Currently,the international economic situation is becoming increasingly complex,and there is significant downward pressure on the global economy.In recent years,China’s infrastructure sector has experienced rapid gro...Currently,the international economic situation is becoming increasingly complex,and there is significant downward pressure on the global economy.In recent years,China’s infrastructure sector has experienced rapid growth,with the structure of its power engineering business gradually shifting from traditional infrastructure construction to more diversified areas such as production and operation,as well as emergency repairs.As a result,the transformation of mechanized construction in power transmission and transformation projects has become increasingly urgent.This article proposes a post-evaluation model based on game theory to improve comprehensive weighting and fuzzy grey relational projection sorting,which can be used to evaluate the optimal mechanized construction scheme for power transmission and transformation projects.The model begins by considering the entire lifecycle of power transmission and transformation projects.It constructs a post-evaluation index system that covers the planning and design stage,on-site construction stage,operation and maintenance stage,and the decommissioning and disposal stage,with corresponding calculation methods for each index.The fuzzy grey correlation projection sorting method is then employed to evaluate and rank the construction schemes.To validate the model’s effectiveness,a case study of a power transmission and transformation project in a specific region of China is used.The comprehensive benefits of three proposed mechanized construction schemes are evaluated and compared.According to the evaluation results,Scheme 1 is ranked the highest,with a membership degree of 0.870945,excelling in sustainability.These results suggest that the proposed model can effectively evaluate and make decisions regarding the optimal mechanized construction plan for power transmission and transformation projects.展开更多
Based on the collection of relevant literature and cases,the research and application status of on-line monitoring technology for electromagnetic environment of power transmission and transformation projects at home a...Based on the collection of relevant literature and cases,the research and application status of on-line monitoring technology for electromagnetic environment of power transmission and transformation projects at home and abroad were introduced.Moreover,the problems existing in the on-line monitoring of electromagnetic environment were expounded,and the development prospect was forecasted.展开更多
Longitudinal cracks are common defects of continuous casting slabs and may lead to serious quality accidents. Image capturing and recognition of hot slabs is an effective way for on-line detection of cracks, and recog...Longitudinal cracks are common defects of continuous casting slabs and may lead to serious quality accidents. Image capturing and recognition of hot slabs is an effective way for on-line detection of cracks, and recognition of cracks is essential because the surface of hot slabs is very complicated. In order to detect the surface longitudinal cracks of the slabs, a new feature extraction method based on Curvelet transform and kernel locality preserving projections (KLPP) is proposed. First, sample images are decomposed into three levels by Curvelet transform. Second, Fourier transform is applied to all sub-band images and the Fourier amplitude spectrum of each sub-band is computed to get features with translational invariance. Third, five kinds of statistical features of the Fourier amplitude spectrum are computed and combined in different forms. Then, KLPP is employed for dimensionality reduction of the obtained 62 types of high-dimensional combined features. Finally, a support vector machine (SVM) is used for sample set classification. Experiments with samples from a real production line of continuous casting slabs show that the algorithm is effective to detect longitudinal cracks, and the classification rate is 91.89%.展开更多
The main purpose of verifiable secret sharing scheme is to solve the honesty problem of participants. In this paper, the concept of nonzero <em>k</em>-submatrix and theresidual vector of system of hyperpla...The main purpose of verifiable secret sharing scheme is to solve the honesty problem of participants. In this paper, the concept of nonzero <em>k</em>-submatrix and theresidual vector of system of hyperplane intersecting line equations is proposed. Based on certain projective transformations in projective space, a verifiable (<em>t</em>, <em>n</em>)-threshold secret sharing scheme is designed by using the structure of solutions of linear equations and the difficulty of solving discrete logarithm problems. The results show that this scheme can verify the correctness of the subkey provided by each participant before the reconstruction of the master key, and can effectively identify the fraudster. The fraudster can only cheat by guessing and the probability of success is only 1/<em>p</em>. The design of the scheme is exquisite and the calculation complexity is small. Each participant only needs to hold a subkey, which is convenient for management and use. The analysis shows that the scheme in this paper meets the security requirements and rules of secret sharing, and it is a computationally secure and effective scheme with good practical value.展开更多
Relying on the management system for agricultural sci-tech achievement transformation funding project in Zhejiang Province, on the basis of current situations and demand of agricultural sci-tech achievement transforma...Relying on the management system for agricultural sci-tech achievement transformation funding project in Zhejiang Province, on the basis of current situations and demand of agricultural sci-tech achievement transformation funding project management system, we present a B/S-structured and J2EE platform-based system which adopts MVC mode and integrates mainstream open-source frame technologies such as Spring, Struts2, ExtJs, TopLink and FreeMarker, etc. Practice has shown that this system provides an original model for management of sci-tech project application, and various projects can be expanded on this model. With the aid of this system, sci-tech project management personnel can be relieved from trivial manual works, so as to increase working efficiency and improve management level of sci-tech project management.展开更多
