Principles of the roof cut short-arm beam mining method (110 method) and its mining-induced stress distribution 被引量:14
1
作者 Tao Zhigang Song Zhigang +2 位作者 He Manchao Meng Zhigang Pang Shihui 《International Journal of Mining Science and Technology》 EI CSCD 2018年第3期391-396,共6页
Since the 1960 s, mining science and technology in China has experienced two technical innovations, i.e.the ‘‘Masonry Beam Theory(MBT)" and ‘‘Transfer Rock Beam Theory(TRBT)". Based on those theories, th... Since the 1960 s, mining science and technology in China has experienced two technical innovations, i.e.the ‘‘Masonry Beam Theory(MBT)" and ‘‘Transfer Rock Beam Theory(TRBT)". Based on those theories, the conventional mining method(being called the 121 mining method) was established, consisting of excavating two tunnels with a pillar left for mining a working panel. However, with increasing mining depth,engineering geological disasters in the underground caverns have been frequently encountered. In addition, the use of the coal-pillar mining results in a large amount of coal resources unexploited. In order to address the problems above, the ‘‘Roof Cut Short-Arm Beam Theory(RCSBT), being called the 110 mining method)" was proposed by He Manchao in 2008. The 110 mining method features the mining of one coal seam panel, excavating necessarily only one roadway tunnel and leaving no pillars. Realization of the 110 mining method includes the following steps:(1) directional pre-splitting roof cutting,(2) supporting the roof by using high Constant Resistance Large Deformation bolt/cable(CRLD), and(3) blocking gangue by hydraulic props. This paper presents an overview of the principles, techniques and application of the 110 mining method. Special emphasis is placed on the numerical simulation of the geostress distribution found in the mining panel using the 110 method compared to that of the 121 method. In addition, the stress distribution on the ‘‘short beam" left by the roof cutting when performing the 110 method was also investigated using both numerical simulation and theoretical formulation. 展开更多
