Application of Three-Dimensional Visualization Technology in Project Management of Offshore Platform Engineering Construction
1
作者 Jianyuan Yang Songlin Xia +2 位作者 Jie Shang Shaofang Li Zhongde Zhang 《Engineering(科研)》 2019年第11期727-734,共8页
Three-dimensional visualization technology converts engineering design drawings and data into graphics or images, realizes virtual reality perception of simulated users in future construction scene, enhances the inter... Three-dimensional visualization technology converts engineering design drawings and data into graphics or images, realizes virtual reality perception of simulated users in future construction scene, enhances the interaction between project management and technical personnel and engineering construction achievement, and provides intuitive, flexible and strong realistic experience for project management. It can effectively improve the level of project communication, and assist the needs of project construction planning management, training, exhibition, etc. As a tool to help improve project management skills, it has good application effect and prospects. 展开更多
关键词 three-dimensional visualization VIRTUAL REALITY Engineering construction PROJECT Management
在线阅读 下载PDF
Application of Three-Dimensional Visual Simulation in Tidal Defense Engineering 被引量:1
2
作者 钟登华 杨斌 +2 位作者 李文倩 刘东海 佟大威 《Transactions of Tianjin University》 EI CAS 2013年第1期1-9,共9页
Any tidal defense engineering involves the collection and analysis of massive information about engineering structures and their surrounding environment. Traditional method, which is carried out mainly by means of two... Any tidal defense engineering involves the collection and analysis of massive information about engineering structures and their surrounding environment. Traditional method, which is carried out mainly by means of twodimensional drawings and textures, is not efficient and intuitive enough to analyze the whole project and reflect its spatial relationship. Three-dimensional visual simulation provides an advanced technical means of solving this problem. In this paper, triangular irregular network (TIN) model simplified by non-uniform rational B-splines (NURBS) technique was used to establish the digital terrain model (DTM) of a super large region. Simulation of dynamic water surface was realized by combining noise function with sine wave superposition method. Models of different objects were established with different modeling techniques according to their characteristics. Application of texture mapping technology remarkably improved the authenticity of the models. Taking the tidal defense engineering in the new coastal region of Tianjin as a case study, three-dimensional visual simulation and dynamic roaming of the study area were realized, providing visual analysis and visible demonstration method for the management and emergency decision-making associated with construction. 展开更多
