovatively utilizes the natural boulders in a debris flow gully by converting destructive boulders into constructive boulders.Overall,this research serves as a basis for future field experiments and applications.展开更多
Wire rope inspection robot is an important tool for wire rope condition monitoring and maintenance,which can accurately locate and judge the damage of wire rope.In addition,the wire rope inspection robot can also be u...Wire rope inspection robot is an important tool for wire rope condition monitoring and maintenance,which can accurately locate and judge the damage of wire rope.In addition,the wire rope inspection robot can also be used for cable inspection.First,the crawling structure and crawling mode of the wire rope inspection robot are reviewed,and the characteristics and existing problems of each crawling mode are analyzed separately.Next,the drive mode of the wire rope inspection robot is discussed,the types of commonly used motors are introduced,and the advantages and disadvantages of drive motors and the control modes are compared.Then,the method and principle of the non-destructive detection of the wire rope inspection robot are expounded,and the commonly used detection methods and existing deficiencies are compared.After that,the types of communication modes are compared and analyzed,and the types of wireless communication modes are also introduced.Finally,the current difficult problems of the wire rope inspection robot are summarized,and the future development trend of the wire rope inspection robot is prospected.展开更多
基金supported by the National High-Technology Research and Development Program of China(Grant No.2007AA091201-1)
文摘A cabled ocean observatory system that can provide abundant power and broad bandwidth communication for undersea instruments is developed. A 10 kV direct current (kVDC) with up to 10 kW power, along with l Gigabit/sec Ethemet communication, can be transmitted from the shore to the seafloor through an umbilical armored cable. A subsea junction box is fixed at a cable terminal, enabling the extension of up to nine connections. The box consists of three main pressure vessels that perform power conversion, power distribution, and real-time communication functions. A method of stacking modules is used to design the power conversion system in order to reduce the 10 kV voltage to levels that can power the attached instruments. A power distribution system and an Ethemet communication system are introduced to control the power supply and transmit data or commands between the terminals and the shore station, respectively. Specific validations of all sections were qualified in a laboratory environment prior to the sea trial. The ocean observatory system was then deployed at the coast of the East China Sea along with three in situ instruments for a 14-day test. The results show that this high voltage-powered observatory system is effective for subsea long-term and real-time observations.
基金Project (No. 2007AA091201-1) supported by the National High-Tech R&D (863) Program of China
文摘Due to the shortage of suitable research methods for real-time and long-term observation of oceans,an innovative approach that can provide abundant power and wide bandwidth is being developed worldwide for undersea instruments.In this paper,we develop a direct current(DC) power system which is applied to a multi-node cabled ocean observatory system named ZERO(Zhejiang University Experimental and Research Observatory).The system addresses significant issues ranging from terrestrial facility to subsea infrastructure,and focuses on using appropriate methods to deal with several key challenges,including delivery,conversion,distribution,and management of power,and heat dissipation in pressure vessels.A basic laboratory platform consisting of a shore station,a primary node in a water tank,and a secondary node in a deep-sea simulation chamber under 42 MPa pressure was built and fully tested.An improved secondary node was deployed in Monterey Bay in California for a deep-sea trial.An 11-day laboratory test and a half-year sea trial proved that the DC power system based on our proposed methods is viable for the underwater multi-node observatory system.
基金supported by the National Natural Science Foundation of China(Nos.51409229,41676089,and 51521064)the National High-Tech R&D Program(863)of China(No.2012AA09A410)the Zhejiang Provincial Natural Science Foundation of China(No.LQ14E070002)
文摘Cabled seafloor observatories play an important role in ocean exploration for its long-term, real-time, and in-situ observation characteristics. In establishing a permanent, reliable, and robust seafloor observatory, a highly reliable cable switching and fault isolation method is essential. After reviewing the advantages and disadvantages of existing switching methods, we propose a novel active switching method for network configuration. Without additional communication path requirements, the switching method provides a way to communicate with a shore station through an existing power transmission path. A coded voltage signal with a distinct sequence is employed as the communication medium to transmit commands. The analysis of the maximum bit frequency of the voltage signals guarantees the accuracy of command recognition. A prototype based on the switching method is built and tested in a laboratory environment, which validated the functionality and reliability of the method.