关键词 Mining innovation 121 mining method Cutting cantilever beam theory Non-pillar mining 110 mining method
在线阅读 下载PDF
“110”工法采空区抽注耦合流场演化研究——以皖北矿区为例
2
作者 张朝举 杨亚黎 《安全》 2025年第5期48-54,共7页
为解决“110”工法将通风模式变为两进一回,加剧采空区漏风的问题,对采空区内气体运移规律进行探究,使用Fluent软件对抽-注条件下采空区瓦斯和氧气浓度分布进行模拟研究,探究瓦斯抽采和氮气注入工况下瓦斯和氧气占比变化规律。研究表明... 为解决“110”工法将通风模式变为两进一回,加剧采空区漏风的问题,对采空区内气体运移规律进行探究,使用Fluent软件对抽-注条件下采空区瓦斯和氧气浓度分布进行模拟研究,探究瓦斯抽采和氮气注入工况下瓦斯和氧气占比变化规律。研究表明:瓦斯抽采会导致采空区危险区域扩大,抽采负压增加会导致采空区氧化带向深部移动;向采空区内注氮会使注氮位置附近的低瓦斯区域扩大,当注氮位置距工作面50 m时,低瓦斯区域显著扩大,氧气浓度明显降低。研究结果对“110”工法采空区煤自燃与瓦斯协同防控提供了理论依据,对优化工作面通风设计、制定差异化注氮参数具有重要工程指导价值。 展开更多
关键词 矿井火灾 110”工法 瓦斯抽采 氧气浓度范围
在线阅读 下载PDF
关键路径挣值法在输变电工程中的应用——以上海市某110 kV变电站工程为例 被引量:2
3
作者 阳山 《河南科技》 2025年第1期11-16,共6页
【目的】以上海市某110 kV变电站工程为例,探讨关键路径法(Critical Path Method,CPM)在变电站工程施工管理中的实际应用效果,特别是在进度控制、成本管理和风险评估方面的表现。【方法】对一个110 kV变电站工程案例进行分析,详细阐述CP... 【目的】以上海市某110 kV变电站工程为例,探讨关键路径法(Critical Path Method,CPM)在变电站工程施工管理中的实际应用效果,特别是在进度控制、成本管理和风险评估方面的表现。【方法】对一个110 kV变电站工程案例进行分析,详细阐述CPM的具体应用流程,包括识别项目关键路径、优化资源分配及预测进度和成本的偏差。【结果】研究结果表明,采用CPM能显著提高项目管理的精确度,为项目团队的决策提供及时且有效的支持,从而提高整个施工过程的效率和质量。【结论】不仅为类似输变电工程项目提供了科学的管理策略和方法论,还对推动工程管理领域的理论发展与实践创新具有重要的参考价值。通过实证分析,表明在变电站工程施工中运用CPM的必要性,为未来工程管理的标准化和精细化提供可行的路径,同时也为应对复杂工程项目中的风险和挑战指明方向。 展开更多
关键词 关键路径挣值法 110 kV变电站 施工管理 成本进度控制
在线阅读 下载PDF
9302综采工作面110工法的应用
4
作者 高鹏飞 《能源与节能》 2025年第2期325-327,331,共4页
在煤炭资源开采过程中,以往主要采用留煤柱方式,此方式容易造成煤炭资源浪费问题,所以近年来相关研究领域积极改进沿空留巷工艺,优化工作面布局方式,逐渐从传统的121工法发展为110工法,从而更科学地设置盘区和巷道,进一步提升煤炭资源... 在煤炭资源开采过程中,以往主要采用留煤柱方式,此方式容易造成煤炭资源浪费问题,所以近年来相关研究领域积极改进沿空留巷工艺,优化工作面布局方式,逐渐从传统的121工法发展为110工法,从而更科学地设置盘区和巷道,进一步提升煤炭资源开采率与回收率。主要以9302综采面为例,通过介绍该工作面条件,分析在此工作面中应用110工法的具体路径,以期为相关工作人员带来一定启示。 展开更多
关键词 煤炭 综采工作面 110工法
在线阅读 下载PDF
“110”工法“一进两回”采面采空区自燃“三带”研究
5
作者 李会云 《煤矿现代化》 2025年第2期75-80,共6页
针对某矿“110”工法“一进两回”采面通风系统采空区可能存在的自然发火问题,采用埋设束管监测和现场实测数据,结合软件数值模拟,对采空区氧气的运移规律进行了分析,划分出了“110工法”“一进两回”采面通风系统采空区自然发火“三带... 针对某矿“110”工法“一进两回”采面通风系统采空区可能存在的自然发火问题,采用埋设束管监测和现场实测数据,结合软件数值模拟,对采空区氧气的运移规律进行了分析,划分出了“110工法”“一进两回”采面通风系统采空区自然发火“三带”范围。结果表明该采空区氧化升温带呈现倒“靴子”形分布,需重点防范进风侧沿空留巷段自然发火的可能性。另外,确定了该工作面最小安全推进速度为1.48 m/d,可为该矿类似条件下综合防灭火措施的实施提供依据。 展开更多
关键词 采空区 110”工法 自燃“三带” 数值模拟
在线阅读 下载PDF
综采工作面“110”工法留巷技术研究与实践
6
作者 吕玉芝 梁永胜 孟凡涛 《山东煤炭科技》 2025年第4期10-14,19,25,共7页
