Dynamic response of a slope reinforced by double-row antisliding piles and pre-stressed anchor cables 被引量:16
1
作者 FAN Gang ZHANG Jian-jing +1 位作者 QI Shun-chao WU Jin-biao 《Journal of Mountain Science》 SCIE CSCD 2019年第1期226-241,共16页
Large-scale shaking table tests were conducted to study the dynamic response of a slope reinforced by double-row anti-sliding piles and prestressed anchor cables. The test results show that the reinforcement suppresse... Large-scale shaking table tests were conducted to study the dynamic response of a slope reinforced by double-row anti-sliding piles and prestressed anchor cables. The test results show that the reinforcement suppressed the acceleration amplification effectively. The axial force time histories are decomposed into a baseline part and a vibration part in this study. The baseline part of axial force well revealed the seismic slope stability, the peak vibration values of axial force of the anchor cables changed significantly in different area of the slope under seismic excitations. The peak lateral earth pressure acting on the back of the anti-sliding pile located at the slope toe was much larger than that acting on the back of the anti-sliding pile located at the slope waist. The test results indicate an obvious load sharing ratio difference between these two anti-slide piles, the load sharing ratio between the two anti-sliding piles located at the slope toe and the slope waist varied mainly in a range of 2-5. The anti-slide pile at the slope waist suppressed the horizontal displacement of the slope surface. 展开更多
关键词 SLOPE stability ANTI-SLIDING pile anchor cable Seismic design SHAKING table test Earthquake
原文传递
Effect of soil set-up on the capacity of jacked concrete pipe piles in mixed soils 被引量:3
2
作者 Jun-wei LIU Zhong-miao ZHANG Feng YU Cun-gang LIN 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2011年第8期637-644,共8页
The increase in capacity of displacement piles with time after installation is typically known as soil/pile set-up. A full-scale field test is carried out to observe the set-up effect for open-ended concrete pipe pile... The increase in capacity of displacement piles with time after installation is typically known as soil/pile set-up. A full-scale field test is carried out to observe the set-up effect for open-ended concrete pipe piles jacked into mixed soils. Both the total capacity and the average unit shaft resistance increase approximately linearly with logarithmic time. The average increase rate for unit shaft resistance is 44% per log cycle, while the average increase for total capacity is approximately 21%. A review on case histories for long-term set-up indicates an average set-up rate of approximately 40%. Based on this, the mechanism of pile set-up is discussed in detail and a three-phase model is suggested. 展开更多
