期刊文献+
共找到14篇文章
< 1 >
每页显示 20 50 100
Analysis of seismic disaster failure mechanism and dam-break simulation of high arch dam 被引量:2
1
作者 Zhang Jingkui Zhang Liaojun 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2014年第2期327-335,共9页
Based on a Chinese national high arch dam located in a meizoseismal region, a nonlinear numerical analysis model of the damage and failure process of a dam-foundation system is established by employing a 3-D deformabl... Based on a Chinese national high arch dam located in a meizoseismal region, a nonlinear numerical analysis model of the damage and failure process of a dam-foundation system is established by employing a 3-D deformable distinct element code(3DEC) and its re-development functions. The proposed analysis model considers the dam-foundation-reservoir coupling effect, infl uence of nonlinear contact in the opening and closing of the dam seam surface and abutment rock joints during strong earthquakes, and radiation damping of far fi eld energy dissipation according to the actual workability state of an arch dam. A safety assessment method and safety evaluation criteria is developed to better understand the arch dam system disaster process from local damage to ultimate failure. The dynamic characteristics, disaster mechanism, limit bearing capacity and the entire failure process of a high arch dam under a strong earthquake are then analyzed. Further, the seismic safety of the arch dam is evaluated according to the proposed evaluation criteria and safety assessment method. As a result, some useful conclusions are obtained for some aspects of the disaster mechanism and failure process of an arch dam. The analysis method and conclusions may be useful in engineering practice. 展开更多
关键词 high arch dam complex foundation 3DEC disaster mechanism dam-break process simulation seismic safety evaluation
在线阅读 下载PDF
Evaluation of cracking potential for concrete arch dam based on simulation feedback analysis 被引量:11
2
作者 FU ShaoJun HE Ting +3 位作者 WANG GuoJin ZHANG ShiHu ZOU LiChun CHEN ShengHong 《Science China(Technological Sciences)》 SCIE EI CAS 2011年第3期565-572,共8页
It is still very difficult for researchers and engineers to implement the simulation analysis including a complete process and a full model with the complicated arch dam and the foundation, and to evaluate the crackin... It is still very difficult for researchers and engineers to implement the simulation analysis including a complete process and a full model with the complicated arch dam and the foundation, and to evaluate the cracking potential in the