关键词 tidal defense engineering three-dimensional visual simulation simulation modeling
在线阅读 下载PDF
Three-Dimensional Visual Analysis for Construction Layout of Reservoir Project
3
作者 钟登华 李文倩 +2 位作者 王瑞 缪正建 佟大威 《Transactions of Tianjin University》 EI CAS 2012年第6期419-425,共7页
It is difficult to analyze the inter-relationship for the construction layout of a reservoir project scientifically and intuitively.According to the characteristics of broad field and huge information,the modeling met... It is difficult to analyze the inter-relationship for the construction layout of a reservoir project scientifically and intuitively.According to the characteristics of broad field and huge information,the modeling methods of digital terrain and solid model as well as the techniques of texture mapping and scene navigation are adopted.The simulation system is developed by C program language,which includes the functions of the interactive navigation of 3D scene,the visual inquiry of project digital model information,the storage and management of project information.A certain reservoir is taken as a case.The 3D visual analysis for the construction layout and engineering information are obtained.The proposed system is of great advantages in dealing with large amount of information and the method provides a theoretical basis and technical support for the construction layout of a reservoir project. 展开更多
关键词 construction layout 3D visual analysis simulation modeling reservoir project
在线阅读 下载PDF
A three dimensional visualized physical simulation for natural gas charging in the micro-nano pore system 被引量:1
4
作者 QIAO Juncheng ZENG Jianhui +7 位作者 XIA Yuxuan CAI Jianchao CHEN Dongxia JIANG Shu HAN Guomeng CAO Zhe FENG Xiao FENG Sen- 《Petroleum Exploration and Development》 CSCD 2022年第2期349-362,共14页
A micro-nano pore three-dimensional visualized real-time physical simulation of natural gas charging, in-situ pore-scale computation, pore network modelling, and apparent permeability evaluation theory were used to in... A micro-nano pore three-dimensional visualized real-time physical simulation of natural gas charging, in-situ pore-scale computation, pore network modelling, and apparent permeability evaluation theory were used to investigate laws of gas and water flow and their distribution, and controlling factors during the gas charging process in low-permeability(tight) sandstone reservoir. By describing features of gas-water flow and distribution and their variations in the micro-nano