In the construction of the Qinghai-Tibet Power Transmission Line (QTPTL), cast-in-place piles (CIPPs) are widely applied in areas with unfavorable geological conditions. The thermal regime around piles in permafro...In the construction of the Qinghai-Tibet Power Transmission Line (QTPTL), cast-in-place piles (CIPPs) are widely applied in areas with unfavorable geological conditions. The thermal regime around piles in permafrost regions greatly affects the stability of the towers as well as the operation of the QTPTL. The casting of piles will markedly affect the thermal regime of the surrounding permafrost because of the casting temperature and the hydration heat of cement. Based on the typical geological and engineering conditions along the QTPTL, thermal disturbance ofa CIPP to surrounding permafrost under different casting seasons, pile depths, and casting temperatures were simulated. The results show that the casting season (summer versus winter) can influence the refreezing process of CIPPs, within the first 6 m of pile depth. Sixty days after being cast, CIPPs greater than 6 m in depth can be frozen regardless of which season they were cast, and the foundation could be reffozen after a cold season. Comparing the refreezing characteristics of CIPPs cast in different seasons also showed that, without considering the ground surface conditions, warm seasons are more suitable for casting piles. With the increase of pile depth, the thermal effect of a CIPP on the surrounding soil mainly expands vertically, while the lateral heat disturbance changes little. Deeper, longer CIPPs have better stability. The casting temperature clearly affects the thermal disturbance, and the radius of the melting circle increases with rising casting temperature. The optimal casting temperature is between 2 ℃ and 9 ℃.展开更多
A number of dry bridges have been built to substitute for the roadbed on the Qinghai-Tibet Railway,China.The aim of this study was to investigate the exothermic process of cast-in-place (CIP) pile foundation of a dry ...A number of dry bridges have been built to substitute for the roadbed on the Qinghai-Tibet Railway,China.The aim of this study was to investigate the exothermic process of cast-in-place (CIP) pile foundation of a dry bridge and its harm to the stability of nearby frozen ground.We present 3D heat conduction functions of a concrete pile and of frozen ground with related boundaries.Our analysis is based on the theory of heat conduction and the exponent law describing the adiabatic temperature rise caused by hydration heat.Results under continuous and initial conditions were combined to establish a finite element model of a CIP pile-frozen ground system for a dry bridge under actual field conditions in cold regions.Numerical results indicated that the process could effectively simulate the exothermic process of CIP pile foundation.Thermal disturbance to frozen ground under a long dry bridge caused by the casting temperature and hydration heat of CIP piles was substantial and long-lasting.The simulated thermal analysis results agreed with field measurements and some significant rules relating to the problem were deduced and conclusions reached.展开更多
Many staircases in reinforced concrete (RC) frame structures suffered severe damage during the Wenchuan earthquake. Elastic analyses for 18 RC structure models with and without staircases are conducted and compared ...Many staircases in reinforced concrete (RC) frame structures suffered severe damage during the Wenchuan earthquake. Elastic analyses for 18 RC structure models with and without staircases are conducted and compared to study the influence of the staircase on the stiffness, displacements and internal forces of the structures. To capture the yielding development and damage mechanism of frame structures, elasto-plastic analysis is carried out for one of the 18 models. Based on the features observed in the analyses, a new type of staircase design i.e., isolating them from the master structure to eliminate the effect of K-type struts, is proposed and discussed. It is concluded that the proposed method of staircase isolation is effective and feasible for engineering design, and does not significantly increase the construction cost.展开更多
Similar to free-standing pile groups, piled raft foundations are conventionally designed in which the piles carry the total load of structure and the raft bearing capacity is not taken into account. Numerous studies i...Similar to free-standing pile groups, piled raft foundations are conventionally designed in which the piles carry the total load of structure and the raft bearing capacity is not taken into account. Numerous studies indicated that this method is too conservative. Only when the pile cap is elevated from the ground level,the raft bearing contribution can be neglected. In a piled raft foundation, pileesoileraft interaction is complicated. Although several numerical studies have been carried out to analyze the behaviors of piled raft foundations, very few experimental studies are reported in the literature. The available laboratory studies mainly focused on steel piles. The present study aims to compare the behaviors of piled raft foundations with free-standing pile groups in sand, using laboratory physical models. Cast-in-place concrete piles and concrete raft are used for the tests. The tests are conducted on single pile, single pile in pile group, unpiled raft, free-standing pile group and piled raft foundation. We examine the effects of the number of piles, the pile installation method and the interaction between different components of foundation. The results indicate that the ultimate bearing capacity of the piled raft foundation is considerably higher than that of the free-standing pile group with the same number of piles. With installation of the single pile in the group, the pile bearing capacity and stiffness increase. Installation of the piles beneath the raft decreases the bearing capacity of the raft. When the raft bearing capacity is not included in the design process, the allowable bearing capacity of the piled raft is underestimated by more than 200%. This deviation intensifies with increasing spacing of the piles.展开更多