关键词 Concrete pipe pile Jack piling SET-UP pile capacity
原文传递
Anchoring Depth Research of Anti-Slide Piles of Anchor Bar in Soil 被引量:6
3
作者 Xunchang Li Yuming Men 《地学前缘》 EI CAS CSCD 北大核心 2009年第S1期182-182,共1页
The model test result of earth force in the side of anti-slide pile of anchor bars was introduced.There are three groups of the tests.The loads were on the back side of the slope in two groups.The other one was loaded... The model test result of earth force in the side of anti-slide pile of anchor bars was introduced.There are three groups of the tests.The loads were on the back side of the slope in two groups.The other one was loaded just behind the pile by the jack.In order to get the force of the soil,some earth-pressure boxes were used to get the earth pressure on the side of the piles. 展开更多
关键词 anti-slide pile of anchor bar model test anchoring depth slip line
在线阅读 下载PDF
Co-Evolution Optimization of Anchored Row Piles for Deep Foundation Pit 被引量:3
4
作者 周东 吴恒 +2 位作者 李陶声 韦日钰 陈秋莲 《Journal of China University of Mining and Technology》 2001年第2期123-131,共9页
The thinking of co evolution is applied to the optimization of retaining and protecting structure for deep foundation excavation, and the system of optimization of anchored row piles for deep foundation pit has been a... The thinking of co evolution is applied to the optimization of retaining and protecting structure for deep foundation excavation, and the system of optimization of anchored row piles for deep foundation pit has been already developed successfully. For the co evolution algorithm providing an evolutionary mechanism to simulate ever changing problem space, it is an optimization algorithm that has high performance, especially applying to the optimization of complicated system of retaining and protecting for deep foundation pit. It is shown by many engineering practices that the co evolution algorithm has obvious optimization effect, so it can be an important method of optimization of retaining and protecting for deep foundation pit. Here the authors discuss the co evolution model, object function, all kinds of constraint conditions and their disposal methods, and several key techniques of system realization. 展开更多