pore system, it is found that the gas charging in the low permeability(tight) sandstone can be divided into two stages, expansion stage and stable stage. In the expansion stage, the gas flows continuously first into large-sized pores then small-sized pores, and first into centers of the pores then edges of pores;pore-throats greater than 20 μm in radius make up the major pathway for gas charging. With the increase of charging pressure, movable water in the edges of large-sized pores and in the centers of small pores is displaced out successively. Pore-throats of 20-50 μm in radius and pore-throats less than 20 μm in radius dominate the expansion of gas charging channels at different stages of charging in turn, leading to reductions in pore-throat radius, throat length and coordination number of the pathway, which is the main increase stage of gas permeability and gas saturation. Among which, pore-throats 30-50 μm in radius control the increase pattern of gas saturation. In the stable stage, gas charging pathways have expanded to the maximum, so the pathways keep stable in pore-throat radius, throat length, and coordination number, and irreducible water remains in the pore system, the gas phase is in concentrated clusters, while the water phase is in the form of dispersed thin film, and the gas saturation and gas permeability tend stable. Connected pore-throats less than 20 μm in radius control the expansion limit of the charging pathways, the formation of stable gas-water distribution, and the maximum gas saturation. The heterogeneity of connected pore-throats affects the dynamic variations of gas phase charging and gas-water distribution. It can be concluded that the pore-throat configuration and heterogeneity of the micro-nanometer pore system control the dynamic variations of the low-permeability(tight) sandstone gas charging process and gas-water distribution features. 展开更多
关键词 low permeability(tight)sandstone gas charging three-dimensional visualization physical simulation micro-nanometer pore network gas and water flow and distribution
在线阅读 下载PDF
Multi-Project in an Integrated BIM Model: Clash Detection and Construction Planning
5
作者 Alcínia Zita Sampaio Nuno R. Gomes +1 位作者 Augusto M. Gomes Alberto Sanchez-Lite 《Journal of Software Engineering and Applications》 2022年第10期345-358,共14页