During the construction of cast-in-place piles in warm permafrost,the heat carried by concrete and the cement hydration reaction can cause strong thermal disturbance to the surrounding permafrost.Since the bearing cap...During the construction of cast-in-place piles in warm permafrost,the heat carried by concrete and the cement hydration reaction can cause strong thermal disturbance to the surrounding permafrost.Since the bearing capacity of the pile is quite small before the full freeze-back,the quick refreezing of the native soils surrounding the cast-in-place pile has become the focus of the infrastructure construction in permafrost.To solve this problem,this paper innovatively puts forward the application of the artificial ground freezing(AGF)method at the end of the curing period of cast-in-place piles in permafrost.A field test on the AGF was conducted at the Beiluhe Observation and Research Station of Frozen Soil Engineering and Environment(34°51.2'N,92°56.4'E)in the Qinghai Tibet Plateau(QTP),and then a 3-D numerical model was established to investigate the thermal performance of piles using AGF under different engineering conditions.Additionally,the long-term thermal performance of piles after the completion of AGF under different conditions was estimated.Field experiment results demonstrate that AGF is an effective method to reduce the refreezing time of the soil surrounding the piles constructed in permafrost terrain,with the ability to reduce the pile-soil interface temperatures to below the natural ground temperature within 3 days.Numerical results further prove that AGF still has a good cooling effect even under unfavorable engineering conditions such as high pouring temperature,large pile diameter,and large pile length.Consequently,the application of this method is meaningful to save the subsequent latency time and solve the problem of thermal disturbance in pile construction in permafrost.The research results are highly relevant for the spread of AGF technology and the rapid building of pile foundations in permafrost.展开更多
The bearing capacity of pile foundations is affected by the temperature of the frozen soil around pile foundations.The construction process and the hydration heat of cast-in-place(CIP)pile foundations affect the therm...The bearing capacity of pile foundations is affected by the temperature of the frozen soil around pile foundations.The construction process and the hydration heat of cast-in-place(CIP)pile foundations affect the thermal stability of permafrost.In this paper,temperature data from inside multiple CIP piles,borehole observations of ground thermal status adjacent to the foundations and local weather stations were monitored in warm permafrost regions to study the thermal influence process of CIP pile foundations.The following conclusions are drawn from the field observation data.(1)The early temperature change process of different CIP piles is different,and the differences gradually diminish over time.(2)The initial concrete temperature is linearly related with the air temperature,net radiation and wind speed within 1 h before the completion of concrete pouring;the contributions of the air temperature,net radiation,and wind speed to the initial concrete temperature are 51.9%,20.3%and 27.9%,respectively.(3)The outer boundary of the thermal disturbance annulus is approximately 2 m away from the pile center.It took more than 224 days for the soil around the CIP piles to return to the natural permafrost temperature at the study site.展开更多
The compositions, technical principles and construction equipments of a new piling method used for ground improvement plastic tube cast-in-place concrete pile were introduced. The results from static load tests on sin...The compositions, technical principles and construction equipments of a new piling method used for ground improvement plastic tube cast-in-place concrete pile were introduced. The results from static load tests on single piles with different forms of pile shoes and on their composite foundations were analyzed. The distribution patterns of axial force, shaft friction and toe resistance were studied based on the measurements taken from buried strain gauges. From the point of engineering application, the pile has merits in convenient quality control, high bearing capacity and reliable quality, showing higher reasonability, advancement and suitability than other ground improvement methods. The pile can be adopted properly to take place of ordinary ground improvement method, achieving greater economical and social benefits.展开更多
A series of small-scale 1g X-section cast-in-place concrete(XCC)pile-penetration model tests were conducted to study the effects of soil density and pile geometry on the lateral responses of an existing pile and the v...A series of small-scale 1g X-section cast-in-place concrete(XCC)pile-penetration model tests were conducted to study the effects of soil density and pile geometry on the lateral responses of an existing pile and the variations in surrounding soil stress.The results showed that the bending patterns of existing XCC piles varied with penetration depth.The lateral response of the existing pile was sensitive to the change in relative density and pile geometry.For example,the bending moment of the existing pile increased along with these parameters.The development of the radial stressσ′r/σ′v0 of the soil around an existing pile showed different trends at various depths during the penetration of the adjacent pile.Moreover,the change in radial stress during the penetration of the XCC pile did not exhibit the“h/R effect”that was observed in the free-field soil,due to the shielding effect of the existing piles.The peak value of radial stressσ′r_max/σ′v0 decreased exponentially as the radial distance r/R increased.The attenuation ofσ′r_max/σ′v0 with r/R in the loose sand was faster than in the medium-dense or dense sands.Theσ′r_max/σ′v0 at the same soil location increased with the cross-section geometry parameter.展开更多