关键词 genetic algorithm co evolution OPTIMIZATION anchored row piles deep foundation pit
在线阅读 下载PDF
Energy‐based analysis of seismic damage mechanism of multi‐anchor piles in tunnel crossing landslide area 被引量:1
5
作者 Hong Wei Honggang Wu +2 位作者 Guojun Ren Lin Tang Kang Feng 《Deep Underground Science and Engineering》 2023年第3期245-261,共17页
To study the damage mechanism of multi‐anchor piles in tunnel crossing landslide area under earthquake,the damping performance of multi‐anchor piles was discussed.The energy dissipation springs were used as the opti... To study the damage mechanism of multi‐anchor piles in tunnel crossing landslide area under earthquake,the damping performance of multi‐anchor piles was discussed.The energy dissipation springs were used as the optimization device of the anchor head to carry out the shaking table comparison test on the reinforced slope.The Hilbert spectrum and Hilbert marginal spectrum were proposed to analyze the seismic damage mechanism of the multi‐anchor piles,and the peak Fourier spectrum amplitude(PFSA)was used to verify the effectiveness of the method.The results show that the seismic energy is concentrated in the high‐frequency component(30-40Hz)of the Hilbert spectrum and the low‐frequency component(12-30 Hz)of the marginal spectrum.This indicates that they can be combined with the distribution law of the PFSA to identify the overall and local dynamic responses of the multi‐anchored piles,respectively.The stretchable deformation of the energy‐dissipation springs improves the coordination of the multi‐anchor piles,resulting in better pile integrity.The damage mechanism of the multi‐anchor piles is elucidated based on the energy method:local damage at the top and middle areas of the multi‐anchor piles is mainly caused by the low‐frequency component(12-30 Hz)of the marginal spectrum under the action of 0.15g and 0.20g seismic intensities.As the seismic intensity increases to 0.30g,the dynamic response of the slope is further amplified by the high‐frequency component(30-40 Hz)of the Hilbert energy spectrum,which leads to the overall damage of the multi‐anchor piles. 展开更多
关键词 Hilbert-Huang transform marginal spectrum multi‐anchor piles seismic damage mechanism
原文传递
Study on the Horizontal Movement State of Suction Anchor Piles for Offshore Wind Power during Horizontal Pulling 被引量:1
6