The Building Information Modelling (BIM) methodology has been adopted in the construction industry, supporting the development of projects. Its implementation has improved the collaboration and integration in the desi... The Building Information Modelling (BIM) methodology has been adopted in the construction industry, supporting the development of projects. Its implementation has improved the collaboration and integration in the design context, increasing the accuracy of the project preparation and the decreasing additional costs and delays of the construction work. The main objective of the present research is to provide an overview of the state of the art of BIM applications, namely, concerning the construction planning. For that, the generation of a BIM 3D model, involving the disciplines of architecture, structures and water supply system was performed. After, over the model a conflict analysis was applied, in order to verify the consistency of all the disciplines, when linked together. In order to obtain a visual simulation of the construction process, the correspondent 4D BIM model was also generated. Along the development of the study, distinct BIM software was applied over a case study. The main remarks of the capacities of the software, as well as the benefits and limitations verified were identified. 展开更多
关键词 BIM Planning construction Conflict Analysis 4D Model visual simulation
在线阅读 下载PDF
用Visual C^(++)实现工作面地层构造的可视化
6
作者 王玉琨 王永茂 潘志勇 《矿业研究与开发》 CAS 北大核心 2007年第5期66-68,共3页
介绍了在Visual C++6.0的平台下,采用面向对象的三维建模方法,实现煤矿工作面地层构造的三维动态模拟显示的方法,结果表明该种处理方法是一种比较可行的方法,为数字化矿山建设打下一定的基础。
关键词 visual C^++ 地层构造 动态模拟 可视化
在线阅读 下载PDF
Theory and practice of construction simulation for high rockfill dam 被引量:10
7
作者 ZHONG DengHua ZHANG Ping WU KangXin 《Science China(Technological Sciences)》 SCIE EI CAS 2007年第z1期51-61,共11页
Construction simulation for high rockfill dam (CSHRD) is the technology that takes advantage of computer simulation to observe and analyze a complex construction process, which is useful for construction design and ma... Construction simulation for high rockfill dam (CSHRD) is the technology that takes advantage of computer simulation to observe and analyze a complex construction process, which is useful for construction design and management. In this paper, the domestic and oversea research status of CSHRD is reviewed firstly, along with introduction of their present achievements and deficiencies, and the CSHRD theory is also described. Then, considering the influence of many stochastic factors, integrated simulation for high rockfill dam construction (HRDC) is presented with technologies of cycle operation network (CYCLONE) and computer simulation. It rationally combines two subsystems in HRDC, namely haulage and placement of rockfill subsystem, which reflects the actual construction objectively. Important parameters, such as the haulage intensity and traffic density, are obtained, and the process of CSHRD is represented intuitively in dynamic visualization. All of these help engineers to make rapid decisions in HRDC scientifically. 展开更多