随着国家智能化采掘的不断推进,采掘接续关系紧张的情况时有发生,掘进放面工程难以满足推采速度的需要。针对采掘接续关系紧张的问题,推行“110”工法切顶沿空留巷技术,实现取消回采巷道隔离煤柱。沿空留巷技术能够显著提高煤炭开采效率... 随着国家智能化采掘的不断推进,采掘接续关系紧张的情况时有发生,掘进放面工程难以满足推采速度的需要。针对采掘接续关系紧张的问题,推行“110”工法切顶沿空留巷技术,实现取消回采巷道隔离煤柱。沿空留巷技术能够显著提高煤炭开采效率,提高资源回收率,缓解矿井采掘接续紧张,降低开采成本,减少了对环境的影响。 展开更多
关键词 沿空留巷 110”工法 切顶卸压
在线阅读 下载PDF
高瓦斯煤矿110工法工作面采空区漏风规律研究
7
作者 张泽 刘文永 《陕西煤炭》 2025年第11期59-63,共5页
为了研究110工法工作面采空区漏风规律,以某矿110工法工作面为研究对象,根据202工作面通风系统特征,利用SF_(6)示踪气体测定技术,现场测定了110工法工作面Y型通风条件下采空区流场的漏风速率和漏风量。结果表明,202工作面采空区从释放... 为了研究110工法工作面采空区漏风规律,以某矿110工法工作面为研究对象,根据202工作面通风系统特征,利用SF_(6)示踪气体测定技术,现场测定了110工法工作面Y型通风条件下采空区流场的漏风速率和漏风量。结果表明,202工作面采空区从释放点到接收点存在多处漏风通道,平均漏风速率为0.21~0.33 m/s。202采空区与工作面、回风巷存在漏风,201采空区与202辅运顺槽存在漏风,漏风量在77~92 m^(3)/min之间,得出了202工作面采空区的漏风规律,可以为110工法工作面采空区封堵漏风提供理论指导。 展开更多
关键词 110工法 采空区 漏风规律 SF_(6)示踪气体
在线阅读 下载PDF
黄陵一号煤矿“110工法”工程实践应用
8
作者 申涛 吕怀宝 《陕西煤炭》 2025年第1期124-127,160,共5页
黄陵一号煤矿通过1006综采工作面300 m沿空留巷工业试验、1009综采工作面实施“110工法”回采期间,沿空留巷段顶板下沉、底鼓严重等现象凸显,顶板支护成为井工煤矿实施“110工法”的一项技术攻关。该矿通过提前对沿空留巷段顶板进行锚... 黄陵一号煤矿通过1006综采工作面300 m沿空留巷工业试验、1009综采工作面实施“110工法”回采期间,沿空留巷段顶板下沉、底鼓严重等现象凸显,顶板支护成为井工煤矿实施“110工法”的一项技术攻关。该矿通过提前对沿空留巷段顶板进行锚梁补强支护,尾巷支护方式由“U29挡矸柱+单体支护”创新性升级为“U29挡矸柱+单体+垛式支架双重支护”,辅运部分端头支架优化调整为特殊支架支护,通过一个工作面的实践、应用,有效控制了沿空留巷段受采动影响顶板压力过大、底鼓严重等造成的影响,成功实现留巷的完整,保证了1006、1009这2个工作面的顺利回采,为后续“N00工法”的进一步实施积累了丰富的作业经验,为“110-N00工法”开采新技术的成功实施应用提供、融合了黄陵经验。 展开更多
关键词 沿空留巷 110工法 锚梁补强支护 顶板压力
在线阅读 下载PDF
不同通风方式下“110工法”采空区自燃“三带”数值模拟研究 被引量:10
9
作者 文虎 孟尧 +4 位作者 樊世星 徐奕铭 叶春辉 童校长 宋金锁 《煤矿安全》 CAS 北大核心 2024年第4期88-97,共10页
为探究不同通风方式下“110工法”采空区自燃“三带”分布特征,以顾北矿1532(1)工作面“两进一回”通风方式为工程背景,基于风流控制方程、浓度组分方程和能量方程等,利用Fluent数值模拟方法建立煤自然发火多物理场耦合数值模型、工作... 为探究不同通风方式下“110工法”采空区自燃“三带”分布特征,以顾北矿1532(1)工作面“两进一回”通风方式为工程背景,基于风流控制方程、浓度组分方程和能量方程等,利用Fluent数值模拟方法建立煤自然发火多物理场耦合数值模型、工作面实时动态推进模型,模拟了3种通风方式下“110工法”采空区自燃“三带”分布特征。结果表明:随着工作面不断推进,在通风方式1(机巷侧和沿空留巷进风,回风巷回风)和通风方式2(机巷侧和回风巷进风,沿空留巷回风)条件下,采空区氧化自燃带均匀分布在运输巷侧、工作面中部和留巷侧,其氧气体积分数分布形状相差不大,采空区温度首先升高,开采约50 d后,最高温度出现在运输巷侧深部,且该位置温度不随工作面继续推进而升高;在通风方式3(沿空留巷和回风巷进风,机巷侧回风)条件下,采空区留巷侧氧化自燃带变宽2~4倍,工作面中部和运输巷侧明显变窄,采空区运输巷侧氧气体积分数较低,留巷侧氧气体积分数较高,漏风量明显增大。采空区高温位置主要出现在1532(1)工作面始采线留巷侧,且当工作面开采50 d后,此处采空区温度最高。综上所述并结合现场实际情况,对氧化自燃带宽度及位置进行分析,最终确定通风方式3更有利于防止煤自燃的发生,对矿井煤自燃的预防提供了理论指导。 展开更多