作者 Jianping Jiang Jiaruo Gao 《World Journal of Engineering and Technology》 2022年第1期88-97,共10页
The subsea anchor piles of offshore wind power floating platform structures are mainly subjected to uplift and horizontal loads, and this paper focuses on the case of horizontal loads. A three-dimensional numerical si... The subsea anchor piles of offshore wind power floating platform structures are mainly subjected to uplift and horizontal loads, and this paper focuses on the case of horizontal loads. A three-dimensional numerical simulation study of the horizontal pullout characteristics of wind power suction anchor piles in clay layers was carried out to reveal the horizontal movement state of the anchor piles during horizontal pile pullout, the range of pile depth at the pullout point where the horizontal movement is achieved (referred to as the horizontal movement range), the relationship between the pullout load and the ultimate load during the horizontal movement, and the optimal location of the pullout point for the horizontal movement. The results show that at certain pull-out points, the anchor pile produces an overall horizontal movement state under suitable horizontal pull-out loads. The depth of the pile pull-out point for horizontal movement is in the middle and lower part of the pile, i.e. 14.2 m to 14.5 m. The horizontal pull-out load of 24,000 kN at a depth of 14.5 m within the pile horizontal movement range of 14.2m to 14.5 m is the maximum ultimate horizontal pull-out load;the optimum pull-out point depth is 14.5 m at 0.275 L (L is the pile length). For each pull-out point of the anchor pile in horizontal movement, the horizontal pull-out load in horizontal movement and the horizontal ultimate pull-out load existed and it was found that the two values were not exactly the same, the values were compared and it was found that at the optimum pull-out point the value of the ultimate horizontal pull-out load/horizontal pull-out load in horizontal movement tended to 1. 展开更多
关键词 Horizontal Movement State Suction anchor piles Horizontal Movement Range Optimum Pull-Out Point Depth Offshore Wind Power
在线阅读 下载PDF
Dynamic Behavior of Double-Row Pre-stressed Anchor Piles under Earthquake Conditions
7
作者 刘昌清 陶云辉 李想 《Journal of Southwest Jiaotong University(English Edition)》 2010年第2期118-123,共6页
