The existing 2D settlement monitoring systems for utility tunnels are heavily reliant on manual interpretation of deformation data and empirical predictionmodels.Consequently,early anomalies(e.g.,minor cracks)are ofte...The existing 2D settlement monitoring systems for utility tunnels are heavily reliant on manual interpretation of deformation data and empirical predictionmodels.Consequently,early anomalies(e.g.,minor cracks)are often misjudged,and warnings lag by about 24 h without automated spatial localization.This study establishes a technical framework for requirements analysis,architectural design,and data-integration protocols.Revit parametric modelling is used to build a 3D tunnel model with structural elements,pipelines and 18 monitoring points(for displacement and joint width).Custom Revit API code integrated real-time sensor data into the BIM platform via an automated pipeline.The system achieved a spatial accuracy of±1 mm in locating deformation hotspots.Notifications are triggered within 10 s of anomaly detection,and the system renders 3D risk propagation paths in real-time.Realtime 3D visualization of risk propagation paths is also facilitated.The efficacy of the solution was validated in a Ningbo utility tunnel project,where it was demonstrated that it eliminates human-dependent judgment errors and reduces warning latency by 99.9%compared to conventional methods.The BIM-IoT integrated approach,which enables millimetre-level precision in risk identification and near-instantaneous response,establishes a new paradigm for intelligent infrastructure safety management.展开更多
Building information modeling(BIM) and project management are two major research topics that accommodate large volumes of research efforts. BIM has been interpreted as a process technology that aids in enhancing proje...Building information modeling(BIM) and project management are two major research topics that accommodate large volumes of research efforts. BIM has been interpreted as a process technology that aids in enhancing project management. Hence, the investigation from an interdisciplinary perspective of the two concepts may bring new insights to understanding related research.In this paper, a structural approach is adopted in reviewing BIM studies in project management from 2005 to 2017 within identified target journals. This review aims to classify the major research directions and topics for BIM research in project management. Moreover, given BIM's potential for application in project management, this paper attempts to establish a fundamental research foundation for a new paradigm of project management that incorporates BIM, namely, BIM-based project management. The preliminary result suggests that BIM research in project management develops drastically in the examined duration. The research directions of BIM studies in project management include enabling BIM as a technology in project management; BIM application as a solution for specific project management scopes; integration issues of BIM that have been brought to project management;institutional environment and regulatory governance of BIM in realizing project management strategies; and analysis of effects and strategies of BIM adoption and implementation in projects. The directions and trends are then analyzed to develop a research route for BIM studies in project management. Finally, conclusions focus on the relations of the research directions, as well as the contributions and theoretical implications of this review.Future research areas are also recommended.展开更多
基金supported by the Scientific Research Projects of the Education Department of Zhejiang Province(Grant No.Y202454744)the Ningbo Public Welfare Science and Technology Project(Grant No.2024S077)+1 种基金International Sci-tech Cooperation Projects under the“Innovation Yongjiang 2035”Key R&D Programme(No.2024H019)the Ningbo Key R&D Program(Grant No.2024Z287).
文摘The existing 2D settlement monitoring systems for utility tunnels are heavily reliant on manual interpretation of deformation data and empirical predictionmodels.Consequently,early anomalies(e.g.,minor cracks)are often misjudged,and warnings lag by about 24 h without automated spatial localization.This study establishes a technical framework for requirements analysis,architectural design,and data-integration protocols.Revit parametric modelling is used to build a 3D tunnel model with structural elements,pipelines and 18 monitoring points(for displacement and joint width).Custom Revit API code integrated real-time sensor data into the BIM platform via an automated pipeline.The system achieved a spatial accuracy of±1 mm in locating deformation hotspots.Notifications are triggered within 10 s of anomaly detection,and the system renders 3D risk propagation paths in real-time.Realtime 3D visualization of risk propagation paths is also facilitated.The efficacy of the solution was validated in a Ningbo utility tunnel project,where it was demonstrated that it eliminates human-dependent judgment errors and reduces warning latency by 99.9%compared to conventional methods.The BIM-IoT integrated approach,which enables millimetre-level precision in risk identification and near-instantaneous response,establishes a new paradigm for intelligent infrastructure safety management.
基金conducted under the framework of a joint Ph.D. program of the IDMR of Sichuan University and The Hong Kong Polytechnic University, which was funded by the Hong Kong Jockey Club
文摘Building information modeling(BIM) and project management are two major research topics that accommodate large volumes of research efforts. BIM has been interpreted as a process technology that aids in enhancing project management. Hence, the investigation from an interdisciplinary perspective of the two concepts may bring new insights to understanding related research.In this paper, a structural approach is adopted in reviewing BIM studies in project management from 2005 to 2017 within identified target journals. This review aims to classify the major research directions and topics for BIM research in project management. Moreover, given BIM's potential for application in project management, this paper attempts to establish a fundamental research foundation for a new paradigm of project management that incorporates BIM, namely, BIM-based project management. The preliminary result suggests that BIM research in project management develops drastically in the examined duration. The research directions of BIM studies in project management include enabling BIM as a technology in project management; BIM application as a solution for specific project management scopes; integration issues of BIM that have been brought to project management;institutional environment and regulatory governance of BIM in realizing project management strategies; and analysis of effects and strategies of BIM adoption and implementation in projects. The directions and trends are then analyzed to develop a research route for BIM studies in project management. Finally, conclusions focus on the relations of the research directions, as well as the contributions and theoretical implications of this review.Future research areas are also recommended.