The high and large span cast-in-place reinforced concrete cantilever structure of the office building of some court, which is located I-steel at the cantilever and used steel pipe scaffold as the support, has guarante...The high and large span cast-in-place reinforced concrete cantilever structure of the office building of some court, which is located I-steel at the cantilever and used steel pipe scaffold as the support, has guaranteed the frame body and structure security by the frame body calculating, on-site test and reasonable construction order.展开更多
Cast-in-place box girder under construction at G ramp of Wenzhou-Zhuangzhuang junction crosses the A and B ramps at the same time. Facing the limited working space of two bridges crossing at the same time, the stress ...Cast-in-place box girder under construction at G ramp of Wenzhou-Zhuangzhuang junction crosses the A and B ramps at the same time. Facing the limited working space of two bridges crossing at the same time, the stress of the bracket system is complex. How to realize the safe and rapid construction of the cast-in-place box girder without affecting the safety of the existing structure is of great significance. This paper calculates and demonstrates the design and construction of the bracket system of the cast-in-place box girder at the upper span. At the same time, it discusses the site cleaning, erection, preloading and other aspects in the construction process, illustrates the construction technical matters needing attention related to the construction of the expressway under construction, and ensures the safety quality and construction progress requirements of the site construction, hoping to provide some reference for the same type of buckle bracket on-span construction projects.展开更多
The construction site of this project is located at the southeast corner of the intersection of Tonghui South Road and Nanxiu Road in Xiaoshan District of Hangzhou City, with a construction land area of approximately ...The construction site of this project is located at the southeast corner of the intersection of Tonghui South Road and Nanxiu Road in Xiaoshan District of Hangzhou City, with a construction land area of approximately 43890 m2, a construction floor area of 26115 m2, a tentative total construction area of 233715m2, and an above-ground total construction area of approximately 131790 m2 (including approximately 100000 m2 of commercial buildings, approximately 7330m2 of office buildings and approximately 24460m2 of Jinjie commercial buildings). The total construction area of the third underground floor is approximately 101925m2 (of which, the first underground floor is approximately 43040 m2, the second underground floor is approximately 38935m2, and the third underground floor is approximately 19950m2 (of which, the air defense area of the basement is approximately 7500m2)).展开更多
In the construction of cast-in-place section of side span of continuous rigid frame bridge, traditional construction methods such as landing support method and steel pipe column method are adopted. When the height of ...In the construction of cast-in-place section of side span of continuous rigid frame bridge, traditional construction methods such as landing support method and steel pipe column method are adopted. When the height of side pier is high, it is difficult, dangerous and uneconomical to cast-in-place construction with ordinary support, and the elastic deformation of support is too large to guarantee the concrete pouring quality of side span cast-in-place section. The steel pipe column method also has some construction problems such as difficult foundation treatment and difficult mechanical installation. After repeated discussion, this problem can be solved by using the cantilever support of the erected beam section of the approach bridge for construction. In the construction of cast-in-place section of continuous rigid frame bridge beam side span, the bracket method is generally adopted, which is difficult, dangerous and uneconomical in the case of high piers. This problem can be solved by using the cantilever bracket erected at the erected beam section of the approach bridge for construction.展开更多
Hanging basket cantilever casting in bridge construction is an important construction technology, at the same time in the construction of the need to pay attention to the connection between the links, ensure the quali...Hanging basket cantilever casting in bridge construction is an important construction technology, at the same time in the construction of the need to pay attention to the connection between the links, ensure the quality of bridge construction and quality requirements, effectively prevent the economic loss caused by the project. At the same time also need to do a good hanging basket production and linear control work. Strengthen the technical ability and responsibility of construction personnel training, improve the quality of construction. In view of this, this paper mainly analyzes the bridge hanging basket cast-in-place box girder construction quality control measures.展开更多
With the acceleration of urbanization, a large number of new-type buildings appear constantly, and building construction has become a normal activity in every city. The process of building construction is a complex an...With the acceleration of urbanization, a large number of new-type buildings appear constantly, and building construction has become a normal activity in every city. The process of building construction is a complex and important process, which directly relates to the quality of the project and the service life of the project. There is a close connection between the various construction links of the building, and once there is a problem in a certain link, it may cause extremely serious consequences. So, as an important construction link, concrete pouring is very important to do a good job in construction and supervision.展开更多