To investigate the seismic performance of the double-row pre-stressed anchor piles (DRPAPs) on the Yuxi-Mengzi railway, FLAC3D was used to construct a three-dimensional model. Using Koyna earthquake records as input... To investigate the seismic performance of the double-row pre-stressed anchor piles (DRPAPs) on the Yuxi-Mengzi railway, FLAC3D was used to construct a three-dimensional model. Using Koyna earthquake records as input motions, dynamic time-history analyses were carried out. In the analyses, we compared earth pressure on the front and back of the piles and deformation of the piles under different seismic forces with or without anchor cables. With the anchor cable present, the earth pressure on the back of the pile's free section increases, but that on the back of the pile's anchorage section decreases. Also, with anchor cables, the earth pressure on the front of the upper pile decreases, and that on the back of the lower pile decreases. 展开更多
关键词 anchor pile Seismic acceleration Dynamic analysis
在线阅读 下载PDF
基于改进变形协调方程的桩锚结构内力计算与工程应用
8
作者 万翼 阳浦江 +2 位作者 张秀丽 冷先伦 王成汤 《安全与环境工程》 北大核心 2026年第1期114-123,共10页
变形协调方程是桩锚结构内力计算的关键。现有的桩锚结构变形协调方程简化了桩身锚点处水平位移与锚索变形量之间的关系,导致当锚索入射角较大时,计算出的桩身内力值有较大误差。针对上述不足,从两个方面改进了变形协调方程:一是引入了... 变形协调方程是桩锚结构内力计算的关键。现有的桩锚结构变形协调方程简化了桩身锚点处水平位移与锚索变形量之间的关系,导致当锚索入射角较大时,计算出的桩身内力值有较大误差。针对上述不足,从两个方面改进了变形协调方程:一是引入了锚索自由段长度值,通过建立桩锚结构变形的几何关系,改进了桩锚结构的变形协调条件;二是在推导变形协调方程时,改进了抗滑桩第j排锚索对第i排锚索锚点处位移贡献值的计算方法。通过MATLAB软件编写了桩锚结构内力计算程序,结合工程实例分别采用现有方法和改进方法计算了桩锚结构的内力,并与数值模拟结果进行了对比。结果表明:改进方法计算结果与数值模拟结果更为吻合,桩身剪力值和弯矩值的相对误差均小于0.3%,证明了改进的桩锚变形协调方程的可行性和合理性。该研究可为桩锚支护系统设计提供理论计算依据。 展开更多
关键词 边坡开挖 桩锚支护 变形协调 内力计算 数值分析
在线阅读 下载PDF
基于FLAC^(3D)的深基坑桩锚支护结构内力与变形特性研究——以重庆某深基坑工程为例
9
作者 李岗 肖伟 +4 位作者 梁延林 古骑银 周元辅 李成 蒙伟 《土木工程与绿色建筑》 2026年第1期116-121,共6页
重庆市沙坪坝区某深基坑工程采用桩锚联合支护结构,基坑开挖深度为19.5 m,开挖面积为7772 m^(2)。文章利用FLAC^(3D)软件建立数值模型,模拟基坑开挖过程中的位移与变形特性,分析不同锚索布置方式对桩锚支护结构的内力和变形的影响。研... 重庆市沙坪坝区某深基坑工程采用桩锚联合支护结构,基坑开挖深度为19.5 m,开挖面积为7772 m^(2)。文章利用FLAC^(3D)软件建立数值模型,模拟基坑开挖过程中的位移与变形特性,分析不同锚索布置方式对桩锚支护结构的内力和变形的影响。研究发现,4排锚索布置方式桩身弯矩最大,达到374.6 kN·m,为最危险布置形式;而3排和5排锚索布置方式弯矩较小,5排锚索布置方式最优。数值模拟和监测结果表明,基坑顶部水平位移随开挖深度逐步增大,模拟结果的最大值为9.6 mm,与监测值接近。通过对比分析数值模拟与实测数据,指出数值模拟普遍偏于安全的原因。本研究揭示了桩锚支护体系的受力与变形规律,为类似工程的设计与施工提供了重要参考。 展开更多
关键词 深基坑 数值模拟 桩锚支护
在线阅读 下载PDF
堆载与锚桩复合基桩静载试验设计方法研究
10
作者 李浩 李健 《工程勘察》 2026年第3期41-47,共7页
从堆载与锚桩复合基桩静载试验中的荷载分担比例问题出发,研究分析了堆载与锚桩复合静载试验系统变形协调关系,进而提出了该复合基桩静载试验设计方法,并进行了现场试验验证。试验系统变形协调关系为堆载系统对次梁平台产生的最大挠度y_... 从堆载与锚桩复合基桩静载试验中的荷载分担比例问题出发,研究分析了堆载与锚桩复合静载试验系统变形协调关系,进而提出了该复合基桩静载试验设计方法,并进行了现场试验验证。试验系统变形协调关系为堆载系统对次梁平台产生的最大挠度y_(1max)应当与锚桩系统最大总位移量S_(max)相等,并讨论了两种情形:当y_(1max)>S_(max)时,应先使用堆载荷载,在次梁上挠量达到(y_(1max)-S_(max))后,再锁定锚桩系统,使两者间保持变形协调;当y_(1max)<S_(max)时,可通过增加堆载荷载或减小锚桩荷载,调整两者间的荷载分担比例,使次梁最大挠度y_(1max)接近或等于S_(max)。据此提出了堆载与锚桩复合基桩静载试验的设计步骤和方法。经有限元分析验证和现场试验结果,表明该设计方法基本能达到设计预期。 展开更多