construction and service periods. To take Xiaowan project of China for an example, a practical system of simulation feedback analysis, a specific cracking criterion, and a resolution for the conflicting requirements of temperature and stress/strain simulation are presented, which are put into a successful practice. The simulation results of temperature, stress, and cracking are identical well with the monitor data. A modified temperature control measure is propounded, and the significant effect is gained by adopting the new scheme. 展开更多
关键词 arch dam cracking potential construction process finite element method simulation feedback analysis
原文传递
复杂地质条件处理前后高拱坝施工期倒悬变形研究 被引量:2
3
作者 郑磊 崔腾洲 +3 位作者 齐问坛 王海州 张国新 张磊 《水利水电技术(中英文)》 北大核心 2024年第4期81-89,共9页
【目的】高拱坝坝址通常面临复杂的地质条件,包括深部卸荷带、节理、裂隙等。深部节理是深部岩体卸荷破裂引起的一种特殊地质缺陷,在自重、温度和混凝土徐变等因素的综合影响下高拱坝的应力分布和变形情况将进一步加大施工期的倒悬变形... 【目的】高拱坝坝址通常面临复杂的地质条件,包括深部卸荷带、节理、裂隙等。深部节理是深部岩体卸荷破裂引起的一种特殊地质缺陷,在自重、温度和混凝土徐变等因素的综合影响下高拱坝的应力分布和变形情况将进一步加大施工期的倒悬变形,不利于高拱坝的工作状态,从而影响到其稳定性和安全性。【方法】采用全坝全过程反馈仿真分析方法,以西南某在建大坝为例,建立大坝复杂地质条件下的精细模型,根据坝体混凝土整体浇筑、封拱灌浆计划,开展对大坝全坝段施工的仿真模拟分析,全面反映温度场、应力场和施工期变形状况,研究了包括Ⅱ级结构面、Ⅲ级结构面和建基面置换块等地质缺陷对倒悬变形和大坝工作性态的影响。【结果】结果显示,高拱坝从坝基开始随浇筑高度的增大,倒悬度不断增大,1/3坝高以下的倒悬变形值较小;在1/3~2/3坝高内产生倾向顺河向上游的倒悬变形,在2/3坝高以上倒悬变形消失,产生顺河向下游方向的变形。全坝全过程仿真计算结果显示,顺河向上游方向倒悬变形的最大值约为20.000 mm,在1/3~2/3坝高间产生;顺河向下游方向变形的最大值约为13.000 mm,在2/3坝高以上产生。同一高程下,上游面至下游面受温度荷载、徐变等综合因素影响,变形波动在3.400 mm范围内,实际安装布置时需考虑此误差对倒悬变形监测的影响,Ⅲ级结构面和建基面置换块对拱冠梁坝段施工期变形影响较小,Ⅱ级结构面(F_(2)、F_(2-1)断层)位于14^(#)坝段下方,对施工期倒悬变形和坝顶下游方向变形影响较大,最大倒悬变形增幅约为4.000 mm,坝顶顺河向下游变形增幅约为7.500 mm。【结论】根据计算结果,在进行施工期变形数据反演时不仅要考虑高拱坝坝体材料的力学参数,也要重点反演Ⅱ级结构面弹性模量和力学参数。 展开更多
关键词 高拱坝 地质缺陷 全坝全过程仿真计算 倒悬变形 施工期 变形
在线阅读 下载PDF
Study on multi-scheme analysis and evaluation method for concrete sequence placement of high arch dam 被引量:2
4
作者 ZHONG GuiLiang,REN BingYu & TONG DaWei Department of Hydraulic and Hydroelectric Engineering,School of Civil Engineering,Tianjin University,Tianjin 300072,China 《Science China(Technological Sciences)》 SCIE EI CAS 2011年第S1期47-53,共7页
A complete scheme for solving the key scientific problems of how to make concrete sequence placement scheme of high arch dam reasonable and feasible and how to meet the need of construction process was presented.First... A complete scheme for solving the key scientific problems of how to make concrete sequence placement scheme of high arch dam reasonable and feasible and how to meet the need of construction process was presented.First,based on a coupling analysis of concrete sequence placement system of high arch dam,a mathematical model considering complex construction constraints