关键词 110工法 矿井通风方式 自燃“三带” 移动网格 氧气体积分数
在线阅读 下载PDF
Longwall mining “cutting cantilever beam theory” and 110 mining method in China——The third mining science innovation 被引量:67
10
作者 Manchao He Guolong Zhu Zhibiao Guo 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2015年第5期483-492,共10页
With the third innovation in science and technology worldwide, China has also experienced thismarvelous progress. Concerning the longwall mining in China, the "masonry beam theory" (MBT) wasfirst proposed in the 1... With the third innovation in science and technology worldwide, China has also experienced thismarvelous progress. Concerning the longwall mining in China, the "masonry beam theory" (MBT) wasfirst proposed in the 1960s, illustrating that the transmission and equilibrium method of overburdenpressure using reserved coal pillar in mined-out areas can be realized. This forms the so-called "121mining method", which lays a solid foundation for development of mining science and technology inChina. The "transfer rock beam theory" (TRBT) proposed in the 1980s gives a further understanding forthe transmission path of stope overburden pressure and pressure distribution in high-stress areas. In thisregard, the advanced 121 mining method was proposed with smaller coal pillar for excavation design,making significant contributions to improvement of the coal recovery rate in that era. In the 21st century,the traditional mining technologies faced great challenges and, under the theoretical developmentspioneered by Profs. Minggao Qian and Zhenqi Song, the "cutting cantilever beam theory" (CCBT) wasproposed in 2008. After that the 110 mining method is formulated subsequently, namely one stope face,after the first mining cycle, needs one advanced gateway excavation, while the other one is automaticallyformed during the last mining cycle without coal pillars left in the mining area. This method can beimplemented using the CCBT by incorporating the key technologies, including the directional presplittingroof cutting, constant resistance and large deformation (CRLD) bolt/anchor supporting systemwith negative Poisson's ratio (NPR) effect material, and remote real-time monitoring technology. TheCCBT and 110 mining method will provide the theoretical and technical basis for the development ofmining industry in China. 展开更多
