期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
黄土高边坡土钉-预加固桩复合支护体系性状分析 被引量:16
1
作者 吴九江 程谦恭 孟祥龙 《岩土力学》 EI CAS CSCD 北大核心 2014年第7期2029-2040,共12页
土钉-预加固桩复合支护技术已在基坑及边坡工程中取得了大量应用,但在黄土高边坡开挖中的应用相对较少。基于详细的现场监测数据并辅以有限元数值计算,分析了边坡开挖过程中支护体系受力及变形随时间和空间的变化规律。结果表明:预加固... 土钉-预加固桩复合支护技术已在基坑及边坡工程中取得了大量应用,但在黄土高边坡开挖中的应用相对较少。基于详细的现场监测数据并辅以有限元数值计算,分析了边坡开挖过程中支护体系受力及变形随时间和空间的变化规律。结果表明:预加固桩的水平位移随着时间的推移与开挖深度的增加呈增大趋势,并最终趋于稳定,同时,桩身剪力及弯矩亦随开挖的进行而不断增大;剪力最大值的位置不断下移,说明边坡的潜在滑动面有不断向下扩展的趋势。与深基坑支护桩的土压力分布相比,土钉-预加固桩复合支护体系中桩后土压力随开挖呈不断减小的趋势,但桩前土压力随着开挖深度的增加,有增有减。随着施工开挖深度的增加,土钉所测得的应力有着明显的增大,说明土钉对抑制坡体变形起到了一定作用。在预加固桩的影响下,桩上方坡体的最危险破裂面为圆弧状,其剪出口位于预加固桩桩顶处。开挖深度较浅时,土钉对整体稳定性的贡献较大,而随着开挖深度的变大,预加固桩的加固效果开始占主导地位。 展开更多
关键词 黄土高边坡 土钉-预加固桩 性状 动态监测 有限元 稳定性分析
原文传递
Stability analysis of a high combination system of soil loess slope reinforced by the nails and stabilization piles 被引量:2
2
作者 Jiu-jiang WU Qian-gong CHENG Xin LIANG Jian-Lei CAO 《Frontiers of Structural and Civil Engineering》 CSCD 2014年第3期252-259,共8页
While the soil nails and the corresponding compound technology are widely used as the support techniques for deep foundation pit and normal slopes, few related engineering cases are found for high loess slopes. By uti... While the soil nails and the corresponding compound technology are widely used as the support techniques for deep foundation pit and normal slopes, few related engineering cases are found for high loess slopes. By utilizing the finite element software of PLAXIS 8.5, the behavior of a high loess slope reinforced by the combination of soil nails and stabilization piles (hereinafter for CSNSP) is studied in this paper. It can be found that the potential slide surface of the slope moves to deeper locations during the process of the multi-staged excavations. The measure of reducing the weight of the top of the slope is a positive factor to the stability of the loess slope, while the rainfhll is a negative factor. The slope can't be stable if it's reinforced only by stabilization piles or soil nails during the process of the multi-staged excavations. The soil nail contributes greater to the overall system stability when the excavation depth is relatively shallow, while the stabilization pile takes it over when the excavation depth reaches a large value. Compared to the results from the Sweden circular slip surface, the data derived from the method of phi/c reduction is relatively large when the slope is unreinforced or reinforced only by stabilization pile, and the data turns to be small when the slope is strengthened by soil nails or the combination system of soil nails and stabilization piles. 展开更多
关键词 high loess slope csnsp PLAXIS philic strength reduction method Sweden circular slip surface
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部