was established.Second,a multi-scheme computational analysis method for concrete sequence placement of high arch dam was proposed based on dynamic simulation.Third,a multi-scheme evaluation method for concrete sequence placement was put forward based on analytic hierarchy process.Fourth,feedback guidance for progress control and management in the high arch dam construction process was proposed.Finally,these methods were applied to a practical project to show that the methods can analyze and evaluate multi-scheme for concrete sequence placement of high arch dam effectively,optimize the process of dam concrete sequence placement,and recommend engineering measures.These methods provide new theoretical principles and technical measures for real-time progress control in the high arch dam construction. 展开更多
关键词 SEQUENCE PLACEMENT analysis multi-scheme evaluation dynamic simulation ANALYTIC hierarchy process high arch dam construction
原文传递
溪洛渡高拱坝渐进破坏过程仿真分析与稳定安全度研究 被引量:30
5
作者 周伟 常晓林 +1 位作者 唐忠敏 黎满林 《四川大学学报(工程科学版)》 EI CAS CSCD 2002年第4期46-50,共5页
采用三维弹塑性有限元方法 ,模拟施工程序和加载过程 ,考虑坝体基础相互作用 ,利用强度储备系数法、超载系数法和能量法等 ,对坝体 -坝基系统进行渐进破坏过程计算分析。计算结果表明 ,模拟破坏的方法不同 ,其渐进破坏过程和失稳模式不... 采用三维弹塑性有限元方法 ,模拟施工程序和加载过程 ,考虑坝体基础相互作用 ,利用强度储备系数法、超载系数法和能量法等 ,对坝体 -坝基系统进行渐进破坏过程计算分析。计算结果表明 ,模拟破坏的方法不同 ,其渐进破坏过程和失稳模式不同 ,相应强度储备安全系数和超载安全系数也不同 ,而用强度分析法和稳定分析法求得的极限承载能力完全一致 。 展开更多
关键词 高拱坝 三维弹塑性有限元 计算分析 渐进破坏过程 极限承载能力 稳定安全度 仿真分析
在线阅读 下载PDF
自重与初次蓄水对特高拱坝应力的影响 被引量:11
6
作者 葛劭卿 张国新 喻建清 《水力发电》 北大核心 2006年第9期25-27,共3页
以小湾拱坝为例,对不同自重施加方式及初次蓄水条件下大坝的应力进行了三维数值仿真分析。对不同施工方案的应力对比研究结果表明,自重施加方式、封拱灌浆过程及初次蓄水均对坝体应力分布有较大影响,自重全部由梁承担过小地估计了坝体... 以小湾拱坝为例,对不同自重施加方式及初次蓄水条件下大坝的应力进行了三维数值仿真分析。对不同施工方案的应力对比研究结果表明,自重施加方式、封拱灌浆过程及初次蓄水均对坝体应力分布有较大影响,自重全部由梁承担过小地估计了坝体上游拉应力,而整体施加自重、水压时,计算得到的拉应力偏大,从计算精度考虑,小湾拱坝应力计算按10次以上的分期浇筑、分期封拱及分期蓄水过程模拟为宜。 展开更多
关键词 应力计算 有限单元法 自重 初次蓄水过程 施工过程 仿真分析 高拱坝
在线阅读 下载PDF
碾压混凝土拱坝温度场和应力场仿真计算研究 被引量:9
7
作者 薛元琦 张晓飞 白继中 《人民黄河》 CAS 北大核心 2014年第1期100-103,106,共5页
采用三维有限元法模拟某碾压混凝土拱坝的施工过程,进行了温控仿真计算,分析了该工程温度场和应力场的分布规律,提出了温控推荐方案。结果表明:采取初期、中期和后期冷却措施后,大坝的最高温度满足碾压混凝土坝设计规范要求,同时也满足... 采用三维有限元法模拟某碾压混凝土拱坝的施工过程,进行了温控仿真计算,分析了该工程温度场和应力场的分布规律,提出了温控推荐方案。结果表明:采取初期、中期和后期冷却措施后,大坝的最高温度满足碾压混凝土坝设计规范要求,同时也满足封拱灌浆要求,最大温度应力小于混凝土的允许拉应力。 展开更多
关键词 三维有限元法 施工过程 仿真计算 封拱灌浆 碾压混凝土拱坝
在线阅读 下载PDF
GPU在SPH方法模拟溃坝问题的应用研究 被引量:4
8
作者 杨志国 黄兴 +1 位作者 郑兴 段文洋 《哈尔滨工程大学学报》 EI CAS CSCD 北大核心 2014年第6期661-666,共6页
SPH方法是一种无网格的粒子方法,对于求解强非线性水动力学问题具有重要意义。随着粒子数增加,该方法的计算效率成为限制其大规模工程应用的重大瓶颈。可将大规模并行计算引入SPH方法中,以得到良好的计算加速效果。采用将GPU运用于SPH... SPH方法是一种无网格的粒子方法,对于求解强非线性水动力学问题具有重要意义。随着粒子数增加,该方法的计算效率成为限制其大规模工程应用的重大瓶颈。可将大规模并行计算引入SPH方法中,以得到良好的计算加速效果。采用将GPU运用于SPH方法并行计算的技术,借助CUDA硬件计算架构,研究SPH方法的并行计算通用性问题。以二维溃坝问题作为数值算例,对GPU计算结果的稳定性和收敛性进行验证,比较CPU与GPU的计算效率。通过计算,验证了GPU在SPH方法并行计算应用中的可靠性、可行性以及高效性,为提高SPH方法的计算效率提供一种重要的参考途径。 展开更多