关键词 复合基桩静载试验 堆载 锚桩 变形协调 设计方法
原文传递
直立边坡桩锚支护结构变形监测与数值模拟
11
作者 蓝锦涛 刘红军 张秋虎 《五邑大学学报(自然科学版)》 2026年第1期63-71,共9页
桩锚支护作为一种高效组合支护形式,在边坡支护工程中应用范围广泛,具备稳定性强、经济效益好、施工便捷等优势.本文依托深圳某水厂直立边坡工程,通过现场监测与Midas GTS NX三维有限元数值模拟相结合的方法,系统研究桩锚支护结构在边... 桩锚支护作为一种高效组合支护形式,在边坡支护工程中应用范围广泛,具备稳定性强、经济效益好、施工便捷等优势.本文依托深圳某水厂直立边坡工程,通过现场监测与Midas GTS NX三维有限元数值模拟相结合的方法,系统研究桩锚支护结构在边坡开挖施工全过程中的变形特性与受力响应.结果表明:在整体开挖过程中,考虑实际分层土层参数的三维数值模拟结果与现场实测数据吻合度良好,所建模型能准确反映工程实际工况,其中桩顶水平位移、桩体深层水平位移、锚索轴力最大偏差分别为14.1%、11.8%、14.7%;桩锚支护结构可有效约束周围岩土体的水平位移,且桩顶水平位移、桩体深层水平位移均与边坡开挖深度呈显著正相关,但监测结果显示锚索的支护潜力未完全发挥.后续可通过优化支护结构参数进一步提升加固效果,研究成果可为类似边坡支护工程设计与施工提供科学参考. 展开更多
关键词 直立边坡 桩锚支护 变形监测 Midas GTS NX
在线阅读 下载PDF
抗浮锚杆耐久性设计理论分析及施工问题解决方法研究
12
作者 党昱敬 高丹青 刘天翔 《建筑技术》 2026年第2期238-244,共7页
在地下结构锚固设计中,抗浮锚杆和抗拔桩作为地下结构锚固构件,应同时满足抗拔承载力、变形控制和防腐耐久性要求。基于现有规程、规范设计理论和工程实践探索,针对目前地下结构锚固构件防腐耐久性设计和抗浮锚杆施工问题进行探析,在指... 在地下结构锚固设计中,抗浮锚杆和抗拔桩作为地下结构锚固构件,应同时满足抗拔承载力、变形控制和防腐耐久性要求。基于现有规程、规范设计理论和工程实践探索,针对目前地下结构锚固构件防腐耐久性设计和抗浮锚杆施工问题进行探析,在指出裂缝控制方法不适用于抗浮锚杆的同时,也对采用裂缝控制方法进行抗拔桩防腐蚀耐久性优化设计进行探讨。最后对压力型预应力抗浮锚杆承载体附近锚固段注浆体质量,以及全长粘结型抗浮锚杆波纹管内外注浆体整体密实性进行分析,所推荐的地下结构锚固构件防腐耐久性设计方法和对有效控制抗浮锚杆施工质量方法的探索,可供地下结构锚固设计与施工技术人员参考。 展开更多
关键词 地下结构锚固设计 抗浮锚杆 抗拔桩 防腐蚀耐久性 裂缝控制设计 压力型预应力抗浮锚杆 全长粘结型抗浮锚杆
在线阅读 下载PDF
路基帮宽段群桩施工挤土效应模型试验研究
13
作者 赵文辉 许锦江 +1 位作者 户军杰 张珂 《铁道学报》 北大核心 2026年第1期160-169,共10页
随着我国铁路交通运输量的不断递增,既有铁路扩能改建工程越来越多,鉴于高速铁路运营时对线路沉降控制的高标准,铁路路基帮宽段复合地基施工对既有线的影响备受关注。采用铝制闭口管桩开展黄土路基帮宽段静压群桩施工挤土效应模型试验,... 随着我国铁路交通运输量的不断递增,既有铁路扩能改建工程越来越多,鉴于高速铁路运营时对线路沉降控制的高标准,铁路路基帮宽段复合地基施工对既有线的影响备受关注。采用铝制闭口管桩开展黄土路基帮宽段静压群桩施工挤土效应模型试验,深入分析群桩施工过程中桩土变形、附加挤土侧压力、既有路基隆起量以及桩身轴力等参数的响应规律。结果表明:沉桩时桩端土体沿球孔呈向外扩张的趋势,桩周土体沿桩身径向扩张;附加挤土侧压力沿深度递增,并在既有桩桩端及以下深度消减;既有路基变形主要发生在坡脚处,连续施工下既有路基隆起最大值为1.33 mm,跳桩法施工既有路基隆起最大值为0.92 mm,相比连续施工减小了35.2%;邻桩的存在对沉桩轴力的影响并不显著。建议实际工程中从靠近既有路基侧开始施工,采用跳桩法的方式减小挤土效应对既有路基的影响,且重点监测临近侧两排桩施工引起的影响。 展开更多
关键词 路基帮宽 静压管桩 模型试验 挤土效应
在线阅读 下载PDF
循环加载下共享桩锚承载变形特性
14
作者 李书兆 张晖 +3 位作者 张梦竹 崔建斌 张友虎 黄滢 《船舶工程》 北大核心 2026年第1期159-167,共9页
[目的]为探究桩锚基础在共享条件下的承载变形特性及与传统独立系泊桩锚的异同,[方法]利用自研的多向加载试验系统开展饱和砂土中共享桩锚系列模型试验。[结果]结果表明:对于合力绕平均方向在一定夹角范围内变化的循环加载模式下的共享... [目的]为探究桩锚基础在共享条件下的承载变形特性及与传统独立系泊桩锚的异同,[方法]利用自研的多向加载试验系统开展饱和砂土中共享桩锚系列模型试验。[结果]结果表明:对于合力绕平均方向在一定夹角范围内变化的循环加载模式下的共享桩锚基础,其失稳模式与独立系泊桩锚相似。桩锚的水平累积位移方向与合力的平均方向一致,其大小随循环次数增加而增长。在循环次数较少时,共享桩锚的累积位移速率与独立系泊桩锚基础基本一致;但循环次数较大时,多向加载效应在一定程度上加速了共享桩锚的位移累积。[结论]研究结果可为优化共享锚的结构设计与实际应用提供一定参考。 展开更多
关键词 漂浮式风电 共享桩锚 相位差 多向加载 承载变形特征
原文传递
高桩码头锚岩桩跟管钻进对锚孔斜率控制的研究
15