基金Project supported by the National Natural Science Foundation of China(No.51409229)。
文摘Cabled ocean networks with tree or ring topologies play an important role in real-time ocean exploration. Due to the time-consuming need for field maintenance, cable switching technology that can actively switch the power on/off on certain branches of the network becomes essential for enhancing the reliability and availability of the network. In this paper, a novel switching-control method is proposed, in which we invert the power transmission polarity and use the current on the power line as the digital signal at low frequency to broadcast information with the address and commands to the network, and the corresponding branching unit (BU) can decode and execute the switching commands. The cable's parasitic parameters, the network scale, and the number of BUs, as the influencing factors of the communication frequency on the power line, are theoretically studied and sim-ulated. An optimized frequency that balances the executing accuracy and rate is calculated and proved on a simulated prototype. The results showed that the cable switching technology with optimized frequency can enhance the switching accuracy and con-figuring rate.
基金Shenzhen Science and Technology Program(Grant No.20220817171811004)(Grant No.RCBS20231211090816033)+4 种基金the Major Key Project of PCL,China under Grant PCL2025A13Longgang District,Shenzhen's"Ten-Action Plan"for Supporting Innovation Projects(Grant No.LGKCSDPT2024002,LGKCSDPT2024003,LGKCSDPT2024004)the"Zhiguo"Action of Guangxi Science and Technology Program(Grant No.ZG2503980003)Guangdong S&T Program under(Grant No.2025B0909040003)Guangdong Provincial Leading Talent Program(Grant No.2024TX08Z319).
文摘The main cable is the primary load-bearing component of a suspension bridge,continuously exposed to harsh environmental conditions,such as wind and rain,throughout the year.These adverse conditions contribute to varying degrees of degradation and damage to the main cable,necessitating regular inspections to prevent catastrophic failures.Traditional manual inspection methods not only suffer from low efficiency but also pose significant safety risks to personnel.To address these challenges and ensure the safe and effective inspection of suspension bridge main cables,this study introduces a novel cooperative climbing robot,designated as Main Cable Robot Version II(CCRobot-M-II),inspired by the locomotion of the inchworm.The robot employs an alternating opening and closing mechanism of four gripper sets,mimicking the inchworm's movement to achieve efficient crawling along the suspension bridge handrails.This paper provides a comprehensive analysis of the structural design,key components,and motion mechanisms of CCRobot-M-II.A detailed force analysis of the robot's crawling process is also presented,followed by the design of the control system and the development of an efficient motion control algorithm.Laboratory experiments demonstrate that the robot achieves a positional error of 00.64%during crawling,with a maximum average crawling speed of 7.6 m/min.Furthermore,the biomimetic design enables the robot to overcome obstacles up to 30 mm in height and possess the capability to handle suspension bridge cables with spans ranging from 740 to 1100 mm.Finally,CCRobot-M-II successfully conducted an inspection of the main cable on a suspension bridge,marking the world's first successful deployment of a climbing robot for main cable inspection on a suspension bridge.
文摘This study investigates the performance of high-strength cable bolts under impact loading conditions representative of rock bursts in underground environments.Although widely used,the dynamic behaviour of these cable bolts has received limited experimental attention,and their effectiveness in seismically active zones remains a subject of ongoing debate.To address this gap,a reverse pull-out test machine integrated with a drop hammer rig was employed.Tests were conducted on 70-t SUMO bulbed and non-bulbed cable bolts with encapsulation lengths of 300 and 450 mm,subjected to an impact energy of 14.52 k J.Results indicate that non-bulbed cables,despite showing lower initial peak loads(average 218 vs.328 k N for bulbed cables at 300 mm encapsulation),demonstrated superior energy absorption(average 11.26 vs.8.75 k J)and displacement capacity(average 48.40 vs.36.25 mm).Increasing the encapsulation length for bulbed cables led to a reduction in initial peak load but improved displacement and energy absorption.The dominant failure mechanism was debonding at the cable-grout interface,characterised by frictional sliding and cable rotation.These findings provide new insights into the energy dissipation mechanisms of cables and support the development of more resilient ground support systems for dynamically active conditions.
基金funded by the National Key R&D Program of China,China(No.2024YFF0507903)the National Key Research and Development Program of China(Grant No.2024YFF0507904)the National Natural Science Foundation of China,China(Grant No.52379114).These supports are gratefully acknowledged.