关键词 HIGH ROCKFILL DAM construction simulation CYCLE operation network visualization
原文传递
Construction Management Utilizing 4D CAD and Operations Simulation Methodologies 被引量:2
8
作者 张建平 张洋 +1 位作者 胡振中 鹿明 《Tsinghua Science and Technology》 SCIE EI CAS 2008年第S1期241-247,共7页
The paper presents applications of simplified discrete-event simulation (SDESA), and 4D-GCPSU, to the National Stadium of the Beijing 2008 Olympics. Taking into account influential factors, e.g., resource, spatial con... The paper presents applications of simplified discrete-event simulation (SDESA), and 4D-GCPSU, to the National Stadium of the Beijing 2008 Olympics. Taking into account influential factors, e.g., resource, spatial condition, and the randomness of the construction process, the installation process of the steel-structure was simulated and optimized by using genetic algorithm (GA) optimization methodology. The operations simulation shortened the installation duration by 39 days (about 16% of the original total duration), guided the manufacturers to plan the construction processes, and provided specific suggestions on the entry time of the installation components, resulting in resource allocation optimization, resource saving, and construction efficiency improvement. Combining with the optimized schedule, the 4D visualization environment can discover time-space conflicts timely, and may assist project managers to reschedule the construction activities in tune with the site layout and resource allocation. 展开更多
关键词 4D computer aided design (CAD) simulation visualization genetic algorithm OPTIMIZATION construction management
原文传递
考虑机械故障影响的碾压混凝土坝施工进度SD-DES耦合可视化仿真
9
作者 李政 吴斌平 +1 位作者 赵梦琦 王佳俊 《水利水电技术(中英文)》 北大核心 2025年第4期94-106,共13页
【目的】碾压混凝土坝(roller compacted concrete dam,RCCD)施工过程仿真方法为分析大坝施工的复杂动态系统提供了科学有效的技术手段。传统的离散事件仿真(discrete event simulation,DES)方法在仿真过程中虽然考虑了影响施工进度的... 【目的】碾压混凝土坝(roller compacted concrete dam,RCCD)施工过程仿真方法为分析大坝施工的复杂动态系统提供了科学有效的技术手段。传统的离散事件仿真(discrete event simulation,DES)方法在仿真过程中虽然考虑了影响施工进度的主要因素(混凝土生产、运输入仓和施工降雨等),但未有效考虑仓面作业中施工机械故障情况对施工过程的影响,施工进度仿真结果的准确性以及三维可视化展示效果有待进一步提高。针对以上情况,在传统施工仿真的基础上结合系统动力学(system dynamics,SD)提出了考虑机械故障的RCCD施工SD-DES耦合可视化仿真方法。【方法】首先,基于系统动力学建立了仓面施工机械故障SD模型,从而实现对仓面施工中碾压机作业、故障、维修等行为的因果关系分析;其次,以传统施工进度DES仿真模型为基础,耦合机械故障SD模型建立RCCD施工SD-DES耦合仿真模型,并以碾压施工时间作为耦合模型的接口变量,从而实现模型的数据通信和交互,有效提高了仿真结果的准确性;再次,将系统仿真技术与可视化技术结合,基于Unity 3D构建大坝施工三维动态场景,实现基于仿真结果的施工过程的三维动态可视化展示;最后,以我国西南地区某高碾压混凝土坝工程为例进行施工仿真分析与成果展示。【结果】相比于传统DES模型仿真结果(与实际偏差2.49%),基于SD-DES耦合模型的仿真结果(与实际偏差0.28%)更加贴近实际情况,同时三维动态可视化展示水平得到进一步提升。【结论】研究表明,SD-DES耦合可视化仿真方法能够有效考虑施工机械故障对施工进度的影响,提高仿真精度和施工过程的可视化表现能力,有助于大坝施工方案的合理制定和现场施工的管理决策。 展开更多
关键词 系统动力学 机械故障 SD-DES耦合 碾压混凝土坝 施工可视化仿真 混凝土 水利工程
在线阅读 下载PDF
基于BIM的高铁大跨连续刚构拱组合桥施工控制可视化系统研究与应用
