In an aircraft final assembly line(AFAL),the rational scheduling of assembly workers to complete tasks in an orderly manner is crucial for enhancing production efficiency.This paper addresses the multi-skilled worker ...In an aircraft final assembly line(AFAL),the rational scheduling of assembly workers to complete tasks in an orderly manner is crucial for enhancing production efficiency.This paper addresses the multi-skilled worker scheduling problem in the AFAL,where the processing time of each task varies due to the assigned workers’skill levels,referred to as variable duration.The objective is to minimize the makespan,i.e.,the total time required for all workers to complete all tasks.A mixed integer linear programming model is formulated under complex constraints including assembly precedence relations,skill requirements,worker skill capabilities,and workspace capacities.To solve the model effectively,a multi-pass priority rule-based heuristic(MPRH)algorithm is proposed.This algorithm integrates 14 activity priority rules and nine worker priority rules with worker weights.Extensive experiments iteratively the best-performing priority rules,and the most effective rule subsets are integrated through a lightweight multi-pass mechanism to enhance its efficiency.The computational results demonstrate that the MPRH can find high-quality solutions effectively within very short central processing unit central processing unit(CPU)time compared to GUROBI.A case study based on real data obtained from an AFAL confirms the necessity and the feasibility of the approach in practical applications.Sensitivity analyses provide valuable insights to real production scenarios.展开更多
Some problems in the optimal topology design of structures with discrete variables are studied in this paper.The problem of a model of discrete optimization is discussed and a neglected fact that discrete optimum desi...Some problems in the optimal topology design of structures with discrete variables are studied in this paper.The problem of a model of discrete optimization is discussed and a neglected fact that discrete optimum design may be controlled by the discreteness of sizing variables and global con- straints is pointed out.A heuristic algorithm for solving discrete topology optimization problems of trusses and frames is proposed.展开更多
基金supported by the National Natural Science Foundation of China(52175475).
文摘In an aircraft final assembly line(AFAL),the rational scheduling of assembly workers to complete tasks in an orderly manner is crucial for enhancing production efficiency.This paper addresses the multi-skilled worker scheduling problem in the AFAL,where the processing time of each task varies due to the assigned workers’skill levels,referred to as variable duration.The objective is to minimize the makespan,i.e.,the total time required for all workers to complete all tasks.A mixed integer linear programming model is formulated under complex constraints including assembly precedence relations,skill requirements,worker skill capabilities,and workspace capacities.To solve the model effectively,a multi-pass priority rule-based heuristic(MPRH)algorithm is proposed.This algorithm integrates 14 activity priority rules and nine worker priority rules with worker weights.Extensive experiments iteratively the best-performing priority rules,and the most effective rule subsets are integrated through a lightweight multi-pass mechanism to enhance its efficiency.The computational results demonstrate that the MPRH can find high-quality solutions effectively within very short central processing unit central processing unit(CPU)time compared to GUROBI.A case study based on real data obtained from an AFAL confirms the necessity and the feasibility of the approach in practical applications.Sensitivity analyses provide valuable insights to real production scenarios.
文摘Some problems in the optimal topology design of structures with discrete variables are studied in this paper.The problem of a model of discrete optimization is discussed and a neglected fact that discrete optimum design may be controlled by the discreteness of sizing variables and global con- straints is pointed out.A heuristic algorithm for solving discrete topology optimization problems of trusses and frames is proposed.