In this paper,the seismic behaviors of precast bridge columns connected with grouted corrugated-metal duct(GCMD)were investigated through the biaxial quasi-static experiment and numerical simulation.With a geometric s...In this paper,the seismic behaviors of precast bridge columns connected with grouted corrugated-metal duct(GCMD)were investigated through the biaxial quasi-static experiment and numerical simulation.With a geometric scale ratio of 1:5,five specimens were fabricated,including four precast bridge columns connected with GCMD and one cast-in-place(CIP)bridge column.A finite element analysis model was also established by using OpenSees and was then calibrated by using the experimental results for parameter analysis.The results show the biaxial seismic performance of the precast bridge columns connected with GCMD was similar to the CIP bridge columns regarding ultimate bearing capacity and hysteresis energy,and further,that it could meet the design goal of equivalent performance.The seismic performance of the precast bridge columns connected with GCMD deteriorated more significantly under bi-directional load than under uni-directional load.A proper slenderness ratio(e.g.,7.0-10.0)and longitudinal reinforcement ratio could significantly improve the energy dissipation capacity and deformation capacity of the precast bridge columns,while the axial load ratio and concrete strength had little influence on the above properties.The research results could bring insights to the development of the seismic design of precast bridge columns connected with GCMD.展开更多
A new type of displacement pile, the X-section cast-in-place concrete (XCC) pile, has recently been developed in China. Extensive field tests and laboratory experi- ments are undertaken to evaluate its performance a...A new type of displacement pile, the X-section cast-in-place concrete (XCC) pile, has recently been developed in China. Extensive field tests and laboratory experi- ments are undertaken to evaluate its performance and quantify the non-uniform deforma- tion effect (NUDE) of the X-shaped cross section during installation. This paper develops a simplified theoretical model that attempts to capture the NUDE. Based on the theory of complex variable plane elasticity, closed-form solutions of the stress and displacement for the X-shaped cavity boundary value problem are given. Subsequently, the analytical solution is used to evaluate the NUDE, the concrete filling index (CFI), and the perimeter reduction coefficient of the XCC pile cross section. The computed results are compared with field test results, showing reasonable agreement. The present simplified theoretical model reveals the deformation mechanism of the X-shaped cavity and facilitates applica- tion of the newly developed XCC pile technique in geotechnical engineering.展开更多
Part of soil around cast-in-place pile will thaw because the heat of hydration produced by concrete during construction. In this paper soil upfreezing action to pile during refreezing process is analyzed, and the meas...Part of soil around cast-in-place pile will thaw because the heat of hydration produced by concrete during construction. In this paper soil upfreezing action to pile during refreezing process is analyzed, and the measures to the action are put forward. Furthermore, soil frictional forces to pile due to the thawing of part of soil around pile and the slowness of refreezing after construction is discussed and a rational method is suggested.展开更多
During the construction process, the treatment of cracks is the top priority. After the construction, it is also necessary to strengthen the maintenance management of all aspects to solve the crack problem from two as...During the construction process, the treatment of cracks is the top priority. After the construction, it is also necessary to strengthen the maintenance management of all aspects to solve the crack problem from two aspects. This paper discusses the crack problem in the construction of mass concrete. Proceed from the actual situation, carried on the measure research and the summary.展开更多
Time to enter the 21st century, our country gradually moving towards modernization power, along with our country's economic strength, science and technology development, such as the country's many industry get...Time to enter the 21st century, our country gradually moving towards modernization power, along with our country's economic strength, science and technology development, such as the country's many industry get the progress by leaps and bounds, road engineering in China traditional architectural engineering, road engineering has always been about the development of China's people's daily life level and the development of the economy, but in the road engineering construction, Often face a variety of construction challenges, in actual engineering construction, due to loose soil, settlement or some other reasons, if the relevant staff careless operation, it is easy to lead to a lot of potential problems in the use of road engineering, and even bring a certain threat to people's daily use experience. In the face of these problems, it is necessary for relevant personnel to analyze the problems existing in the construction process and operate in strict accordance with the operation plan of drilling perfusion technology in road construction.展开更多
This study presents the results of field and numerical investigations of lateral stiffness, capacity, and failure mechanisms for plain piles and reinforced concrete piles in soft clay. A plastic-damage model is used t...This study presents the results of field and numerical investigations of lateral stiffness, capacity, and failure mechanisms for plain piles and reinforced concrete piles in soft clay. A plastic-damage model is used to simulate concrete piles and jet-grouting in the numerical analyses. The field study and numerical investigations show that by applying jet-grouting sur- rounding the upper 7.5D (D = pile diameter) of a pile, lateral stiffness and beating capacity of the pile are increased by about 110% and 100%, respectively. This is partially because the jet-grouting increases the apparent diameter of the pile, so as to en- large the extent of failure wedge and hence passive resistance in front of the reinforced pile. Moreover, the jet-grouting pro- vides a circumferential confinement to the concrete pile, which suppresses development of tensile stress in the pile. Corre- spondingly, tension-induced plastic damage in the concrete pile is reduced, causing less degradation of stiffness and strength of the pile than that of a plain pile. Effectiveness of the circumferential confinement provided by the jet-grouting, however, diminishes once the grouting cracks because of the significant vertical and circumferential tensile stress near its mid-depth. The lateral capacity of the jet-grouting reinforced pile is, therefore, governed by mobilized passive resistance of soil and plastic damage of jet-grouting.展开更多