10
作者 张丽萍 王凯波 +2 位作者 王力 王征 王广 《铁道标准设计》 北大核心 2025年第8期108-115,共8页
连续刚构拱组合铁路桥是一种具有复杂结构形式和施工工序繁多的桥梁类型。为实现对该类型桥梁施工过程的全面监控和管理,以目前在建最大跨径无砟轨道高墩大跨连续刚构拱组合体系桥为背景,阐述BIM技术在该领域取得的研究成果,通过BIM技... 连续刚构拱组合铁路桥是一种具有复杂结构形式和施工工序繁多的桥梁类型。为实现对该类型桥梁施工过程的全面监控和管理,以目前在建最大跨径无砟轨道高墩大跨连续刚构拱组合体系桥为背景,阐述BIM技术在该领域取得的研究成果,通过BIM技术对连续刚构拱组合梁桥进行参数化建模、施工动态模拟,以Visual Studio 2022作为开发平台开发了线形与应力监控系统,系统包含数据管理、测点设计、接口设计、模型应用等四大功能模块,对施工监控数据进行有效管理。研究结果表明:采用基于BIM数据驱动的参数化建模技术,提高了建模效率和准确性。桥梁线形数据的可视化表达简化了监控数据与设计值的对比工作,可视化模拟施工工况和动态预警提示功能为桥梁线形的发展规律分析提供参考。实现了监测数据与桥梁BIM模型的关联,方便数据存储和查找,同时可以直观地比较实测值与理论值的误差是否超限,简化了监测数据统计和对比工作。该软件系统为铁路桥梁工程的设计、施工和监测提供有力支持。 展开更多
关键词 刚构拱桥 铁路桥 BIM 参数化建模 施工动态模拟 可视化预警
在线阅读 下载PDF
基于数字孪生的复杂风场下斜拉-悬索桥建造过程虚拟仿真方法 被引量:1
11
作者 亢秀山 罗垒 +3 位作者 雷蕾 张振 祝兵 刘彦明 《中国公路学报》 北大核心 2025年第6期84-95,共12页
复杂风场作用对跨海斜拉-悬索协作体系桥的建造品质影响显著,而数字孪生是实现对桥梁建造环境及过程的统筹考虑和一体化仿真的有效途径。为此,以某大跨度斜拉-悬索协作体系桥为工程实例,基于WRF-CFD方法,通过中尺度气象模型与计算流体... 复杂风场作用对跨海斜拉-悬索协作体系桥的建造品质影响显著,而数字孪生是实现对桥梁建造环境及过程的统筹考虑和一体化仿真的有效途径。为此,以某大跨度斜拉-悬索协作体系桥为工程实例,基于WRF-CFD方法,通过中尺度气象模型与计算流体力学精细化模拟的耦合,在传统模拟框架中引入真实桥梁结构的影响,结合数据拟合与用户自定义函数边界条件加载技术,建立了针对复杂环境下大跨度桥梁施工阶段的高精度风场预测及结构受力分析方法;提出了融合虚拟地理环境、桥梁孪生模型及仿真模拟的数字孪生场景构建方法,形成“数据采集-模型修正-指令反馈-方案调整”闭环反馈的动态更新机制,解决了传统静态模型难以动态响应施工变化的难题;基于Cesium引擎开发了4层系统架构的桥梁建造虚拟仿真平台,涵盖施工进度、风场分布及结构力学响应模块,通过三维GIS全局展示与局部细节渲染,辅助工程师进行决策优化。工程实例表明,该方法能动态映射施工过程、预测风场与结构行为,可为切实提升桥梁建造智能化、信息化发展提供有力支撑。 展开更多
关键词 桥梁工程 数字孪生 仿真模拟 斜拉-悬索协作体系 桥梁建造 可视化
原文传递
基于实时监控与仿真技术的碾压混凝土坝施工优化研究——以韩庄水利枢纽工程为例
12
作者 严伟 《海河水利》 2025年第6期83-87,共5页
碾压混凝土坝施工过程复杂,施工质量和效率受多种因素影响,实时监控技术与仿真分析的结合为优化施工提供了重要手段。本研究基于韩庄节制闸工程案例,构建了数据驱动的施工仿真框架,整合实时监控数据与动态仿真模型,验证了监控数据的可... 碾压混凝土坝施工过程复杂,施工质量和效率受多种因素影响,实时监控技术与仿真分析的结合为优化施工提供了重要手段。本研究基于韩庄节制闸工程案例,构建了数据驱动的施工仿真框架,整合实时监控数据与动态仿真模型,验证了监控数据的可靠性并实现了施工过程的可视化分析。研究表明,优化施工方案后大坝压实均匀性和施工效率均有所提升,施工风险预测准确率得到显著提高。结果表明,该方法能够有效解决施工中的实际问题,为碾压混凝土坝智能建造提供技术支持。 展开更多
关键词 碾压混凝土坝 实时监控 施工仿真 可视化分析
在线阅读 下载PDF
异形铝板幕墙设计与施工过程中的BIM技术应用研究
13
作者 陈湄 彭捷 +1 位作者 严启威 吴昊 《矿产与地质》 2025年第5期1147-1152,共6页
该研究系统探讨了建筑信息模型(BIM)技术在异形铝板幕墙设计与施工全流程中的深度融合与创新应用。通过结合实际工程案例,重点分析了BIM技术在方案生成、模型优化、多专业协同、数字化加工与施工管控等关键环节的实施路径与技术方法。... 该研究系统探讨了建筑信息模型(BIM)技术在异形铝板幕墙设计与施工全流程中的深度融合与创新应用。通过结合实际工程案例,重点分析了BIM技术在方案生成、模型优化、多专业协同、数字化加工与施工管控等关键环节的实施路径与技术方法。研究提出了一套适用于异形幕墙工程的BIM协同设计与施工管理框架,并通过对施工偏差控制、材料利用率和工期优化等指标的量化分析,验证了BIM技术在提升设计合理性、施工精度与工程效率方面的显著优势。结果表明,基于参数化设计、三维扫描与实时数据修正的BIM技术应用,可有效降低非标准构件的加工误差与现场安装偏差,为异形幕墙的高质量实施提供了理论依据与技术支撑。 展开更多
关键词 异形铝板幕墙 BIM技术 参数化设计 三维扫描 施工模拟 可视化交底
在线阅读 下载PDF
基于GIS的水电工程施工导流三维动态可视化 被引量:41
14
作者 刘东海 钟登华 +1 位作者 周锐 李定葵 《计算机辅助设计与图形学学报》 EI CSCD 北大核心 2002年第11期1051-1055,共5页
为直观逼真地描述水电工程施工导流各环节之间复杂的动态时空逻辑关系 ,提出基于 GIS的施工导流三维动态可视化方法 ,构造了施工导流三维动态数字模型 ,并在此基础上实现了模型的动态显示、交互操作、空间分析以及施工导流全过程可视化... 为直观逼真地描述水电工程施工导流各环节之间复杂的动态时空逻辑关系 ,提出基于 GIS的施工导流三维动态可视化方法 ,构造了施工导流三维动态数字模型 ,并在此基础上实现了模型的动态显示、交互操作、空间分析以及施工导流全过程可视化仿真等功能 ,从而为水电工程施工组织设计与宏观决策提供了一个科学有效的可视化分析手段 .最后给出一个工程应用实例 ,表明文中方法具有较好的实用性 . 展开更多
