In renewal theory, the Inspection Paradox refers to the fact that an interarrival period in a renewal process which contains a fixed inspection time tends to be longer than one for the corresponding uninspected proces...In renewal theory, the Inspection Paradox refers to the fact that an interarrival period in a renewal process which contains a fixed inspection time tends to be longer than one for the corresponding uninspected process. We focus on the paradox for Bernoulli trials. Probability distributions and moments for the lengths of the interarrival periods are derived for the inspected process, and we compare them to those for the uninspected case.展开更多
地下储气库(以下简称储气库)老井封堵施工,因井况复杂、动态交互性强,存在井筒窜气及封堵失效等高风险隐患。现有封堵井施工风险评价方法多依赖定性分析,难以量化关键因素间的非线性影响,且传统决策试验和评价实验室(DEMATEL)方法存在...地下储气库(以下简称储气库)老井封堵施工,因井况复杂、动态交互性强,存在井筒窜气及封堵失效等高风险隐患。现有封堵井施工风险评价方法多依赖定性分析,难以量化关键因素间的非线性影响,且传统决策试验和评价实验室(DEMATEL)方法存在主观偏差问题。为此,基于模糊集理论改进DEMATEL算法,通过量化专家判断与引入原因度—中心度权重优化机制,构建了从系统级事故到不安全控制行为(UCA)的动态因果路径;然后结合概率阈值判定与多级风险传递分析,实现关键风险因素的定量排序与演化机理解析,最后建立了一种融合模糊逻辑与系统理论过程分析(Systematic Theory Process Analysis, STPA)的多尺度风险评价模型。研究结果表明:(1)融合改进的模糊DEMATEL与系统理论过程分析(STPA)方法能有效量化关键风险因素,通过引入原因度和中心度优化权重计算,显著降低了主观偏差,改进后方法的皮尔逊积矩(Pearson)相关系数优于传统模糊DEMATEL;(2)改进后的多级分析能对多个相互影响的风险因素进行多尺度的风险评价,确定不同风险因素的优化权重、相互间的因果关系、整体概率分布和传递路径;(3)多级风险传递路径分析揭示了不安全控制行为动态演化机制。结论认为,案例验证识别结果与施工现场实际风险高度吻合,该方法可以有效识别关键风险因素,且能够克服专家评价的模糊性与不确定性,为储气库老井封堵施工系统精准风险管控提供了理论和技术支撑。展开更多
氯化工艺在工业生产中广泛应用,但极易引发火灾、爆炸、中毒等事故。为全面识别和评估氯化工艺影响因素,确保生产过程的安全性和可靠性,提出了基于决策试验与评估实验法(Decision Making Trial and Evaluation Laboratory,DEMATEL)、解...氯化工艺在工业生产中广泛应用,但极易引发火灾、爆炸、中毒等事故。为全面识别和评估氯化工艺影响因素,确保生产过程的安全性和可靠性,提出了基于决策试验与评估实验法(Decision Making Trial and Evaluation Laboratory,DEMATEL)、解释结构模型(Interpretative Structural Modeling,ISM)和层次分析法(Analytic Hierarchy Process,AHP)的氯化工艺评价模型。首先,确定了36个氯化工艺评价指标,运用DEMATEL和ISM,分析氯化工艺影响因素间的因果关系和关键影响因素,并建立递阶层次结构模型。其次,以制备四氯化钛的氯化工艺为例,利用AHP计算因素的层次权重,并将由DEMATEL得到的中心度融入层次权重中,确定该氯化工艺影响因素综合权重。该模型在氯化工艺安全评价中具有较好的可行性和实用性,可为风险预警提供支持,推动化工工艺的安全稳定发展。展开更多
文摘In renewal theory, the Inspection Paradox refers to the fact that an interarrival period in a renewal process which contains a fixed inspection time tends to be longer than one for the corresponding uninspected process. We focus on the paradox for Bernoulli trials. Probability distributions and moments for the lengths of the interarrival periods are derived for the inspected process, and we compare them to those for the uninspected case.
文摘地下储气库(以下简称储气库)老井封堵施工,因井况复杂、动态交互性强,存在井筒窜气及封堵失效等高风险隐患。现有封堵井施工风险评价方法多依赖定性分析,难以量化关键因素间的非线性影响,且传统决策试验和评价实验室(DEMATEL)方法存在主观偏差问题。为此,基于模糊集理论改进DEMATEL算法,通过量化专家判断与引入原因度—中心度权重优化机制,构建了从系统级事故到不安全控制行为(UCA)的动态因果路径;然后结合概率阈值判定与多级风险传递分析,实现关键风险因素的定量排序与演化机理解析,最后建立了一种融合模糊逻辑与系统理论过程分析(Systematic Theory Process Analysis, STPA)的多尺度风险评价模型。研究结果表明:(1)融合改进的模糊DEMATEL与系统理论过程分析(STPA)方法能有效量化关键风险因素,通过引入原因度和中心度优化权重计算,显著降低了主观偏差,改进后方法的皮尔逊积矩(Pearson)相关系数优于传统模糊DEMATEL;(2)改进后的多级分析能对多个相互影响的风险因素进行多尺度的风险评价,确定不同风险因素的优化权重、相互间的因果关系、整体概率分布和传递路径;(3)多级风险传递路径分析揭示了不安全控制行为动态演化机制。结论认为,案例验证识别结果与施工现场实际风险高度吻合,该方法可以有效识别关键风险因素,且能够克服专家评价的模糊性与不确定性,为储气库老井封堵施工系统精准风险管控提供了理论和技术支撑。
文摘氯化工艺在工业生产中广泛应用,但极易引发火灾、爆炸、中毒等事故。为全面识别和评估氯化工艺影响因素,确保生产过程的安全性和可靠性,提出了基于决策试验与评估实验法(Decision Making Trial and Evaluation Laboratory,DEMATEL)、解释结构模型(Interpretative Structural Modeling,ISM)和层次分析法(Analytic Hierarchy Process,AHP)的氯化工艺评价模型。首先,确定了36个氯化工艺评价指标,运用DEMATEL和ISM,分析氯化工艺影响因素间的因果关系和关键影响因素,并建立递阶层次结构模型。其次,以制备四氯化钛的氯化工艺为例,利用AHP计算因素的层次权重,并将由DEMATEL得到的中心度融入层次权重中,确定该氯化工艺影响因素综合权重。该模型在氯化工艺安全评价中具有较好的可行性和实用性,可为风险预警提供支持,推动化工工艺的安全稳定发展。