基金supported by the National Key Basic Research Program of China (973 Program) (No.2012CB026106)the National Natural Science Foundation of China (Grant No. 41171059)the Fund of the State Key Laboratory of Frozen Soil Engineering (No. SKLFSE-ZY-16)
文摘In the construction of the Qinghai-Tibet Power Transmission Line (QTPTL), cast-in-place piles (CIPPs) are widely applied in areas with unfavorable geological conditions. The thermal regime around piles in permafrost regions greatly affects the stability of the towers as well as the operation of the QTPTL. The casting of piles will markedly affect the thermal regime of the surrounding permafrost because of the casting temperature and the hydration heat of cement. Based on the typical geological and engineering conditions along the QTPTL, thermal disturbance ofa CIPP to surrounding permafrost under different casting seasons, pile depths, and casting temperatures were simulated. The results show that the casting season (summer versus winter) can influence the refreezing process of CIPPs, within the first 6 m of pile depth. Sixty days after being cast, CIPPs greater than 6 m in depth can be frozen regardless of which season they were cast, and the foundation could be reffozen after a cold season. Comparing the refreezing characteristics of CIPPs cast in different seasons also showed that, without considering the ground surface conditions, warm seasons are more suitable for casting piles. With the increase of pile depth, the thermal effect of a CIPP on the surrounding soil mainly expands vertically, while the lateral heat disturbance changes little. Deeper, longer CIPPs have better stability. The casting temperature clearly affects the thermal disturbance, and the radius of the melting circle increases with rising casting temperature. The optimal casting temperature is between 2 ℃ and 9 ℃.
基金Project supported by the National Natural Science Foundation of China (No.50678076)the Opening Foundation of the State Key Laboratory of Frozen Soil Engineering (No.SKLFSE200603),China
文摘A number of dry bridges have been built to substitute for the roadbed on the Qinghai-Tibet Railway,China.The aim of this study was to investigate the exothermic process of cast-in-place (CIP) pile foundation of a dry bridge and its harm to the stability of nearby frozen ground.We present 3D heat conduction functions of a concrete pile and of frozen ground with related boundaries.Our analysis is based on the theory of heat conduction and the exponent law describing the adiabatic temperature rise caused by hydration heat.Results under continuous and initial conditions were combined to establish a finite element model of a CIP pile-frozen ground system for a dry bridge under actual field conditions in cold regions.Numerical results indicated that the process could effectively simulate the exothermic process of CIP pile foundation.Thermal disturbance to frozen ground under a long dry bridge caused by the casting temperature and hydration heat of CIP piles was substantial and long-lasting.The simulated thermal analysis results agreed with field measurements and some significant rules relating to the problem were deduced and conclusions reached.
基金The National Key Technologies R&D Program under Grant No. 2009BAJ28B01The Technologies R&D Program of China State Construction Engineering Co., Ltd under Grant No. CSCEC-2009-Z-15
文摘Many staircases in reinforced concrete (RC) frame structures suffered severe damage during the Wenchuan earthquake. Elastic analyses for 18 RC structure models with and without staircases are conducted and compared to study the influence of the staircase on the stiffness, displacements and internal forces of the structures. To capture the yielding development and damage mechanism of frame structures, elasto-plastic analysis is carried out for one of the 18 models. Based on the features observed in the analyses, a new type of staircase design i.e., isolating them from the master structure to eliminate the effect of K-type struts, is proposed and discussed. It is concluded that the proposed method of staircase isolation is effective and feasible for engineering design, and does not significantly increase the construction cost.
文摘Similar to free-standing pile groups, piled raft foundations are conventionally designed in which the piles carry the total load of structure and the raft bearing capacity is not taken into account. Numerous studies indicated that this method is too conservative. Only when the pile cap is elevated from the ground level,the raft bearing contribution can be neglected. In a piled raft foundation, pileesoileraft interaction is complicated. Although several numerical studies have been carried out to analyze the behaviors of piled raft foundations, very few experimental studies are reported in the literature. The available laboratory studies mainly focused on steel piles. The present study aims to compare the behaviors of piled raft foundations with free-standing pile groups in sand, using laboratory physical models. Cast-in-place concrete piles and concrete raft are used for the tests. The tests are conducted on single pile, single pile in pile group, unpiled raft, free-standing pile group and piled raft foundation. We examine the effects of the number of piles, the pile installation method and the interaction between different components of foundation. The results indicate that the ultimate bearing capacity of the piled raft foundation is considerably higher than that of the free-standing pile group with the same number of piles. With installation of the single pile in the group, the pile bearing capacity and stiffness increase. Installation of the piles beneath the raft decreases the bearing capacity of the raft. When the raft bearing capacity is not included in the design process, the allowable bearing capacity of the piled raft is underestimated by more than 200%. This deviation intensifies with increasing spacing of the piles.