关键词 GIS 水电工程 施工导流 三维动态 可视化 数字模型 动态仿真
在线阅读 下载PDF
构建矿井通风可视化仿真系统的关键问题研究 被引量:55
15
作者 魏连江 王德明 +1 位作者 王琪 葛鹏 《煤矿安全》 CAS 北大核心 2007年第7期6-9,共4页
近几年来矿井通风安全管理系统在国内成为研究的热点,而且已经取得了非常重要的成就,但是在构建矿井通风可视化仿真系统方面还有一些关键问题和技术需要解决和完善。本文分析了矿井通风安全管理系统的开发现状、趋势,并对构建矿井通风... 近几年来矿井通风安全管理系统在国内成为研究的热点,而且已经取得了非常重要的成就,但是在构建矿井通风可视化仿真系统方面还有一些关键问题和技术需要解决和完善。本文分析了矿井通风安全管理系统的开发现状、趋势,并对构建矿井通风可视化仿真系统的关键问题进行了分析与研究,并给出了相应的解决办法,这对于构建矿井通风可视化仿真系统或改进现有矿井通风管理系统具有一定的促进作用和参考价值。 展开更多
关键词 构建 矿井通风 可视化 仿真 关键问题
在线阅读 下载PDF
潜流人工湿地基质结构与水力特性相关性研究 被引量:20
16
作者 白少元 宋志鑫 +2 位作者 丁彦礼 游少鸿 何珊 《环境科学》 EI CAS CSCD 北大核心 2014年第2期592-596,共5页
利用数值模拟方法结合实验手段,研究基质结构与系统水力特性的相关性,数值模拟结果表明,填料渗透系数对人工湿地水力效率影响很大,单层结构人工湿地系统中,填料渗透系数越大,流场分布越不均匀;由上到下填料渗透系数逐渐增加的分层填充... 利用数值模拟方法结合实验手段,研究基质结构与系统水力特性的相关性,数值模拟结果表明,填料渗透系数对人工湿地水力效率影响很大,单层结构人工湿地系统中,填料渗透系数越大,流场分布越不均匀;由上到下填料渗透系数逐渐增加的分层填充方式能有效避免短流及死区的发生,提高系统水力效率.根据数值模拟结果构建两个人工湿地对比小试实验系统,并开展示踪实验对模拟结果进行验证,示踪实验结果表明,分层填充结构水力特性显著优于单层结构潜流人工湿地,二者有效体积比分别为0.87和0.49.可见,数值模拟方法能够有效应用于潜流人工湿地基质结构参数优化方面. 展开更多
关键词 潜流人工湿地 visual MODFLOW 数值模拟 基质结构 示踪
原文传递
基于实时监控的碾压混凝土坝仓面施工仿真可视化分析 被引量:21
17
作者 钟登华 张元坤 +1 位作者 吴斌平 任炳昱 《河海大学学报(自然科学版)》 CAS CSCD 北大核心 2016年第5期377-385,共9页
结合系统仿真技术、实时监控技术、数据库技术和可视化技术,开展碾压混凝土坝仓面施工仿真可视化分析研究,构建仓面施工精细仿真模型。该模型不仅可以通过仿真计算获得详细的仓面施工进度信息,而且实现了可交互的仓面施工三维动态可视... 结合系统仿真技术、实时监控技术、数据库技术和可视化技术,开展碾压混凝土坝仓面施工仿真可视化分析研究,构建仓面施工精细仿真模型。该模型不仅可以通过仿真计算获得详细的仓面施工进度信息,而且实现了可交互的仓面施工三维动态可视化分析。研究成果已应用于西南某碾压混凝土坝工程。 展开更多
关键词 水利工程施工 碾压混凝土坝仓面施工 实时监控 精细仿真模型 施工仿真三维可视化
在线阅读 下载PDF
沥青混凝土心墙堆石坝施工仿真建模与可视化分析 被引量:13
18
作者 钟登华 陈永兴 +1 位作者 常昊天 吴斌平 《天津大学学报》 EI CAS CSCD 北大核心 2013年第4期285-290,共6页
沥青混凝土心墙堆石坝施工仿真通过计算机模拟来研究和分析坝体的复杂施工过程,为工程设计和施工管理提供了有效的工具.文中对沥青混凝土心墙堆石坝施工系统进行了分解协调,阐述了沥青混凝土心墙堆石坝施工仿真的基本原理;在综合考虑施... 沥青混凝土心墙堆石坝施工仿真通过计算机模拟来研究和分析坝体的复杂施工过程,为工程设计和施工管理提供了有效的工具.文中对沥青混凝土心墙堆石坝施工系统进行了分解协调,阐述了沥青混凝土心墙堆石坝施工仿真的基本原理;在综合考虑施工过程中的复杂约束条件下,建立了沥青混凝土心墙堆石坝施工动态仿真的数学逻辑关系模型;基于Unity3D引擎,研发出网络环境下沥青混凝土心墙堆石坝施工过程的三维可视化分析系统.研究成果在某工程实例中进行了具体应用,成果验证了该仿真模型的有效性和技术方法的先进性. 展开更多
关键词 沥青混凝土心墙堆石坝 施工仿真 仿真建模 Unity3D引擎 可视化分析
在线阅读 下载PDF
基于GIS的水电工程施工动态可视化仿真方法及其应用 被引量:14
19
作者 钟登华 刘东海 郑家祥 《水利学报》 EI CSCD 北大核心 2003年第7期101-106,共6页
提出了基于地理信息系统(GIS)的水电工程施工三维动态可视化仿真方法,包括仿真建模可视化、仿真计算过程可视化及仿真结果可视化,并以混凝土坝施工仿真为例,进行了实例研究,为制定合理的大坝施工组织计划提供了科学依据。
关键词 可视化仿真 水电工程 地理信息系统(GIS) 三维动态 混凝土坝施工
在线阅读 下载PDF
基于OGRE的碾压混凝土坝施工过程可视化仿真系统 被引量:10
20
作者 赵春菊 胡超 周宜红 《水利水电科技进展》 CSCD 北大核心 2013年第4期41-45,共5页
构建了基于碾压混凝土坝施工过程仿真数据动态交换机制的数据库管理模式,运用面向对象的建模方式建立了系统中不同属性对象的实体模型,并采用面向对象的图形渲染引擎OGRE开发了碾压混凝土坝施工过程三维可视化系统。系统能对仿真方案的... 构建了基于碾压混凝土坝施工过程仿真数据动态交换机制的数据库管理模式,运用面向对象的建模方式建立了系统中不同属性对象的实体模型,并采用面向对象的图形渲染引擎OGRE开发了碾压混凝土坝施工过程三维可视化系统。系统能对仿真方案的调整实时响应并根据仿真结果动态展示坝体施工全过程;通过友好的人机交互功能使用户能够自由观察和查询施工详细信息。系统在某碾压混凝土坝工程中的应用表明,该系统能够提高可视化实现的效率及效果,可为工程施工方案的管理和决策提供信息化支撑。 展开更多
关键词 碾压混凝土坝 OGRE 三维可视化 施工仿真 施工过程