文摘Currently,the international economic situation is becoming increasingly complex,and there is significant downward pressure on the global economy.In recent years,China’s infrastructure sector has experienced rapid growth,with the structure of its power engineering business gradually shifting from traditional infrastructure construction to more diversified areas such as production and operation,as well as emergency repairs.As a result,the transformation of mechanized construction in power transmission and transformation projects has become increasingly urgent.This article proposes a post-evaluation model based on game theory to improve comprehensive weighting and fuzzy grey relational projection sorting,which can be used to evaluate the optimal mechanized construction scheme for power transmission and transformation projects.The model begins by considering the entire lifecycle of power transmission and transformation projects.It constructs a post-evaluation index system that covers the planning and design stage,on-site construction stage,operation and maintenance stage,and the decommissioning and disposal stage,with corresponding calculation methods for each index.The fuzzy grey correlation projection sorting method is then employed to evaluate and rank the construction schemes.To validate the model’s effectiveness,a case study of a power transmission and transformation project in a specific region of China is used.The comprehensive benefits of three proposed mechanized construction schemes are evaluated and compared.According to the evaluation results,Scheme 1 is ranked the highest,with a membership degree of 0.870945,excelling in sustainability.These results suggest that the proposed model can effectively evaluate and make decisions regarding the optimal mechanized construction plan for power transmission and transformation projects.
基金Supported by the Open Project of Jiangsu Key Laboratory of Environmental Engineering(ZX2017005)
文摘Based on the collection of relevant literature and cases,the research and application status of on-line monitoring technology for electromagnetic environment of power transmission and transformation projects at home and abroad were introduced.Moreover,the problems existing in the on-line monitoring of electromagnetic environment were expounded,and the development prospect was forecasted.
基金Sponsored by Program for New Century Excellent Talents in University of China(NCET-08-0726)Beijing Nova Program of China(2007B027)
文摘Longitudinal cracks are common defects of continuous casting slabs and may lead to serious quality accidents. Image capturing and recognition of hot slabs is an effective way for on-line detection of cracks, and recognition of cracks is essential because the surface of hot slabs is very complicated. In order to detect the surface longitudinal cracks of the slabs, a new feature extraction method based on Curvelet transform and kernel locality preserving projections (KLPP) is proposed. First, sample images are decomposed into three levels by Curvelet transform. Second, Fourier transform is applied to all sub-band images and the Fourier amplitude spectrum of each sub-band is computed to get features with translational invariance. Third, five kinds of statistical features of the Fourier amplitude spectrum are computed and combined in different forms. Then, KLPP is employed for dimensionality reduction of the obtained 62 types of high-dimensional combined features. Finally, a support vector machine (SVM) is used for sample set classification. Experiments with samples from a real production line of continuous casting slabs show that the algorithm is effective to detect longitudinal cracks, and the classification rate is 91.89%.
文摘The main purpose of verifiable secret sharing scheme is to solve the honesty problem of participants. In this paper, the concept of nonzero <em>k</em>-submatrix and theresidual vector of system of hyperplane intersecting line equations is proposed. Based on certain projective transformations in projective space, a verifiable (<em>t</em>, <em>n</em>)-threshold secret sharing scheme is designed by using the structure of solutions of linear equations and the difficulty of solving discrete logarithm problems. The results show that this scheme can verify the correctness of the subkey provided by each participant before the reconstruction of the master key, and can effectively identify the fraudster. The fraudster can only cheat by guessing and the probability of success is only 1/<em>p</em>. The design of the scheme is exquisite and the calculation complexity is small. Each participant only needs to hold a subkey, which is convenient for management and use. The analysis shows that the scheme in this paper meets the security requirements and rules of secret sharing, and it is a computationally secure and effective scheme with good practical value.
基金Supported by Scientific and Technological Planning Project of Zhejiang Province (2008D30001)
文摘Relying on the management system for agricultural sci-tech achievement transformation funding project in Zhejiang Province, on the basis of current situations and demand of agricultural sci-tech achievement transformation funding project management system, we present a B/S-structured and J2EE platform-based system which adopts MVC mode and integrates mainstream open-source frame technologies such as Spring, Struts2, ExtJs, TopLink and FreeMarker, etc. Practice has shown that this system provides an original model for management of sci-tech project application, and various projects can be expanded on this model. With the aid of this system, sci-tech project management personnel can be relieved from trivial manual works, so as to increase working efficiency and improve management level of sci-tech project management.