文摘In-situ enlargement of super-large-span tunnels can intensify excavation-induced unloading in the surrounding rock,increasing deformation demand and failure risk during construction.This study combines laboratory model tests with FLAC3D simulations to evaluate the stabilizing role of prestressed anchor cables and to establish an energy-balance framework for support optimization.Comparative model tests of existing and enlarged tunnel sections,with and without anchors,show that reinforcement increases load-carrying capacity,reduces displacement,and confines damage to more localized zones.The numerical simulations reproduce displacement fields,shear-strain localization,and plastic-zone evolution with good agreement against the experimental observations.The energy framework is implemented in the in-situ simulations by quantifying unloading-related energy release in the rock mass and reinforcement work contributed by the anchors,and by introducing an energy release–reinforcement ratio as a stability indicator.Parametric analyses indicate that anchor length,spacing,and prestress influence stability in a nonlinear manner,with diminishing returns once reinforcement extends beyond the mechanically dominant deformation zone.An efficient parameter window is identified that improves deformation and yielding control while avoiding unnecessary reinforcement.The results provide an energy-consistent and design-oriented basis for prestressed anchorage selection in large-span tunnel expansion.
文摘To investigate the impact of temporary structures on the mechanical behavior of shaped bridge towers during the construction process,the Dianbu River Special Bridge was selected as the engineering background.A finite element model of the middle tower column during the construction stage was established using ABAQUS to analyze the effects of key parameters,including the angle and pretension of temporary cables,as well as the wall thickness and diameter of temporary diagonal braces.The study examines how these parameters influence the stresses at the towergirder consolidation.The results indicate that the angle of temporary cables significantly affects the tensile stresses at the tower-girder consolidation,while its impact on compressive stresses is minimal.Among all parameters,the pretension of temporary cables has the most pronounced effect on the stresses at the tower-girder consolidation.In contrast,the wall thickness of temporary diagonal braces has only a minor influence,whereas the diameter of temporary diagonal braces has an almost negligible impact.These findings provide valuable insights for optimizing the design and arrangement of temporary support structures in similar bridge construction projects.
基金The National Natural Science Foundation of China(No.52338011).
文摘To investigate the wind⁃induced vibration re⁃sponse characteristics of multispan double⁃layer cable photo⁃voltaic(PV)support structures,wind tunnel tests using an aeroelastic model were carried out to obtain the wind⁃induced vibration response data of a three⁃span four⁃row double⁃layer cable PV support system.The wind⁃induced vibration characteristics with different PV module tilt angles,wind speeds,and wind direction angles were analyzed.The results showed that the double⁃layer cable large⁃span flexible PV support can effectively control the wind⁃induced vibration response and prevent the occur⁃rence of flutter under strong wind conditions.The maxi⁃mum value of the wind⁃induced vibration displacement of the flexible PV support system occurs in the windward first row.The upstream module has a significant shading effect on the downstream module,with a maximum effect of 23%.The most unfavorable wind direction angles of the structure are 0°and 180°.The change of the wind direction angle in the range of 0°to 30°has little effect on the wind vi⁃bration response.The change in the tilt angle of the PV modules has a greater impact on the wind vibration in the downwind direction and a smaller impact in the upwind di⁃rection.Special attention should be paid to the structural wind⁃resistant design of such systems in the upwind side span.
基金supported by the National Natural Science Foundation of China(12072136).
文摘Research on the mechanical–electrical properties is crucial for designing and preparing high-temperature superconducting(HTS)cables.Various winding core structures can influence the mechanical–electrical behavior of cables,but the impact of alterations in the winding core structure on the mechanical–electrical behavior of superconducting cables remains unclear.This paper presents a 3D finite element model to predict the performance of three cables with different core structures when subjected to transverse compression and axial tension.The three cables analyzed are CORC(conductor-on-round-core),CORT(conductor-on-round-tube),and HFRC(conductor-on-spiral-tube).A parametric analysis is carried out by varying the core diameter and inner-to-outer diameter ratio.Results indicate that the CORT cable demonstrates better performance in transverse compression compared to the CORC cable,aligning with experimental data.Among the three cables,the HFRC cables exhibit the weakest resistance to transverse deformation.However,the HFRC cable demonstrates superior tensile deformation resistance compared to the CORT cable,provided that the transverse compression properties are maintained.Finite element results also show that the optimum inner-to-outer diameter ratios for achieving the best transverse compression performance are approximately 0.8 for CORT cables and 0.6 for HFRC cables.Meanwhile,the study explores the effect of structural changes in HTS cable winding cores on their electromagnetic properties.It recommends utilizing small tape gaps,lower frequencies,and spiral core construction to minimize eddy losses.The findings presented in this paper offer valuable insights for the commercialization and practical manufacturing of HTS cables.