基金supported by the National Natural Science Foundation of China(Grant No.42071095)the Program of the State Key Laboratory of Frozen Soil Engineering(Grant No.SKLFSE-ZQ-59)+1 种基金the Science and Technology Project of Gansu Province(Grant No.22JR5RA086)the Science and Technology Research and Development Program of the Qinghai-Tibet Group Corporation(Grant No.QZ2022-G02).
文摘During the construction of cast-in-place piles in warm permafrost,the heat carried by concrete and the cement hydration reaction can cause strong thermal disturbance to the surrounding permafrost.Since the bearing capacity of the pile is quite small before the full freeze-back,the quick refreezing of the native soils surrounding the cast-in-place pile has become the focus of the infrastructure construction in permafrost.To solve this problem,this paper innovatively puts forward the application of the artificial ground freezing(AGF)method at the end of the curing period of cast-in-place piles in permafrost.A field test on the AGF was conducted at the Beiluhe Observation and Research Station of Frozen Soil Engineering and Environment(34°51.2'N,92°56.4'E)in the Qinghai Tibet Plateau(QTP),and then a 3-D numerical model was established to investigate the thermal performance of piles using AGF under different engineering conditions.Additionally,the long-term thermal performance of piles after the completion of AGF under different conditions was estimated.Field experiment results demonstrate that AGF is an effective method to reduce the refreezing time of the soil surrounding the piles constructed in permafrost terrain,with the ability to reduce the pile-soil interface temperatures to below the natural ground temperature within 3 days.Numerical results further prove that AGF still has a good cooling effect even under unfavorable engineering conditions such as high pouring temperature,large pile diameter,and large pile length.Consequently,the application of this method is meaningful to save the subsequent latency time and solve the problem of thermal disturbance in pile construction in permafrost.The research results are highly relevant for the spread of AGF technology and the rapid building of pile foundations in permafrost.
基金supported by the Natural Science Foundation of China (Grants No.41101065)the State Key Laboratory of Frozen Soil Engineering Funds (SKLFSE-ZT-34,SKLFSE-ZQ-202103).
文摘The bearing capacity of pile foundations is affected by the temperature of the frozen soil around pile foundations.The construction process and the hydration heat of cast-in-place(CIP)pile foundations affect the thermal stability of permafrost.In this paper,temperature data from inside multiple CIP piles,borehole observations of ground thermal status adjacent to the foundations and local weather stations were monitored in warm permafrost regions to study the thermal influence process of CIP pile foundations.The following conclusions are drawn from the field observation data.(1)The early temperature change process of different CIP piles is different,and the differences gradually diminish over time.(2)The initial concrete temperature is linearly related with the air temperature,net radiation and wind speed within 1 h before the completion of concrete pouring;the contributions of the air temperature,net radiation,and wind speed to the initial concrete temperature are 51.9%,20.3%and 27.9%,respectively.(3)The outer boundary of the thermal disturbance annulus is approximately 2 m away from the pile center.It took more than 224 days for the soil around the CIP piles to return to the natural permafrost temperature at the study site.
基金Project (2007H03) supported by Communications Department of Zhejiang Province
文摘The compositions, technical principles and construction equipments of a new piling method used for ground improvement plastic tube cast-in-place concrete pile were introduced. The results from static load tests on single piles with different forms of pile shoes and on their composite foundations were analyzed. The distribution patterns of axial force, shaft friction and toe resistance were studied based on the measurements taken from buried strain gauges. From the point of engineering application, the pile has merits in convenient quality control, high bearing capacity and reliable quality, showing higher reasonability, advancement and suitability than other ground improvement methods. The pile can be adopted properly to take place of ordinary ground improvement method, achieving greater economical and social benefits.
基金supported by the National Natural Science Foundation of China(Nos.52308352,52238009,and 52108321)the Jiangxi Provincial Natural Science Foundation of China(No.20232BAB214082)+1 种基金the Open Research Fund Program of Guangdong Key Laboratory of Earthquake Engineering and Application Technology(No.2020B1212060071)the Science&Technology Project of the Education Department of Jiangxi Province(No.GJJ2200681),China.