关键词 Mining innovation 121 mining method Cutting cantilever beam theory (CCBT) Non-pillar mining 110 mining method
在线阅读 下载PDF
Research and application of mechanical models for the whole process of 110 mining method roof structural movement 被引量:12
11
作者 BIAN Wen-hui YANG Jun +2 位作者 HE Man-chao ZHU Chun XU Dong-ming 《Journal of Central South University》 SCIE EI CAS CSCD 2022年第9期3106-3124,共19页
For the 110 mining method,it is challenging to accurately calculate the support resistance of the roadway due to the lack of understanding of the dynamic movement of the overlying strata in this method.The consequenti... For the 110 mining method,it is challenging to accurately calculate the support resistance of the roadway due to the lack of understanding of the dynamic movement of the overlying strata in this method.The consequential excessive support results in a significant increase in the cost of roadway support.The authors explored the overlying strata movement and roadway deformation of the gob-entry retaining in the 110 mining method to solve this problem.First,the typical stages of the roof-cutting gob-side entry were defined.Second,the mechanical model and calculation formula of the support resistance on the roof were explored.Then,using numerical simulation software,the starting ranges of the specific supports at different stages were verified and the feasibility of the support scheme was examined.Finally,combined with the field measurement data,the stress and the deformation of the gob roadway at different stages under the influence of two mining processes in the 110 mining method were obtained.The numerical simulation results obtained are consistent with the field test results,providing a theoretical basis for precision support at different stages by the 110 mining method. 展开更多
关键词 110 mining method gob-side entry retaining roof structure movement mechanical model
在线阅读 下载PDF
神南矿区“110工法”采空区覆岩稳定性研究 被引量:5
