期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
Flexible region aggregation of adjustable loads via an adaptive convex hull strategy
1
作者 Yisha Lin Zongxiang Lu +1 位作者 Ying Qiao Ruijie Chen 《Global Energy Interconnection》 2025年第1期106-120,共15页
Increasing interest has been directed toward the potential of heterogeneous flexible loads to mitigate the challenges associated with the increasing variability and uncertainty of renewable generation.Evaluating the a... Increasing interest has been directed toward the potential of heterogeneous flexible loads to mitigate the challenges associated with the increasing variability and uncertainty of renewable generation.Evaluating the aggregated flexible region of load clusters managed by load aggregators is the crucial basis of power system scheduling for the system operator.This is because the aggregation result affects the qual-ity of the scheduling schemes.A stringent computation based on the Minkowski sum is NP-hard,whereas existing approximation meth-ods that use a special type of polytope exhibit limited adaptability when aggregating heterogeneous loads.This study proposes a stringent internal approximation method based on the convex hull of multiple layers of maximum volume boxes and embeds it into a day-ahead scheduling optimization model.The numerical results indicate that the aggregation accuracy can be improved compared with methods based on one type of special polytope,including boxes,zonotopes,and homothets.Hence,the reliability and economy of the power sys-tem scheduling can be enhanced. 展开更多
关键词 AGGREGATION Flexible region Heterogeneous load Power system scheduling
在线阅读 下载PDF
Optimization based accurate scheduling for generation and reserve of power system 被引量:6
2
作者 GAO YunLong PAN JinYan +2 位作者 YANG ZiJiang GAO Feng JI GuoLi 《Science China(Technological Sciences)》 SCIE EI CAS 2012年第1期223-232,共10页
With the improvement of electricity markets,the gradual aggravation of energy shortage and the environment pollution,it is urgent to formulate a new model to precisely satisfy the system demand for energy and reserve.... With the improvement of electricity markets,the gradual aggravation of energy shortage and the environment pollution,it is urgent to formulate a new model to precisely satisfy the system demand for energy and reserve.Currently,power system opti-mization dispatching is always formulated as a discrete-time scheduling model.In this paper,we first demonstrate through an example that the upper and lower bounds of spinning reserve offered by a unit,given in the discrete-time model framework as constraints,is unreachable.This causes the problem that the reserve delivery obtained by the discrete-time scheduling model cannot be carried out precisely.From the detailed analysis of the ramp rate constraints,it is proved that the reachable upper and lower bounds of spinning reserve in every period can be expressed as functions of two variables,i.e.,generation level of unit at the start and end of this period.Thus,a new method is provided to calculate the upper and lower bounds of spinning reserve which are reachable in average.Furthermore,a new model based on this proposed method for joint scheduling of generation and reserve is presented,which considers the ability to realize the scheduled energy and reserve delivery.It converts the opti-mization based accurate scheduling for generation and reserve of power system from a continuous-time optimal control prob-lem to a nonlinear programming problem.Therefore,the proposed model can avoid the difficulties in solving a continu-ous-time optimal control problem.Based on the sequential quadratic programming method,numerical experiments for sched-uling electric power production systems are performed to evaluate the model and the results show that the new model is highly effective. 展开更多
关键词 power system scheduling continuous-time scheduling model precisely reachable up and down spinning reserve sequentialquadratic programming
原文传递
A Distributionally Robust Optimization Scheduling Considering Distribution of Tie-line Endpoint
3
作者 Minghao Guo Hongjun Gao +1 位作者 Haifeng Qiu Junyong Liu 《Journal of Modern Power Systems and Clean Energy》 2025年第5期1714-1725,共12页
As power systems scale up and uncertainties deepen,traditional centralized optimization approaches impose significant computation burdens on large-scale optimization problems,introducing new challenges for power syste... As power systems scale up and uncertainties deepen,traditional centralized optimization approaches impose significant computation burdens on large-scale optimization problems,introducing new challenges for power system scheduling.To address these challenges,this study formulates a distributionally robust optimization(DRO)scheduling model that considers source-load uncertainty and is solved using a novel distributed approach that considers the distribution of tie-line endpoints.The proposed model includes a constraint related to the transmission interface,which consists of several tie-lines between two subsystems and is specifically designed to ensure technical operation security.In addition,we find that tie-line endpoints enhance the speed of distributed computation,leading to the development of a power system partitioning approach that considers the distribution of these endpoints.Further,this study proposes a distributed approach that employs an integrated algorithm of column-and-constraint generation(C&CG)and subgradient descent(IACS)to address the proposed model across multiple subsystems.A case study of two IEEE test systems and a practical provincial power system demonstrates that the proposed model effectively ensures system security.Finally,the scalability and effectiveness of the distributed approach in accelerating problem-solving are confirmed. 展开更多
关键词 Power system scheduling distributionally robust optimization distributed approach transmission interface TIE-LINE
原文传递
Integrated Frequency-constrained Scheduling Considering Coordination of Frequency Regulation Capabilities from Multi-source Converters 被引量:8
4
作者 Jiaming Li Ying Qiao +3 位作者 Zongxiang Lu Wei Ma Xin Cao Rongfu Sun 《Journal of Modern Power Systems and Clean Energy》 SCIE EI CSCD 2024年第1期261-274,共14页
As the proportion of renewable energy(RE)increases,the inertia and the primary frequency regulation(FR)capability of the power system decrease.Thus,ensuring frequency security in the scheduling model has become a new ... As the proportion of renewable energy(RE)increases,the inertia and the primary frequency regulation(FR)capability of the power system decrease.Thus,ensuring frequency security in the scheduling model has become a new technical requirement in power systems with a high share of RE.Due to a shortage of conventional synchronous generators,the frequency support of multi-source converters has become an indispensable part of the system frequency resources,especially variable-speed wind turbine generation(WTG)and battery energy storage(BES).Quantitative expression of the FR capability of multi-source converters is necessary to construct frequency-constrained scheduling model.However,the frequency support performance of these converter-interfaced devices is related to their working states,operation modes,and parameters,and the complex coupling of these factors has not been fully exploited in existing models.In this study,we propose an integrated frequency-constrained scheduling model considering the coordination of FR capabilities from multi-source converters.Switchable FR control strategies and variable FR parameters for WTG with or without reserved power are modeled,and multi-target allocation of BES capacity between tracking dispatch instruction and emergency FR is analyzed.Then,the variable FR capabilities of WTG and BES are embedded into the integrated frequency-constrained scheduling model.The nonlinear constraints for frequency security are precisely linearized through an improved iteration-based strategy.The effectiveness of the proposed model is verified in a modified IEEE 24-bus standard system.The results suggest that the coordinated participation of BES and WTG in FR can effectively reduce the cost of the scheduling model while meeting frequency security constraints. 展开更多
关键词 Battery energy storage(BES) wind turbine generation(WTG) frequency regulation(FR) frequency security power system scheduling
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部