文摘Beishan Rock Carvings in Chongqing,a renowned cultural heritage site in China,flourished during the Tang and Song dynasties and are often referred to as the“Stone Carving Art Museum of the Tang and Song Dynasties.”Cave 168 is a key component of the Beishan Rock Carvings.At present,several through-going cracks have developed in the roof of Cave 168,severely compromising the structural stability of the grotto.The early internal steel plate supports have suffered severe corrosion and can no longer provide effective reinforcement.In addition,the presence of steel columns obstructs visitor access and negatively affects the viewing experience.A new reinforcement method is urgently needed.Therefore,studying the deformation patterns of the structure is of critical importance.This study analyzes the stratigraphic parameters and fracture distribution of Cave 168,considering key influencing factors such as rainfall,self-weight,and the overlying Quaternary soil.On-site monitoring and physical model experiments were conducted to evaluate the changes in roof crack width and displacement before and after reinforcement with negative Poisson's ratio(NPR)anchor cables.The results reveal that the roof of Cave 168 contains several through-going cracks and numerous microcracks,which serve as infiltration channels for surface water.These accelerate the softening of the mudstone and pose a significant threat to the cave's structural safety.During the experiment,the main change in the crack exhibited a“semi-archshaped”propagation pattern.In the first ten minutes,as the rock transitioned from dry to moist conditions,a slight crack closure was observed.As rainfall continued,crack propagation accelerated.After rainfall ceased,crack width remained stable over a short period.Under NPR anchor support,the influence of rainfall on roof settlement was effectively mitigated,ensuring the safety and stability of the roof.The NPR anchors successfully limited the roof settlement to within 0.3 mm and provided effective control over both total and differential settlement.These findings offer valuable insights into the application of NPR anchor cables in the conservation of grotto heritage structures.
文摘This paper reviews the existing testing techniques for high voltage direct current(HVDC)cable systems,following as a backbone the structure of CIGRE Technical Brochure(TB)852:2021‘Recommendations for testing DC extruded cable systems for power transmission at a rated voltage up to 800 kV’because it has a fairly similar structure to CIGRE TB 853:2021 for lapped DC cables,and especially because of the impressive spread of HVDC extruded cables experienced worldwide in the last 25 years.The review considers development tests,pre-qualification tests,extension of qualification test,type tests(with hints at IEEE 1732-2017 for space charge measurements in the qualification of HVDC extruded cables),routine tests(with hints at IEEE 2862-2020 for routine tests of HVDC extruded cable system joints),sample tests and after installation tests.The review also analyses CIGRE TB 853 for lapped HVDC cable systems,as these cables remain unbeaten for submarine applications at the highest sea depths.The main novelties of CIGRE TB 852 and 853 with respect to previous standards for HVDC cable systems(mainly CIGRE TB 496 and IEC 62895 for extruded cables and CIGRE Electra 189:2000 for lapped cables)are put under the spotlight-with focus on the so-called temporary over-voltage tests-together with the limits and gaps of CIGRE TB 852.The main HVDC cable system testing equipment that is usually employed for electro-thermal tests is also treated.Emphasis is given to CIGRE TB 490 to treat the peculiarities of submarine cable systems,as well as to mechanical tests,having CIGRE TB 623 as a reference,with particular focus on the special sea trial tests.An example of an innovative sea trial testing procedure is shown,which is the outcome of a fruitful partnership between a cable manufacturer and the national Transmission System Operator in Italy.
文摘High-voltage direct current(HVDC)cables are growing rapidly all over the world due to the development of offshore wind power interconnections,cross-island power interconnections,etc.Extensive research has been conducted and many achievements have been made in the study of theoretical issues of HVDC insulation,structural design and manufacture of HVDC cables with the corresponding accessories,as well as in condition monitoring technology.