作者 王卓 陈百明 胡志浩 《价值工程》 2026年第7期145-147,共3页
从参与建设的某LNG高桩码头项目当中,发现其在斜桩锚岩桩施工中,为保障斜桩情况下锚杆正确下放至准确位置,减小锚孔偏位对桩基承载力影响,采取跟管钻进的控制措施,对锚孔斜率进行控制。基于此锚岩桩锚孔施工控制措施,结合锚岩桩受力特... 从参与建设的某LNG高桩码头项目当中,发现其在斜桩锚岩桩施工中,为保障斜桩情况下锚杆正确下放至准确位置,减小锚孔偏位对桩基承载力影响,采取跟管钻进的控制措施,对锚孔斜率进行控制。基于此锚岩桩锚孔施工控制措施,结合锚岩桩受力特性分析、锚杆锚固体应力分布及斜锚短柱基础抗拔受力特性等研究成果,总结分析了跟管钻进控制措施,通过把控锚孔斜率进一步保障了锚杆锚固质量,提高锚岩桩整体施工质量,对后续类似高桩码头斜桩锚岩桩在锚孔斜率控制上具有一定指导意义。 展开更多
关键词 高桩码头 斜桩 锚岩桩 锚孔精度 跟管钻进
在线阅读 下载PDF
大型泵站基坑围护设计方案研究
16
作者 郭卉 《科技创新与应用》 2026年第6期119-122,共4页
该文对大型泵站基坑支护设计方法进行工程特点进行简要阐述,通过对设计中关键要素的分析找出设计中的要点及处理方式。通过工程实例,分析在围护结构设计过程中的方案选择方式。另外,简单阐述目前的研究热点及技术创新。希望通过该文,能... 该文对大型泵站基坑支护设计方法进行工程特点进行简要阐述,通过对设计中关键要素的分析找出设计中的要点及处理方式。通过工程实例,分析在围护结构设计过程中的方案选择方式。另外,简单阐述目前的研究热点及技术创新。希望通过该文,能够给设计者提供新的设计思路。 展开更多
关键词 围护结构 排桩 内支撑 锚索 锚杆
在线阅读 下载PDF
基于桩锚体系在红粘土深基坑支护中的应用
17
作者 杨雲斌 张才兵 +2 位作者 潘世佳 吴正超 郑冰 《地下水》 2026年第1期200-204,共5页
以贵阳市某深基坑项目为实例,综合分析红粘土特征、地下水及周边复杂环境条件,从支护的难点进行剖析,最终确定采用桩锚体系进行支护处理,通过对锚索分类、分次施加预应力,解决支护结构及周边环境位移控制难题;结合现场监测数据,分析基... 以贵阳市某深基坑项目为实例,综合分析红粘土特征、地下水及周边复杂环境条件,从支护的难点进行剖析,最终确定采用桩锚体系进行支护处理,通过对锚索分类、分次施加预应力,解决支护结构及周边环境位移控制难题;结合现场监测数据,分析基坑施工期支护结构位移、基坑周边及建(构)筑物周边地表沉降趋势,均满足规范要求,达到支护目的;总结分析基坑运营期遇到的不利影响,为后续类似工程总结经验,认为在设计过程中应提前考虑可能遇到的不利情况及其对边坡的影响,在设计过程中提前做好安全储备,是很有必要的;项目案例的成功实施,验证了桩锚体系在红粘土深基坑边坡支护中的安全可靠、经济合理,可为类似基坑项目提供借鉴作用。 展开更多
关键词 红粘土 桩锚体系 预应力锚索 安全储备
在线阅读 下载PDF
港口桩基工程中钢管桩与锚岩桩组合应用技术研究
18
作者 陈卓 《价值工程》 2026年第3期29-32,共4页
在港口工程建设中,桩基作为关键基础部分,其选型与施工技术直接关乎整个工程的稳定性与安全性。传统单一的桩基形式在面对复杂地质条件与多样化荷载需求时,常显露出局限性。钢管桩与锚岩桩组合应用技术应运而生,通过将钢管桩的高承载、... 在港口工程建设中,桩基作为关键基础部分,其选型与施工技术直接关乎整个工程的稳定性与安全性。传统单一的桩基形式在面对复杂地质条件与多样化荷载需求时,常显露出局限性。钢管桩与锚岩桩组合应用技术应运而生,通过将钢管桩的高承载、易施工特性与锚岩桩在岩石层锚固的优势相结合,为港口桩基工程提供了更可靠、高效的解决方案。本文深入剖析该组合技术在港口桩基工程中的应用,从理论基础、设计要点、施工工艺到质量控制与经济效益评估,全面且系统地阐述其技术细节与应用价值,旨在为相关工程实践提供坚实的技术参考与理论支撑,推动港口建设事业的高质量发展。 展开更多
关键词 港口桩基 钢管桩 锚岩桩 组合应用技术
在线阅读 下载PDF
既有危大深基坑结构超挖支护技术分析与实践
19
作者 钱琪祥 《广东水利水电》 2026年第2期110-115,共6页
在城市建成区地下空间开发中,深基坑工程常面临既有结构保护、突发性设计变更与复杂地质条件交织的技术难题。该文以紧邻敏感建(构)筑物的深基坑工程为对象,针对广州某项目基坑工程既有支护体系失效、建设条件变更引发基坑超挖及花岗岩... 在城市建成区地下空间开发中,深基坑工程常面临既有结构保护、突发性设计变更与复杂地质条件交织的技术难题。该文以紧邻敏感建(构)筑物的深基坑工程为对象,针对广州某项目基坑工程既有支护体系失效、建设条件变更引发基坑超挖及花岗岩残积土地层遇水软化特性等技术难题,通过已施工结构检测、动态设计验算,提出了具体的加固体系重构以及施工工艺优化的解决方案。通过工程实践,成功控制重要建筑物差异沉降在12 mm以内,保证支护结构与已有建筑物的安全,为复杂条件下的深基坑超挖加固设计提供了安全可靠的技术实例,其既有结构再利用的加固理念,对后续城市更新中的类似地下空间开发具有实践指导意义,可为后续的类似工程提供经验和借鉴。 展开更多
关键词 深基坑 桩锚支护 加固 加深开挖 预应力锚索 应用
在线阅读 下载PDF
某建筑工程基桩检测中锚桩法静载试验的应用案例分析
20
作者 所世开 《中国厨卫》 2026年第3期259-261,共3页
文章结合合肥市某工程实例,通过静载试验,校核锚固桩侧土阻力、钢筋抗拔力和开裂情况,验证了该测试方法的有效性和实用性,通过对现场试桩资料的分析,提出了锚桩静荷载试验的施工程序,对类似工程有借鉴意义。
关键词 单桩竖向抗压静载试验 锚桩法 桩身裂缝
在线阅读 下载PDF