文摘A series of small-scale 1g X-section cast-in-place concrete(XCC)pile-penetration model tests were conducted to study the effects of soil density and pile geometry on the lateral responses of an existing pile and the variations in surrounding soil stress.The results showed that the bending patterns of existing XCC piles varied with penetration depth.The lateral response of the existing pile was sensitive to the change in relative density and pile geometry.For example,the bending moment of the existing pile increased along with these parameters.The development of the radial stressσ′r/σ′v0 of the soil around an existing pile showed different trends at various depths during the penetration of the adjacent pile.Moreover,the change in radial stress during the penetration of the XCC pile did not exhibit the“h/R effect”that was observed in the free-field soil,due to the shielding effect of the existing piles.The peak value of radial stressσ′r_max/σ′v0 decreased exponentially as the radial distance r/R increased.The attenuation ofσ′r_max/σ′v0 with r/R in the loose sand was faster than in the medium-dense or dense sands.Theσ′r_max/σ′v0 at the same soil location increased with the cross-section geometry parameter.
文摘The high and large span cast-in-place reinforced concrete cantilever structure of the office building of some court, which is located I-steel at the cantilever and used steel pipe scaffold as the support, has guaranteed the frame body and structure security by the frame body calculating, on-site test and reasonable construction order.
文摘Cast-in-place box girder under construction at G ramp of Wenzhou-Zhuangzhuang junction crosses the A and B ramps at the same time. Facing the limited working space of two bridges crossing at the same time, the stress of the bracket system is complex. How to realize the safe and rapid construction of the cast-in-place box girder without affecting the safety of the existing structure is of great significance. This paper calculates and demonstrates the design and construction of the bracket system of the cast-in-place box girder at the upper span. At the same time, it discusses the site cleaning, erection, preloading and other aspects in the construction process, illustrates the construction technical matters needing attention related to the construction of the expressway under construction, and ensures the safety quality and construction progress requirements of the site construction, hoping to provide some reference for the same type of buckle bracket on-span construction projects.
文摘The construction site of this project is located at the southeast corner of the intersection of Tonghui South Road and Nanxiu Road in Xiaoshan District of Hangzhou City, with a construction land area of approximately 43890 m2, a construction floor area of 26115 m2, a tentative total construction area of 233715m2, and an above-ground total construction area of approximately 131790 m2 (including approximately 100000 m2 of commercial buildings, approximately 7330m2 of office buildings and approximately 24460m2 of Jinjie commercial buildings). The total construction area of the third underground floor is approximately 101925m2 (of which, the first underground floor is approximately 43040 m2, the second underground floor is approximately 38935m2, and the third underground floor is approximately 19950m2 (of which, the air defense area of the basement is approximately 7500m2)).
文摘In the construction of cast-in-place section of side span of continuous rigid frame bridge, traditional construction methods such as landing support method and steel pipe column method are adopted. When the height of side pier is high, it is difficult, dangerous and uneconomical to cast-in-place construction with ordinary support, and the elastic deformation of support is too large to guarantee the concrete pouring quality of side span cast-in-place section. The steel pipe column method also has some construction problems such as difficult foundation treatment and difficult mechanical installation. After repeated discussion, this problem can be solved by using the cantilever support of the erected beam section of the approach bridge for construction. In the construction of cast-in-place section of continuous rigid frame bridge beam side span, the bracket method is generally adopted, which is difficult, dangerous and uneconomical in the case of high piers. This problem can be solved by using the cantilever bracket erected at the erected beam section of the approach bridge for construction.
文摘Hanging basket cantilever casting in bridge construction is an important construction technology, at the same time in the construction of the need to pay attention to the connection between the links, ensure the quality of bridge construction and quality requirements, effectively prevent the economic loss caused by the project. At the same time also need to do a good hanging basket production and linear control work. Strengthen the technical ability and responsibility of construction personnel training, improve the quality of construction. In view of this, this paper mainly analyzes the bridge hanging basket cast-in-place box girder construction quality control measures.
文摘With the acceleration of urbanization, a large number of new-type buildings appear constantly, and building construction has become a normal activity in every city. The process of building construction is a complex and important process, which directly relates to the quality of the project and the service life of the project. There is a close connection between the various construction links of the building, and once there is a problem in a certain link, it may cause extremely serious consequences. So, as an important construction link, concrete pouring is very important to do a good job in construction and supervision.