文摘The ocean holds abundant petroleum,natural gas,and mineral resources that form an essential material foundation for the sustainable development of modern society.The safe and efficient exploitation of these resources depends heavily on various slender,composite,flexible structures,including umbilical cables,dynamic power cables for offshore wind turbines,petroleum pipelines(both bonded and unbonded),deep-sea mining risers,and LNG cryogenic flexible hoses.These structures feature highly complex configurations and incur substantial design and manufacturing costs,while operating in environments far more severe and variable than those of onshore pipelines.They must withstand multisource stochastic loads generated by the combined action of wind,waves,currents,and tides,and maintain robustness under extreme conditions such as typhoons,earthquakes,and explosions.
基金supported by the National Natural Science Foundation of China(Grant Nos.42307189 and 42030701)the China Postdoctoral Science Foundation(Grant No.2023M740974).
文摘The actively heated fiber-optic(AHFO)technology has emerged as a frontier and hotspot in soil water content measurement,offering advantages such as easy installation,large-scale distributed measurement capability,and resistance to electromagnetic interference.However,current AHFO water content sensors fail to simultaneously achieve high precision,applicability for deep soil,and automated real-time monitoring,thereby limiting their development and application.Therefore,this study introduces a novel actively heated fiber Bragg grating(AH-FBG)cable.Laboratory tests were conducted to assess the heating uniformity of the AH-FBG cable and to establish the temperature characteristic value(T_(t))-soil water content(θ)calibration formula for water content measurement.Subsequently,AH-FBG cables were deployed for in situ soil water content monitoring in a test pit on the Loess Plateau.Through two-year monitoring data verified the accuracy of the AH-FBG cable and elucidated the spatiotemporal distribution of in situ loess water content.Laboratory results demonstrated superior heating uniformity of AHFBG cable,with a T_(t) standard deviation of approximately 0.3℃.In the field,the AH-FBG cable exhibited excellent performance in soil water content measurement,achieving a high accuracy of 0.023 cm^(3)/cm^(3).Further analysis revealed that the θ fluctuation predominantly occurred within a 10 m depth from the soil surface,with an overall upward trend over the two-year monitoring period;the response of shallow θ to precipitation was significant but exhibited increasing hysteresis with depth;frequent precipitation significantly enhanced water infiltration depth.This study provides technical guidance for highprecision,quasi-distributed,automated and real-time water content measurement of deep soil.
基金financial support from the National Natural Science Foundation of China(Grant No.41941018).
文摘The impacts of natural boulders carried by debris flows pose serious risks to the safety and reliability of structures and buildings.Natural boulders can be highly random and unpredictable.Consequently,boulder control during debris flows is crucial but difficult.Herein,an eco-friendly control system featuring anchoring natural boulders(NBs)with(negative Poisson's ratio)NPR anchor cables is proposed to form an NB-NPR baffle.A series of flume experiments are conducted to verify the effect of NB-NPR baffles on controlling debris flow impact.The deployment of NB-NPR baffles substantially influences the kinematic behavior of a debris flow,primarily in the form of changes in the depositional properties and impact intensities.The results show that the NB-NPR baffle matrix successfully controls boulder mobility and exhibits positive feedback on solid particle deposition.The NB-NPR baffle group exhibits a reduction in peak impact force ranging from 29%to 79%compared to that of the control group in the basic experiment.The NPR anchor cables play a significant role in the NB-NPR baffle by demonstrating particular characteristics,including consistent resistance,large deformation,and substantial energy absorption.The NB-NPR baffle innovatively utilizes the natural boulders in a debris flow gully by converting destructive boulders into constructive boulders.Overall,this research serves as a basis for future field experiments and applications.
基金the National Natural Science Foundation of China(No.12072362)the Priority Academic Program Development of Jiangsu Higher Education Institutions。
文摘Wire rope inspection robot is an important tool for wire rope condition monitoring and maintenance,which can accurately locate and judge the damage of wire rope.In addition,the wire rope inspection robot can also be used for cable inspection.First,the crawling structure and crawling mode of the wire rope inspection robot are reviewed,and the characteristics and existing problems of each crawling mode are analyzed separately.Next,the drive mode of the wire rope inspection robot is discussed,the types of commonly used motors are introduced,and the advantages and disadvantages of drive motors and the control modes are compared.Then,the method and principle of the non-destructive detection of the wire rope inspection robot are expounded,and the commonly used detection methods and existing deficiencies are compared.After that,the types of communication modes are compared and analyzed,and the types of wireless communication modes are also introduced.Finally,the current difficult problems of the wire rope inspection robot are summarized,and the future development trend of the wire rope inspection robot is prospected.