12
作者 张卫 陈玉涛 +1 位作者 倪倩 臧立岩 《矿业安全与环保》 CAS 北大核心 2024年第2期106-110,共5页
以神南矿区为工程背景,采用岩体微观室内实验、现场监测、物理模拟实验(DIC监测、应变监测)和FLAC3D数值模拟方法,分析了矿区主要岩层岩体结构特征,获得了“110工法”(一种新型的无煤柱开采技术)开采工艺下采空区上覆岩体位移场和应力... 以神南矿区为工程背景,采用岩体微观室内实验、现场监测、物理模拟实验(DIC监测、应变监测)和FLAC3D数值模拟方法,分析了矿区主要岩层岩体结构特征,获得了“110工法”(一种新型的无煤柱开采技术)开采工艺下采空区上覆岩体位移场和应力场的演变规律。研究结果表明:神南矿区岩体节理裂隙发育程度较高,岩体质量等级较差;110工法利用岩体的碎胀效应和高恒阻能量吸收锚索补偿力学支护特性,在千米级埋深的煤层开采中仍具有良好的沿空留巷效果;110工法下的采空区位移沉降从大到小依次为中部区域、切线侧区域、非切线侧区域。110工法的切顶卸压和高恒阻能量吸收锚索的联合开采技术,可为其他地下空间中大变形软弱围岩的稳定性研究提供科学依据。 展开更多
关键词 采空区 110工法 干湿循环 数值模拟 物理模型
在线阅读 下载PDF
基于数字孪生技术的110 kV电力设备运行状态监测方法 被引量:11
13
作者 邢佳源 《科技创新与应用》 2024年第15期163-166,共4页
为提升110 kV电力设备的运行稳定性,需要对其运行状态进行监测,该文根据数字孪生技术,以浙江金华110 kV亚体变为例,通过无线网络、机器人等方式,对电力设备运行状态数据信息进行收集,基于数字孪生技术,进行数字信号模拟,将物理实体转化... 为提升110 kV电力设备的运行稳定性,需要对其运行状态进行监测,该文根据数字孪生技术,以浙江金华110 kV亚体变为例,通过无线网络、机器人等方式,对电力设备运行状态数据信息进行收集,基于数字孪生技术,进行数字信号模拟,将物理实体转化成数字虚拟体,构建电力设备运行状态孪生模型,实现110 kV电力设备运行状态的检测。传统的电力设备监测其监测效率、监测精度较低,通过数字孪生技术的支撑,构建新的监测模型,有效提升变电站电力设备的可靠性与安全性,以供参考。 展开更多
关键词 数字孪生技术 电力设备 运行状态监测 监测方法 110 kV亚体变
在线阅读 下载PDF
110工法在中厚煤层开采中的应用研究 被引量:4
14
作者 李志岗 《山西化工》 CAS 2024年第4期219-220,233,共3页
煤矿开采过程中经常会遇到中厚煤层,在进行中厚煤层开采作业时,要合理应用110工法开展作业。下面以110工法概述为切入点,阐述了110工法优势,最终依据工程实例,针对110工法的应用进行了深入探讨。
关键词 110工法 中厚煤层 巷道 煤柱
在线阅读 下载PDF
黄陵一号煤矿中厚煤层110工法瓦斯治理技术研究 被引量:1
15
作者 石新禹 《煤炭与化工》 CAS 2024年第3期107-111,共5页
切顶留巷无煤柱开采下煤与瓦斯共采是我国无煤柱开采技术的重要发展方向,为解决陕西黄陵一号煤矿中厚煤层110工法开采工艺条件下卸压瓦斯治理难题,采用理论分析与数值模拟相结合的研究方法,分析了切顶留巷开采导致覆岩结构变化及裂隙分... 切顶留巷无煤柱开采下煤与瓦斯共采是我国无煤柱开采技术的重要发展方向,为解决陕西黄陵一号煤矿中厚煤层110工法开采工艺条件下卸压瓦斯治理难题,采用理论分析与数值模拟相结合的研究方法,分析了切顶留巷开采导致覆岩结构变化及裂隙分布特征。结果表明,根据110工法开采过程顶板结构状态变化特征,将切顶留巷围岩结构运动划分为4个阶段。工作面充分采动后,垮落带的高度基本不再变化,稳定在7 m左右,裂隙带发育高度为55 m左右,应力集中系数约为2.73,采空区中部垮落带内裂隙基本处于压实闭合状态,裂隙区宽度约为40 m,切眼处岩层破断角为67°,工作面停采处岩层破断角约为62°。根据1009工作面切顶留巷无煤柱开采技术下裂隙分布特征,施工定向高位试验钻孔,现场抽采效果良好,有效治理了1009回风巷瓦斯浓度超限问题,实现了1009工作面安全回采。 展开更多
关键词 110工法 卸压瓦斯抽采 覆岩结构演变 卸压瓦斯储运区
在线阅读 下载PDF
110工法采空区漏风控制及煤自燃分区防控技术 被引量:3
16
作者 董亚楠 张宁涛 《山东煤炭科技》 2024年第4期58-64,共7页