基金National Natural Science Foundation of China under Grant No.51408360the Natural Science Foundation of Fujian(NSFF)under Grant No.2020J01477the Technology Project of Fuzhou Science and Technology Bureau(TPFB)under Grant No.2020-GX-18。
文摘In this paper,the seismic behaviors of precast bridge columns connected with grouted corrugated-metal duct(GCMD)were investigated through the biaxial quasi-static experiment and numerical simulation.With a geometric scale ratio of 1:5,five specimens were fabricated,including four precast bridge columns connected with GCMD and one cast-in-place(CIP)bridge column.A finite element analysis model was also established by using OpenSees and was then calibrated by using the experimental results for parameter analysis.The results show the biaxial seismic performance of the precast bridge columns connected with GCMD was similar to the CIP bridge columns regarding ultimate bearing capacity and hysteresis energy,and further,that it could meet the design goal of equivalent performance.The seismic performance of the precast bridge columns connected with GCMD deteriorated more significantly under bi-directional load than under uni-directional load.A proper slenderness ratio(e.g.,7.0-10.0)and longitudinal reinforcement ratio could significantly improve the energy dissipation capacity and deformation capacity of the precast bridge columns,while the axial load ratio and concrete strength had little influence on the above properties.The research results could bring insights to the development of the seismic design of precast bridge columns connected with GCMD.
基金supported by the National Natural Science Foundation of China(No.51420105013)the State Key Laboratory for Geomechanics and Deep Underground Engineering,China University of Mining and Technology(No.SKLGDUEK1713)the Fundamental Research Funds for the Central Universities(Nos.106112017CDJXY200003 and 106112017CDJPT200001)
文摘A new type of displacement pile, the X-section cast-in-place concrete (XCC) pile, has recently been developed in China. Extensive field tests and laboratory experi- ments are undertaken to evaluate its performance and quantify the non-uniform deforma- tion effect (NUDE) of the X-shaped cross section during installation. This paper develops a simplified theoretical model that attempts to capture the NUDE. Based on the theory of complex variable plane elasticity, closed-form solutions of the stress and displacement for the X-shaped cavity boundary value problem are given. Subsequently, the analytical solution is used to evaluate the NUDE, the concrete filling index (CFI), and the perimeter reduction coefficient of the XCC pile cross section. The computed results are compared with field test results, showing reasonable agreement. The present simplified theoretical model reveals the deformation mechanism of the X-shaped cavity and facilitates applica- tion of the newly developed XCC pile technique in geotechnical engineering.
文摘Part of soil around cast-in-place pile will thaw because the heat of hydration produced by concrete during construction. In this paper soil upfreezing action to pile during refreezing process is analyzed, and the measures to the action are put forward. Furthermore, soil frictional forces to pile due to the thawing of part of soil around pile and the slowness of refreezing after construction is discussed and a rational method is suggested.
文摘During the construction process, the treatment of cracks is the top priority. After the construction, it is also necessary to strengthen the maintenance management of all aspects to solve the crack problem from two aspects. This paper discusses the crack problem in the construction of mass concrete. Proceed from the actual situation, carried on the measure research and the summary.
文摘Time to enter the 21st century, our country gradually moving towards modernization power, along with our country's economic strength, science and technology development, such as the country's many industry get the progress by leaps and bounds, road engineering in China traditional architectural engineering, road engineering has always been about the development of China's people's daily life level and the development of the economy, but in the road engineering construction, Often face a variety of construction challenges, in actual engineering construction, due to loose soil, settlement or some other reasons, if the relevant staff careless operation, it is easy to lead to a lot of potential problems in the use of road engineering, and even bring a certain threat to people's daily use experience. In the face of these problems, it is necessary for relevant personnel to analyze the problems existing in the construction process and operate in strict accordance with the operation plan of drilling perfusion technology in road construction.
基金supported by the National Science Foundation for Distinguished Young Scholars of China(Grant No.51325901)the International Science and Technology Cooperation Program of China(Grant No.2015DFE72830)State Key Program of National Natural Science of China(Grant No.51338009)
文摘This study presents the results of field and numerical investigations of lateral stiffness, capacity, and failure mechanisms for plain piles and reinforced concrete piles in soft clay. A plastic-damage model is used to simulate concrete piles and jet-grouting in the numerical analyses. The field study and numerical investigations show that by applying jet-grouting sur- rounding the upper 7.5D (D = pile diameter) of a pile, lateral stiffness and beating capacity of the pile are increased by about 110% and 100%, respectively. This is partially because the jet-grouting increases the apparent diameter of the pile, so as to en- large the extent of failure wedge and hence passive resistance in front of the reinforced pile. Moreover, the jet-grouting pro- vides a circumferential confinement to the concrete pile, which suppresses development of tensile stress in the pile. Corre- spondingly, tension-induced plastic damage in the concrete pile is reduced, causing less degradation of stiffness and strength of the pile than that of a plain pile. Effectiveness of the circumferential confinement provided by the jet-grouting, however, diminishes once the grouting cracks because of the significant vertical and circumferential tensile stress near its mid-depth. The lateral capacity of the jet-grouting reinforced pile is, therefore, governed by mobilized passive resistance of soil and plastic damage of jet-grouting.