关键词 GPU 并行计算 CUDA SPH方法 溃坝 水动力学 数值计算
在线阅读 下载PDF
施工过程对小湾高拱坝运行期应力状态的影响 被引量:6
9
作者 杨梅 常晓林 周伟 《水电能源科学》 2006年第1期34-36,共3页
采用三维有限元方法对小湾高拱坝多种工况下的坝体应力变形进行了仿真计算,计算中考虑了封拱灌浆过程及水库分期蓄水过程对坝体应力的影响。计算结果表明,施工过程对坝体运行期应力有显著影响,给出了仿真计算荷载步数目,为类似工程的拱... 采用三维有限元方法对小湾高拱坝多种工况下的坝体应力变形进行了仿真计算,计算中考虑了封拱灌浆过程及水库分期蓄水过程对坝体应力的影响。计算结果表明,施工过程对坝体运行期应力有显著影响,给出了仿真计算荷载步数目,为类似工程的拱坝应力分析提供了参考依据。 展开更多
关键词 高拱坝 施工过程 仿真分析 运行期应力
在线阅读 下载PDF
高拱坝混凝土施工与钢衬安装仿真分析研究 被引量:8
10
作者 刘金飞 尹习双 +2 位作者 李仁江 邱向东 何友忠 《四川水力发电》 2013年第2期96-99,101,共5页
在高拱坝泄洪孔钢衬安装与坝体混凝土浇筑交叉施工时,起重设备、空间位置、施工资源等方面均存在干扰。详细分析了高拱坝钢衬施工工艺流程,研究了钢衬安装与混凝土浇筑的干扰机制,提出了考虑钢衬安装施工干扰的高拱坝混凝土施工仿真方... 在高拱坝泄洪孔钢衬安装与坝体混凝土浇筑交叉施工时,起重设备、空间位置、施工资源等方面均存在干扰。详细分析了高拱坝钢衬施工工艺流程,研究了钢衬安装与混凝土浇筑的干扰机制,提出了考虑钢衬安装施工干扰的高拱坝混凝土施工仿真方法。该方法在某高拱坝钢衬安装方案优选和混凝土进度控制中发挥了重要作用。 展开更多
关键词 高拱坝 钢衬安装 施工仿真 进度控制
在线阅读 下载PDF
大花水RCC双曲拱坝施工期仿真分析
11
作者 郑璀莹 张国新 +1 位作者 费晶 陈宏 《中国水能及电气化》 2010年第8期19-25,共7页
大花水RCC拱坝(H=134.5m)是世界上已建的最高的碾压混凝土双曲薄拱坝。大坝在碾压施工过程中,陆续发现了十几条裂缝,并有多条贯穿性裂缝。本文通过对全坝进行施工期全过程仿真分析,对施工过程中出现的裂缝现象进行深入细致的分析,得出... 大花水RCC拱坝(H=134.5m)是世界上已建的最高的碾压混凝土双曲薄拱坝。大坝在碾压施工过程中,陆续发现了十几条裂缝,并有多条贯穿性裂缝。本文通过对全坝进行施工期全过程仿真分析,对施工过程中出现的裂缝现象进行深入细致的分析,得出施工过程中温度应力过高是导致大坝裂缝产生的重要原因。 展开更多
关键词 RCC双曲拱坝 施工期仿真分析 裂缝成因
在线阅读 下载PDF
木瓜溪拱坝施工过程仿真及安全性分析 被引量:2
12
作者 陈俊宇 傅少君 +2 位作者 罗滔 孙佳伟 惠建伟 《武汉大学学报(工学版)》 CAS CSCD 北大核心 2020年第4期293-302,共10页
木瓜溪拱坝坝体在施工期出现了大量裂缝,导致裂缝的原因多且复杂,裂缝稳定性及其对拱坝安全性的影响是工程最为关注的重要问题。根据木瓜溪拱坝的结构设计资料、实际施工-蓄水过程、冷却措施、坝体裂缝情况,应用ANSYS软件对施工-蓄水过... 木瓜溪拱坝坝体在施工期出现了大量裂缝,导致裂缝的原因多且复杂,裂缝稳定性及其对拱坝安全性的影响是工程最为关注的重要问题。根据木瓜溪拱坝的结构设计资料、实际施工-蓄水过程、冷却措施、坝体裂缝情况,应用ANSYS软件对施工-蓄水过程的温度场进行了仿真计算,应用自行开发的三维弹粘塑性有限元分析程序COCE-3D计算了实际记录的施工-蓄水过程的应力应变,并分析了裂缝处理效果及拱坝安全性。研究结果为木瓜溪水电站下闸蓄水可行性论证提供了参考依据。 展开更多
关键词 木瓜溪拱坝 施工蓄水过程仿真 裂缝 安全性分析
原文传递
拱坝CADC中施工放样图形处理研究 被引量:1
13
作者 彭元珍 张红民 张心怡 《电脑开发与应用》 2002年第5期36-37,共2页
在拱坝有限元网格剖分获得数据的基础上 ,对计算机模拟拱坝施工放样中的二维图形和三维图形进行了设计处理 ,并已编程实现 。
关键词 拱坝 CADC 施工放样 图形处理 计算机模拟
在线阅读 下载PDF
基于增强现实的智能建造虚拟仿真实验教学系统 被引量:3
14
作者 张馨予 吴宇静 +1 位作者 王晓轩 陈静 《自动化与仪器仪表》 2023年第1期140-145,151,共7页
针对当前高拱坝施工可视化效果差,导致无法对施工质量和施工进度进行有效管理的问题,提出基于增强现实技术实现高拱坝仓面施工智能建造和仿真模拟。首先,根据高拱坝仓面施工的工序关系,通过增强现实技术对高拱坝仓面施工进行可视化仿真... 针对当前高拱坝施工可视化效果差,导致无法对施工质量和施工进度进行有效管理的问题,提出基于增强现实技术实现高拱坝仓面施工智能建造和仿真模拟。首先,根据高拱坝仓面施工的工序关系,通过增强现实技术对高拱坝仓面施工进行可视化仿真流程构建和数学模型构建;然后计算出仓面的工序历时;最后根据施工机械工作位置和坐标进行仓面施工仿真。工程应用表明,基于增强现实的仿真模型对仓面1施工的实际历时为24.73 h,低于标准平均值为26.38 h,置信度控制在95%以内,由此说明该模型对仓面施工的计算结果准确较高,可准确反映仓面实际施工情况。仿真验证发现,提出的方法可实现高拱坝施工进度的精细仿真,很大程度上提高了可视化效果,施工管理人员可根据虚拟仿真模型结合现场实际情况对施工进度和施工质量进行分析管理,可提升高拱坝整体施工效果。 展开更多
关键词 增强现实 智能建造 虚拟仿真 高拱坝 施工工序
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部