针对陕西黄陵一号煤矿“两进一回”通风方式下,采空区漏风通道复杂及煤自燃防治困难等问题,通过数值模拟结合现场实测,分析通风量对漏风规律、氧浓度分布的影响,提出110工法沿空留巷采空区漏风控制与煤自燃分区防控技术。研究结果表明,... 针对陕西黄陵一号煤矿“两进一回”通风方式下,采空区漏风通道复杂及煤自燃防治困难等问题,通过数值模拟结合现场实测,分析通风量对漏风规律、氧浓度分布的影响,提出110工法沿空留巷采空区漏风控制与煤自燃分区防控技术。研究结果表明,“两进一回”通风方式下,采空区内漏风影响范围随着辅运顺槽风量增加而增大,辅运顺槽侧采空区内氧气浓度大于进风顺槽侧;进风顺槽风量增大也会产生类似的现象,但较辅运顺槽风量改变时不明显。现场观测结果表明:1009工作面进风顺槽氧浓度测点在125m处降至18%,当深入到273m处氧气浓度降至8%,辅运顺槽测点在300m处氧气浓度降至18%,与模拟结果基本吻合。结合现场实际提出集“隔离、堵漏、惰化、阻化、应急”为一体的采空区防灭火工艺,研究结果对采空区漏风及煤自燃灾害防治具有重要意义。 展开更多
关键词 110工法 采空区 漏风规律 煤自燃防治
在线阅读 下载PDF
三交河矿“110工法”无煤柱开采技术试验研究 被引量:1
17
作者 荀建梁 《凿岩机械气动工具》 2024年第3期53-58,共6页
针对煤矿井下因留设煤柱造成的回采率低、巷道掘进量大、安全性差等问题,设计采用“110工法”增加了煤炭资源回采率。以三交河矿10-207工作面为工程背景,通过理论分析、数值模拟和实践相结合方法,模拟分析出最佳的切顶孔角度和切顶高度... 针对煤矿井下因留设煤柱造成的回采率低、巷道掘进量大、安全性差等问题,设计采用“110工法”增加了煤炭资源回采率。以三交河矿10-207工作面为工程背景,通过理论分析、数值模拟和实践相结合方法,模拟分析出最佳的切顶孔角度和切顶高度。通过对切顶后巷道顶板的动态监测,当切顶角度为5°,切顶高度为20.5 m时,能确保切顶顺槽巷道顶板的位移下沉量最小,从而有利于巷道的管理和维护。 展开更多
关键词 切顶卸压 110工法 采空区
在线阅读 下载PDF
110工法沿空留巷顶板注浆加固技术实践 被引量:3
18
作者 卢少帅 薛小锋 高军伟 《陕西煤炭》 2024年第10期60-64,共5页
沿空留巷巷道受下一阶段回采工作面采动动压影响,采用常规的锚网索支护方式难以控制巷道顶板下沉。以韩家湾煤矿214202工作面回风顺槽沿空留巷巷道围岩控制为研究对象,分析受两次回采扰动影响下巷道顶板岩层结构变化特征,提出在第2次回... 沿空留巷巷道受下一阶段回采工作面采动动压影响,采用常规的锚网索支护方式难以控制巷道顶板下沉。以韩家湾煤矿214202工作面回风顺槽沿空留巷巷道围岩控制为研究对象,分析受两次回采扰动影响下巷道顶板岩层结构变化特征,提出在第2次回采扰动影响前,采用顶板注浆加固方式稳定巷道围岩,运用现场施工测量技术对加固前后巷道顶板下沉、围岩变化等实测数据进行分析。结果表明,沿空留巷经过注浆加固之后,在沿空留巷受二次采动影响时,巷道顶板离层量大大的减少,相比未注浆段巷道顶板离层量普遍减少300~400 mm,通过对顶板进行注浆加固,固结了破碎顶板,显著增大了围岩的内聚力和内摩擦角,增强顶板整体自承载能力,保证了工作面的安全高效回采。 展开更多
关键词 110工法 沿空留巷 注浆加固 巷道顶板 切顶卸压
在线阅读 下载PDF
庞庞塔煤矿110501综放工作面“110工法”技术研究及实践 被引量:2
19
作者 杨凯 《晋控科学技术》 2024年第1期42-45,共4页
针对霍州煤电集团吕临能化有限公司庞庞塔煤矿留煤柱开采导致采掘接替紧张、煤炭资源回收率低的问题,以110501综采工作面为研究对象,提出采用切顶卸压无煤柱自成巷“110工法”进行开采,设计了恒阻大变形锚索补强支护和顶板预裂切缝孔布... 针对霍州煤电集团吕临能化有限公司庞庞塔煤矿留煤柱开采导致采掘接替紧张、煤炭资源回收率低的问题,以110501综采工作面为研究对象,提出采用切顶卸压无煤柱自成巷“110工法”进行开采,设计了恒阻大变形锚索补强支护和顶板预裂切缝孔布置方案。现场应用结果表明:所采用的技术方案有效控制了110501胶带顺槽围岩变形,使110501综采工作面多回收煤柱资源约5.8万t,创造经济效益约3480万元。 展开更多
关键词 110工法 切顶卸压 补强支护 围岩控制
在线阅读 下载PDF
110 kV电力输电线路施工方法及技术分析 被引量:2
20
作者 童有超 《科技资讯》 2024年第18期75-77,共3页
110 kV既是变电站的入电电压,也是高压侧电压,因此,保障110 kV线路的运行安全是确保变电站正常运行的关键。为了实现这一目标,需要采取一系列措施来提高110 kV线路的可靠性与安全性。结合当前我国110 kV电力输电线路施工的实际情况,以11... 110 kV既是变电站的入电电压,也是高压侧电压,因此,保障110 kV线路的运行安全是确保变电站正常运行的关键。为了实现这一目标,需要采取一系列措施来提高110 kV线路的可靠性与安全性。结合当前我国110 kV电力输电线路施工的实际情况,以110 kV电力输电线路为主要研究对象,着重从输电线路施工的角度明确110 kV电力输电线路中应用的施工方法,进而探讨110 kV电力输电线路应用的施工技术,希望能够为保障和提升110 kV输电线路的运行安全提供借鉴思路和经验。 展开更多
关键词 110 kV电力输电线路 施工方法 施工技术 电压
在线阅读 下载PDF